CHAPTER VII.

_The Builders._

Their Material and Methods--Oakes Ames (Financier)--George Francis

Train (Promoter)--John A. Dix (First President)--Thomas C. Durant

(Vice President and President)--Granville M. Dodge (Chief

Engineer)--Subordinate Officials--Casement Brothers, Track-layers,

Mormons--Materials Used--Their Source--Methods.

At Sherman Station, the highest point on the Union Pacific Railroad,

stands a monument some sixty feet square and about the same height,

bearing the simple legend, "In Memory of Oakes Ames and Oliver Ames."

This was erected in compliance with a resolution passed at the meeting

of the Company's stockholders held in Boston, March 10th, 1875, which

read as follows, "Resolved that in memory of Oakes Ames and in

recognition of his services in the construction of the Union Pacific

Railroad to which he devoted his means and his best energies with a

courage, fidelity, and integrity unsurpassed in the history of

railroad construction, the directors (of this Company) are requested

to take measure in co-operation with such friends as may desire to

contribute, for the erection at some point in the line of the road,

of a suitable and permanent monument." (By the recent shortening of

the line this monument has been left some three miles away from the

present track. Its removal to Cheyenne Depot Grounds or some other

equally prominent position is under consideration.)

Oliver Ames was born at North Easton, Mass., January 10th, 1804; he

passed his youth and early manhood assisting his father in the work of

a farmer and later of manufacturing shovels, attending during the

winter a country school. Serving first as apprentice, then foreman, he

was in due time taken into partnership with his father to whose

business he succeeded.

From twenty thousand dozen shovels turned out in 1845, their output

increased to one hundred and twenty-five thousand dozens in 1870. A

tireless worker dispensing with clerk or bookkeeper, his accounts were

kept in his head. Over six feet in height, weighing over two hundred

pounds, broad shouldered and massive in built. Elected to Congress in

1860 where he was kept until 1872. Becoming associated with the Union

Pacific in 1865, at the time when the enterprise was languishing for

lack of funds and it seemed almost hopeless. His attention was first

directed in that channel by his duties as a member of the House

Committee of Railroads in 1865. He was then a man of considerable

means, recognized as an authority on business matters, and he enjoyed

the confidence of President Lincoln and other prominent men of that

day to a marked degree. In fact, it was at the urgent solicitation of

the President that he undertook the almost hopeless task of

financiering the construction of the road.

Entering into the undertaking with all of his energy and means, using

his influence and persuasive powers with his fellow capitalists, he

was able to raise by various means, the necessary funds for the

construction of the line. Among others who took stock in the Company

and Credit Mobilier were a number of public men, including

Vice-President Colfax, Speaker James G. Blaine, James A. Garfield,

afterwards President, and others of that ilk. The cry of corruption

and bribery was raised in the campaign of 1872, resulting in

investigation by Congressional Committees and a trial by the House,

which rendered a very remarkable verdict, censuring Mr. Ames for

having induced members of Congress to invest in the stock of a

corporation in which he was interested and whose interests depended on

legislation of Congress--but with the further finding on the part of

the House Committee that no one had been wronged--that the Congressmen

in question had paid him what the stock cost him and no more--that he

had neither offered nor suggested a bribe--that their object in taking

the stock originally was a profitable investment, and at the time no

further action at the hands of Congress was desired.

Leaving Congress at the end of ten years' service, in 1872; he died

from the effects of pneumonia during May, 1873, universally respected

and esteemed, and the one man above all others who by financiering the

proposition, was entitled to a monument at the hands of the

stockholders of the Union Pacific Railroad. The following remarks made

by him in regard to the road, at a time of apparently hopeless

financial stringency, indicate quite clearly the character of the man

and his views of the work:

"Go ahead; the work shall not stop if it takes the shovel shop. What

makes me hold on is the faith of you soldiers," referring to the

opinions held by the ex-soldiers employed on the construction. Or

again, when it became evident that either the Ames' or the Railroad

Company would have to go to the wall, "Save the credit of the road--I

will fail."

George Francis Train may well be considered as the promoter of the

Union Pacific Railroad. In season and out. Before Congressional

Committees, public meetings, or to the unfortunate individual whom he

succeeded in buttonholing "the Union Pacific Railroad," was the

subject of endless oratory. In no small degree was he responsible for

the opinion, "The road should and must be built," that became

prevalent in 1860-1864, and which resulted in the action of Congress

looking to the construction of the line. He was prominent in its

affairs and largely instrumental in the formation of the Credit

Mobilier.

As to the man himself, he was a genius, if, as a celebrated writer

has said, "Genius is a form of insanity." A contemporaneous writer

(George D. Prentice) thus describes him:

"A locomotive that has run off the track, turned upside down and its

wheels making a thousand revolutions a minute. A kite in the air

without a tail. A ship without a rudder. A clock without hands. A

sermon that is all text; the incarnation of gab. Handsome, vivacious,

versatile, muscular, neat, clean to the marrow. A judge of the effect

of clothes, frugal in food and regular only in habits. With brains

enough in his head for twenty men all pulling different ways. A man

not bad--a practical joke in earnest."

