CHAPTER XII

AMMUNITION AND OTHER ORDNANCE

The armistice found in the United States an enormous industry devoted

to the production of ammunition for the artillery. Including its

powder-making plants and its plants for the production of the raw

materials of powder, its scores of shell-making factories, and its

loading establishments, this industry overshadowed, in money invested

and operatives employed, even the artillery-manufacturing project.

The demobilization of this vast enterprise, therefore, afforded the

Ordnance Department one of its major problems after the armistice.

The production of powders, both high-explosive and propellant, in which

about 70,000 persons were engaged at the time of the armistice, was

terminated in a remarkably brief time. When the armistice was six weeks

old all manufacture of high explosives on war contracts had ceased, and

two weeks after that the last of the war-time propellant (smokeless)

powder was made. This termination left on the hands of the Ordnance

Department a considerable amount of special-purpose machinery which had

little or no market value. This machinery was therefore retained and

stored at various arsenals, particularly at the Frankford and Picatinny

arsenals, the permanent army ammunition production centers.

For a while the Old Hickory Powder Plant at Nashville, Tennessee,--its

daily capacity of 900,000 pounds of smokeless powder making it the

largest powder factory in the world,--was retained as a stand-by

plant, but later it was sold. The Nitro (West Virginia) Powder Plant,

another government institution nearly as large as Old Hickory, was

sold after the armistice, with the result that a new industrial city

is developing on its site. The War Department’s enormous ammonium

nitrate plant at Perryville, Maryland (ammonium nitrate being used

in the manufacture of the widely used war explosive amatol), the

equipment of which included several hundred model dwellings, was, after

the armistice, turned over to the Public Health Service to be used

as a hospital for ex-service men. The three government picric acid

plants--at Little Rock, Arkansas, Grand Rapids, Michigan, and Savannah,

Georgia--were sold. Briggs & Turivas, Chicago steel manufacturers,

bought the plant built by the Government at Senter, Michigan, for the

production of tetryl, an explosive used as the charge in boosters in

high-explosive shell. The Ordnance Department also closed out and sold

the facilities provided at Bound Brook, New Jersey, for the production

of tetranitroaniline, another booster charge.

In general, plants and machinery used in making powder could be used

also to some extent to make the commodities of peaceful commerce, and

therefore the Ordnance Department had little difficulty in disposing of

these surplus facilities at good prices. The powder-making facilities

created during the war by the DuPont Powder Company near Wilmington,

for instance, almost at once after the armistice turned to the

manufacture of dyestuffs. Another war powder plant, with practically

the same machinery, is to-day producing artificial silk, a cellulose

commodity similar in chemical composition to smokeless powder. A third

is making celluloid and artificial ivory; a fourth, paper.

[Illustration:

_Photo by Howard E. Coffin_

AMERICAN FIELD GUNS ON THE RHINE]

[Illustration:

_Photo by Howard E. Coffin_

AMERICAN GUN ON EHRENBREITSTEIN, COBLENZ]

Since trinitrotoluol (T. N. T.) was the most widely used of all

war explosives, the Ordnance Department was forced to go into the

production of the basic toluol itself as well as into the manufacture

of its nitrated compound. One war source of toluol was coal gas, and

to secure the chemical from this source the Ordnance Department set up

stripping plants in the gas works of thirteen American cities. Nine of

the gas companies bought this equipment after the armistice. The other

four plants were sold on the market, the machinery eventually finding

its way into the new industry which is taking gasoline from natural

gas. The Government sold out completely its two T. N. T. plants, which

were located respectively at Racine, Wisconsin, and Giant, California.

[Illustration:

_Photo by Signal Corps_

DESTROYING CAPTURED GERMAN AMMUNITION]

[Illustration:

_Photo by Signal Corps_

A CAPTURED AMMUNITION DUMP]

One of the most notable enterprises in all the liquidation of war

industry was that of closing up the war project for the fixation

of atmospheric nitrogen and the placing of that undertaking upon

a permanent peace footing. In order to conduct this enterprise

intelligently the Secretary of War selected certain scientists and

men of business experience to study every phase of the subject of the

military and commercial fixation of nitrogen and to recommend to the

War Department what disposition to make of the war fixation plants.

This board was known as the Fixed Nitrogen Administration.

