It is impossible to leave the study of the Cumberland Road without

gathering up into a single chapter a number of threads which have not

been woven into the preceding record. And first, the very appearance of

the old road as seen by travelers who pass over it today. One cannot go

a single mile over it without becoming deeply impressed with the

evidence of the age and the individuality of the old Cumberland Road.

There is nothing like it in the United States. Leaping the Ohio at

Wheeling, the Cumberland Road throws itself across Ohio and Indiana,

straight as an arrow, like an ancient elevated pathway of the gods,

chopping hills in twain at a blow, traversing the lowlands on high

grades like a railroad bed, vaulting river and stream on massive bridges

of unparalleled size. The farther one travels upon it, the more

impressed one must become, for there is, in the long grades and

stretches and ponderous bridges, that "masterful suggestion of a serious

purpose, speeding you along with a strange uplifting of the heart," of

which Kenneth Grahame speaks; "and even in its shedding off of bank and

hedgerow as it marched straight and full for the open downs, it seems to

declare its contempt for adventitious trappings to catch the

shallow-pated."[73] For long distances, this road "of the sterner sort"

will be, so far as its immediate surface is concerned, what the tender

mercies of the counties through which it passes will allow, but at

certain points, the traveler comes out unexpectedly upon the ancient

roadbed, for in many places the old macadamized bed is still doing noble

duty.

Nothing is more striking than the ponderous stone bridges which carry

the roadbed over the waterways. It is doubtful if there are on this

continent such monumental relics of the old stone bridge builders' art.

Not only such massive bridges as those at Big Crossings (Smithfield,

Pennsylvania) and the artistic "S" bridge near Claysville,

Pennsylvania, will attract the traveler's attention, but many of the

less pretentious bridges over brooks and rivulets will, upon

examination, be found to be ponderous pieces of workmanship. A pregnant

suggestion of the change which has come over the land can be read in

certain of these smaller bridges and culverts. When the great road was

built the land was covered with forests and many drains were necessary.

With the passing of the forests many large bridges, formerly of much

importance, are now of a size out of all proportion to the demand for

them, and hundreds of little bridges have fallen into disuse, some of

them being quite above the general level of the surrounding fields. The

ponderous bridge at Big Crossings was finished and dedicated with great

éclat July 4, 1818. Near the eastern end of the three fine arches is the

following inscription: "Kinkead, Beck & Evans, builders, July 4, 1818."

[Illustration: CULVERT ON THE CUMBERLAND ROAD IN OHIO]

The traveler will notice still the mileposts which mark the great road's

successive steps. Those on the eastern portion of the road are of

iron and were made at the foundries at Connellsville and Brownsville.

Major James Francis had the contract for making and delivering those

between Cumberland and Brownsville. John Snowdan had the contract for

those between Brownsville and Wheeling. They were hauled in six-horse

teams to their sites. Those between Brownsville and Cumberland have

recently been reset and repainted. The milestones west of the Ohio River

are mostly of sandstone, and are fast disappearing under the action of

the weather. Some are quite illegible though the word "Cumberland" at

the top can yet be read on almost all. In central Ohio, through the

Darby woods, or "Darby Cuttings," the mileposts have been greatly

mutilated by vandal woodchoppers, who knocked off large chips with which

to sharpen their axes.

The bed of the Cumberland Road was originally eighty feet in width. In

Ohio at least, property owners have encroached upon the road until, in

some places, ten feet of ground has been included within the fences.

This matter has been brought into notice where franchises for electric

railway lines have been granted. In Franklin County, west of Columbus,

Ohio, there is hardly room for a standard gauge track outside the

roadbed, where once the road occupied forty feet each side of its axis.

When the property owners were addressed with respect to the removal of

their fences, they demanded to be shown quitclaim deeds for the land,

which, it is unnecessary to say, were not forthcoming from the state.

Hundreds of contracts, calling for a width of eighty feet, can be given

as evidence of the original width of the road.[74] In days when it was

considered the most extraordinary good fortune to have the Cumberland

Road pass through one's farm, it was not considered necessary to obtain

quitclaim deeds for the land.

