BRIDGES

The State Highway Department has, during the period covered by this

report, prepared designs for ninety-six bridges and fourteen special

culverts. Of these structures sixty bridges and ten culverts have been

constructed at a total cost to State and Counties of $617,388.09.

The structures paid for out of State funds consist of twenty-two

reinforced concrete bridges, ten wood bridges, and seven culverts. The

total expenditure of State funds for these bridges and culverts was

$239,044.85.

[Illustration: REINFORCED CONCRETE BRIDGE OVER HOOD RIVER, NEARING

COMPLETION, ON THE COLUMBIA RIVER HIGHWAY AT HOOD RIVER CITY. BUILT IN

1918.]

The structures paid for out of county funds consist of thirteen

reinforced concrete bridges, fourteen wood and steel bridges, and four

culverts; the total cost of these structures being $378,343.24.

Of the structures paid for by the counties, the State Highway Department

supervised the construction for three reinforced concrete bridges, four

steel and wood bridges, and one culvert; the cost of which totaled

$288,743.24.

A complete tabulation of the bridges designed and constructed is given

in another part of this report, and complete descriptions of the more

important structures will be found in the articles devoted to the

particular counties in which the structures are located.

The $250,000.00 intercounty bridge across the Willamette River at Salem

was completed, and has attracted more than local attention. While the

cost of this structure was borne by Marion and Polk Counties the design

and construction engineering were handled by this Department.

The reinforced concrete arch bridge at Hood River, the largest concrete

bridge yet constructed in this State was designed and built under State

supervision, although the County also contributed toward its cost.

Among the proposed bridges of considerable magnitude for which county

officials have requested designs from this Department may be mentioned

the Deschutes and Oregon City. The former will be located between the

present toll bridge and the railroad bridge across the Deschutes River

and will thus obviate the necessity of toll payments. It will consist of

a series of reinforced concrete arches. The Oregon City bridge will

replace the old suspension bridge across the Willamette. Studies are

being made and comparisons of various types of bridges and locations of

site are being made.

During the war period, both for patriotic and economic reasons the

employment of steel bridges was discontinued and wooden truss bridges

used instead. Now that the demand for steel for war purposes has

subsided, and there are indications of a decline in the price of

structural steel in the near future, the resumption of use of that

material in the construction of bridges will probably be more general.

Third biennial report of the Oregon State Highway Commission · 第 17 / 292 题