CHAPTER XI

SOME LIGHT PATROLS OF THE FRENCH COAST

In the matter of safeguarding its shores the French nation has

displayed considerable enterprise, and its engineers have added some

magnificent contributions to this field of engineering. The maintenance

and welfare of these aids to navigation is placed in the hands of the

Service des Phares, which is controlled by the Department of Bridges

and Roads. The French scheme is the disposition of the lights along the

shore in such a way that their ranges overlap on either side, so that,

as one passes along the coast, before one ray is dropped the next is

picked up. Electricity is employed extensively as the illuminant, so

that the lights are of great power and twinkle like brilliant white

stars on a clear night.

While the majority of these guides are erected on the mainland, others

rise from islands lying off the coast, which, by their position in deep

water, render navigation hazardous. The finest expressions of French

lighthouse engineering are to be found along the rugged islet-dotted

coast of the huge indentation in which lie the Channel Islands--the

cruel coast of Brittany. It was off the western extremity of Brittany,

which thrusts itself well out into the Atlantic Ocean, forming the

point generally known as Ushant, that the _Drummond Castle_ lost her

way, to pull up with a fatal crash against one of the jagged reefs

stretching to seaward. While this wreck was but one of many in these

troubled waters, it sent a thrill round the world, owing to the

terrible loss of life with which it was accompanied.

It is not surprising, therefore, that the French Government has

endeavoured to remove the evil notoriety which this coast has reaped,

and to render it as safe as the other stretches lying to the north and

south. The conditions, however, are against the engineer, as the nose

of the mainland projects well into the ocean, and receives the full

brunt of its attacks when gales rage, so that a foothold is precarious.

When the question of lighting this inhospitable stretch of coast arose,

the French authorities debated whether it would not be easier, cheaper,

and more satisfactory, to place the lighthouses on the mainland at a

sufficient altitude, and to fit them with adequately powerful lights

to indicate the outlying reefs. The general opinion was in favour of

such a practice. So when Léonce Reynaud proposed to mark the Heaux de

Bréhat with a magnificent tower, there was considerable opposition. The

critics maintained that it was a flagrant temptation of Fate to attempt

the conquest of such an evil wave-swept rock, the head of which was

barely visible above high-water, and was of such small dimensions that

work would be possible for only a few hours daily and then by no more

than a mere handful of men.

The engineer was confident that he could surmount all difficulties in

construction, and that he would be able to erect a tower which would

defy wind and wave, so he gained the day and received the requisite

sanction to proceed with his undertaking. He had surveyed the rock

and its surroundings thoroughly; had discovered the velocity of the

currents, and their varying directions under all conditions of weather.

They tore along at about nine and a half miles an hour, and this speed

was augmented considerably in rough weather. He selected the site for

the lighthouse about nine miles from the Isle of Bréhat, where landing

would have to be made at low-water, owing to the water rushing first

from the island to the rock, and then in the opposite direction,

according to the movements of the tides.

The Isle of Bréhat was made the base for operations. It is freely

indented, and one of the coves was found to form an excellent little

harbour. A rough stone jetty was run out for a length of 170 feet, and

while one fleet of boats was retained to convey material from the

island to the rock, another was kept to bring supplies to the island

for preparation, and the support of the men, whose quarters were

established at this depot. Sixty men were employed on the work. They

dressed the granite stones and prepared the woodwork as it arrived in

the raw condition, ample workshops being provided for these purposes.

[Illustration:

_Photo by permission of the Lighthouse Literature Mission._

THE HEAUX DE BRÉHAT LIGHT.

A striking tower built by Léonce Reynaud off the exposed Brittany

coast. It is 159 feet high and took six years to complete.]

The face of the rock was cleaned off during the brief intervals when

it was bared by the sea, and rough stones and masonry were laid in

concrete and continued solidly to a point 13 feet above high-water.

Around this confined platform quarters were built for the handful of

men who stayed on the rock during the periods of calm weather, as too

much time was lost in travelling to and from the island, while there

were risks of landing being interrupted by the swell. A temporary light

was also placed in position while constructional work was proceeding,

to warn navigation. The facilities also included a small forge for

the fashioning upon the spot of the iron dogs and bolts whereby the

stones were clamped together, and this proved highly convenient,

except for one thing: when the water was somewhat rough and playful,

the waves, striking the rock, flew into the air, soused the forge, and

extinguished the fire.

