As we saw in our last chapter, ground was broken at Omaha, December

2nd, 1863. This, however, was more in the nature of a jollification on

the part of the citizens of Omaha over the selection of their city as

the eastern terminus of the line,--it being under the auspices of "the

leading citizens," organized and enthused by the irrepressible George

Francis Train.

Grading was commenced in July, 1864, and track-laying the spring of

1865. The start was not auspicious, the line was originally located

directly west from Omaha, but after one hundred thousand dollars had

been spent, it was abandoned on account of the hills and consequent

heavy grades, and two new lines were surveyed, one to the north and

then west and the other south nearly to Bellevue, Kan., and then west.

This latter was called the "Ox-bow Route" and was finally selected by

the Company, notwithstanding violent opposition on the part of the

people of Omaha, who feared that the Company would cross the Missouri

at Bellevue, thus leaving Omaha out.

September 25th, 1865, saw eleven miles finished, and in November an

excursion was run from Omaha to the end of the track, fifteen miles.

This was gotten up by Vice-President Durant, who took an engine and

flat car, inviting about twenty gentlemen to go with him on the first

inspection trip to Sailing's Grove. Among the excursionists was

General Sherman who gloried in the undertaking and expressed regret

that at his age he could hardly anticipate living until the completion

of the work. The party was very enthusiastic, and as the narrator

naively puts it "as the commissary was well supplied, the gentlemen

enjoyed themselves."

For a number of reasons the work dragged. It took one year to complete

the first forty miles. The lack of rail connections east of Omaha

were, previous to January, 1867, when the Chicago and Northwestern

Railroad reached Council Bluffs, a very serious occasion of expense

and delay. The work was new, those in charge were not at that time

experienced, funds were scarce, and the credit of the Company not yet

established, and as a result the average rate of progress during the

first twelve months was but a mile a week.

The work of construction was in charge of Vice-President and General

Manager, Thomas C. Durant.--The location, General Granville M. Dodge,

Chief Engineer, formerly General of the United States Army and who had

up to this time been in charge of the department. The operation of the

line, forwarding of material and supplies, actual construction, etc.,

was in charge of Samuel B. Reed, General Superintendent and Engineer

in charge of Construction. The track laying was done under contract by

"Casement Brothers" (General and Daniel) while Mr. H. M. Hoxie was

ubiquitous with the title of General Western Agent. Colonel Silas

Seymour of New York was Consulting Engineer and Mr. W. Snyder,

Assistant Superintendent and General Freight and Ticket Agent.

Another of the reasons for the slow progress made up to 1865 was the

scarcity of labor. The surrounding territory had no surplus workmen

and the East had not as yet grasped the idea that the road was

actually under construction. With the disbandment of the armies, both

North and South after the war, this situation was changed for the

better. Large numbers of the ex-soldiers drifted West and were glad to

find steady work at remunerative wages with the construction forces.

The Secretary of the Interior in his annual report for 1866 stated

that out of fifteen hundred laborers employed on the Pacific Railways,

three hundred were negroes and performed their duties faithfully and

well, and he recommended legislation looking to the employment of more

of the surplus freedmen on the same work. Among the officials,--engineers

and bosses,--there were many who were ex-officers in the army. Thus

the Chief Engineer had been a General, the Consulting Engineer, a

Colonel, the head of the track-laying force, a General. This can best

be explained by quoting from a paper on trans-continental railroads

read by General Dodge, before the Society of the Army of the Tennessee

at Toledo, Ohio, September, 1888.

"The work was military in character and one is not surprised to find

among the superintendents and others in charge, a liberal sprinkling

of military titles. Surveying parties were always accompanied by a

detachment of soldiers as a protection against Indians. The

construction trains were amply supplied with rifles and other arms and

it was boasted that a gang of track-layers could be transmuted into a

battalion of infantry at any moment. Over half of the men had

shouldered muskets in many a battle."

The same facts are brought out by the following extract from a

newspaper of that day.

