No satisfactory records appear to have been kept as to the origin and

development of track circuiting outside the United States, which

renders it very difficult to arrive at any conclusions that could

serve as a basis for a real historical sketch upon this interesting

subject. In view of the fact that the Signal Section of the American

Railway Association proposes to publish a memorial to the late Dr.

William Robinson, generally regarded as the inventor of the closed

track circuit and certainly the first to utilize it in the control of

an automatic block system, the following brief remarks may prove of

interest to the writer's fellow members of the Signal Section. It is

not suggested that they are in any sense complete, as to make a

complete survey would require considerable investigation. They really

represent the writer's present general understanding of the subject

and are open to such criticism and correction as anyone may be able to

offer to them, in England or elsewhere.

There is no doubt but that track circuits were thought of and actually

experimented with in England a great many years ago--probably as far

back as the earliest American attempts--but the want of satisfactory

records make it very difficult to decide on what actually took place.

However, it is certain that the late W. R. Sykes, well-known

throughout the railway world for his controlled manual block and other

inventions, endeavored to use the track circuit in the sixties and

that Bull, the inventor of the bull-headed rail employed in England

for the chaired track universally found there, clearly had the idea of

a track circuit in his mind, for he refers to it in a patent obtained

in 1860. It was apparently in the early part of the sixties that W. R.

Sykes fixed a track circuit experimentally at Briseton on the old

London, Chatham and Dover Railway, and shortly after also at the

Crystal Palace Station on the same line. The apparatus employed must

necessarily have been rather primitive. In the seventies, track

circuit was installed by him at St. Paul's station, also on the

Chatham Railway. At that time very little was known about the track

circuit theoretically and the construction of the relay was very

different from our modern types. Sykes' relay completed the control

circuit by the insertion of a contact point into a mercury trough. It

was also, the writer believes, built on the solenoid principle. So far

as is known it was not suggested at this time and at all events not

attempted to make an automatic block system controlled by track

circuits, such schemes for signaling of this type as were put forward

being always based on the intermittent or track instrument control

plan.

It must be remembered that the conditions obtaining in England, widely

different from those seen in the United States, were not such as to

give much encouragement to the development of automatic signaling,

while over and above this, the English conservative nature always

looked askance at automaticity in railway apparatus. Automatic

signals, worked on a track instrument plan, were put into regular work

on the Liverpool Overhead Railway in 1893, but it was not till 1902

that automatic signals controlled by continuous closed track circuits

were to be seen in operation on an English main line railway. Before

this, however, track circuits had made some progress, though not very

much; the most important instance of its application was in the Kings

Cross tunnels, just outside the London terminal of the Great Northern

Railway, in the early nineties. This installation, which was used

under none too favorable circumstances from the point of view of

successful operation, proved to the English what the track circuit

could do and heralded the day when its place in the safe working of

railways should be better appreciated. By this time in the United

States, largely under the influence of the pioneer work of Dr.

Robinson, automatic signaling had made quite considerable progress and

the potentialities of the track circuit had been fairly realized.

It may occur to Americans to ask why it was that progress in England

was so slow and this is a question which cannot be answered by a

single reason since a combination of circumstances was the cause. In

the first place the older type of English signal officer was

extraordinarily conservative regarding signaling practice of other

countries as he had that peculiar type of contempt which generally

comes from want of knowledge. Anyone who, like the writer, listened

for instance to the objections brought forward by some of these men to

controlled manual block, will know to what absurd lengths they could

go in resisting improvements in working. Although this spirit, which

has markedly diminished during the last 15 years, must have accounted

to some extent for the slow development of the track circuit in

England, there were yet some reasons of a more sensible kind which

must be borne in mind. The English light weight four-wheeled freight

car without air brakes was and still is a bother to the track circuit

engineer because of the difficulty of getting a satisfactorily low

shunt under all circumstances. Then again the Mansell disc wheel made

it necessary to resort to bonding between the tire and the hub before

a vehicle would shunt the track circuit at all and this was an expense

to which the companies were loath to go, especially if they had or

contemplated very few track circuits, though the use of even one

circuit really necessitated the whole of these wheels being so

treated. There was no great demand for automatic signaling, as the

manual system was giving good results and was also cheap at that time,

owing to the low wages paid to railway men. This and the other reasons

just given combined to render the progress in England extremely slow.