It is difficult to sufficiently emphasize the aristocracy which existed

among the old "pike boys," as those most intimately connected with the

road were called. This was particularly true of the drivers of the mail

and passenger stages, men who were as often noted for their quick wit

and large acquaintance with men as for their dexterous handling of two

hands full of reins. Their social and business position was the envy of

the youth of a nation, whose ambition to emulate them was begotten of

the best sort of hero-worship. Stage-drivers' foibles were their pet

themes, such as the use of peculiar kinds of whips and various modes of

driving. Of the latter there were three styles common to the Cumberland

Road, (1) The flat rein (English style), (2) Top and bottom

(Pennsylvania adaptation), (3) Side rein (Eastern style). The last mode

was in commonest use. Of drivers there were of course all kinds,

slovenly, cruel, careful. Of the best class, John Bunting, Jim Reynolds,

and Billy Armor were best known, after "Red" Bunting, in the east, and

David Gordon and James Burr, on the western division. No one was more

proud of the fine horses which did the work of the great road than the

better class of drivers. As Thackeray said was true in England, the

passing of the era of good roads and the mailstage has sounded the

knell of the rugged race of horses which once did service in the Central

West.

As one scans the old files of newspapers, or reads old-time letters and

memoirs of the age of the Cumberland Road, he is impressed with the

interest taken in the coming and going of the more renowned guests of

the old road. The passage of a president-elect over the Cumberland Road

was a triumphant procession. The stage companies made special stages, or

selected the best of their stock, in which to bear him. The best horses

were fed and groomed for the proud task. The most noted drivers were

appointed to the honorable station of Charioteer-to-the-President. The

thousands of homes along his route were decked in his honor, and

welcoming heralds rode out from the larger towns to escort their noted

guests to celebrations for which preparations had been making for days

in advance. The slow-moving presidential pageant through Ohio and

Pennsylvania was an educational and patriotic ceremony, of not

infrequent occurrence in the old coaching days--a worthy exhibition

which hardly has its counterpart in these days of steam. Jackson, Van

Buren, Monroe, Harrison, Polk, and Tyler passed in triumph over portions

of the great road. The taverns at which they were fêted are remembered

by the fact. Drivers who were chosen for the task of driving their coach

were ever after noted men. But there were other guests than

presidents-elect, though none received with more acclaim. Henry Clay,

the champion of the road, was a great favorite throughout its towns and

hamlets, one of which, Claysville, proudly perpetuates his name. Benton

and Cass, General Lafayette, General Santa Anna, Black Hawk, Jenny Lind,

P. T. Barnum, and John Quincy Adams are all mentioned in the records of

the stirring days of the old road. As has been suggested elsewhere,

politics entered largely into the consideration of the building and

maintenance of the road. Enemies of internal improvement were not

forgotten as they passed along the great road which they voted to

neglect, as even Martin Van Buren once realized when the axle of his

coach was sawed in two, breaking down where the mud was deepest. Many

episodes are remembered, indicating that all the political prejudice and

rancor known elsewhere was especially in evidence on this highway, which

owed its existence and future to the machinations of politicians.

But the greatest blessing of the Cumberland Road was the splendid era of

growth which it did its share toward hastening. Its best friends could

see in its decline and decay only evidences of unhappiest fortune, while

in reality the great road had done its noble work and was to be

superseded by better things which owed to it their coming. Historic

roads there had been, before this great highway of America was built,

but none in all the past had been the means of supplanting themselves by

greater and more efficient means of communication. The far-famed Appian

Way witnessed many triumphal processions of consuls and proconsuls, but

it never was the means of bringing into existence something to take its

place in a new and more progressive era. It helped to create no free

empire at its extremity, and they who traversed it in so much pride and

power would find it today nothing but a ponderous memorial of their

vanity. The Cumberland Road was built by the people and for the people,

and served well its high purpose. It became a highway for the products

of the factories, the fisheries and the commerce of the eastern states.

It made possible that interchange of the courtesies of social life

necessary in a republic of united states. It was one of the great

strands which bound the nation together in early days when there was

much to excite animosity and provoke disunion. It became the pride of

New England as well as of the West which it more immediately benefited;

"The state of which I am a citizen," said Edward Everett at Lexington,

Kentucky, in 1829, "has already paid between one and two thousand

dollars toward the construction and repair of that road; and I doubt not

she is prepared to contribute her proportion toward its extension to the

place of its destination."[75]

Hundreds of ancient but unpretentious monuments of the Cumberland

Road--the hoary milestones which line it--stand to perpetuate its name

in future days. But were they all gathered together--from Indiana and

Ohio and Pennsylvania and Virginia and Maryland--and cemented into a

monstrous pyramid, the pile would not be inappropriate to preserve the

name and fame of a highway which "carried thousands of population and

millions of wealth into the West; and more than any other material

structure in the land, served to harmonize and strengthen, if not save,

the Union."

What of the future? The dawning of the era of country living is in

sight. It is being hastened by the revolution in methods of locomotion.