The preparations of the foundations proved exceedingly tedious. The

rock is a very hard black porphyry, but the surface was so scarred

with fissures and deep cracks that the whole of the upper surface had

to be cleaned off, so as to remove all rotten and splintered rock in

order to secure a firm, solid foundation. Then a circle 38 feet in

diameter was marked off, and masons cut away all the rock around this

line to a depth of about 20 inches and of sufficient width to take

the stones--a trench, as it were. This work had to be executed during

the short period of low-water, and a special schedule was prepared

to insure the men concentrating the whole of their energies upon the

task when opportunity offered. As the ebbing tide began to bare the

space, the workmen were called, and they followed the receding water,

never leaving the spot for meals, but toiling continuously until

the returning tide drove them off. As a rule the men were sufficiently

fleet to get clear untouched, although they delayed their retreat until

the very last moment; but at other times the sea was a trifle quicker,

and the men received an unexpected douche from a scurrying wave.

When this trench had been cleared out and the face levelled, the outer

ring of stones was laid and secured firmly in position. The inner

space of the rock was left in its roughly trimmed condition, and was

then buried beneath cement and rock to the level of the outer ring of

stones, forming a platform ready to receive the mass of the tower. The

outer ring was the main consideration, and the work had to be finished

in such a manner that a tight joint was made with the rock, to resist

the penetration of the water. When the men were compelled to lay down

their tools for the coming tide, they hastily applied a thick covering

of quick-drying cement to the work completed, thereby protecting it

against the disintegrating and percolating action of the sea.

Ere the work had started thoroughly, the engineer was faced with a

trouble which he had not anticipated. The men were left to attend to

their own desires in the way of provisions. This haphazard arrangement

had the inevitable sequel. Some of the men were stricken down with

scurvy, and the disease promised to secure a firm hold, when the

engineer stepped in with a firm hand. He established a canteen, the

contractor of which was compelled to maintain a supply of varied

provisions for six months at least, lest the little colony should

become isolated by rough weather. A regular varied bill of fare

was imposed upon the workmen, who were compelled to purchase their

requirements from the canteen. By this firm and timely action the

disease was stamped out. The engineer also enforced other stringent

regulations in the interests of health. The men were compelled to bathe

once a week, and had to turn their sleeping-blankets into the open air

every day; while the quarters had to be washed out and the walls given

a dressing of limewash at frequent intervals.

[Illustration: FITTING THE LANTERN OF LA JUMENT LIGHT.]

When the visitor approaches the tower for the first time, he cannot

fail to be impressed by its unusual design. It appears as if a former

tower of great diameter had been decapitated, and another more slender

building placed upon its butt. This is due to the ingenious idea

adopted by Reynaud. The lower part of the tower rises like the trunk

of a tree from the base, which is a solid plinth, to a height of 39

feet above highest spring-tides. At the top this lower tower is 28 feet

in diameter, as compared with 38 feet at the base. Here the butt is

levelled off, and from its surface rises the lighthouse proper, in the

form of a slightly tapering cone, leaving a narrow gallery around the

superimposed structure to serve as a “set-off” and landing or entrance

platform.

In carrying out his work, Reynaud followed a principle quite divergent

from the prevailing practice in lighthouse construction. He did not

attach every stone irremovably to its neighbours, but merely made

fast the masonry at varying points, where the mass of water might be

expected to expend the greater part of its violence. The method he

adopted is very simple. Keystones are introduced at selected points in

each course, and these are driven up and held tight by granite plugs

and wedges. The principle was assailed at the time as being deficient

in strength, but no apprehensions ever have arisen concerning the

safety of the tower, so that the engineer’s daring ingenuity has been

completely justified.

Considering the isolation of the rock and its wind-swept position,

it was built in a very short time. The whole of the year 1834 was

devoted to the survey of the rock, close observations of the prevailing

meteorological conditions, and the preparation of the design. The

succeeding year was confined to the establishment of the workmen’s

quarters, the cutting of the annular trench in the rock, and the

setting of the masonry course. The erection of the superstructure

occupied nearly four years, the work being completed and the light

exhibited in 1859, according to the inscription. The tower is 159 feet

in height, and the light has a range of eighteen miles.

