Table of Contents 5

Report of the State Highway Commission 7

General Resume of the Work of the Biennium 7

Proposals Received on Construction Jobs 9

Bond Sales 10

Financial Statement 11

State Highway Engineer's Report to the Highway Commission 13

Letter of Transmittal 14

Work Accomplished 17

Moneys Available and Expended 17

Paving 18

Macadamizing 18

Grading 19

Bridges 19

Elimination of Grade Crossings 21

Federal Cooperation 22

Post Road Projects 23

Forest Road Projects 23

The Pacific Highway 27

The Columbia River Highway 28

County Work Supervised by the Highway Department 29

Construction Work by State Forces 29

State Highway Funds 30

Equipment 31

Office Organization 32

Cost Keeping 34

Employes in the Army Service 35

Tabulated Statements of Expenditures and Costs 39

Allotments to Various Highway Funds 40

Summary of Fund Allotments and Fund Expenditures 40

Expenditures Segregated by Counties 41

Expenditures Segregated Under the Heads of General

Administrative, Surveys, Construction Engineering,

Construction, Equipment, Etc. 41

Expenditures for Construction Detailed by Jobs 42

Expenditures for Surveys Detailed by Jobs 45

Expenditures for Equipment, Bond Interest and Overhead 47

Summary of County Funds Expended by the Department 48

General Tabulated Information and Highway Maps 51

Miles of Highway Construction by the Department During 1917 and

1918 52

Tabulation of Bridge Design and Construction 54

Miles of Location Surveys Made by the Department during 1917

and 1918 58

Miles of Different Types of Roads in Each County 59

Motor Vehicle Registration by Counties 60

County Bond Issues 60

Tabulation of Contract Prices --

Yearly Expenditure of State Funds in Counties 61

Mileage Table of Main Travelled Roads 62

Map of Main Travelled Roads --

Official Designation of State Highways 63

Employes of the Highway Commission 65

Numbers and Mileages of State Highways 66

Map of State Highway System 67

General Description of Work in Various Counties 69

Baker County 69

Benton County 71

Clackamas County 71

Clatsop County 75

Columbia County 80

Coos County 89

Crook County 89

Curry County 90

Deschutes County 91

Douglas County 92

Gilliam County 100

Grant County 101

Harney County 104

Hood River County 106

Jackson County 112

Jefferson County 117

Josephine County 117

Klamath County 122

Lake County 122

Lane County 122

Lincoln County 123

Linn County 123

Malheur County 124

Marion County 125

Morrow County 129

Multnomah County 131

Polk County 132

Sherman County 132

Tillamook County 133

Umatilla County 135

Union County 138

Wallowa County 141

Wasco County 142

Washington County 143

Wheeler County 146

Yamhill County 150

Third Biennial Report

of the

State Highway Commission

of the

State of Oregon

1917-1918

The law establishing this Commission was approved by Governor Withycombe

on February 19, 1917 and on March 1 the following appointments were

made: S. Benson, Portland, for the three-year period; W. L. Thompson,

Pendleton, two-year period; E. J. Adams, Eugene, one-year period. The

first meeting was held on March 6, 1917, when this Commission was

organized and S. Benson elected Chairman and G. Ed Ross, Secretary.

The former Commission, consisting of James Withycombe, Governor, Ben W.

Olcott, Secretary of State, and Thos. B. Kay, State Treasurer, held

meetings on December 15, 1916 and January 15, 1917 and on the

qualification of the members of the new commission, as provided in

Section 14, Article II, Chapter 237, Laws of 1917, transferred all

records, maps, equipment and property in its possession. The former

Commission, in view of proposed legislation providing for a new highway

code, made no appropriations nor were policies outlined, so that when

the new Commission entered upon its duties, it was not embarrassed by

policies made by its predecessors.

At a meeting on April 10, 1917, Herbert Nunn was appointed State Highway

Engineer. On April 1, 1918, Robert A. Booth, of Eugene, was appointed by

Governor Withycombe to succeed E. J. Adams. On August 6, 1918, Roy A.