The bicycle and automobile presage an era of good roads, and of an

unparalleled countryward movement of society. With this era is coming

the revival of inn and tavern life, the rejuvenation of a thousand

ancient highways and all the happy life that was ever known along their

dusty stretches. By its position with reference to the national capital,

and the military and commercial key of the Central West, Pittsburg, and

both of the great cities of Ohio, the Cumberland Road will become,

perhaps, the foremost of the great roadways of America. The bed is

capable of being made substantial at a comparatively small cost, as the

grading is quite perfect. Its course measures the shortest possible

route practicable for a roadway from tidewater to the Mississippi River.

As a trunk line its location cannot be surpassed. Its historic

associations will render the route of increasing interest to the

thousands who, in other days, will travel, in the genuine sense of the

word, over those portions of its length which long ago became hallowed

ground. The "Shades of Death" will again be filled with the echoing horn

which heralded the arrival of the old-time coaches, and Winding Ridge

again be crowded with the traffic of a nation. A hundred Cumberland Road

taverns will be opened, and bustling landlords welcome, as of yore, the

travel-stained visitor. Merry parties will again fill those tavern

halls, now long silent, with their laughter.

And all this will but mark a new and better era than its predecessor, an

era of outdoor living, which must come, and come quickly, if as a nation

we are to retain our present hold on the world's great affairs.

Appendixes

APPENDIX A

APPROPRIATIONS BY CONGRESS AT VARIOUS TIMES FOR MAKING, REPAIRING, AND

CONTINUING THE ROAD

1. Act of March 29, 1806, authorizes the President to appoint a

commission of three citizens to lay out a road four rods in width

"from Cumberland or a point on the northern bank of the river

Potomac in the State of Maryland, between Cumberland and the place

where the main road leading from Gwynn's to Winchester, in Virginia,

crosses the river, ... to strike the river Ohio at the most

convenient place between a point on its eastern bank, opposite the

northern boundary of Steubenville and the mouth of Grave creek,

which empties into the said river a little below Wheeling, in

Virginia." Provides for obtaining the consent of the states through

which the road passes, and appropriates for the expense, to be paid

from the reserve fund under the act of April 30, 1802, $30,000.00

2. Act of February 14, 1810, appropriates to be expended under the

direction of the President in making the road between Cumberland and

Brownsville, to be paid from fund act of April 30, 1802, $60,000.00

3. Act of March 3, 1811, appropriates to be expended under the

direction of the President in making the road between Cumberland and

Brownsville, and authorizes the President to permit deviation from a

line established by the commissioners under the original act as may

be expedient; _Provided_, that no deviation shall be made from the

principal points established on said road between Cumberland and

Brownsville; to be paid from fund act of April 30, 1802 $50,000.00

4. Act of February 26, 1812, appropriates balance of a former

appropriation not used, but carried to surplus fund, $3,786.60

5. Act of May 6, 1812, appropriates to be expended under direction

of the President, for making the road from Cumberland to

Brownsville, to be paid from fund act of April 30, 1802 $30,000.00

6. Act of March 3, 1813 (General Appropriation Bill), appropriates

for making the road from Cumberland to the state of Ohio, to be

paid from fund act of April 30, 1802 $140,000.00

7. Act of February 14, 1815, appropriates to be expended under

the direction of the President, for making the road between

Cumberland and Brownsville, to be paid from fund act of April 30,

1802, $100,000.00

8. Act of April 16, 1816 (General Appropriation Bill), appropriates

for making the road from Cumberland to the state of Ohio, to be paid

from the fund act April 30, 1802 $300,000.00

9. Act of April 14, 1818, appropriates to meet claims due and

unpaid $52,984.60

Demands under existing contracts $260,000.00

(From money in the treasury not otherwise appropriated.)

10. Act of March 3, 1819, appropriates for existing claims and

contracts $250,000.00

Completing road $285,000.00

(To be paid from reserved funds, acts admitting Ohio, Indiana, and

Illinois.)

11. Act of May 15, 1820, appropriates for laying out the road

between Wheeling, Virginia, and a point on the left bank of the

Mississippi River, between St. Louis and the mouth of the Illinois

River, road to be eighty feet wide and on a straight line, and

authorizes the President to appoint commissioners. To be paid out

of any money in the treasury not otherwise appropriated $10,000.00

12. Act of April 11, 1820, appropriates for completing contract for

road from Washington, Pennsylvania, to Wheeling, out of any money in

the treasury not otherwise appropriated $141,000.00

13. Act of February 28, 1823, appropriates for repairs between

Cumberland and Wheeling, and authorizes the President to appoint a

superintendent at a compensation of three dollars per day. To be

paid out of any money not otherwise appropriated $25,000.00

14. Act of March 3, 1825, appropriates for opening and making a road

from the town of Canton, in the state of Ohio, opposite Wheeling, to

Zanesville, and for the completion of the surveys of the road,

directed to be made by the act of May 15, 1820, and orders its

extension to the permanent seat of government of Missouri, and to

pass by the seats of government of Ohio, Indiana and Illinois, said

road to commence at Zanesville, Ohio; also authorizes the

appointment of a superintendent by the President, at a salary of

fifteen hundred dollars per annum, who shall make all contracts,

receive and disburse all moneys, etc.; also authorizes the

appointment of one commissioner, who shall have power according to

provisions of the act of May 15, 1820; ten thousand dollars of the

money appropriated by this act is to be expended in completing the

survey mentioned. The whole sum appropriated to be advanced from

moneys not otherwise appropriated, and replaced from reserve

fund provided in acts admitting Ohio, Indiana, Illinois, and

Missouri $150,000.00

15. Act of March 14, 1826 (General Appropriation Bill), appropriates

for balance due to the superintendent, $3,000; assistant

superintendent, $158.90; contractor, $252.13 $3,411.03

16. Act of March 25, 1826 (Military Service), appropriates for the

continuation of the Cumberland Road during the year 1825 $110,749.00

17. Act of March 2, 1827 (Military Service), appropriates for

construction of road from Canton to Zanesville, and continuing and

completing the survey from Zanesville to the seat of government of

Missouri, to be paid from reserve fund, provided in acts admitting

Ohio, Indiana, Illinois, and Missouri $170,000.00

For balance due superintendent, from moneys not otherwise

appropriated, $510.00

18. Act of March 2, 1827, appropriates for repairs between

Cumberland and Wheeling, and authorizes the appointment of a

superintendent of repairs, at a compensation to be fixed by the

President. To be paid from moneys not otherwise appropriated.

The language of this act is: "For repairing the public road

from Cumberland to Wheeling" $30,000.00

19. Act of May 19, 1828, appropriates for the completion of the road

to Zanesville, Ohio, to be paid from fund provided in acts admitting

Ohio, Indiana, Illinois, and Missouri $175,000.00

20. Act of March 2, 1829, appropriates for opening road westwardly,

from Zanesville, Ohio, to be paid from fund provided in acts

admitting Ohio, Illinois, Indiana, and Missouri $100,000.00

21. Act of March 2, 1829, appropriates for opening road eighty feet

wide in Indiana, east and west from Indianapolis, and to appoint two

superintendents, at eight hundred dollars each per annum, to be paid

from fund provided in acts admitting Ohio, Indiana, Illinois, and

Missouri, $51,600.00

22. Act of March 3, 1829, appropriates for repairing bridges, etc.,

on road east of Wheeling $100,000.00

23. Act of May 31, 1830 (Internal Improvements), appropriates for

opening and grading road west of Zanesville, Ohio, $100,000; for

opening and grading road in Indiana, $60,000; commencing at

Indianapolis, and progressing with the work to the eastern and

western boundaries of said state; for opening, grading, etc., in

Illinois, $40,000, to be paid from reserve fund provided in acts

admitting Ohio, Indiana, Illinois, and Missouri; for claims due

and remaining unpaid on account of road east of Wheeling,

$15,000; to be paid from moneys in the treasury not otherwise

appropriated $215,000.00

24. Act of March 2, 1831, appropriates $100,000 for opening,

grading, and so forth, west of Zanesville, Ohio; $950 for repairs

during the year 1830; $2,700 for work heretofore done east of

Zanesville; $265.85 for arrearages for the survey from Zanesville to

the capital of Missouri; and $75,000 for opening, grading, and so

forth, in the state of Indiana, including bridge over White River,

near Indianapolis, and progressing to eastern and western

boundaries; $66,000 for opening, grading and bridging in Illinois;

to be paid from the fund provided in acts admitting Ohio, Indiana,

Illinois, and Missouri $244,915.85

25. Act of July 3, 1832, appropriates $150,000 for repairs east of

the Ohio River; $100,000 for continuing the road west of Zanesville;

$100,000 for continuing the road in Indiana, including bridge over

east and west branch of White River; $70,000 for continuing road in

Illinois; to be paid from the fund provided in acts admitting Ohio,

Indiana, and Illinois $420,000.00

26. Act of March 2, 1833, appropriates to carry on certain

improvements east of the Ohio River, $125,000; in Ohio, west of

Zanesville, $130,000; in Indiana, $100,000; in Illinois, $70,000;