Since the Heaux de Bréhat was conquered so successfully, French

lighthouse engineering skill has been manifested actively around the

ill-famed Brittany coast, which now is robbed of the greater part of

its dangers. Reynaud’s work, however, did not bring complete safety to

the waters from which it lifts its imposing form. Four miles off the

self-same island is the plateau of Horaine. This is a chain of rocks,

the greatest peril of which is that at high-tide nothing whatever of

them is seen, and their existence is betrayed only by the agitated and

broken waves rushing over them with fearful force. As the tide falls

the water becomes more tormented, and is torn into flying foam, until,

when it has almost ebbed, these jagged fangs may be seen projecting

above the surf. Bearing in mind these terrible characteristics, it is

not surprising that time after time vessels which had been driven out

of their course by tempestuous weather, or had got lost in a dense fog,

blundered into this death-trap and were lost.

The French Government was sorely puzzled as to how to overcome this

danger. The engineers fought the elements valiantly for forty years

in an effort to crown Horaine with a beacon, but time after time they

were defeated. Landing on the reef is highly dangerous. The rocks are

surrounded by surging, eddying currents, running at anything from six

miles upwards per hour, while the slightest ruffle of wind is quite

sufficient to stir up the water so as to fling it swirling over the

rocks even at lowest tide. Once or twice, when a period of abnormal

calm prevailed, the engineers struggled on to the rock and hurriedly

built a substantial masonry beacon, but its life was always brief.

The first two or three gales which pounded and roared over the chain

invariably scattered the handiwork of man in all directions.

Then another expedient was attempted. A party landed upon the ridge,

drove a hole into the solid rock, and there set a vertical iron girder

4 inches in thickness, trusting that it would hold fast and indicate

the reef sufficiently during the day. But its life was short. A gale

came along and snapped the post in twain, leaving a twisted, bent

stump, some 36 inches long, remaining on the rock.

[Illustration: PREPARING THE FOUNDATIONS OF THE JUMENT LIGHT.

This illustration conveys an idea of the difficulties encountered in

connection with this work.]

In 1890 another bold effort to subjugate the ridge was made. An

hexagonal structure was designed, and it was determined to plant this

on the rock by hook or by crook, and so firmly as to resist the most

powerful hammerings to which it could be subjected by the waves. Six

holes were bored into the rock surface to form the corners of the

hexagon. But before commencing the work proper it was decided to insert

an iron post, 6½ inches thick, into one of the holes, and to leave it

to see what would happen. Time after time it was inspected, and was

found to be safe and sound. Two years had slipped by, practically,

since the post was planted, and it was still intact. The engineers

thought they had triumphed, and were preparing their plans, when the

news came that a heavy storm, which had swept the coast, had broken the

pillar off flush with the rock.

This necessitated another change in the designs and the plan of

campaign. After further discussion it was decided to proceed right

away with a masonry tower, although the engineers were prepared for

a mighty tussle. The surveys showed that, as the rock upon which the

building was to be erected was covered by 10 feet of water during the

highest spring-tides, work upon the foundations would be confined to

the lowest neap-tides, when about 4 feet of the rock were exposed. But

the tide sinks to the very low level desired infrequently--about four

days in every month. Even then work would be possible for only about

an hour per day--four hours per month! The prospect certainly was far

from being attractive, especially as even to accomplish this meed of

toil the calmest weather and smoothest sea were imperative, and it

was scarcely to be expected that everything would be in favour of the

engineers at one and the same time.

Another adverse feature was only too apparent. If unpropitious weather

prevailed just after an hour or two’s work had been completed, the

chances were a thousand to one that it would be swept away. But this

was a contingency which had to be faced. The engineer could only do the

utmost humanly possible to secure his work, and then must trust to luck.

With infinite difficulty a small corps of daring workmen and appliances

of the simplest description, together with materials, were got out to

the rock upon the first favourable day when there was a very low tide.

An outer wall of bricks was built piecemeal, and the space within

was filled with concrete. This stood, and so the engineer secured a

level plinth upon which to place his tower. He selected an octagonal

building, the angles of which touch the circumference of a circle

20 feet in diameter described on the rock. It was to be 50 feet in

height, bringing the warning light about 40 feet above high-water.