In 1916 the United States, almost entirely dependent upon foreign

sources for its supply of commercial nitrogen, took the first step

toward independence by appropriating $20,000,000 for the work of

developing a domestic fixation industry. With this money the Corps of

Engineers began, about the time we declared war against Germany, the

construction of a great dam to arrest the power of the Tennessee River

at Muscle Shoals, Alabama. This project, including a hydroelectric

power house, was set for completion in 1923. The head of water at

Muscle Shoals is expected to provide from 100,000 to 200,000 horsepower

continuously, and during nine months of the year high water will

produce a secondary power almost as great.

Aware that this development would in all probability not come

through in time to serve the war explosives program, soon after the

declaration of war the Government entered upon an enormous project to

fix atmospheric nitrogen with power developed from coal. Five fixation

plants of this sort were from first to last authorized. Three of these

were completely built, and the other two were partially constructed

before their projects were canceled.

In the fall of 1917 the War Department began the construction of a

nitrogen plant at Sheffield, Alabama, and in 1918 completed it, at a

cost of about $13,000,000. This plant produced usable nitrogen in

the form of ammonium nitrate, a product used with trinitrotoluol in

the production of the important shell-explosive amatol. It used the

modified German Haber process, combining hydrogen and nitrogen to

form ammonia, which is oxidized into nitric acid, which in turn is

combined with ammonia to form ammonium nitrate. This plant produced

its first ammonia in September, 1918, and its first ammonium nitrate

on the second day of the armistice. The process, however, was never

satisfactorily developed in this plant.

The second fixation-plant project was inaugurated in the autumn of

1917 about the time the Interallied Ordnance Agreement put upon the

United States the burden of producing most of the powder and explosives

used by the Allies, thus tremendously increasing our need of nitrogen.

It was no time to be experimenting with processes. The one fixation

process of proved success known in the United States was the cyanamid

process, used by the American Cyanamid Company at its plant at Niagara

Falls. The Government therefore engaged this concern to build an

enormous fixation plant at Muscle Shoals, a plant which was to use

steam power until the hydroelectric power from the river should become

available. On the day of the armistice this plant, known as the No. 2

Nitrate Plant, was nearly complete: it turned out its first ammonium

nitrate within two weeks thereafter. It cost $70,000,000 and had a

capacity of 110,000 tons of ammonium nitrate a year. The test runs

indicated that the plant could fix nitrogen at a cost commercially

practicable.

Two other plants, both to use the cyanamid process, were projected

in 1918, and the Government began the construction of both of them.

One was at Toledo, Ohio, and the other at Cincinnati. Their combined

capacity was to equal the capacity of the Muscle Shoals plant. At the

armistice the construction of these plants was well under way, but the

Government terminated both projects, at a net cost of $12,000,000.

The fifth plant was built by the Bureau of Mines for the Chemical

Warfare Service at Saltville, Virginia. It used the Bucher process,

producing fixed atmospheric nitrogen in the form of sodium cyanide,

a chemical used in the manufacture of toxic war gases. It was about

complete at the time of the armistice, having cost the Government

$2,500,000. A test run indicated that the Bucher process was too costly

to be practicable in normal times.

The Fixed Nitrogen Administration, in its report, recommended that

the Saltville plant be abandoned, but that the plant at Sheffield and

the one at Muscle Shoals be retained permanently, the modified Haber

process at the No. 1 Plant to be developed by further research. No.

2 Plant at Muscle Shoals was designated as the principal peace-time

source of nitrates within the United States, and the report advised

the United States to remain in the nitrates business as a commercial

producer of fertilizer material, the Government to operate through a

corporation similar to that which operates the Panama Railroad and its

related steamship line. This report was based upon research which sent

a commission of experts to Europe to study fixation processes there,

and which even cultivated experimental farms in the United States to

determine by practical tests upon growing crops the fertilizing value

of various forms of fixed atmospheric nitrogen.

The armistice found dozens upon dozens of American factories and

machine shops, both large and small, engaged exclusively in producing

the metallic shell used by the field artillery. This in itself was

an industry of great size. The industry had not yet attained its

production peak, but it was rapidly nearing that point; so nearly so

that, during the tapering-off process, the factories working only

eight hours of each twenty-four (as compared with the pre-armistice

three-shift, twenty-four-hour day), the output was enormous. Take, as

an example, the 75-millimeter size alone. In sixteen months before the

armistice the mills, working continuously twenty-four hours a day,

produced about 10,000,000 forgings for 75-millimeter shell. The same

mills after the armistice, working now only eight hours each day and

tapering off their work as rapidly as possible, in the two months

before the wheels stopped, produced 5,000,000 additional forgings.