and in Virginia, $34,440 $459,440.00

27. Act of June 24, 1834, appropriates $200,000 for continuing the

road in Ohio; $150,000 for continuing the road in Indiana; $100,000

for continuing the road in Illinois, and $300,000 for the entire

completion of repairs east of Ohio, to meet provisions of the acts

of Pennsylvania (April 4, 1831), Maryland (Jan. 23, 1832), and

Virginia (Feb. 7, 1832), accepting the road surrendered to the

states, the United States not thereafter to be subject to any

expense for repairs. Places engineer officer of army in control of

road through Indiana and Illinois, and in charge of all

appropriations; $300,000 to be paid out of any money in the Treasury

not otherwise appropriated, balance from that provided in acts

admitting Ohio, Indiana and Illinois, $750,000.00

28. Act of June 27, 1837 (General Appropriation), for arrearages due

to the contractors $1,609.36

29. Act of March 3, 1835, appropriates $200,000 for continuing the

road in the state of Ohio; $100,000 for continuing road in the

state of Indiana; to be out of fund provided in acts admitting Ohio,

Indiana and Illinois, and $346,186.58 for the entire completion of

repairs in Maryland, Pennsylvania and Virginia; but before any part

of this sum can be expended east of the Ohio River, the road shall

be surrendered to and accepted by the states through which it

passes, and the United States shall not thereafter be subject to any

expense in relation to said road. Out of any money in the Treasury

not otherwise appropriated $646,186.58

30. Act of March 3, 1835 (Repair of Roads), appropriates to pay for

work heretofore done by Isaiah Frost on the Cumberland Road, $320;

to pay late superintendent of road a salary, $862.87 $1,182.87

31. Act of July 2, 1836, appropriates for continuing the road in

Ohio, $200,000; for continuing road in Indiana, $250,000, including

materials for a bridge over the Wabash River; $150,000 for

continuing the road in Illinois, provided that the appropriation for

Illinois shall be limited to grading and bridging, and shall not be

construed as pledging Congress to future appropriations for the

purpose of macadamizing the road, and the moneys herein appropriated

for said road in Ohio and Indiana must be expended in completing the

greatest possible continuous portion of said road in said states so

that said finished part thereof may be surrendered to the states

respectively; to be paid from fund provided in acts admitting Ohio,

Indiana, Illinois, and Missouri $600,000.00

32. Act of March 3, 1837, appropriates $190,000 for continuing the

road in Ohio; $100,000 for continuing the road in Indiana; $100,000

for continuing the road in Illinois, provided the road in Illinois

shall not be stoned or graveled, unless it can be done at a cost not

greater than the average cost of stoning and graveling the road in

Ohio and Indiana, and provided that in all cases where it can be

done the work to be laid off in sections and let to the lowest

substantial bidder. Sec. 2 of the act provides that Sec. 2 of act of

July 2, 1836, shall not be applicable to expenditures hereafter made

on the road, and $7,183.63 is appropriated by this act for repairs

east of the Ohio River; to be paid from fund provided in acts

admitting Ohio, Indiana, and Illinois $397,183.63

33. Act of May 25, 1838, appropriates for continuing the road in

Ohio, $150,000; for continuing it in Indiana, including bridges,

$150,000; for continuing it in Illinois, $9,000; for the completion

of a bridge over Dunlap's Creek at Brownsville; to be paid from

moneys in the Treasury not otherwise appropriated and subject to

provisions and conditions of act of March 3, 1837 $459,000.00

34. Act of June 17, 1844 (Civil and Diplomatic), appropriates for

arrearages on account of survey to Jefferson, Missouri $1,359.81

Total $6,824,919.33

APPENDIX B

SPECIMEN ADVERTISEMENT FOR BIDS FOR REPAIRING CUMBERLAND ROAD IN OHIO

(1838)

Sealed proposals will be received at Toll-gate No. 4, until the 6th day

of March next, for repairing that part of the road lying between the

beginning of the 23rd and end of the 42nd mile, and if suitable bids are

obtained, and not otherwise, contracts will be made at Bradshaw's hotel

in Fairview, on the 8th. Those who desire contracts are expected to

attend in person, in order to sign their bonds. On this part of the road

three hundred rods or upwards (82-1/2 cubic feet each) will be required

on each mile, of the best quality of limestone, broken evenly into

blocks not exceeding four ounces in weight, each; and specimens of the

material proposed, must be furnished, in quantity not less than six

cubic inches, broken and neatly put up in a box, and accompanying each

bid; which will be returned and taken as the standard, both as regards

the quality of the material and the preparation of it at the time of

measurement and inspection.

The following conditions will be mutually understood as entering into,

and forming a part of the contract, namely: The 23, 24 and 25 miles to

be ready for measurement and inspection on the 25th of July; the 26, 27

and 28 miles on the 1st of August; the 29, 30 and 31 miles on the 15th

of August; the 32, 33 and 34 miles on the 1st of September; the 35, 36,

37 miles on the 15th of September; the 38, 39 and 40 miles on the 1st of

October; and the 41 and 42 miles, if let, will be examined at the same

time.

