UNION COUNTY

In the matter of highway improvement Union County has shown considerable

progress. Substantial road building machinery is owned by the County in

units sufficient to allow work to proceed simultaneously in various

sections of the County. It is noticeable however that most of their work

has been done (and justifiably so) on local and feeder roads rather than

on trunk highways. Local funds and equipment are inadequate to make all

the improvements needed when the mountainous sections of the main roads

are considered.

As in other counties the State Highway Commission easily recognized the

necessity and importance of co-operation and accordingly in 1917 plans

were laid and steps taken to extend State and Federal Aid.

During 1917 and 1918 a total of 83.54 miles of survey was made on the

two principal roads of the County. 45.26 miles on the Old Oregon Trail

and 38.28 miles on the La Grande-Joseph Highway.

Agreements were signed by the Secretary of Agriculture providing for

co-operation with the State on equal basis, for the grading of a six

mile section between Union and Telocaset and a 9.37 mile section between

Elgin and Minam. The respective amounts expended on each of these

projects to the date of this report, November 30, 1918, are: $16,642.29

and $3,838.44. State funds amounting to $5,000.00 have been expended for

grading in cooperation with the County on the La Grande-Hot Lake

Section. This road is 7.95 miles in length and involves the opening of a

new road for the entire distance. The State Highway Commission has set

aside funds for graveling this section preparatory to surfacing. The

completion of these three projects will require approximately $66,737.06

from the State, $35,575.50 from the Federal Government, and $3,000 from

the County.

The following summary shows for each project amounts expended to date

and funds set aside to be expended during 1919: