CHAPTER IX

_BUILDING THE HOUSE, CONCLUDED.--OUTSIDE COVERING, PAINTING_

That part of the house which of necessity must be exposed to the

buffetings of snow and rain, wind and sun, should be considered more

carefully than any other part except the foundation. If economy demands,

the doors, floors, bath rooms, and wardrobes may be of plain and

inexpensive material, for later they may be replaced when means justify

additional expenditure; but if the outside covering be faulty, the house

is a partial failure from the beginning.

The first principle to be observed is to place all projections intended

to serve as water-tables at somewhat acute angles, for if placed at

nearly right angles with the sides of the house, rains accompanied by

heavy winds will certainly reach the framework. The water-tables which

crown the top of the base-board are more exposed than those which are

higher up, and therefore should be steep and rabbeted to prevent the

water from reaching the sills. The too usual method is shown in Fig. 71.

An enlarged view of a better style of water-table is shown in Fig. 72.

[Illustration: Fig. 71. A faulty water-table.]

[Illustration: Fig. 72. A good water-table.]

Outside window frame sills which have insufficient pitch tend to become

water-soaked, and not infrequently the lower member of the window itself

rots by reason of the water which drives in and remains under the sill

of the window for considerable periods of time. Figs. 73 and 74 show

perfect and faulty methods of construction.

[Illustration: Fig. 73. Perfect construction of window sill.]

[Illustration: Fig. 74.

Faulty construction.]

The siding of a house for various reasons would better be put on

horizontally, although material put on this way, unless it is kept well

painted, is not so durable as when placed vertically. The horizontal

covering is more beautiful, lends itself better to the numerous

openings, and gives better protection from cold and wind than does the

vertical covering. If the building is not to be painted, then the

covering would better be placed vertically. Nearly all wooden houses are

covered with either thin lap-siding or inch siding, prepared in various

ways and known by various names. The inch or novelty siding was first

introduced in the West, and costs but little more than the lap-siding,

because, being thicker, it can be made of somewhat inferior lumber. The

novelty or rabbeted covering gives greater strength to the building and

is much more quickly and cheaply put on. It may be said that this style

of covering is extremely faulty if placed on the building in the usual

way, namely, before the doors and windows and corner boards are in

position. If the same method of placing the material be practiced as in

placing the lap-siding, then the objections to this class of siding

disappear to a certain extent. The diagram, Fig. 75, shows the novelty,

or drop, or O G siding (A), the rabbeted (B) and lap-siding (C). It will

readily be seen that if a drop (A) or rabbeted (B) siding be put on

before the window frames are placed, as is the usual custom, an opening

(x) is left under the facing of the window frame which extends through

to the studding. This permits the rain, in a driving storm, to pass

horizontally along this opening to the studding and then downward along

the framework of the building. Many instances could be cited in which

these openings have had to be filled by triangular blocks of wood or

putty, and even then the water was not entirely excluded.

[Illustration: Fig. 75.

Forms of siding.]

This method of covering houses or even barns with this new kind of

siding is usually disappointing and wasteful of material. All that is

gained is a little more facility and cheapness in placing the covering.

If it is put on, as it should be, after the window and door frames are

set, it is more difficult and more expensive to place than lap-siding.

No way of covering a wooden house has been found superior to the

one-half inch lap-siding with joints tight enough at the frames and

corners, in conjunction with the paint, to make water-tight joints. The

lap should not be less than one inch, and the nails should be so placed

that in case of considerable shrinkage in the siding the inside will

give or even check, instead of the outside (z). If made as at y, the

outside will check. This implies that the nails are to be driven rather

more than one-half inch above the edge of the siding. The nails which

hold the outer covering should either be set and puttied, or the heads

should be left even with or slightly above the surface of the wood, that

the paint may cover all parts of the nail head. If the nails are driven

too far in the heads are not fully covered and protected by the paint,

in which case they will rust and present an unsightly appearance.

Some one has said that if a woman’s feet, hands, and head are well and

appropriately clothed, the balance of the dress may be plain and simple,

and yet she will have an elegant appearance. So, if a house has a good

foundation and a suitable and well-placed roof, the balance of the

outside may be extremely plain and yet it will be beautiful. Some of our

modern houses rest on unpointed, poorly constructed, and narrow

foundations, are bedecked with peaks, pigeon lofts, and dog-eared

cornices, and remind one of the suspenderless, barefooted darky crowned

with a cast-off silk hat.

