COST KEEPING

The keeping of an accurate segregation of expenditures and a detailed

distribution of costs for an organization handling the amount of work

and the character of work handled by the Highway Department is a matter

of the greatest importance. The Highway Department seldom has under way

less than eighty or ninety separate and distinct jobs. These jobs are

scattered all over the State, and few of them are of sufficient size to

warrant the employment of timekeepers on the jobs to keep exact records

of expenditures and costs. The records for all of these jobs must be

kept in the main office where it is impossible for those keeping the

records to be personally familiar with the details of the numerous

expenditures made on each of the many jobs.

To secure proper records of expenditures, therefore, a system of cost

keeping must be used which requires little attention from the engineers

and superintendents in charge of the various jobs, and at the same time

gives sufficient information to those keeping the records in the main

office to enable them to segregate all expenditures so that detailed

information as regards total expenditures, monthly expenditures,

expenditures from different funds, expenditures for different purposes,

unit costs, etc., are readily available at any time, and in such form

that all jobs may be combined to give total expenditures of various

kinds, so that the Department is always Informed as to the financial

status of each job and of all jobs.

The system of cost keeping now in use by the Department has been evolved

from a number of other systems in use on work of a similar nature, and

is a system specially devised to meet the requirements of the

Department. For every cent expended by the Highway Department or under

its supervision, there appears in the cost records, entries which give

at a glance the name of the County in which the expenditure is

incurred, the name of the particular job, whether it is an engineering

cost or a construction cost, the particular part of the work involved,

the fund from which it is paid, and a reference to the original invoice

or statement upon which the payment is made. These records are so

arranged and so summarized each month that almost any desired

combination of costs is available, such as the totals for each county,

for each job, for each fund, for engineering, for construction, for

surveys, for administration, for construction engineering, etc.

The expenditure tabulations given in various parts of this report, and

especially those in the part devoted to the Financial Report, give a

good idea of the results being obtained with the system in use although

they do not give the detail which is readily available in the records

themselves.