Klein was appointed Secretary to succeed G. Ed Ross, resigned.

The Commission has held fifty-one meetings for the transaction of its

business. The State highway system as outlined in the law has been

adopted and the work of the biennium confined to the various units of

this system. Specifications covering hard surface pavement have been

prepared by the State Highway Engineer and adopted by the Commission, as

well as specifications for grading and bridge construction which have

been acceptable to the United States Office of Public Roads and are used

on all Federal Aid Projects in the State.

Surveys have been made on State highway routes to determine the best and

most economical location, at the request of the counties, and also

several important bridges have been designed and constructed under the

supervision of the Department. Engineers have been furnished at State

expense to supervise construction work being done by the counties on

State highways in several instances.

The program for 1917 depending upon the passage of the $6,000,000.00

Bonding Act, the working season remaining after ratification by the

voters was short, but engineering parties were sent out and the first

contract under this act was let on June 30, 1917. All except the smaller

contracts entered into were carried over into the 1918 working season.

No new paving or grading contracts of any magnitude have been awarded

this year due to the rising costs of material and scarcity of labor.

There was early seen the necessity of conserving labor and capital in

the national emergency and for that reason the Commission has been

unable to give aid to many meritorious projects submitted by various

sections of the State. At a meeting held on June 25, the Commission went

on record, as a war measure, to devote its resources to the completion

of the two trunk line highways, the Columbia River Highway and the

Pacific Highway, completing projects under construction, temporary

surfacing to keep trunk highways open or roads to develop resources

which are an aid in the prosecution of the war. Notwithstanding the

mandatory nature of the State law which created the Commission and

provides funds for work under it, the Commission believes this course

was warranted and that its action will be supported.

Due to the uncertainty of materials, supplies, labor conditions, etc.,

contractors have been unable to make satisfactory bids and on several

occasions no satisfactory bids being received, the Commission undertook

to do the work by day labor, in each case effecting a saving under the

low bid.

In a few cases, either no bids being received or the ones received being

considered excessive, work has been let on the cost plus basis with

definite cost limit set, beyond which no percentage would be paid. Three

of these force account jobs have later been taken over by the

Commission, as it was felt that the work could be handled more

economically with its own forces.

To determine the legality of the State and Federal co-operative bonds

for co-operation on post and forest roads, a friendly suit was brought

in the Supreme Court which was decided favorable to the issue.

The interpretation placed on the Federal Aid Road Law by the Secretary

of Agriculture requiring actual carriage of the mails or a reasonable

prospect before approving as eligible for Federal co-operation

eliminated from the classification practically all of the Columbia River

Highway and especially links in the Pacific Highway in Douglas county on

which it was desired to receive Federal aid.

Under the post road law seventeen projects have been agreed upon, and to

date ten have been approved, three disapproved, two pending and two in

preparation. Construction work has been started on two of these

projects. Under the forest road law fourteen projects have been

approved. Construction has been started on four of these projects.

Several will carry over into the 1920 program.

A railroad asphalt paving plant was purchased but not used during the

1918 season, since no bituminous pavements were constructed, under new

contracts, in that period. Three concrete pavers are owned by the

Commission, as well as three road rollers, four rock crushers, and six

auto trucks, besides considerable grading construction equipment. A

large part of this equipment has been in use this season and not only

has saved the cost of rented equipment but has been available at times

when it was impossible to get the same elsewhere.

A total of seventy-one projects have been advertised as follows. It will

be noted that the number of proposals exceeds the number of bidders

which may be explained by the fact that on paving work bidders have made

proposals on more than one type of pavement.