If the foundation is too small and shabbily built, no amount of paint

and cornice can relieve the house from a look of shabby gentility. A few

brown or cream-colored stones or bricks, when placed on the outside of

the foundation where it shows above ground, will give dignity, beauty

and a substantial look to the whole house. It may do for it what a

nickel does for one’s shoes.

The roof of the farm house, and for that matter of all other houses,

should, in the trying climate of America, have an ample projection. An

abbreviated cornice may be admissible if the building is constructed of

stone which is of sufficient density to resist the American tooth of

time. Fig. 76 shows a section of an abbreviated and a well extended

cornice. The house which has this short-cut cornice stands within a few

hundred feet of the one with the wide projecting eaves. During the past

twenty years it has been necessary to paint the former twice as often

as the latter.

[Illustration: Fig. 76.

Deep and narrow cornices.]

The roof covering would better be of slate or tiles, for the time has

passed for building temporary, make-shift houses, though they might have

served their purpose well in a new and rapidly developing country. With

rare exceptions, the houses to be built in the future should be

permanently located, well built, and of durable material. The slates

which compose a roof should be not more than 8 inches wide and should

not be put on roofs of less than one-third pitch, since they are only

double-lapped and do not lie as closely, one upon the other, as do

shingles, which are laid triple-lapped. Slate and tile roofs are

comparatively heavy, and hence require stronger roof structures than

shingles.

The roof boarding for slate roofs should be matched--tongued and

grooved--and covered with paper to prevent cold and draughts of air from

passing into the attic. Since slates, on account of their somewhat rough

surfaces, do not lie closely together, the wind is likely to pass

through the cracks in the roof, if there are any, and carry snow and

rain into the upper part of the house; therefore the roof covering

immediately under the slates should be virtually air-tight. The roof

boards for a shingle roof should be narrow and laid with openings of

from 1¹⁄₂ to 2 inches between the boards. Rain and snow seldom drive up

and through the shingle roof, and since wooden roofs are more likely to

rot out than to wear out, the more perfectly the shingles are dried out

after a storm the better. The narrow roof boards and the spaces between

them allow the shingles to dry quickly, and therefore are better than

matched boards.

The short, or common, shingle of commerce is 16 inches long, ³⁄₈- to

¹⁄₂-inch thick at one end, and ¹⁄₈ of an inch at the other, and is

computed at 4 inches wide. A bunch of shingles contains one fourth of a

thousand. It should have 25 double courses and the band should be 20

inches long. Not infrequently there is a course or two wanting, or the

bands are an inch or so short. Having this data, one can easily

determine if the bunch is of legal size. A little cheating is not

uncommonly done by placing the shingles in the bunch loosely. This can

be detected by examining the bunches at the thick ends of the shingles.

Theoretically, 1,000 shingles should cover 10 feet square, or 100 square

feet, known in carpentry as “a square,” if the shingles are laid 4

inches to the weather. Since shingles are usually laid 4¹⁄₂ to 5 inches

to the weather, 1,000 shingles should cover about 120 square feet.

Two-thirds of the lower part of the roof may be laid 4¹⁄₂ inches, and

the upper third 4³⁄₄ or 5 inches to the weather, if the roof is not

flat.

If shingles are treated with lime water or diluted gas tar, or be

painted as they are laid, the life of the roof may be prolonged. The

painting of roofs with tar or common earth or mineral paints, after they

are laid, does little or no good in preserving them. Sometimes painting

is resorted to to make the roof harmonize with the color of the sides of

the building.

Neither extremely narrow nor extremely wide shingles are desirable.

Those from 3 to 6 inches wide, when carefully laid, are satisfactory.

Each shingle should receive but two nails; one is usually enough, and

these should be placed about ³⁄₄ of an inch from the edges, and about 1

inch above the point where the butts of the next course will come. When

the courses above are laid upon the shingle having but one nail, two or

three other nails, which are driven in the courses above, will serve to

help hold it in position. The joints of shingle roofs should be double

broken: that is, the joints in the shingles of one course should not

coincide with the joints of the first or second course below. Consult

Fig. 77.