Any failure to be ready for inspection at the time above specified, will

incur a penalty of five per cent. for every two days' delay, until the

whole penalty shall amount to 25 per cent. on the contract paid. All the

piles must be neatly put up for measurement and no pile will be measured

on this part of the work containing less than five rods. Whenever a pile

is placed upon deceptive ground, whether discovered at the time of

measurement or afterward, half its contents shall in every case be

forfeited for the use of the road.

Proposals will also be received at the American Hotel in Columbus, on

the 15th of March for hauling broken materials from the penitentiary

east of Columbus. Bids are solicited on the 1, 2 and 3 miles counting

from a point near the Toll-gate towards the city. Bids will also be

received at the same time and place, for collecting and breaking all the

old stone that lies along the roadside, between Columbus and

Kirkersville, neatly put in piles of not less than two rods, and placed

on the outside of the ditches.

APPENDIX C

ADVERTISEMENT FOR PROPOSALS FOR BUILDING A CUMBERLAND ROAD BRIDGE AND

FOR TOLL HOUSES IN OHIO--1837

Proposals will also be received in Zanesville on Monday, the 1st day of

May next, at Roger's Tavern, for rebuilding the Bridge over Salt Creek,

nine miles east of Zanesville. The structure will be of wood, except

some stone work to repair the abutments. A plan of the Bridge, together

with a bill for the timber, &c., can be seen at the place of letting

after the 24th inst. Conditions with regard to proposals the same as

above.

At the same time and place, proposals will likewise be received, for

building three or four Toll-gates and Gate Houses between Hebron, east

of Columbus, and Jefferson, west of it. The house of frame with stone

foundations, and about 13 by 24 feet, one story high, and completely

finished. Bills of timber, stone, &c., will be furnished, and

particulars made known, by calling on the undersigned, at Rodger's

Tavern, in Zanesville after the 24th inst. In making bids, conditions

the same as above.

All letters must be post-paid, or no attention shall be given to them.

THOMAS M. DRAKE, _Superintendent_.

P. S.--Proposals will also be received at Columbus, on Monday, the 17th

of April, for repairing the National Road between Kirkersville and

Columbus--by William B. Vanhook, superintendent.

April 12.

WILLIAM WALL, _A. C. B. P. W._

APPENDIX D

ADVERTISEMENT OF CUMBERLAND ROAD TAVERN IN OHIO--1837

Tavern Stand for Sale or Rent.--A valuable Tavern Stand Sign of the

Harp, consisting of 25-1/2 acres of choice land partly improved, and a

dwelling house, together with three front lots. This eligible and

healthy situation lies 8 miles east of Columbus City, the capital of

Ohio, on the National Road leading to Zanesville, at Big Walnut Bridge.

The stand is well supplied with several elegant springs.

It is unnecessary to comment on the numerous advantages of this

interesting site. The thoroughfare is great, and the growing prospects

beyond calculation. For particulars inquire of

T. ARMSTRONG, Hibernia.

Dec. 4-14.

FOOTNOTES:

[1] _United States Statutes at Large_, vol. ii, p. 173.

[2] _Senate Reports_, 9th Cong., 1st Sess., Rep. No. 195.

[3] Keyser's Ridge.

[4] The dates on which the three states gave their permission were:

Pennsylvania, April 9, 1807; Maryland, 1806; Ohio, 1824.

[5] Richardson (editor): _Messages and Papers of the Presidents_, vol.

ii, p. 142.

[6] Harriet Martineau's _Society in America_, vol. ii, pp. 31-35.

[7] See Appropriation No. 27, in Appendix A.

[8] For specimen advertisement for repairs see Appendix B.

[9] The early official correspondence concerning the route of the road

shows plainly that it was really built for the benefit of the

Chillicothe and Cincinnati settlements, which embraced a large portion

of Ohio's population. The opening of river traffic in the first two

decades of the century, however, had the effect of throwing the line of

the road further northward through the capitals of Ohio, Indiana, and

Illinois. Zane's Trace, diverging from the Cumberland Road at

Zanesville, played an important part in the development of southwestern

Ohio, becoming the course of the Lancaster and Maysville Pike. See

_Historic Highways of America_, vol. xi.

[10] See Appropriation No. 14, in Appendix A.

[11] See Appropriations Nos. 20 and 21, in Appendix A.

[12] _Private Laws of the United States_, May 17, 1796.

[13] _Springfield Pioneer_, August 1837; also _Ohio State Journal_,

August 8, 1837.

[14] Harriet Martineau's _Society in America_, vol. i, p. 17.