=============================+================+===========+===========

Project | Date | Number of | Number of

| | Proposals | Bidders

-----------------------------+----------------+-----------+-----------

Sheridan Paving | May 29, 1917 | 2 | 2

Sheridan Grading | May 29, 1917 | 8 | 2

Cummings Hill Grading | June 19, 1917 | 1 | 1

Pendleton Paving | June 29, 1917 | 8 | 4

Rex-Tigard Grading | July 20, 1917 | 5 | 4

Rex-Tigard Paving | July 20, 1917 | 9 | 4

Clackamas-Marion Paving | July 20, 1917 | 9 | 5

Siskiyou Grading | July 20, 1917 | 1 | 1

Siskiyou Paving | July 20, 1917 | 1 | 1

Astoria-Svenson Grading | July 20, 1917 | 4 | 4

Astoria-Svenson Paving | July 20, 1917 | 7 | 4

Goble Section Grading | July 30, 1917 | 2 | 2

Rainier Hill Section Grading | July 30, 1917 | 4 | 4

Cascade Locks Section Grading| July 30, 1917 | 3 | 3

Viento Section Grading | July 30, 1917 | 4 | 4

Ruthton Hill Section Grading | July 30, 1917 | 7 | 7

Columbia County Bridges, Wood| Aug. 7, 1917 | 5 | 5

Columbia County Bridges, | | |

Concrete | Aug. 7, 1917 | 5 | 5

Wasco County, Macadam | Aug. 7, 1917 | 1 | 1

Cummings Hill, Macadam | Aug. 7, 1917 | 1 | 1

Condon-Thirty Mile Creek, | | |

Macadam | Aug. 7, 1917 | 1 | 1

Mult. County Line-Scappoose, | | |

Paving | Aug. 7, 1917 | 3 | 2

Bend-Lapine, Cindering | Aug. 7, 1917 | 2 | 2

Clatsop County Line-Goble, | | |

Macadam | Aug. 7, 1917 | 2 | 2

New Era Grading | Aug. 7, 1917 | 1 | 1

Divide-Latham Macadam | Aug. 7, 1917 | - | -

Pioneer Mountain Section, | | |

Grading | Aug. 7, 1917 | - | -

Lakeview-Paisley Macadam | Aug. 7, 1917 | - | -

Svenson-Westport Macadam | Aug. 7, 1917 | 1 | 1

Tillamook-Cloverdale Paving | Aug. 7, 1917 | 9 | 3

Oregon City-Canby Paving | Sept. 4, 1917 | 1 | 1

Lane County Line-Comstock | | |

Grading | Sept. 5, 1917 | 2 | 2

Comstock-Leona Grading | Sept. 5, 1917 | 2 | 2

Yoncalla-Oakland Grading | Sept. 5, 1917 | 3 | 3

Locust Hill Section Grading | Sept. 25, 1917 | 4 | 4

Wolf Creek-Grave Creek | | |

Grading | Nov. 6, 1917 | 9 | 9

Myrtle Creek-Dillard Grading | Nov. 27, 1917 | 7 | 7

Bridge Creek Section Grading | Nov. 27, 1917 | 2 | 2

John Day Bridge | Nov. 27, 1917 | 4 | 4

Goble Creek Bridge | Nov. 27, 1917 | 5 | 5

Onion Flat Bridge | Nov. 27, 1917 | 3 | 3

Canemah-New Era Grading | Dec. 10, 1917 | 4 | 4

Tualatin Bridge | Jan. 1, 1918 | 3 | 3

Umpqua Bridge 21/2 miles south | | |

of Dillard | Jan. 9, 1918 | 4 | 4

Umpqua Bridge 1 mile north | | |

of Dillard | Jan. 9, 1918 | 5 | 5

Pendleton-Echo Grading and | | |

Macadam | Feb. 5, 1918 | 3 | 3

Echo-Morrow County Line | | |

Grading and Macadam | Feb. 5, 1918 | 5 | 4

Umpqua Bridge 21/2 miles south | | |

Dillard | Feb. 5, 1918 | 4 | 4

Hood River Bridge | Mar. 5, 1918 | 4 | 4

Umpqua Bridge 21/2 miles south | | |

Dillard | Mar. 5, 1918 | 3 | 3

Beaver Creek Bridge No. 11 | Mar. 23, 1918 | 1 | 1

Half Viaduct Little Jack | | |

Falls | Mar. 23, 1918 | 1 | 1

Svenson-Columbia County Line | | |

Macadam | Mar. 23, 1918 | 1 | 1

Sheridan-McMinnville Section | | |

Paving | Mar. 23, 1918 | 1 | 1

Graham Creek Bridge | Mar. 23, 1918 | ... | ...