Among his many undertakings were the Freeing of Ireland, Candidacy for

the Presidency, Woman's Suffrage, Circumnavigation of the world. As

illustrative of his character the following incident is apropos: While

publishing a newspaper in England he was assessed a small fine,

failing to pay which he was put in jail, where he preached to the

prisoners on the rights of man and attacked the monarchy. The day

following the authorities freed him on the ground that he was

demoralizing the prisoners. Time has dealt lightly with him, and no

one can read of his latter days--his brilliancy all eclipsed--a

recluse except for his love and companionship for children--unmoved.

In his day he was a power and in no small degree did he contribute to

the living monument of great men--The Union Pacific Railroad.

The first President of the Company, Major General John A. Dix, was

selected for the universal respect in which he was held. Secretary of

the Treasury in 1861, resigning to go as general in the Union Army, he

was the one man who it was felt would command confidence in the early

days of the proposition, when the promoters had not as yet an

opportunity to gain the respect of the financial world or of Congress.

It was understood that he would not be able to devote his entire time

or attention to the proposition, being in the Army at the time of his

election. Still in no small degree did he contribute to its success.

Appointed Minister to France in 1866, his absence from the United

States made necessary his retirement. On his return in 1869, he was

elected Governor of New York; and died greatly honored on April 21st,

1879.

The man who built the road was Thomas C. Durant. During the whole of

its construction he was the man in control. He was Vice President and

General Manager, with headquarters at Omaha; from the day ground was

broken until the line was finished. He had been connected with several

of the Iowa Lines previous to the commencement of work on the Union

Pacific Railroad, mostly as contractor. As an organizer and director

he was unsurpassed. In all the accounts of matters affecting the Union

Pacific Railroad--hearings before Congress, Opening Ceremonies,

Excursions given, appointment of officials and completion ceremonies,

his name appears. He made enemies as do all strong men, and he also

disagreed with his associates as to the best methods to pursue--still,

he built the road, and after the man who persuaded the public it was

necessary and the one who found the funds, he it is who is entitled to

credit. Mr Durant severed his official connections with the road May

24, 1869, shortly after its completion, remaining, however, its

largest stockholder.

The surveying and actual work of construction of the Union Pacific was

done under the direction of General Granville M. Dodge. From 1854 to

1860 General Dodge was engaged in preliminary surveys for the Pacific

Railroad, under governmental auspices. Entering the Union Army he

reached the grade of Major General and at the close of the war entered

the service of the Union Pacific Railroad Company as General

Superintendent and Chief Engineer. To his ability and knowledge was

due the location of the line and the rapidity with which the work was

done. The General is still living--is in active service--having,

during the last thirty years been connected with construction of many

of the important railroads of the West, among them the Texas and

Pacific Railway, Missouri, Kansas and Texas, International and Great

Northern and Fort Worth and Denver City. He had been President of the

Missouri, Kansas & Texas Railway; St. Louis, Des Moines and Northern

Railway, Fort Worth and Denver City Railway, etc.

Peter A. Dey was the first engineer of the line, but left in 1864. He

was not able to accept the methods of enormous expenditures the

Company and the Credit Mobilier were adopting and retired on the

ground that the Hoxie contract was made against his recommendation.

Colonel Silas Seymour was Consulting Engineer of the line during

1865-1866 and 1867, leaving it to enter the service of the Kansas

Pacific Railway.

H. M. Hoxie was first in charge of Council-Bluffs-Omaha Ferry, then of

the steamboats carrying construction material on the Missouri River,

later Assistant General Superintendent, earning for himself the title

of "The Ubiquitous." He died in 1866, while holding the position of

Vice President and General Manager of the Missouri Pacific Railway.

S. B. Reed, Superintendent of Construction, was the man who had the

handling of the forces at the front. He it was who ran the

construction trains--fought the Indians and the toughs and bore the

heat and burden of the day. He also made the surveys and located the

line between Salt Lake Valley and Green River.

P. T. Brown, Assistant Engineer, was in charge of the advance survey

under the direction of General Dodge and also located the line from

the "foot of the Black Hills" to Julesburg.

James A. Evans was Division Engineer and in that capacity made many of

the profiles, plats and estimates and final surveys. Also made the

final surveys and location between Green River and the foot of the

Black Hills.

D. B. Warren was Superintendent Utah Division; Colonel Hopper,

Superintendent Laramie Division; L. H. Eicholtz, Engineer of Bridges

and Buildings, and General Ledlie, Bridge Builder.

Among others to whom credit is due is Brigham Young, the then head

(President) of the Mormon Church, and other prominent Mormons. The

contract for grading from the head of Echo Canon to Ogden, known as

"the hundred mile job," costing two and a half million dollars, was

taken by President Young personally, and by him sublet in part to

Bishop John Sharp and Joseph A. Young, the President's eldest son.