The total production of the metallic elements of artillery shell, both

before and after the armistice, recorded some totals of fantastic

size. It should be remembered that for the most part our war shell

were of the European nose-fuse type and therefore unlike any shell

which the War Department had ever produced before. An apparently simple

manufacturing proposition turned out to be a most difficult one,

particularly in the production of two small but important elements

of the nose-fuse shell, the booster, which accelerates the rate of

explosion, and the adapter, which holds the booster in place. It was

months before our manufacturers could produce boosters and adapters

successfully, but then the effort came along with a rush. When

production ceased the Ordnance Department had 26,000,000 boosters and

adapters to dispose of. Other surpluses for salvage were 60,000,000

shell forgings, 60,000,000 shell machinings, 60,000,000 cannon

cartridge cases, nearly 70,000,000 metal parts for grenades, and over

6,000,000 metal parts for trench mortar shell.

The demobilization policy was to store reserves of shell sufficient to

meet the consumption of an army of 1,000,000 men during six months of

active field service. In the 75-millimeter size, for instance, such

a reserve meant 2,500,000 shell. Since we had produced 15,000,000

75-millimeter shell, it is evident that the Ordnance Department found

on its hands 12,500,000 such shell to be disposed of in some way.

Surpluses in other sizes were also large. The steel strike of the

autumn of 1919 occurred opportunely for those disposing of the excess

shell, for it enabled the surplus metal to be sold at good prices

as melting scrap. A brisk demand for shell and cartridge cases as

souvenirs also absorbed a surprisingly large quantity of the excess

materials.

As in the demobilization of the artillery industry, here in the

shell-making industry we see at work the same preparedness policy of

designating established arsenals and retained stand-by plants to be a

manufacturing reserve against some future war emergency. Frankford and

Picatinny arsenals were selected to inherit the shell-making facilities

created in private plants during the war. At Frankford Arsenal was

concentrated an equipment able to manufacture daily 6,000 shell,

ranging from 75 millimeters to 240 millimeters. The Frankford shell

plant was made a complete unit, capable of taking billet steel, forging

out the shell blanks, machining them, and turning out shell ready for

loading. At Picatinny Arsenal was created an experimental shell plant

with a daily capacity of 300 shell of all sizes.

As an addition to the two arsenals, but as a subsidiary to the

Frankford Arsenal, the Ordnance Department retained the 155-millimeter

shell factory of the Symington-Anderson Company at Chicago and equipped

it as an enormous stand-by shell factory with facilities for producing

simultaneously 155-millimeter and 240-millimeter shell. This plant has

been named the Chicago Storage Depot. Here was concentrated most of

the special-purpose shell-making machinery acquired by the Ordnance

Department during the war. It consists to-day of two departments. The

active manufacturing department exists in ordinary, all machinery

ready for immediate operation. In the storage department exists

special machinery with a capacity for producing nearly 70,000 shell

daily. This machinery is catalogued and assembled in factory layouts,

virtually complete except for the ordinary commercial machinery used

in the manufacturing processes, so that on short notice the Ordnance

Department can ship from the depot shell-making units up to whatever

capacity any future war contractor may wish to undertake. The installed

equipment of the active manufacturing department has a daily capacity

of 12,000 shell. In 1917 the shell-making capacity of the United

States was small, and it was a year before facilities could be created

and production started on a quantity basis. The reserve industrial

equipment to-day gives us a daily manufacturing capacity of nearly

90,000 shell, a sufficient supply for a field army of 1,000,000 men

until a new shell-making industry can come into existence.

Powder and shell after manufacture went to the various sorts of loading

plants, the propellant powder to be loaded into cartridge cases (for

field guns of smaller calibers) or bags (for the bigger guns) and

the high explosive to be poured or packed into the shell, boosters,

or fuses. In carrying on this enterprise the Government either built

or fostered the creation of seventeen great loading plants, eight

of them--employing 35,000 persons, most of whom were women--being

owned entirely by the Government. These had cost from $5,000,000

to $12,000,000 apiece. A few of these government institutions were

retained by the War Department after the armistice. The shell-loading

plant at Amatol, New Jersey, was added to the arsenal system under

the name of the Amatol Arsenal, but the machinery was condemned for

salvage. The Amatol Arsenal is being used principally as a depot for

the storage of reserve shell-loading machinery acquired during the war.