The beacon was to be a concrete monolithic structure at least for the

greater part of its height, as the light was to be of the unattended

class. Accordingly, the mould was formed by setting a cast-iron post,

18 inches in height, at each corner of the octagon, this support being

anchored into the solid rock beneath. These posts contained grooves to

admit sliding wooden uprights, which were to be firmly wedged, these

joists being inclined to take the angle, or batter, proposed for the

tower. Heavy transverse pieces of timber were laid between these posts,

forming a capacious octagonal box, into which the concrete was poured.

As the filling process behind the wooden wall advanced, angle pieces of

steel were superimposed and bolted up.

[Illustration: THE JUMENT LIGHT RECENTLY ERECTED OFF USHANT.

This beacon was built with a legacy left by M. Potron, a distinguished

French traveller, in the interests of humanity.]

The security of the structure occupied the sole attention of the

engineer. When work had to cease, and the boat put off with the workmen

after a spell of toil, the engineer would watch the rising tide and

the waves sweeping over his structure, until at last it disappeared

from sight. As the tide fell he followed the receding waters just as

eagerly, and gave a sigh of relief when he saw that the tower was still

withstanding the blind forces of Nature. In the early stages an effort

to protect the work, when the men had to retreat before the rising

tide, was made by covering it with a heavy piece of sailcloth, lashed

down and weighted in position with huge masses of pig-iron. This served

its purpose for a time, but finally the sea got the upper hand, tore

the canvas from its lashings, and carried it away, together with the

whole of its weights. Then a wooden protective device was employed, and

this likewise held out until a particularly unfriendly September gale

smashed it to matchwood, as well as damaging the concrete slightly here

and there.

The men took their tools and materials with them on every visit, and,

as the tower rose, the working spells between the tides became longer

and longer, until, when a point above high-water was reached, work was

continued throughout the day whenever the rock was approachable. A

small wooden platform was erected on one side, on which the concrete

was mixed, while on the other there was a little shelf with a small

cistern, which was filled with water from the boats below, through the

agency of a pump. A jury derrick was rigged up to lift the material and

men to the working level. As the tower rose in height, the wooden mould

had to be dismembered and re-erected upon the new level, this operation

being repeated no less than forty times until the desired height was

gained. Work was exasperatingly slow and intermittent, while it had to

be suspended entirely for about six or seven months, as no one dared

to venture near the rock in winter. Taken on the whole, it was one of

the most anxious and difficult pieces of the work of this character

which the French Government has ever undertaken, while the working area

was so confined that less than a dozen men could toil simultaneously

without getting in one another’s way.

Recently the Brittany coast has been further protected by another

magnificent beacon, the Jument lighthouse, off Ushant. This awful spot

has long been marked by a very powerful electric light at Creach, which

may be seen over twenty miles away, and, together with its fellow

on the opposite end of the island, may be said to guide the crowded

shipping around this promontory very effectively. But foggy weather

reduces the mariner to helplessness, as the sea for two miles round

the island is studded with reefs, ridges and rocky humps of a very

formidable character, so that vessels have to keep well beyond this

zone. When the light is obscured, safe travelling is possible only by

going very slowly and making liberal use of the lead, while the captain

must keep a sharp eye upon the rapid currents which set inshore if he

would not be thrown upon the rocks he is seeking sedulously to avoid.

The French Government, with its characteristic thoroughness, determined

to secure the complete indication of the Ushant and all its dangers by

a carefully-conceived and comprehensive chain of lights distributed

over the dangerous area. The urgency of such a scheme is obvious

when it is remembered that it is computed that 24,000 vessels of all

classes pass Ushant in the course of the year. At the same time the

sea’s harvest of vessels and lives off this rocky shore every year is

appallingly heavy. The only handicap to the immediate completion of the

Government’s humane project is the extreme difficulty of the work and

its prodigious cost.

Fortunately, through the extreme generosity of a French traveller--M.

Potron--it was rendered possible to commence the scheme. Upon his

death, and according to the terms of his will, dated January 9, 1904,

this gentleman left 400,000 francs--£16,000, or $80,000--for the

erection of a lighthouse of the latest type and with the most powerful

lighting apparatus off the coast washed by the open Atlantic, and even

suggested that a site off Ushant would be found the most beneficial to

humanity. After consultation between his executor, residuary legatee,

and the Government, a rock known as La Jument, off the south of the

Ile d’Ouessant (Ushant) was selected for the site of his monument. The

lighthouse engineers advocated a tower 118 feet in height, with a light

of the latest type and a modern fog-signalling apparatus. This proposal

was accepted, and was sanctioned on November 18, 1904, by the parties

concerned.

