CHAPTER IX.

_The Kansas Division (Kansas Pacific Railway.)_

Conflicting Interest on Location--Leavenworth, Pawnee and Western

Chartered By Kansas--Plans to Connect With the Union Pacific at the

Hundredth Meridian--Supplementary Charter 1864--San Diego Or

Denver--Construction Work--Indian Troubles--Receiverships--Consolidation

With the Union Pacific.

At the time Congress passed the Pacific Railroad Bill in 1862 there

were three conflicting interests contending as to the location. First

that in favor of the Northern (now the Northern Pacific) Route, second

the Central, and third that in favor of the Missouri-Kansas location.

The Northern interest had not developed to a sufficient extent to cut

much figure, only having the support of Minnesota, Wisconsin and

Michigan. The Central Route was backed by Chicago and the railroad

interests centering there. The Missouri-Kansas Route had the support

of St. Louis and the territory tributary thereto. The last two were

sufficiently persistent to have both of them recognized. Accordingly

the Charter called for the one line commencing at the hundredth

Meridian and running west with branches of feeders reaching that

point, one from Omaha (Iowa Branch, Union Pacific Railroad), one from

Sioux City (to be known as the Sioux City Branch, Union Pacific

Railroad), one from St. Joseph or Atchison (to be built by the

Hannibal and St. Joseph Railroad, later known as the Central Branch,

Union Pacific Railway, Eastern Division and then the Kansas Pacific

Railway); this latter in connection with the Pacific Railroad of

Missouri from St. Louis to Kansas City to be the St. Louis line.

The Pacific Railroad Bill of 1862 read, "The Leavenworth, Pawnee, and

Western Railroad Company of Kansas are hereby authorized to construct

a railroad from the Missouri River at the mouth at the Kansas River

where it should connect with the Pacific Railroad of Missouri (now the

Missouri Pacific Railroad) to the hundredth Meridian of longitude upon

the same terms and conditions as applied to the construction of the

Pacific Railroad which it was to meet and connect with at the meridian

point named." Through Kansas it was to be located so as to make

connections with the several railroads through Iowa and Missouri,

provided it could be done without deviating from the general direction

of the whole line to the Pacific Coast. It further specified that two

hundred miles should be built within the first two years and one

hundred miles a year thereafter, and after finishing their own line

they could unite on equal terms with the Union Pacific Railroad

Company in the construction of the latter's line west of the

hundredth-Meridian. This gave them the alternate sections of land

within five miles on either side and United States Bonds to the amount

of sixteen thousand dollars per mile,--similar to the aid extended the

Union Pacific Railroad Company by the Government.

The Leavenworth, Pawnee and Western Railroad Company had been

incorporated by the legislature of the state of Kansas in 1855, and

was organized in January, 1857, but nothing was done of any

consequence under its state Charter. The Company was re-organized

June, 1863, and changed its name to harmonize with the Act of Congress

to "Union Pacific Railway, Eastern Division." Under its state Charter

it was to have extended from Leavenworth, Kan., on the East to Pawnee,

Kan. (Fort Riley) on the West, with the privilege of building on west

to the Kansas State line,--the state charter not permitting work

outside of the Kansas boundaries.

Ground was broken on the line at Wyandotte, Kan., the state line

between Kansas and Missouri, in August, 1863. Active grading commenced

at Wyandotte, September 1st, 1863. The contract for the construction

was first let by the Leavenworth, Pawnee, and Western Railroad Company

to Ross, Steele and Company, but before they got down to actual work

the Company had been re-organized as the Union Pacific Railway,

Eastern Division, and had changed hands. The work was begun by Samuel

Hallett who had been very prominent in promoting the latter Company,

the contract being in the name of Hallett and Fremont. The Fremont

being the erstwhile candidate for the Presidency of the United States.

He is best known today as "The Pathfinder," from his several exploring

expeditions between the Mississippi Valley and the Pacific Ocean.

Fremont had been identified with the idea of a railroad to the Pacific

in the interest of St. Louis, Mo. He, however, did not continue as one

of the contractors but withdrew. It was a time of bitter feeling over

the Slavery Question. Missouri was "Pro Slavery," Kansas "Free Soil."