A fire in October, 1918, destroyed the government shell-loading plant

at Morgan, New Jersey, and a temporary storage depot was erected on the

site. The two bag-loading plants at Woodbury, New Jersey, and Seven

Pines, Virginia, were disposed of after the armistice; but the third,

at Tullytown, Pennsylvania, as the Tullytown Arsenal, was retained

as an ammunition storage depot. Four other shell-loading plants were

retained as storage depots, and at these several points exist the great

reserves of loaded ammunition and of ammunition components left by the

war.

Nearly all the loading machinery was concentrated at Amatol and

Picatinny arsenals. At Picatinny also was set up an experimental plant

for the development of processes in loading powder and explosives. This

plant also contains machinery for loaded pyrotechnics in rockets, star

shell, and signal-pistol cartridges. One piece of equipment is a dark

tunnel in which the candle power of field illuminants can be tested.

The plant includes facilities for loading grenades, fuses, and boosters.

The American Expeditionary Forces after the armistice had on their

hands some 65,000 tons of field ammunition, mostly of French

manufacture, besides several thousand tons of German ammunition taken

in the advance to the Rhine under the terms of the armistice agreement.

At first it was thought that the French ammunition, shipped to the

United States, would be a military asset for several years to come;

but as the months went on it became evident that, instead of being

an asset, this ammunition was an embarrassment and a liability, and

finally the War Department was glad enough to pay various foreign

governments to take it off its hands.

Gas shell, for instance, it was thought, could not be stored, because

the contained chemicals would soon destroy the metal, and the shell

would begin to leak their lethal contents. Later experience, however,

showed that there was no sound basis for such an apprehension. In the

advance through Belgium, Alsace-Lorraine, Luxemburg, and the German

Rhine country, the American forces collected about 7,000 tons of

German ammunition, none of which would fit our own guns and much of

which consisted of gas shell. The gas shell could not be destroyed

in dumps because of the danger to civilians in the neighborhood. The

only safe method of destruction was to transport it to sea and sink it

in deep water; but the A. E. F. had no labor to spare for this work,

and, besides, the French Government refused to allow the gas shell to

be shipped on the French railroads. Finally, for a price, the French

themselves undertook to dispose of this German gas ammunition.

In Belgium we had 6,000 tons of captured German ammunition. The

Belgians could not use it, forbade its destruction in dumps because

these dumps were in territory which had not been devastated by the

war, and would not permit it to be moved by rail to the devastated

districts, because of the supposed danger from the gas shell. The

A. E. F. therefore had 6,000 tons of ammunition which it could not use,

give away, destroy, or move. Finally, by agreeing to give the Belgians

a large quantity of German engineering and construction material found

in this area, the American authorities induced the Belgian Government

to accept responsibility for this ammunition.

The German ammunition found in Germany was sold to German contractors,

and, under the eyes of American inspectors, changed into useful

commercial products.

As to the A. E. F.’s own 65,000 tons of loaded shell, it was decided

to destroy all gas shell and all explosive shell and cartridges loaded

with explosives of doubtful stability and to return the rest to the

United States. The work of shipping the serviceable ammunition home

actually started, but it went on slowly because of the lack both of

labor and of ammunition ships. A fire destroyed one of the three

collection dumps in the Château-Thierry area. As the ships repatriated

the A. E. F. at a faster and faster rate, the various army areas were

evacuated one by one, but it was necessary to leave guards behind at

the various ammunition dumps. Then the War Department began studying

the problem with a practical eye. Nearly all this ammunition was

“war quality”: good enough for rapid consumption on the field, but

made hurriedly by inexperienced labor under conditions that made its

permanent stability questionable. It was found to be impossible to

separate the better ammunition from that of doubtful stability. It was

conceded that under ideal conditions this ammunition might be stored

safely for five years. Some of it had already been stored for eighteen

months; it would take at least a year to transport it all to the United

States; and therefore in this country it would be good for only a

brief time. Accordingly the A. E. F. authorities negotiated with the

French to assume liability for the ammunition, and it all went into

the general settlement of 1919 with the French, but as an American

liability reducing the financial liability of the French under the

agreement.