[Illustration: Fig. 77. The laying of shingles.]

If two nails be driven in the sides of an unseasoned shingle, when it

shrinks it is likely to split in the middle; and in laying a roof the

joint immediately above the course under consideration is likely to come

at or near the middle of the shingle, which splits by reason of the

shrinking. The case is still worse when three nails are put in a

shingle, for then it is almost certain to split in the middle and

immediately in line with the joint in the course above.

Unscientific placing of shingles and insufficient mixing of mortar

results in an unsatisfactory house, both inside and outside, however

good the materials may be.

[Illustration: Fig. 78. A veneered wall.]

VENEERED HOUSES

A most excellent way to secure a warm, durable house, and one that will

require the minimum of care-taking, is to first construct a 4-inch wall

after the balloon pattern, as has been previously described. To this

frame, sheathing surfaced on one side is attached. The 4-inch brick wall

is securely fastened to the wooden structure by means of 30-penny

spikes, one at each studding, which are driven in at the top of every

seven courses of brick. (See Fig. 78.) A wooden house may also be

veneered with stone, the veneering being held in place by means of metal

anchors attached to the boarding.

The foundation needs to be a little stronger than for the wooden house,

and must be provided with a stone water-table for receiving the

veneering.

In a veneered house, all the lightness and dryness of a wooden house are

secured on the inside and on the outside all the durability and solidity

of a brick or stone house. When the veneering is of hard-burned,

cream-colored or neutrally tinted brick or brown stone, the effect is

extremely pleasing. The first cost of such a house is somewhat more than

an all-wood house, but its greater durability and freedom from constant

repairs makes it no more expensive in the end. When one builds such a

house and covers it with a steep slate roof, he feels that he has

builded for many coming generations.

It is not necessary to speak in detail of stone and brick houses, since

such structures are quite expensive, and their construction should

always be placed in the hands of experts. It may be well, however, to

discuss them generally. The cost of building brick houses is nearly

twice as great as those of wood; stone houses cost more than brick

houses. The foundations of brick or stone structures must be broad and

placed deep in the ground, to sustain the great weight placed upon them.

However much pains has been taken, the walls of the superstructure often

crack by reason of the unequal settling of the foundation or by unequal

strain on the walls, due to the window and door openings. Once the walls

are cracked they become unsightly, and cannot well be restored without

being rebuilt. Unless the windows are extra large the house will not be

well lighted because of the thick walls. (See Fig. 24, p. 108.) The

walls do not heat and cool as quickly as do wooden walls, hence brick

and especially stone houses are likely to be damp, since the warm air of

the rooms tends to part with its moisture when it comes in contact with

the relatively cool walls. This tendency of the walls to condense

moisture may be obviated by studding and plastering them on the inside,

but all this adds to the expense. Until building material becomes much

less expensive than it now is, the farmer would better build either a

wooden or veneered house.

[Illustration: Fig. 79. Re-siding an old wall.]

OLD HOUSES

Houses which were built some time ago and before building paper and

better methods of construction were in vogue, are usually too cold and

often extremely unsatisfactory. The outside covering may be warped and

cracked and too often paintless. Where these conditions prevail the

house may be re-sided without removing the old covering. The window

frames, corner boards, and like members which receive the siding are

built out by placing bands around the frames and on the corner boards of

sufficient thickness to receive the new second siding. Strong building

paper is then placed over the old siding, and strips one inch thick and

two inches broad are nailed immediately upon it and over the several

studs of the old frame. (Fig. 79.) The house is now ready to receive new

siding. If paper be laid on the floors and a well seasoned second floor

be laid upon it, they will be greatly improved at slight cost.

[Illustration: Fig. 80. Faulty gutter or eave trough.]

[Illustration: Fig. 81. Well constructed gutter.]

Eave troughs should be placed outside the perpendicular line of the

walls to prevent water from entering the house should the troughs leak

or overflow from being filled with ice. Eave troughs are frequently made

of tin which is too narrow, in which case, especially on flat roofs, the

water will back up under the shingles and run over that part of the

gutter which lies hidden in the roof. The elevation of the front edge of

the gutter should be at least 2 inches below the extreme upper edge of

the tin of which the gutter is made. (Compare Figs. 80 and 81.) Gutters

placed at the end of the rafters are usually not as durable as those

placed on the roof, but if carefully put up so that they will keep their

position they serve their purpose well and may be made to give

additional beauty to the eaves of the roof. The conductors which lead

the water from the gutters to the ground should be made large and of

corrugated material, that expansion may be provided for should they

become filled with ice.