Hallett inaugurated his work by planting a post inscribed on the

Missouri side "Slavery," and on the Kansas side "Freedom." Mr. Hallett

was assassinated on the streets of Wyandotte, July 27th, 1864. An

employee named Talbot had surreptitiously written the Secretary of the

Interior in regard to the work not being up to requirements, more

especially that the buildings were simply makeshifts put up to evade

the law, etc. Through this and other complaints the Government refused

to accept the first section of forty miles and withheld the bonds and

land grants that Congress had granted. Hallett on his trips to

Washington became aware of Talbot's action, and on his return called

him to task with the result that Talbot shot him from a doorway as he

was returning to his work from his midday lunch. After Hallett's death

the work passed into the hands of St. Louis parties with John D. Perry

as Director.

Under the Supplementary Pacific Railroad Bill of 1864, the conditions

as far as the Union Pacific Railroad--Eastern Division as it was then

called, were materially improved. It was authorized to connect with

the Union Pacific Railroad at any point deemed desirable, but no more

bonds or land grants were to be given than if connection were made as

originally contemplated at the hundredth Meridian. It was also given

the option of building from the mouth of the Kansas River to

Leavenworth thence west, or of building directly west with a branch

from Leavenworth connecting with the main line at Lawrence, but in the

latter case no bonds or land grant would be given account the branch

line mileage. Another feature of the Bill was permission to build on

west to a connection with the Central Pacific Railroad, provided when

it, the Union Pacific Railroad--Eastern Division reached the hundredth

Meridian, the Union Pacific Railroad proper was not proceeding with

the construction of its line in good faith. The Company under the

discretion granted them elected to abandon the junction with the Union

Pacific Railroad at the hundredth Meridian and to build directly West.

The Company proceeded to explore the country South and West in search

of a practicable route to the Pacific, which being found they then

went further and had the several routes thoroughly surveyed. In their

investigations they had four thousand four hundred and sixty-four

miles chained and leveled. The most extensive survey on record.

Careful surveys demonstrated that the distance to the point of

connection with the Union Pacific Railroad would have been three

hundred and ninety-four miles from Kansas City, and this much of the

line--Kansas City to Pond Creek, Kan.--was bonded-aided and land

grant, the Government aid amounting to six million three hundred and

two thousand dollars.

The Hannibal and St. Joseph Railroad reached St. Joseph, February,

1859, Kansas City, soon afterwards. The Missouri Pacific Railway

reached Kansas City, October 1865. Owing to the fact that there were

these railroad connections between the East and the eastern terminal

of the line the work of construction was greatly facilitated and the

expense of building the line greatly reduced.

The headway made was slow at first. The work was new to the officers

in charge as well as to the men. The following table shows the

progress made:

Sept. 1, 1863 commenced work at State Line (Wyandotte, Kan.)

Nov. 28, 1864 reached Lawrence--40 miles.

Oct. 30, 1865 first 40 miles accepted by the Government.

Dec. 15, 1865 50 miles done.

Aug. 18, 1866 reached Manhattan--118 miles.

Oct. 7, 1866 reached Pawnee (Fort Riley) 135 miles.

Jan. 7, 1867 to Mile Post 155.

April 8, 1867 to Mile Post 181.

Oct. 15, 1867 to Mile Post 335.

Fall 1867 to Mile Post 405 (Phil Sheridan.)

Mar. 24, 1870 reached Kit Carson--487 miles.

Aug. 15, 1870 completed into Denver.

The difference in altitude between Kansas City and the western

boundary of Kansas is some twenty-seven hundred feet and is thus

distributed--six hundred feet the first two hundred miles, seven

hundred and sixty-nine feet in the next hundred miles, and thirteen

hundred and twenty thence to the Kansas line.

The original intention had been to follow the Republican River, but

this was changed and the "Smoky Hill Route" from Junction City, Kan.,

west adopted. When the road reached Monument, three hundred and

eighty-six miles from Kansas City, dissensions arose among the

stockholders. One faction was for building to San Diego on the Pacific

Coast via New Mexico and Arizona, another was for building to Pueblo

and up the Arkansas River, while the third and successful one was for

pushing straight ahead to Denver and from there to a connection with

the main line of the Union Pacific Railroad,--the idea being to secure

for St. Louis a portion of the trans-continental business and the line

the carrying thereof.

