At left, 4-in. water pipe; at right, transmission line connection]

Mr. Loines’ new power house is a stone masonry building, the masonry

being uncoursed rubble, constructed in a very artistic and attractive

manner. The building is 9½ feet by 15½ feet in plan and is about 9 feet

high to the eaves. It has a concrete foundation and the floor is of

first-class concrete. A concrete foundation, about 3 feet by 5 feet,

provides a permanent support for the water motor and the generator.

This foundation projects 6 inches above the level of the concrete

floor. On one end of the foundation stands the waterwheel, there being

an opening about 8 inches by 18 inches through the concrete base under

the water motor to carry off the water after it has passed through

the wheel. The supply pipe for the waterwheel enters the side of the

building on a level about one foot above the floor. Just inside, the

pipe reduces to a diameter of about 2½ inches and is fitted with a

gate valve by means of which the water may be turned on or off. The

nozzle of the waterwheel is also equipped with an adjusting device

by means of which the size of the jet issuing from the nozzle may be

varied in order to secure various speeds or the maximum efficiency

of the waterwheel. The setting required to give the desired speed is

determined by experiment by the operator.