"The whole organization of the road is semi-military. The men who go

ahead (surveyors and locators) are the advance guard, following them

is the second line (the graders) cutting through the gorges, grading

the road and building the bridges. Then comes the main body of the

army, placing the ties, laying the track, spiking down the rails,

perfecting the alignment, ballasting and dressing up and completing

the road for immediate use. Along the line of the completed road are

construction trains pushing 'to the front' with supplies. The advance

limit of the rails is occupied by a train of long box-cars with bunks

built within them, in which the men sleep at night and take their

meals. Close behind this train come train loads of ties, rails,

spikes, etc., which are thrown off to the side. A light car drawn by a

single horse gallops up, is loaded with this material and then is off

again to the front. Two men grasp the forward end of the rail and

start ahead with it, the rest of the gang taking hold two by two,

until it is clear of the car. At the word of command it is dropped

into place, right side up, during which a similar operation has been

going on with the rail for the other side,--thirty seconds to the rail

for each gang, four rails to the minute. As soon as a car is unloaded,

it is tipped over to permit another to pass it to the front and then

it is righted again and hustled back for another load.

"Close behind the track-layers comes the gaugers, then the spikers and

bolters. Three strokes to the spike, ten spikes to the rail, four

hundred rails to the mile. Quick work you say,--but the fellows on the

Union Pacific are tremendously in earnest."

Or as another writer has it, "We witnessed here the fabulous speed

with which the line was built. Through the two or three hundred miles

beyond were scattered ten to fifteen thousand men (?) in great gangs

preparing the road-bed with plows, scrapers, shovels, picks, and

carts, and among the rocks, with drills and powder were doing the

grading as rapidly as men could stand and move with their tools. Long

trains brought up to the end of the track, loads of ties and rails the

former were transferred to teams and sent one or two miles ahead and

put in place on the grade, then spikes and rails were reloaded on

platform cars and pushed up to the last previously laid rail and with

an automatic movement and celerity that was wonderful, practiced hands

dropped the fresh rails one after another on the ties exactly in line.

Hugh sledges sent the spikes home,--the car rolled on and the

operation was repeated; while every few minutes the long heavy train

behind sent out a puff of smoke from its locomotive and caught up with

its load of material the advancing work. The only limit to the

rapidity with which the track could thus be laid was the power of the

road behind to bring forward material."

The above description applies to the later period of construction,

when the forces had become thoroughly organized and the work

systematized. The following table shows the rate of construction:

Ground broken at Omaha December 2nd, 1863.

Work commenced at Omaha Spring, 1864.

11 Miles completed to Gilmore September 25th, 1865.

40 Miles completed to Valley December 31st, 1865.

47 Miles completed to Fremont January 24th, 1866.

50 Miles completed March 13th, 1866.

100 Miles completed June 2nd, 1866.

247 Miles completed to the 100th Meridian October 5th, 1866.

305 Miles completed December 31st, 1866.

414 Miles completed to Sidney, Wyo. August, 1867.

516 Miles completed to Cheyenne, Wyo. November 13th, 1867.

573 Miles completed to Laramie, Wyo. May 9th, 1868.

745 Miles completed December 31st, 1868.

1033 Miles completed to Ogden, Utah March 8th, 1869.

1086 Miles completed:

To Promontory, Utah April 28th, 1869.

Formal connection made May 10, 1869.

Regular train service commenced July 15th, 1869.

Completed according to Judicial decision November 6th, 1869.

The progress made was daily wired East and published in the principal

newspapers. Thus in the "Chicago Tribune" items such as "One and

nine-tenth miles of track laid yesterday on the Union Pacific

Railroad" appeared in every issue.

During the construction of the line, headquarters were established at

different points at the front, which were used as a basis of

operations for the construction of the section beyond. These places

enjoyed a temporary boom, some of them like Jonah's Gourd to wither up

and die away, others profiting by the start are today points of

importance. The first of these was North Platte, Nebraska, its

selection being caused by the delay incident to bridging the river.

This was the terminus of the road during the fall of 1866 and up to

June 1867. During this time it was the distributing point for all the

country west. The mixture of railroad laborers, freighters, etc., all

of them with more or less money, inaugurated a rough time and was the

beginning of the wild scenes that attended the construction of the

line. The town during the winter had a population of five thousand and

over a thousand buildings. With the completion of the line to Sidney,

Wyo., in June, 1867, the rough element left and established themselves

at that point, leaving at North Platte about three hundred of the more

sedentary law-abiding class who had determined on that point for their

home. In moving to the front, houses were torn down, loaded on cars to

be taken to the new site and there re-erected.