The line was built under contract by the following firms: Hallett and

Fremont--Wyandotte to Lawrence, Kan., thirty-nine miles. Ira M.

Schoemaker and Company--Lawrence to Mile Post one hundred and forty--a

distance of one hundred miles. Schoemaker and Miller--Mile Post one

hundred and forty to Mile Post four hundred and five--two hundred and

sixty miles. West of Mile Post four hundred and five or "Phil

Sheridan" as it was then called, the Denver extension was built by the

Company itself, General W. J. Palmer being in charge.

During the construction of the line, the contract to feed the forces

at the front was let to Goddard Brothers who utilized to a very great

extent buffalo meat for this purpose. To procure these they employed

W. F. Cody at five hundred dollars per month. During this engagement

Cody claims to have killed four thousand two hundred and eighty

buffaloes, earning for himself the appellation "Buffalo Bill" by which

name he has ever since been known. The best heads were by special

arrangement shipped to the headquarters of the Company at Kansas City,

where they were nicely mounted and used as an advertisement of the

road.

The line reached Ellsworth, Kan., the spring of 1867 and made for some

time its terminus there. In all the history of "Boom Towns" or

"railroad towns" there were none that surpassed this place. For

ninety-three consecutive days there was one or more homicide in the

town or its immediate vicinity--one hundred in all.

Another place that sprang into prominence during the time it was the

end of the track was "Phil Sheridan" located near the point where the

road crossed the hundredth Meridian, Mile Post four hundred and five.

During its brief existence it was a rattling noisy place, full of life

and vigor, rowdyism predominating. Not a stake, brick, or shingle is

left to mark its site. It was here the construction rested for nearly

a year and a half, financial troubles,--uncertainty as to whether to

build to San Diego, Cal., or Denver, and some very fine work on the

part of the Union Pacific proper being the occasion of the suspension

of work.

On June 26th, 1865, work was begun on the branch line from Leavenworth

to Lawrence (Leavenworth and Lawrence Railroad), Major B. S. Hennings

being in charge as Superintendent. Upon the completion of the branch

in the spring following, the headquarters of the Union Pacific

Railway--Eastern Division was moved to Lawrence, the operation of the

line being under the direction of R. H. Shoemaker, Superintendent,

who was succeeded in December, 1867, by George Noble. The work of

construction was in charge of General W. W. Wright.

At the meeting of the Company held April 1st, 1867, Mr. John D. Perry

of St. Louis was elected President, Mr. Adolph Meier of the same place

Vice-President, and among the directors was Thomas A. Scott, of

Philadelphia, (afterwards President of the Pennsylvania Railroad.)

In 1864 the population of the State of Kansas was one hundred and

thirty-five thousand eight hundred and seven and in 1870 when the line

was completed three hundred and sixty-four thousand three hundred and

ninety-nine. This marvelous increase was due in no small degree to the

construction of this line and the facilities it provided for the

settlers to reach the cheap land in the interior of the state as well

as the security it gave them against Indian depredations. Stage Lines

between the Missouri River points and Denver had been running between

St. Joseph, Atchison, and Omaha for several years, but after the line

was built some distance the route was changed and connection was made

between the end of the track and Denver by the Holliday Overland Mail.

Much trouble was caused by the Indians during the construction, even

more than was encountered: on the Union Pacific Railroad. To this

cause in no small degree were the delays of 1868 and 1869

attributable. It was necessary not only to arm the engineer corps,

but also the graders, the Government issuing arms and ammunition for

that purpose. Military escorts and guards were furnished by the Army

to the Railroad men, both on the grade or ahead surveying. For the

better protection of the road and construction forces Army Posts or

Forts proper were maintained as follows:

Fort Riley Mile Post 140

Fort Harker Mile Post 230

Fort Hays Mile Post 300

Fort Wallace Mile Post 412

It was the Cheyennes, Arapahoes, Sioux, and the Utes who made the

trouble.