The chief permanent benefits accruing to the United States from its

extensive war industry engaged in the manufacture of instruments for

sighting and controlling the fire of field guns were (1) a reserve

of optical instruments of the most advanced types, some of which had

previously been produced only by the French, (2) a large collection of

machinery for making these and similar instruments, and (3) an optical

glass industry more than sufficient to the normal needs of the country.

Before 1914 little, if any, optical glass had been produced in the

United States. In demobilizing this industry, the Ordnance Department

took care that all these military assets were properly fitted into the

preparedness plan.

Again we see at work the policy of centering future production in

an arsenal. Frankford Arsenal was designated as the military center

for fire-control instruments, and here were brought the reserves of

materials and tools acquired by the Government in the course of the

enterprise.

The production of some of the artillery sights proved to be almost

beyond the mechanical ability of American workmen. It took three

skilled organizations to produce the panoramic sights. Warner &

Swasey, of Cleveland, built these sights, but had to turn to the

J. A. Brashear Company, of Pittsburg, for the optical-glass prisms

to go into them. That company, in turn, did not have a skilled force

large enough to correct the roof angles of all the prisms required.

The Ordnance Department found a man who understood the correction of

optical plane surfaces in the person of Dr. G. W. Ritchey of the Mt.

Wilson Observatory, Pasadena, California. He trained a number of men

in this recondite craft, and they staffed an important department of

the extensive optical shop which the Carnegie Institution built at

government expense at Pasadena.

An extensive production of military optical instruments was permitted

after the armistice and before the contracts were terminated. The

work of producing some of these instruments was long and difficult,

the instruments themselves would not deteriorate in storage, and the

evolution and improvement of such instruments is slow. Moreover, the

labor cost is by far the greatest cost in making optical instruments.

The value of the unfinished components as scrap, even from an industry

as large as that created in 1917–1918, with its eighty-three factories

at work on contracts of a value of $50,000,000, was almost negligible.

As a result of this permission to proceed, the industry reached its

peak of production late in January, 1919. The only contracts terminated

were those under which no production had begun before the armistice,

those the holders of which asked for termination, and those which had

already produced undue excesses of easily made articles.

The largest producer of army optical instruments, the Bausch & Lomb

Optical Company, of Rochester, held contracts amounting to more than

$6,000,000 in value and produced before the armistice materials worth

over $3,000,000. The War Department obtained no machinery from this

plant when the contracts were terminated, but it received and shipped

to Frankford Arsenal large quantities of finished parts of instruments.

The present optical shop at Frankford was largely equipped with

machinery originally procured by the Recording & Computing Machines

Company of Dayton. This company, which had never built optical

instruments before the war, took contracts worth $4,000,000, built

and equipped a complete optical plant, and became a producer, among

other things developing a mechanical method of milling glass for

prisms. Similar methods of demobilization were followed at all the

war factories making sights and fire-control instruments: desirable

machinery and unfinished components were collected at Frankford

Arsenal, and the excess materials were sold. This plan put thousands

of instruments into the war reserves, enough of some sorts to maintain

the military establishment for years to come. Of certain important

classes of instruments the quantities obtained from the war industry

are deficient.

Between the year 1914, when war broke out, shutting off the export

of optical glass from Germany, and 1917, when the United States went

into the war, five American organizations--the Bureau of Standards,

the Pittsburg Plate Glass Company, Keuffel & Esser, the Spencer Lens

Company, and Bausch & Lomb--developed the manufacture of optical glass

on a small scale, but in quality the glass was not up to the European

standard. In the spring of 1917, scientists of the Carnegie Institution

of Washington stepped in to help the manufacturers with their glass

problems, and complete coöperation all along the line resulted in a

successful industry before many months had gone by. The four commercial

producers eventually turned out optical glass more rapidly than both

the Army and Navy could use it. Some of this glass was the equal of

any ever made in Germany, and much of it, though of “war quality,”

was still good enough for many uses. The army ordnance contracts were

entirely with Bausch & Lomb and the Pittsburg Plate Glass Company

at its Charleroi (Pennsylvania) plant. The production of glass on

the war contracts was terminated immediately after the armistice. A

large quantity of glass not yet formed into sets of optics was stored

at Frankford. The Pittsburg Plate Glass Company did not resume any

production, but Bausch & Lomb continued to make optical glass for their

own uses.

