The Salem Bridge

The new bridge over the Willamette River at Salem, designed and built

under the supervision of the State Highway Department, is one of the

largest strictly highway bridges erected in the United States in 1918.

This structure has a total length of 2,220 feet, and consists of 352

feet of reinforced concrete approach on the Marion County end, six steel

spans over the river aggregating 885 lineal feet, and 780 feet of high

class pile trestle approach on the Polk County end.

To provide for the river navigation, the U. S. Engineers required a

minimum horizontal clearance normal to the channel of 120 feet and a

vertical clearance of at least sixty-six feet above low water, in case a

high level type of bridge were adopted. After careful study it was

decided to construct a high level bridge of the deck type, and to carry

the pony channel span on cantilevers projecting from the adjoining

spans, giving an arch effect over the channel. By this type of

construction, a clear distance of about 145 feet between channel piers

was obtained.

To minimize the cost of fabrication and erection of steel, four spans

were made practically the same. The east span was necessarily shorter

than the typical ones, since otherwise it would place the channel

opening too far across the river. This span is not so deep as the

adjoining one, and the difference in height is made up by means of a

rocker under the small span, which, of course, also serves the purpose

of movable shoes. The channel span rests on cast steel rockers on one

end, which are carried by a shelf on the cantilever panel. The opposite

end of the span was pin connected.

Previous to the design of the bridge, wash borings were made, which

indicated in a general way that the bed of the stream was composed of a

few feet of gravel, underlaid with sand for a considerable depth. It was

accordingly decided to carry the foundations down below the probable

point of future scour, and carry the loads entirely upon piling. The two

channel piers were sunk about thirty-five feet below low water.

The west approach is carried on fir piling treated in an open vat with

carbolineum to a temperature of about 220 degrees F.

Lumber being comparatively cheap, the entire roadway deck of the bridge

and wooden approach is composed of fir, three by seven inches and

twenty-six feet long on edge, spiked together, thus projecting a foot

outside the curb on either side, the roadway being twenty-four feet

between curbs. An asphaltic wearing surface three and one-half inches

thick effectively waterproofs the wood, and the small interstices

between the pieces will allow sufficient circulation of air to preclude

any possibility of attack of dry rot. The ends of the floor members were

painted with hot carbolineum, as were also the wooden members contiguous

to openings in the floor occasioned by expansion joints between spans.

The two five-foot concrete sidewalks are carried on brackets beyond the

trusses. The curbs serve as reinforced concrete beams to carry half the

sidewalk load to the trusses, there being small concrete struts

extending up from the top of the top chords at panel and midpanel

points. Between the bottom of the curb and the top of the wooden floor

is a three-quarter-inch cushion of "Sarco." Since the bridge is on a

grade, it was necessary to precast this in sheets the width of the curb.

When the material hardened, it was rolled up in convenient lengths and

placed. It will thus be possible in the future to renew the wooden floor

with comparatively little difficulty, although it is believed that the

wood floor base, protected as it is now, should last at least fifty

years.

On account of the rather extreme length for pony trusses of the channel

span, 123 feet between end pins, it was decided to tie the trusses

together, and this was accomplished by means of two arched lattice

struts placed each twenty feet and six inches from the center of the

span.

A final coat of battleship gray paint was applied to the steel work, and

has evoked considerable favorable comment, being an innovation from the

black paint commonly used in this part of the country.

The bridge was built by the Coast Bridge Company and Robert Wakefield of

Portland. The cost of the structure complete was $250,000.00, of which

Marion County paid approximately $200,000.00 and Polk County $50,000.00.

The engineering cost for the work is remarkably low. It includes

surveys, borings, inspection of cement and steel fabrications, resident

engineer's salary, cost of design, blue prints and supplies and

stenographic work, and amounts to $4,600.00, or about one and

eight-tenths per cent of the total cost.

Third biennial report of the Oregon State Highway Commission · 第 221 / 292 题