What has been said about using too narrow tin for gutters is doubly

applicable to the valleys. Open valleys are better than closed. All tin

used for gutters or valleys should be painted on both sides before it is

placed upon the roof, and all used about the outside of the building

should be kept well painted, as it is more economical to paint often

than to mend leaks.

PAINTING THE HOUSE

After much solicitude and money have been expended on the construction

of the house, it is poor economy to let it suffer for want of paint. Not

infrequently the house is planned so large, or so much is spent on its

erection that means are not at hand for fully protecting the outside

with suitable paints.

As to the colors of paints or their combinations, little can be said,

since tastes and conditions are extremely variable. A farm house should

have its own distinctive features, and its own personality, and while it

may be similar to many other houses it should not be a duplicate of any

other one.

In manufacturing towns long rows of houses are built, each one the exact

duplicate of all the others in shape, dimensions, and color. The effect

is abominable. This illustration of exact imitation only goes to show

how necessary it is to have diversity of style in the houses themselves

and variation in the colors of the paints if the maximum beauty of the

home and adaptation to landscape and site are secured. In painting the

farm house beauty should not be ignored, but beauty may not be

compatible with durability and necessary economy. The farm home may and

should be placed in such beautiful environment that the paint which

covers it sinks into comparative insignificance as compared to the

painting of the city house; therefore the elements of economy and

durability play as important parts in the painting of farm houses as

does beauty. Even a great, plain, two-story white farm house with green

window-blinds can be made to look beautiful and home-like if it has a

suitable setting of noble trees.

If the outside covering of the house is placed some time before it

receives its first coat of paint, the wood tends to check and usually

becomes too dry for applying it. If exposed for some days to the direct

rays of the sun before painting, so much of the oil of the paint will

be taken up by the wood that there will not be enough left to bind the

mineral matter of the paint to the wood. This is especially the case

where an attempt is made to complete the painting by the application of

but two coats, in which case, the first or prime coat must contain

relatively much mineral material and little oil, and must be spread

thickly if the surfaces are to be well covered by the two coats. Not

infrequently, the outside woodwork is swollen and somewhat displaced by

rains before the roof is in place. Even after it has dried out the ideal

conditions are not secured. The roof should be placed as soon as the

siding is completed, or if possible before. The carpenter should put on

the first, or prime, coat as fast as the house is sided; that is, the

woodwork which has been placed from one scaffold or stage should be

painted from the scaffold before the one above is constructed. The

corner boards, window sash, and frame should receive one coat of paint

before they leave the shop. The prime coat may be of yellow ochre mixed

with some white lead, since the after painting with the desired color

will cover the yellow if two coats be applied. Good yellow ochre is a

most durable paint when properly mixed and spread, although it may be

said that the more white lead used in the prime coat the better. Yellow

ochre should contain a large per cent of iron; when ochres are composed

largely of colored clay they are inferior. The paint for the first coat

should, in any case, be thin, since the oil which it contains plays an

important part. This first coat tends, or should tend, to fill the wood

with oil so that the oil in the after coat will mostly remain with the

paint, and not leave it and pass into the wood, thereby destroying its

binding force. Too much stress can hardly be laid on the necessity of

rubbing the first coat into the wood by vigorous use of the brush. To

realize the value of this principle one has but to visit a first-class

carriage manufactory and observe the methods which are in use to prepare

a carriage body for its final coat of dark paint and varnish. In too

many cases the first coat of paint is mixed too thickly and is not

pressed into the pores of the wood as it should be, in which case the

paint may either peel or rub off in a few years. The country boy dressed

in his best black suit often has a reminder of this if he chances to

lean against the outside of the old country church while “waiting for

meeting to take up.”