Those who assume that, because we created an ample optical glass

industry during the war, the United States is to be forever free of

dependence upon foreign sources of this commodity, probably are too

optimistic. There are numerous reasons why an optical glass industry

is not likely to survive in the United States, at least on any

large scale. The total normal American consumption of optical glass

amounts to less than $1,000,000 a year--not enough to support many

glass-making establishments. Secondly, nearly all the Allies developed

war glass industries of their own, and the result is that the world

has a large surplus of optical glass, which, if of good quality,

does not deteriorate in storage. Thirdly, the war expansion of the

world industry has created facilities above the present normal world

requirements. In the fourth place, the industry is a precarious one,

subject to heavy losses from carelessness or ineptitude in the mill.

In the fifth, there is no tariff protection for American glass, the

law permitting the free importation of precision optics for scientific

purposes. Finally, there is a long-standing prejudice in favor of

European-made scientific instruments, a prejudice against which an

American industry would have to fight. Three American producers,

however, are said to be making optical glass for their trade.

In anticipation of a possible collapse of the industry, the Bureau of

Standards has brought to Washington the glass-making facilities which

it set up in a special war plant at Pittsburg. This plant can make two

tons of optical glass a month. It is to be operated by the Government

with the view both of improving processes and of creating within the

Government an expert knowledge of this vital war industry.

The United States carried further than any other nation in the war the

substitution of mechanical power for the power of draft animals in the

movement of field artillery. Nothing in our army equipment in France

did the French, themselves the premier artillerists of the world,

admire more than our motorization of artillery. The total contracts

for ordnance vehicles represented an expenditure of $400,000,000. The

program actually delivered 13,000 vehicles to the A. E. F., produced

before the armistice an equal number ready for shipment abroad, and

had 60,000 other vehicles under construction when the halt came. The

Maxwell-Chalmers plant at Detroit and the Reo plant at Lansing, working

in coöperation, were producing 1,100 5-ton tractors a month, and this

production represented the military power of 12,000 draft animals and

4,000 men.

The demobilization of this industry was accomplished rapidly. Orders

were cut to the bone, merely enough post-armistice production being

allowed to enable the plants to dovetail their war business into the

resumption of their commercial businesses. Since little special-purpose

machinery was required in producing war tractors, the Ordnance

Department created no manufacturing center after the armistice as a

source of future supply. The war left the Army, however, with a number

of engineers who had gained experience in adapting mechanical power to

military uses in the field, and these men are continuing a development

which, doubtless, will in time eliminate the horse from our artillery

regiments.

One of the innovations of the war was the motor-driven mobile repair

shop for repairing artillery in the field. Each shop consisted of

two sections, with fifteen trucks and fourteen trailers in each

section--nearly sixty vehicles to the entire shop. On the trailers were

installed the heavy machine tools, and one trailer of each section was

equipped with an electric generator for light and power. When the shop

was set up for business it presented the spectacle of two rings of

vehicles ranged around the two power plants and hooked up with electric

cables. The manufacturing program, both before and after the armistice,

produced sixteen such shops, consisting of 600 vehicles. Six of these

shops have been stored; ten are in use by the permanent establishments.

In addition, in terminating the contracts the Ordnance Department came

into possession of the unassembled but finished components of eight

additional shops. Thousands of jigs, fixtures, and small tools used in

this manufacturing project have been stored away and catalogued.

Tank production was drastically curtailed immediately after the

armistice. The tank contracts involved the expenditure of $175,000,000.

The total production of 6-ton Renault tanks was limited to 950, of

which sixty-four were produced before the armistice. The contracts with

the Ford Motor Company to build 15,000 3-ton tanks were terminated at

once after the armistice, production being limited to the fifteen trial

machines produced before November 11, 1918. Of the great 36-ton tanks,

Anglo-American design, the Ordnance Department built 100 at Rock Island

Arsenal after the armistice, procuring from the British for the purpose

the hulls and guns. The tank assembly plant at Châteauroux, France,

went to the French Government in the general settlement of 1919 and is

now being used as a car repair shop.

No considerations of future reserves of finished materials affected the

demobilization of the extensive war industry which was manufacturing

our rifles, machine guns, pistols, and the ammunition for them. The

production of these articles had been so successful that the moment

the war ended the supplies on hand were sufficient for the permanent

Army for years to come, with reserve supplies heavy enough to arm

a large field force. The interests of the Army, considered alone,

therefore, demanded the immediate cessation after the armistice of

all this manufacture; but economic considerations and the dictates of

good business practice made it expedient to taper off this production

gradually, even at the cost of producing more materials than the War

Department could possibly use.