Headquarters were established in the Bay of Lampaul, on Ushant

Island, which immediately faces the site, and by the end of 1904

the preparations were well advanced. A steamboat, a launch and a

lifeboat were secured, the first-named for the purpose of maintaining

communication with the mainland and to bring in supplies, together

with suitable craft for transporting material and provisions to the

rock. The situation of the ledge and its exposure to the worst weather

rendered approach very difficult. The danger spot itself is completely

covered at high-tide, and only projects 4 feet at low-water. So far

as the foundations were concerned, work was only possible for a few

hours at a time. During the closing months of 1904 seventeen landings

were made and fifty-two hours in all spent upon the rock, while in the

succeeding year the men landed fifty-nine times, to put in an aggregate

of 206½ hours.

The current rushes round the reef with a velocity of some ten miles per

hour, varying its direction according to the movements of the tides.

Investigation proved the existence of a small space of water on one

side where the boats could approach and moor safely in an eddy. The men

were brought out in the steamer, which also towed the launch and the

lifeboat. The latter was kept in readiness alongside the rock while

the men were at work, in case of emergency. A sharp eye had to be kept

upon the weather while the handful of men laboured hastily preparing

the face of the rock, and at the first signs of a threatening sky or

increased movement in the swell the steamer blew its siren, the men

scrambled aboard, and were hurried back to the island.

The year 1906 was one of bad weather, rendering frequent approach

impossible. During this season the men landed only thirty-nine times

and toiled for 152 hours, while the sum of their achievement was the

least throughout the whole seven years which the tower occupied in

its erection. The building is solid for about 30 feet above the rock,

and in 1908 the construction of the tower proper was commenced. The

base is circular, with a diameter of 33¾ feet; but the tower itself is

of octagonal form, with a diameter at the base of 28 feet, tapering

slightly to the top.

One notable feature in connection with the work was the utilization

of electricity for the operation of the derrick, which was driven by

a petrol motor coupled thereto. This was supplemented in times of

pressure with another derrick, driven by current generated on the

steamer, from which a cable trailed to the rock. Altogether 4,180 tons

of masonry were transported to the rock and set in position. During

the seven years the work was in progress, from the first landing to

the final withdrawal of the workmen, 449 landings were made and 2,937

hours of work put in. The largest annual aggregate of labour was

in 1911, when 70 landings were made and 400 hours turned to useful

purpose. The tower, which is of imposing appearance, has six floors for

the convenience of the keeper, stores, etc. The apartment immediately

beneath the lantern contains the fog-signalling apparatus, which

comprises a siren driven by air which is compressed for the purpose by

means of a fourteen horse-power petrol motor. The signal is as follows:

Three blasts of one and a half seconds’ duration with intervening

intervals of one and a half seconds, followed by a silent period of

fifty-two and a half seconds, one cycle thus being emitted every

minute. The light, which is thrown from an elevation of 110¼ feet above

high-water, throws groups of three red flashes at intervals of fifteen

seconds, and has a maximum range of twenty miles in very clear weather.

In accordance with the terms of the donor’s will, the light is named

after the rock upon which it stands, and therefore is known as the

Jument of Ushant lighthouse. The benefactor’s second wish is also

respected in the inscription wrought in the solid granite, which

translated runs: “This lighthouse was built with the legacy of Charles

Eugène Potron, traveller, and member of the Geographical Society of

Paris.” The sum set aside by this benefactor of humanity, however, did

not defray the entire cost of the lighthouse. As a matter of fact,

the total outlay on the undertaking was more than twice the sum left

for the purpose, totalling 850,000 francs--£34,000, or $170,000. The

Government decided that the munificence of its citizen offered the

opportunity to carry out the first instalment of the scheme it had

in view upon the most complete lines--hence the heavy disbursement.

Nevertheless the origin of the Jument lighthouse is almost

unprecedented in the annals of lighthouse engineering, and it probably

ranks as the first important light which has been built in accordance

with the terms, and with funds, left by a will.

Lightships and Lighthouses · 第 11 / 23 章