Some of the First Installations

Nevertheless, in 1902 the British Pneumatic Railway Signal Company,

who had in the previous year installed its first low pressure

pneumatic interlocking at Grateley, on the London and South Western

Railway, brought into use between that station and Andover an

automatic block system controlled by continuous track circuits, the

distance being about six miles. The signals were worked by low

pressure air. The success of these systems led to the adoption of them

shortly afterwards on the widened four-track main line between Woking

and Basingstoke on the South Western, a distance of 24 miles. The

Grateley-Andover installation has now been removed, not because it was

at all unsatisfactory, but because it was felt traffic and other

circumstances did not warrant its further employment. In 1905, Hall

electro-gas automatic signals were brought into use on the North

Eastern main line between Alne and Thirsk, a distance of 11 miles. In

1907, semi-automatic signals were installed between Pangbourne and

Goring, a distance of 2-3/4 miles, four track, by the Great Western

Railway to divide up a long manual block section and a few similar

installations have been made on the Midland, the Great Central, the

Belfast and County Down and other roads.

By this year, track circuiting had begun to be extensively used in

England. The British Pneumatic Signal Company had installed a series

of low-pressure plants near Manchester on the Great Central and track

circuits were used throughout while the same thing had been done at

Clapham Junction on the South Western. The Westinghouse Company had

supplied the District Railway, London, with automatic signals and were

actively engaged in fitting similar apparatus to the tube lines; they

soon afterwards commenced work on the Metropolitan Railway.

The main steam lines began to apply track circuits at various places

in conjunction with ordinary manual signaling and this process

received an added impetus from the terrible disaster which befell the

Midland Company's Scotch Express near a station called Hawes Junction,

when, in emerging from a tunnel it crashed into two light engines that

had been forgotten and had entered the block under the signals set for

the express. Several other bad accidents, notably one at Pontypridd,

on the Taff Vale Railway, due to trains and engines being overlooked

by signalmen while standing at adverse signals, emphasized the

necessity for paying serious attention to the question of track

circuiting and for undertaking a really earnest study of the matter to

see whether the difficulties due to the light freight car, etc., could

not be overcome or at least considerably minimized.

Considerable progress had been made by the time the war broke out and

quite a number of track circuits had come into existence on all the

principal roads, although no extension work worth noticing was made to

purely automatic block systems on steam roads, this class of work

being confined to the suburban electric lines. Unfortunately, in this

as in so many things the war had a retarding effect and caused the

postponement of many plans. The increased price of wages and materials

has hampered progress a great deal and it will be some time yet before

any great improvement is noticeable. On the other hand, the great

increase in wages has caused a demand on the railways for a reduction

of operating costs with the result that signal engineers are

endeavoring to produce schemes which will enable signal towers to be

abolished or closed at intervals where they were formerly kept

continuously in service and in this and other ways to dispense with

unnecessary staff. It is in this that the track circuit will help very

considerably. Its further extension on English lines is a certainty

and simply a question of time and money. Since the inception of the

Institution of Railway Signal Engineers a great amount of work has

been done in discussing and studying requisites and so on for track

circuit work, both of the direct current and alternating current

types. All this has resulted in increased confidence on the part of

the traffic officers in track circuit and allied apparatus and caused

them to look more and more to the signal engineer to help them in

their work and to accord him the respect and credit he deserves.

The writer is aware that these lines can only convey a very imperfect

idea of the actual state of affairs, but he prefers to write them now

as a preliminary account, not yet being in a position to furnish the

figures which the Signal Section desires.

Track Circuits on the Continent

Turning to the continent, the writer must necessarily speak in very

general terms since there is less published on this subject by

continental journals than by English and, of course, the field is

rather a wide one, embracing so many lands and tongues. The track

circuit is, of course, known there fairly well, but there are no very

great installations of automatic block to be found. In the case of

France, the Paris, Lyons & Mediterranean had, before the war, an

installation between Larsche and Auperre, 24 miles, and some

semi-automatic sections in various places. The Midi Railway had also

the Hall disc system from Bordeaux to Langon, 26 miles, and the writer

believes extensions to this have since been made. The Est Railway

began trials before the war and during the war, owing to shortage of

staff and having greatness of traffic to the eastern military area,

installed automatic signaling on the Paris-Nugent line. The writer has

been told that it is under consideration to equip the whole line to

Avricourt, where it connects with the Alsace-Lorraine system. The

writer is not aware whether the other companies in France have any

automatic blocks, but he believes not. They all have, however, track

circuits installed at various places in connection with the ordinary

signaling. Owing to the lower standard of living and the employment of

women operators at many points, there is not so great an incentive to

the adoption of automatic devices, as in some other countries. French

engineers, however, know what Americans have done in this way and some

very complete accounts of American systems have appeared in "La Revue

generale des chemins de fer." The Paris Metropolitan line is

automatically signaled by an intermittent contact system without track

circuit.