Special problems arose in the liquidation of this great industry. In

the first place, the factories which made rifles and machine guns were

sharply specialized for just this work, making it difficult for them

to turn to any commercial production with the same equipment. Several

of these plants were specially created for the war work, and therefore

had no prewar occupation to which they could turn. It was necessary

for them either to close out entirely (as the Eddystone rifle plant of

the Midvale Steel & Ordnance Company near Philadelphia actually did

do) or to develop some new product. Two of the small-arms plants after

the armistice added departments for the manufacture of ball bearings,

one went into the production of automobile accessories and sporting

arms, and a fourth (which had made bayonets) took up the manufacture of

cutlery. It was necessary to give these concerns time to work out these

conversions, if an acute problem in unemployment were to be avoided.

The sharp centralization of the small-arms industry in the East was

another factor which influenced the Government to permit an unwelcome

production after the armistice. Most of the rifles, for instance, were

manufactured within a small area in the state of Connecticut. The

Winchester plant at New Haven employed 20,000 operatives, the Remington

plant at Bridgeport 12,000, and there were several others of this size.

To close them all up forthwith would have created a bad industrial

situation in this busy and prosperous section of New England.

The policy adopted, therefore, was to taper off the production of such

materials. Upon the signing of the armistice ten American plants were

engaged exclusively in the production of automatic arms. They employed

20,000 persons. They had reached a daily output of more than 1,100

machine guns and automatic rifles on contracts calling for the delivery

of 650,000 such weapons, at a projected cost of $193,000,000, of which

465,000 guns were as yet undelivered. The final cancellations stopped

the production of 382,000 guns, making the total war production 268,000

guns. In the various plants the Government had invested $11,000,000 in

machinery.

By January 15, 1919, the rate of producing machine guns had been cut

in two. By June 28, all production of machine guns had stopped. The

Springfield and Rock Island arsenals, always the Army’s development

and manufacturing centers for small arms, were selected to receive the

reserve manufacturing equipment acquired by the Ordnance Department

in the prosecution of the machine-gun project. One unit of machinery

sufficient for the daily manufacture of 100 Browning heavy machine

guns, and another unit for the daily manufacture of 200 Browning

automatic rifles were stored at Rock Island Arsenal. This reserve

machinery was worth about $4,275,000.

Similar measures were taken in the demobilization of the war rifle

industry. Production was curtailed gradually, ceasing entirely in

March, 1919. Three great private plants and two government factories

(Springfield Armory and Rock Island Arsenal) built our war rifles.

The War Department invested over $22,000,000 in machinery. With this

machinery the rifle-making departments of the Springfield Armory and

the Rock Island Arsenal were practically reëquipped to produce the

Model of 1903 (Springfield) rifle. The Springfield Armory (the chief

future manufacturing center for this arm) was equipped to make 1,000

of these rifles in an 8-hour day, and Rock Island, 600. Working at

full speed, both centers can produce 3,500 Springfield rifles every

twenty-four hours. In addition special small tools, jigs, and fixtures

sufficient for the production of 1,000 Model of 1917 (Enfield)

rifles daily were stored at the Springfield Armory, and a unit of

manufacturing equipment for producing 500 automatic pistols daily was

also stored at Springfield.

Four-fifths of the outstanding orders for 5,250,000,000 rounds of

rifle and pistol cartridges were terminated after the armistice. The

policy adopted was to permit the small-arms ammunition factories

to operate until September 1, 1919, if they so elected; but their

production in that time could not exceed a quantity equal to what they

might have produced if they had operated twenty-four hours a day from

the armistice to February 1, 1919. This policy enabled the factories

to dispense with their war labor slowly. About 1,600,000,000 rounds

of small-arms ammunition were stored as a future reserve. The War

Department had purchased machinery with a total producing capacity

of about 3,000,000 rounds of ammunition in an 8-hour day. All the

single-purpose special machinery and all special tools, jigs, and

fixtures were retained, and with them the Frankford Arsenal was built

up as a great center for the manufacture of small-arms ammunition.

Before 1917 the annual productive capacity of the arsenal was not

more than 100,000,000 rounds of rifle and pistol ammunition. The

Ordnance Department has increased this capacity to 750,000 rounds in

an 8-hour day. Immense quantities of bandoleers, cartridge clips,

cartridge cases, metal, and other ammunition components acquired in the

liquidation have been stored for future use.