Bridge Surveys

In May, 1918, surveys were made by the Department for two large bridges

in Lincoln County. One of these was for a bridge over Alsea River near

Waldport and the other was for a bridge across the Yaquina River at

Toledo. At the present time the only means of crossing the streams at

these points is by ferry.

For the Alsea River Crossing a 264 foot bridge has been designed and is

now under construction by Curtis Gardner, Bridge Contractor. This bridge

consists of one 144 foot medium traffic wood span and 120 feet of wood

trestle. The total cost of the structure will be approximately

$10,000.00. The construction is under the supervision of the Highway

Department, but is being paid for by Lincoln County.

The design has not yet been prepared for the bridge at Toledo, but the

total length of the bridge will be about 3,000 feet.