[15] Wabash-Erie, Whitewater, and Indiana Central Canals and the Madison

and Indianapolis Railway. Cf. Atwater's _Tour_, p. 31.

[16] _Illinois in '37_, pp. 766-767. This was probably passenger and

freight traffic as the mails went overland from the very first, until

the building of railways.

[17] _Ohio State Journal_, January 8, 1836.

[18] _Laws of Pennsylvania_ (pamphlet), p. 500.

[19] See Appropriation No. 27, in Appendix A.

[20] _Laws of Ohio_, XXIX, p. 76. For specimen advertisement for bids

for erection of tollgates in Ohio see Appendix D.

[21] _Laws of Pennsylvania_ (pamphlet), p. 419.

[22] _Id._, p. 523.

[23] _Id._, p. 477.

[24] _Laws of Ohio_, XXXIV, p. 41; XXV, p. 7.

[25] _Id._, XXIII, p. 447.

[26] _Id._, XLIII, p. 89.

[27] _Laws of Pennsylvania_ (pamphlet), p. 477.

[28] _Laws of Ohio_, XLIII, p. 140.

[29] _Id._, LVIII, p. 140.

[30] _Laws of Pennsylvania_ (pamphlet), p. 500.

[31] _Laws of Ohio_, XXVI, p. 41.

[32] _Id._

[33] Concerning the celerity of opening the road after the completion of

contracts, Captain Weaver, Superintendent in Ohio, made the following

statement in his report of 1827:

"Upon the first, second and third divisions, with a cover of metal of

six inches in thickness, composed of stone reduced to particles of not

more than four ounces in weight, the travel was admitted in the month of

June last. Those divisions that lie eastward of the village of Fairview

together embrace a distance of very nearly twenty-eight and a half

miles, and were put under contract on the first of July, and first and

thirty-first of August, 1825. This portion of the road has been, in

pursuance of contracts made last fall and spring, covered with the third

stratum of metal of three inches in thickness, and similarly reduced. On

parts of this distance, say about five miles made up of detached pieces,

the travel was admitted at the commencement of the last winter and has

continued on to this time to render it compact and solid; it is very

firm, elastic and smooth. The effect has been to dissipate the

prejudices which existed very generally, in the minds of the citizens,

against the McAdam system, and to establish full confidence over the

former plan of constructing roads.

"On the first day of July, the travel was admitted upon the fourth and

fifth divisions, and upon the second, third, fourth, and fifth sections

of the sixth division of the road, in its graduated state. This part of

the line was put under contract on the eleventh day of September, 1826,

terminating at a point three miles west of Cambridge, and embraces a

distance of twenty-three and a half miles. On the twenty-first of July

the balance of the line to Zanesville, comprising a distance of a little

over twenty-one miles, was let."

[34] _Laws of Pennsylvania_ (pamphlet), p. 419.

[35] _Laws of Ohio_, XXVI, p. 41; _Laws of Pennsylvania_ (pamphlet), p.

102.

[36] _Id._, XXVI, p. 41.

[37] Tolls for 1845 were based on number of horses, each additional

horse being taxed about .20. Tolls for 1900 (in Franklin County) were

practically identical with tolls of 1845.

[38] _Laws of Ohio_, XXX, p. 321.

[39] _Id._, XXX, p. 8.

[40] _Id._, XXXIV, p. 111.

[41] _Id._, XLIII, p. 89.

[42] _Laws of Pennsylvania_ (pamphlet), pp. 534, 164, 430-431.

[43] _Laws of Ohio_, XXXV, p. 7.

[44] _Laws of Pennsylvania_ (pamphlet), p. 353.

[45] _Laws of Ohio_, XXX, p. 8.

[46] _Id._, XXIX, p. 76.

[47] _Id._, XXX, p. 8.

[48] _Id._, XXX, p. 7.

[49] _Id_., XXXII, p. 265; XXX, p. 7.

[50] Searight's _The Old Pike_, p. 298.

[51] _Id._, pp. 362-366.

[52] _Id._, pp. 367-370.

[53] _Laws of Ohio_, LII, p. 126.

[54] _Id._, LVI, p. 159.

[55] _Id._, LXX, p. 194.

[56] _Id._, LXXIII, p. 105.

[57] _Laws of Ohio_, LXXIV, p. 62.

[58] _Report of the Superintendent of the National Road, with Abstract

of Tolls for the fiscal year_ (1837).

[59] _Laws of Ohio_, XXX, p. 8.

[60] Thackeray's _The Newcomes_, vol. i, ch. x.

[61] In one instance a struggle between two stagecoach lines in Indiana

resulted in carrying passengers from Richmond to Cincinnati for fifty

cents. The regular price was five dollars.