In March 1869, the Company was authorized by special act of Congress

to assume the name of the Kansas Pacific Railway Company instead of

the Union Pacific Railroad (Eastern Division.) A witty epigram on this

change that went the rounds of the papers at the time read as follows:

The Union Pacific's about to apply

For a change In Its name and no wonder;

Tis as warlike as Jove that great God of the skies,

And Pacific about as his thunder.

And talking of this, it is strange as it goes

Through perpetual snows in some quarters,

This railroad should be in the midst of its foes

Perpetually in hot water.

While those in authority had decided to push through to Denver, the

idea of building through to San Diego was not abandoned, and in 1872 a

branch line was commenced at Kit Carson destined to Pueblo and thence

South along the Rampart Range to New Mexico and thence to the coast.

This line was completed nearly due south to Fort Lyon and some twenty

miles of grading done between Fort Lyon and Pueblo. Financial

stringency together with the building of the Atchison, Topeka and

Santa Fe into the same territory resulted in the abandonment of these

plans and eventually the track from Kit Carson to Lyons was taken up

under the following circumstances.

The owners of the Central Branch (Union Pacific), R. M. Pomeroy of

Boston and associates, were pushing the construction of this line

westwardly and announced their intention of building to Denver, thus

making a competitor for the Kansas Pacific Railway. Mr. Jay Gould who

at that time (1879) was the principal owner of the latter line, while

out on an inspection trip over the line instructed his General

Manager, "Sill Smith" Mr. Sylvester T. Smith to build into their

territory and parallel them. Out of this grew the Junction City and

Fort Kearney Railway (now a part of the Union Pacific Railroad). Smith

was unable to buy sufficient rails to build and accordingly took up

those on the branch of the Kansas Pacific Railway, Kit Carson to

Lyons, i. e. the Arkansas Valley Railroad and re-laid them on the

Junction City Line. Some of the Arkansas Valley Railway bonds were

owned in Holland and a representative of the Dutch happened along on

an investigating tour, but was unable to find any road. The matter

soon got into Court and an effort was made to locate who was

responsible for the tearing up of the Arkansas Valley Railway. Finally

General Manager Smith was put on the stand and frankly acknowledged

what he had done--and that he had no orders from President, Directors,

or any one. The question was then asked who ordered you to build the

Junction City and Fort Kearney Railway and the answer was Jay Gould;

and who is he, for at that time he was not the well-known man he

afterwards became. At this point Judge Dillon obtained permission to

interrupt the proceedings with a query as in whose behalf all this

investigating was being done. The holders of the bonds was the

reply--then that must be myself, for said he, I have here in my hands

all of the bonds in question. Mr. Gould had quietly bought in the

bonds while the matter was in the Courts, bringing the inquiry to an

end.

The line cost for its six hundred and seventy-three miles, Kansas City

to Denver, and branch, Leavenworth to Lawrence, thirty-six million

seven hundred and forty-seven thousand three hundred dollars, or about

fifty-two thousand dollars per mile.

In 1873 the road was unable to meet its obligations and was placed in

the hands of C. S. Greeley and Henry Villard, Receivers,--a majority

of its stock passing into the hands of interests friendly to Mr. Jay

Gould about 1877. Complaint was made that Villard and Greeley were

not the proper men to act as receivers, that they were antagonistic to

the owners of the bonds--lacking practical knowledge, etc. The matter

finally reached the Supreme Court of the United States who in

remanding it back to the District Court ordered their removal and the

appointment of one man and he a practical railroad man as receiver in

their stead. Under this order, in 1879, Sylvester T. Smith who had

been connected with the road in various capacities, including that of

General Manager, was appointed receiver.

In 1879 the Company was re-organized and in January 1880 consolidated

with the Union Pacific Railroad under the name of the Union Pacific

Railway Company, the holders of Kansas Pacific Railway stock being

given share for share in the new consolidated Company.

The basis of the consolidation being

Miles Capital Stock Funded Debt.

Union Pacific Railroad 1,042 $36,762,300.00 $78,508,350.65

Kansas Pacific Railway 675 10,000,000.00 30,567,282.78

Denver Pacific Railroad 106 4,000,000.00 581,000.00

----- ------------- --------------

1,823 50,762,300.00 109,656,633.43