Plympton Creek Bridge | Mar. 23, 1918 | ... | ...

Little Creek Bridge | Mar. 23, 1918 | ... | ...

Big Creek Bridge | Mar. 23, 1918 | ... | ...

Clatsop County Line-Tide | | |

Creek Macadam | Mar. 23, 1918 | ... | ...

2 half viaducts in Columbia | | |

County | Mar. 23, 1918 | ... | ...

Stone Wall Construction | | |

Columbia County | Mar. 23, 1918 | ... | ...

Cascade Locks Section Gravel | May 14, 1918 | 1 | 1

Salem-Aurora Paving unit | | |

No. 1 | June 25, 1918 | 3 | 2

Salem-Aurora Paving unit | | |

No. 2 | June 25, 1918 | 3 | 2

Fanno Creek Bridge | July 9, 1918 | 6 | 6

Elgin-Minam Section Grading | July 9, 1918 | 1 | 1

Union-Telocaset Section | | |

Grading | July 9, 1918 | 4 | 4

Elgin-Minam Section Grading | July 9, 1918 | 3 | 3

Ashland Paving | July 9, 1918 | 3 | 2

Divide-Comstock Macadam | July 9, 1918 | 1 | 1

Divide Overhead Crossing | Sept. 10, 1918 | 1 | 1

Divide Overhead Crossing | | |

Grading | Sept. 10, 1918 | 1 | 1

Marshfield-Coquille Macadam | Oct. 8, 1918 | 2 | 2

| +-----------+-----------

| | 216 | 182

-----------------------------+----------------+-----------+-----------

Under the provisions of the Six Million Dollar Bonding Act, bonds to the

amount of $2,190,000.00 par value have been sold. These bonds bear four

per cent interest and mature in from five to twenty-five years from date

of issue. An average of six proposals were made for each issue.

===========+==========+===========+===============+==========+==========

Date of | Date of | Numbers | Highest |Par Value |Price Paid

Sales | Bonds | | Bidder | |

-----------+----------+-----------+---------------+----------+----------

Aug. 7, | Aug. 1, | 1- 520 | Lumbermen's | $ 500,000| $ 471,300

1917 | 1917 | | Trust | |

| | | Company | |

Sept. 12, | Sept. 1, | 521-1040 | E. H. Rollins | 500,000| 472,130

1917 | 1917 | | & Sons | |

Mar. 15, | April 1, | 1041-1560 | Henry Teal | 500,000| 455,850

1918 | 1918 | | | |

July 9, | July 1, | 1561-2280 | E. H. Rollins | 690,000| 643,770

1918 | 1918 | | & Sons and | |

| | | A. B. Leach | |

| | | +----------+----------

Totals |$2,190,000|$2,043,050

--------------------------------------------------+----------+----------

Under the provisions of Chapter 175 of the Laws of 1917, (Bean-Barrett)

bonds to meet Federal co-operation are authorized. Four hundred thousand

dollars par value of these bonds were sold August 18, 1918 by the Board

of Control to the highest bidder, Clark-Kendall & Co., whose proposal

was $381,160.00. These bonds are four per cent and mature in from four

to eight years.

The work accomplished during the biennium may be summed up as follows:

50 miles of hard surface.

111.8 miles of broken stone or gravel surface.

134.5 miles of graded roadbed.

40 bridges.

With the close of the war and the prospect of declining prices of

material and a more plentiful supply of labor, the Commission looks

forward to 1919 as a year in which a great deal can be accomplished and

at this date a tentative program has been prepared providing for

improvement of the State Highways in every county of the State.

The report of the State Highway Engineer to the Commission is hereto

appended, showing in detail the work accomplished and the expenditures

during the biennium.

Third biennial report of the Oregon State Highway Commission · 第 6 / 292 题