[62] An old Ohio National Stage driver, Mr. Samuel B. Baker of

Kirkersville, Ohio, is authority for the statement that the Ohio

National Stage Company put a line of stages on the Wooster-Wheeling mail

and freight route and "ran out" the line which had been doing all the

business previously, after an eight months' bitter contest.

[63] The following appeared in the _Ohio State Journal_ of August 12,

1837: "A SPLENDID COACH--We have looked at a Coach now finishing off in

the shop of Messrs. Evans & Pinney of this city, for the Ohio Stage

Company, and intended we believe for the inspection of the Post-Master

General, who sometime since offered premiums for models of the most

approved construction, which is certainly one of the most perfect and

splendid specimens of workmanship in this line that we have ever beheld,

and would be a credit to any Coach Manufactory in the United States. It

is aimed, in its construction, to secure the mail in the safest manner

possible, under lock and key, and to accommodate three outside

passengers under a comfortable and complete protection from the weather.

It is worth going to see."

[64] Before the era of the Cumberland Road the price for hauling the

goods of emigrants over Braddock's Road was very high. One emigrant paid

$5.33 per hundred for hauling "women and goods" from Alexandria,

Virginia, to the Monongahela. Six dollars per hundredweight was charged

one emigrant from Hagerstown, Maryland, to Terre Haute, Indiana.

[65] _Ohio State Journal_, February 9, 1838. "The land mail between this

and Detroit crawls with snails pace."--_Cleveland Gazette_, August 31,

1837. Cf. _Historic Highways of America_, vol. i., p. 29.

[66] The northern and southern Ohio mails connected with the Great

Eastern and Great Western mails at Columbus. They were operated as

follows:

NORTHERN MAIL: Left Sandusky City 4 A. M., reached Delaware 8 P. M. Left

Delaware next day 3 A. M., reached Columbus 8 A. M. Left Columbus 8:30

A. M., reached Chillicothe 4 P. M. Left Chillicothe next day 4 A. M.,

reached Portsmouth 3 P. M.

SOUTHERN MAIL: Left Portsmouth 9 A. M., Chillicothe 5 P. M., Columbus 1

P. M., day following. Delaware 7 P. M., Sandusky City 7 P. M. day

following. A Cleveland mail left Cleveland daily for Columbus via

Wooster and Mt. Vernon at 3 A. M. and reached Columbus on the day

following at 5 P. M., returning the mail left Columbus at 4 A. M. and

reached Cleveland at 5 P. M. on the ensuing day.

[67] "The extreme irregularity which has attended the transmission of

newspapers from one place to another for several months past has been a

subject of general complaint with the editors of all parties. It was to

have been expected that, after the adjournment of Congress, the evil

would have ceased to exist. Such, however, is not the case. Although the

roads are now pretty good, and the mails arrive in due season, our

eastern exchange papers seem to reach us only by chance. On Tuesday

last, for instance, we received, among others, the following, viz., _The

New York Courier_ and _Enquirer_ of March 1, 5 and 19; the _Philadelphia

Times_ and _Saturday Evening Post_ of March 2; the _United States

Gazette_ of March 6; and the _New Jersey Journal_ of March 5 and 19. The

cause of this irregularity, we have reason to believe, does not

originate in this state."--_Ohio State Journal_, March 30, 1833.

[68] _Ohio State Journal_, August 9, 1837

[69] It may be found upon investigation that the portions of our country

most noted for hospitality are those where taverns gained the least hold

as a social institution. Cf. Allen's _The Blue Grass Region of

Kentucky_, p. 38.

[70] The Virginian House of Burgesses met in the old Raleigh Tavern at

Williamsburg, in 1773. (Woodrow Wilson's _George Washington_, p. 146.)

[71] For advertisement of sale of a Cumberland Road tavern see Appendix

D.

[72] Mr. Edward P. Pressey in _New England Magazine_, vol. xxii, no. 6

(August, 1900).

[73] Grahame's _The Golden Age_, p. 155.

[74] "The proper limits of the road are hereby defined to be a space of

eighty feet in width--forty feet on each side of the center of the

graded road-bed."--Law passed April 18, 1870, _Laws of Ohio_, LVIII, p.

140.

[75] Everett's _Speeches and Orations_, vol. i, p. 202.

* * * * *

Transcriber's Notes:

1. Passages in italics are surrounded by _underscores_.

2. Obvious errors in spelling and punctuation have been corrected.

3. Footnotes have been moved to the end of the main text body.

4. Images have been moved from the middle of a paragraph to the closest

paragraph break.

5. Certain words use an oe ligature in the original.

The Cumberland Road · 第 7 / 7 章