All outside painting, with the exception of the first coat, should be

done, as far as possible, in cool weather. Early spring and late fall,

when flies and dust are not present, are the best. If the house is

built in the summer, the second coat may be put on in the fall and the

third coat the following spring. The paint of the second coat may be a

little thicker than that of the first, and that of the third a little

thicker than the second. If the best job is desired the paint for all

three coats should be mixed thinner than is customary, in which case a

fourth coat will be required the following fall. The house will now have

a polish similar to the well painted carriage body, and, like it, will

resist moisture and remain good for a long time. If a building is to be

painted at all it would better be painted at the beginning and be kept

well painted, as it is the more economical in the end. Better curtail

the size of the house than to build it so large that the outside

covering must be neglected.

The oil used in paints is usually derived from the vegetable oil found

in flax or linseed. Although many other kinds of oils have been tried,

nothing has been discovered which can take the place, in paints, of

linseed oil. This is most remarkable, for there are many vegetable oils

which are very similar to this one. Linseed oil is expensive as compared

with several other kinds, hence many attempts have been made to find an

oil equally as good for painting; so far as I am able to learn, none

have been discovered. Linseed oil in paints, when dried, forms a hard,

tough, gluey coating which serves to bind firmly the particles of paint

together, and to the wood, and to exclude water as no other oil does;

hence if any other oil is mixed with the linseed oil, it is said to be

adulterated. At the present time linseed oil is adulterated in some

cases, and it is believed that this adulteration is the chief cause of

the lack of durability in many of the ready-mixed paints. If linseed oil

be mixed with other oils which are wanting in its valuable

characteristic, it is certain that such oils will not bind the particles

of paint together as they should be bound.

At present the only protection is to purchase guaranteed pure oil of

dealers who are reliable beyond peradventure. Outside painting should be

done with unboiled oil unless, on account of the weather, boiled oil

must be used to hasten drying. In extreme cases a drier (litharge) is

used. The drying process should not be rapid in outside painting, as

slow drying promotes durability.

The substances mixed with the oil to form paints are extremely variable

in composition and color. Some are good, and are usually relatively high

priced. Others are inferior and relatively low priced. Now that so many

brands of ready-mixed paints of many tints are in common use, it is

impracticable to analyze all of them and determine their quality so that

the inferior may be distinguished from the superior. There appears to be

but two ways out of this serious dilemma: use the best brands of the

ready-mixed paints and await results, or purchase pure white lead and

zinc paints and pure oil, and tint to suit tastes and conditions.

Heretofore, to do this successfully has required much skill and

patience, especially if the house was to be painted in many colors.

Paints are now so universally adulterated that I deem it my duty to call

attention to a company which virtually guarantees the material sold. The

National Lead Company makes white paints of pure white lead and pure

linseed oil. It also manufactures pure tinting colors, at least the

company so advertise, and without doubt would be liable for damages

should the paints prove to be adulterated. Sample tint cards are

furnished and directions given as to the quantity and kind of tinting

material to be mixed with the white paint to give the desired color. All

this greatly simplifies painting, and if these paints are pure, as

represented, the farmer will have no difficulty in securing pure paint

of any tint desired.

The farmer who desires a beautifully painted house, and simplicity, may

well restrict the colors of the paints he uses to two, being careful

that they are in harmony, one with the other, and with the character of

the house and its surroundings.

The following figures show the composition of some common paints (No. 1

was analyzed at the Cornell Exp. Sta., the others at the Iowa Station):

I. The paint known as white lead, when pure, is a basic carbonate of

lead mixed in oil. A sample showed--

White lead 93.62%

Oil and undetermined 6.38%

There was no evidence of adulteration.

II. White lead--

White lead 41.12%

Barium sulfate 30.29%

Zinc oxide 28.59%

Adulterated with barium sulfate and zinc oxide. Barium sulfate is very

heavy; in fact, in nature it is known as heavy spar.

III. Venetian red, dry--

Ferric oxide 24.12%

Calcium carbonate } 66.36%

Calcium sulfate }

Undetermined 9.52%

Adulterated with calcium carbonate and calcium sulfate. Venetian red

is ferric oxide, or a natural red oxide of iron. Calcium carbonate is

chalk or limestone, and calcium sulfate is plaster.

IV. Venetian red in oil--

Ferric oxide 12.82%

Calcium sulfate 3.54%

Barium sulfate 63.98%

Oil and undetermined 19.66%

--------

100.00%

Adulterated with barium sulfate and calcium sulfate.

The farmstead: The making of the rural home and the lay-out of the farm (5th edition) · 第 9 / 21 章