When it was known that Cheyenne was to be the terminus for the winter

of 1867-1868, there was a grand hegira of roughs, gamblers,

prostitutes from all along the line and from the East. The population

jumped to six thousand. Dwellings sprang up like mushrooms. They were

of every conceivable character. Some simply holes in the ground roofed

over, known as "dug outs," others of canvas, while some few were of

wood and stone. Town lots were sold at fabulous prices. The only

pastimes were gambling and drinking. Shooting scrapes with "a man for

breakfast" were an every day occurrence, and stealing so common as to

occasion no comment. It is said of old Colonel Murrian, the then Mayor

of Cheyenne, that he advanced the City's script eighteen cents on the

dollar, by inflicting a fine of ten dollars on those who "made a gun

play" i. e. shot at any one,--and that it was his custom to add a

quarter to the fines he inflicted, making them ten dollars and

twenty-five cents or twenty-five dollars and twenty-five cents, with

the explanation that his was dry work and the extra quarter was to

cover the stimulant his arduous duties required.

Such conditions brought about an uprising on the part of the more

respectable element. Vigilance committees with "Judge Lynch" in

command, took hold and from his Court there was neither appeal, nor

stays. Witnesses were not held to be essential. The toughs were known

and the judgments of the Court generally right. At least the

defendants were not left in a condition to make complaint or appeal.

The Vigilance Committee during the first year of its existence hung

or shot twelve of the desperadoes, and were instrumental in sending as

many more to the Penitentiary. The effect was to compel the tough

element to either leave or abide by the laws and to put the decent

element in control.

The next headquarters was Benton, Wyo. In two weeks (July 1868) a city

of three thousand inhabitants sprang up as if by the touch of

Aladdin's Lamp. It was laid out in regular squares, divided into five

wards, had a Mayor and Board of Aldermen, a Daily Paper and volume of

ordinances for the City Government. It was the end of the freight and

passenger service and the beginning of the division under

construction. Twice a day, long trains arrived from and departed for

the East, while stages and wagon trains connected it with points in

Idaho, Montana, and Utah. All the passengers and goods for the West,

came here by rail and were re-shipped to their several destinations.

Twenty-three saloons paid license to the city, while dance halls and

gambling dens were even more numerous. The great institution was the

"Big Tent." This was a frame structure, one hundred feet long and

forty feet wide, floored for dancing, to which and gambling it was

entirely devoted. A visitor to the city thus described it: "One to two

thousand men and a dozen or more women were encamped on the alkali

plain in tents and shanties." Only a small proportion of them had

aught to do with the road or any legitimate occupation. Restaurant and

saloon keepers, gamblers, desperadoes of every grade, the vilest of

men and women made up this "Hell on Wheels" as it was most aptly

termed. Six months later, all that was left to mark the site was a few

rock piles and half destroyed chimneys together with piles of old

cans. The city after a tumultuous existence of only sixty days had

"got up and pulled its freight" to the next headquarters.

Green River, Bryan, Bear River City, and Wasatch were the headquarters

successively. The first, owing to the railroad having made it the end

of a division and located shops there, has survived; the other three

are but memories.

At Bear River City, the tough element who had been driven out of the

different points East, congregated in large numbers, proposing to make

a stand, it being supposed it would become a permanent town. The law

abiding element numbered about a thousand, the toughs as many more.

Three thugs were hung for murder, and in a reprisal the town was

attacked on November 19th, 1868, by the tough element. They seized and

burned the jail, then sacked and destroyed the plant of the "Frontier

Index," a printing outfit that followed up the railroad, issuing a

Daily Paper, and which had been particularly outspoken in its

denunciation of the lawless element. They then proceeded to attack

some of the stores, but were met by the townspeople and in the

pitched battle that ensued, badly defeated. They made an undignified

retreat, leaving fifteen of their number dead in the streets. From

this time on the tough element fought shy of the city and with the

extension of the road, its business left. Today there is not a thing

to indicate that a town of four or five thousand had ever stood there.

The tough element started in to make Rawlins one of the "Hells" but

the decent element had had enough and proceeded to clean up the

town--showing they proposed to stand no foolishness.

The last of the railroad towns was Wasatch located at the eastern end

of the longest tunnel (770 feet) on the road. In fact it was the delay

occasioned by this work that gave rise to the town. When the line was

put down a temporary track was built around the obstruction so as to

permit the materials for the track beyond to reach the front. This

place originally had a machine shop, round house and eating station

all of which were removed to Evanston in 1870.