In Germany, the track circuit for steam lines is not looked on with

much favor, as owing to the extensive employment of the Siemen's

controlled manual and the peculiar station masters' system of control,

called "Station Block," always used in that country (with, it must be

admitted, a very high record for safety,) the Germans think they would

not gain much by any great use of track circuit or automatic signals.

The writer has just had this view confirmed by a friend returned from

visiting the important works of the German Railway Signal Company at

Bruchsal, Baden. Automatic signaling is used on certain important

sections of the Berlin Elevated and Underground Road, installed before

the war by the Westinghouse Company, of London, with a.c. double rail

track circuits and this will be extended eventually to cover the

remaining sections still worked by the Siemen's controlled manual. Dr.

Kemmann, a member of the General Railway Direction, Berlin, published

last year a very interesting book describing his work with accounts

also of the London Underground and New York Subway installations,

showing that foreign systems are studied in Germany. But for steam

roads the writer believes from what he has studied of German methods

and ideas on the subject that the manual system will remain in use and

that the track circuit will not be much adopted.

The same remarks apply generally to Austria, Holland and Scandinavia,

though in the latter case English ideas are more in evidence and it is

probable that the track circuit, already in use to some extent, will

be developed as time goes on. In Austria automatic signaling was

certainly tried on a small scale on the Southern Railway, but with

what results the writer cannot say. In Switzerland the extended use of

iron ties is against the track circuit. In Belgium the Hall system was

at one time in use between Ghent and Wondelgem, but as the course of

the line was changed, these signals were removed. The section was

about 3-1/4 miles long. Automatic signals do not exist there now but

the track circuit is used at certain stations, notably throughout the

all-electric power installation at and close to Brussles Nord. The

writer does not believe it likely that automatic signaling will be

used on the steam roads in Belgium, at all events for some time yet.

With regard to Italy, Spain and Portugal, the writer does not possess

details, but believes it likely that the track circuit is only in use,

if at all, at a few important stations. The new Metropolitan line in

Madrid is equipped with an intermittent contact system, probably

copied from the Paris Metropolitan.

Although a little outside the scope of these notes, the writer would

emphasize that in the English colonies and in South America

(especially, however, the former) the track circuit is being much used

and its value appreciated. Automatic signaling is in use in Victoria,

Queensland, South Australia and New South Wales. The operating

conditions in these countries no doubt much resemble American

circumstances and the adoption of automatic signals is a natural

development.

Summing up, the writer would say, that the earliest experiments of W.

R. Sykes in England are probably as old as those of Dr. Robinson, but

owing to the different circumstances in which the former inventor was

placed, he had little encouragement to continue them and thus American

development at first went on far ahead of English, while owing to the

vastness of the American continent it must always present a larger

field to the signal engineers' ingenuity and activity. In later years,

however, the English signalmen awoke to the importance of the question

and installations were constructed which, if smaller, showed as great

a degree of technical perfection as any in America. The future will

doubtless see more such installations.

It is not known to the writer whether anyone on the continent had the

idea of a track circuit as far back as Sykes' or Robinson's

experiments or when the first attempts were made. It would require

much investigation to find this out. Track circuit possibilities are

now well known there and no doubt its use will extend, but in certain

countries, notably Germany and Switzerland, there are local

circumstances which act rather strongly against it at present. The

writer cannot give statistics on the subject now. There are some

figures which he possesses, but they should be verified and amplified

before being used by the Signal Section for publication. The preceding

notes are, he is too fully aware, very incomplete and general, but he

hopes they may be of some present use.

The Invention of the Track Circuit The history of Dr. William Robinson's invention of the track circuit, the fundamental unit which made possible our present automatic block signaling and interlocking systems · 第 3 / 3 章