They employed between five and six hundred men and the amount of their

contract was about one million dollars. Other subcontractors were

Apostle John Taylor, George Thatcher, Brigham Young, Jr., etc.

President Young is said to have cleared about eight hundred thousand

dollars out of this contract. East of his section the grading was done

by Joseph F. Nounnan & Company, Gentile bankers of Salt Lake City, who

sublet it to the Mormons. West of President Young's section the

grading was done by Sharp & Young, the same parties mentioned above as

subcontractors under President Young. It was conceded that the Mormons

carried out their contracts not only to the letter, but in the spirit.

Doing some of the best work on the line.

The track laying proper was done by General J. S. (Jack) Casement and

his brother, D. T. (Dan), with Captain Clayton as their

Superintendent. They had in their employ as high as two thousand men

at one time and worked under a contract that gave them a substantial

bonus for all track laid in excess of two miles a day, as well as made

them allowance for idle time occasioned by their being unable to work

on account of the grade not being ready for them. Thus they were to

receive eight hundred dollars per mile of track laid if two miles or

less was laid in a day. If they laid over two miles in one day they

were to receive twelve hundred dollars per mile, and for time they

were idle waiting for the grade they were to receive three thousand

dollars per day.

Many other names should be mentioned here and would did space permit,

but will have to be omitted.

The men who built the Union Pacific Railroad are entitled to great

credit and praise. They made money, much money out of the project, but

they were entitled to it. Their success brought in its train the usual

consequences, they have been accused of almost every crime in the

calendar, assailed by the press, investigated by Congress, and sued by

their less fortunate associates. Their achievement speaks for them

louder than words and they can leave their reputations to history for

vindication.

The line was originally laid with fifty pound iron from the mills of

Pennsylvania for four hundred and forty miles and with fifty-six

pound iron west of there. As has been mentioned before, the first

section was laid with cottonwood ties of local growth, treated by the

burnettizing process, which was erroneously supposed would prevent

decay. West of there hard wood ties from the East were used, some of

them coming from far away Pennsylvania, and costing the Company two

dollars and fifty cents laid down in Omaha. For the mountain section,

ties of local growth were largely and satisfactorily used. The basis

was twenty-four hundred ties to the mile on the plains, twenty-six

hundred and forty through the mountains, and twenty-five hundred west

of Laramie.

The lumber for bridges and building came from Minnesota and Wisconsin,

excepting in the far West, where native lumber was used.

The grading was done to a very large extent by manual labor. It was

before the day of the steam shovel or air drill. Pick and shovel and

wheelbarrow reinforced by teams and scrapers were the means used,

excepting where rock was encountered and then hand drills and black

powder and occasionally nitro-glycerine were relied upon to quarry the

rock which was very much in demand for masonry work.

The graders worked as much as two hundred miles ahead of the track.

They were housed in tents, and all supplies for their sustenance and

material used by them were necessarily hauled from the several

terminal points. This resulted in the employment of a good sized army

of teamsters and freighters. In the buffalo they had a food that,

while cheap, was of the first order, and the number thus utilized was

away up in the thousands.

No pretense was made to ballast the track, as the construction work

was done. The ties were laid on the grade with just enough dirt on

them to keep them in place. Speedy construction was considered of the

first importance and then the ballasting could be done much cheaper

after the track was down.

To a very great extent temporary trestles of timber were used, to be

replaced later by more permanent culverts of stone. In some places

where the piles were thus replaced by masonry, it was necessary to

tear out the stone and put in piles again. The heavy freshets proved

more than the culverts could carry off, and besides the stone work

would wash out much quicker than did piles.

The bridges were mostly Howe wooden truss uncovered, with stone or

wooden abuttments. Where the span was short, wooden trestles on piles

were used.

One reason for deferring the masonry work as well as the ballasting

was the inability to handle the necessary supplies. Every engine and

all the equipment were kept in constant use hauling construction

material to the front.

Notwithstanding what, to the contractor of today, would seem

antiquated and expensive methods, the work progressed and made headway

to an extent that has never since been equalled. It was the immense

army, as high as twelve thousand men at times, that enabled this to be

the case. One-fifth the number of men with modern methods and

labor-saving devices would have been equally efficious.

The expense of hauling water and supplies for the army of men was

enormous. The statement has been made that this cost more than it did

to do the actual grading.

The great bugaboo of the day was the question of operating the line

during the winter season, it being the general impression that the

snow fall was so great through the Rocky Mountain region as to render

it impossible to keep the line open. To ascertain the facts in regard

to this as well as to obtain data as to the best method of overcoming

the same, engineers were stationed at points where it was anticipated

there would be trouble. For three winters they were kept in tents and

dug outs to obtain information on this point, and on the spring and

winter freshets which it was anticipated would be a source of great

annoyance.

The story of the first trans-continental railroad · 第 7 / 12 章