Upon the passage of the supplementary Charter in 1864 the restriction

confining the Central Pacific to the State of California was withdrawn

and they were authorized to build for one hundred and fifty miles east

of the California boundary. This latter restriction was also withdrawn

by Congress in 1866, leaving the meeting point to be determined by the

rapidity of the construction of the respective lines, or as the Act

of Congress put it, they could locate, construct, and continue their

line until it should meet the Union Pacific continuous line. With the

experience of three years behind them and the Land Grant, Government

Bonds and prospective earnings, not to speak of the element of pride

ahead, the two lines entered into a race the like of which had never

been seen. The rivalry extended from the Presidents of the respective

Companies down to the boy who carried water to the graders. Both

forces, justly proud of their achievements, considered themselves a

little better than the other. One form of the rivalry was as to which

outfit could get the greatest amount of track down in one day. The

Union Pacific's forces led off with six miles, soon after the Central

went them a mile better. Then seven and a half miles were put down by

the Union Pacific; the Central Pacific forces not to be outdone

announced they could get down ten miles inside of one working day.

Vice-President Durant offered to wager ten thousand dollars it could

not be done, and the Central Pacific outfit resolved it should be

done. Waiting until there were but fourteen miles for them to lay,

they started in and laid ten miles and two hundred feet from seven

A.M. to seven P.M., using four thousand men in the operation. And then

the Union Pacific outfit was mad. They claimed if they had massed

their forces, made special preparation, etc., they could do better

than their competitors, but they could not prove it for there was no

more track to lay.

The Central Pacific people ran their grade east of Ogden to Echo

Canon, this when their completed line was only built to the vicinity

of Wadsworth, Nev. The Union Pacific Railroad located their line to

the California State line and had their graders at work as far west as

Humboldt Wells, Nev., four hundred and sixty miles west of Ogden. This

line west of Promontory was never built, however, and it is said that

one million dollars was expended in this way. As it was the Central

Pacific had their grade established some eighty miles east of

Promontory Point, thirty miles east of Ogden, and this when the Union

Pacific were laying their completed track within a mile of and

parallel to their grade. The prize was so great that every nerve was

strained on the part of both contestants as to who should push their

track the further. The advantages were about equal. The Central

Pacific were somewhat nearer their base of supplies, their laborers

were the quiet, orderly, and easily managed Chinese and then they were

in comparatively good financial shape. The Union Pacific, though

farther from their base of supplies, were in railroad communication

with the points of manufacture, their men, while turbulent and hard to

control, were enthusiastic and worth three to one of the opposing

forces. They were well paid, well housed and well fed, and were

handled by men who had as a rule, army experience back of them and

who certainly were "bosses" in the best and fullest sense. During the

winter of 1868-1869 the advantage was with the Central Pacific

Company. Their line across the Sierras was fully protected by snow

sheds and they only met with one week's suspension of business from

snow troubles during the whole winter, while the Union Pacific were

blocked between Cheyenne and Green River for four long months. The

rate of construction grew rapidly. During 1864 there were about two

hundred men employed on the grading and track-laying. While it took

one year to complete the first forty miles, the second year, the year

1865, saw two hundred and sixty five miles done, over a mile a day

working time, and this was exceeded from that on. There were about two

thousand five hundred graders employed in 1867 in addition to four

hundred and fifty track-layers and from this number up, until the

completion of the road. Their forces numbered twelve thousand men and

three thousand teams, while six hundred tons of material were placed

daily during the spring of 1869 when the contest was at its height.

The maximum track laid in one day, was seven and a half miles. As the

line progressed round houses were put up at Omaha, North Platte,

Cheyenne, Laramie, and Ogden, each having twenty stalls, and at Grand

Island, Sidney, Rawlins, Bitter Creek, Medicine Bow and Bryan, of ten

stalls each. These were substantial buildings of brick or stone with

sheet-iron roofs thoroughly fire proof.

In addition to the large shops at Omaha where much of the building of

equipment was done, repair shops were built at Cheyenne and Laramie.

Stations were established at an average of fourteen miles apart. The

station buildings were built of wood and of two classes, three-fourths

of them twenty-five by forty feet, the remaining one-fourth thirty-six

by sixty feet. At each station water tanks were erected, surmounted by

wind mills. Sidings three thousand feet long were located at each

station and in some cases at points intermediate fifteen hundred feet

long. In all there was about six per cent of the main line distance in

side tracks.

To accommodate not only the Public, but their own employees, the

Company put up good sized hotels at North Platte, Cheyenne, Laramie

and Rawlins.

Eating houses were established at Grand Island, North Platte, Sidney,

Cheyenne, Laramie, Rawlins, Bryan (Near Granger long ago passed out of

existence) Wasatch (afterwards removed to Evanston) and Ogden. During

construction days the charge for a meal was a dollar and a quarter,

but with the opening of the road this was reduced to one dollar and

afterwards to the present price seventy-five cents.