Illustration: (‡ RAILROAD TUNNEL.)

Tunnels are underground passages made for the purpose of continuing

roads, railways, or canals through hills or elevated parts of the

ground. In slight elevations “cuttings” are generally made, and it

becomes a question of expediency for the engineer as to which of

the two shall be chosen, as there will be a much greater quantity of

earth to remove from a deep cutting than from a tunnel; in fact, the

question is often at once determined by the demand for this material,

for if it should so happen that the level of the road is such, that

many or large embankments are required, the earth taken from the

cuttings will be wanted to construct them. As a general rule, tunnels

are only made where a hill has to be penetrated which is too high to

be cut through; another object sought by tunnelling is to cause the

road to pass beneath a canal, river, buildings, or roads, where the

level of the road or railway is far below them. The Thames Tunnel is

the most remarkable example of this kind of work.

Tunnels were constructed by the ancient Greeks and Romans, chiefly

for the purpose of forming aqueducts, and for draining lakes. A few

years back, tunnels were not very frequently undertaken, those that

were made being chiefly on the lines of canals, but they are now far

more numerous, on account of the great number of railways, on which

they frequently occur. Before a tunnel is undertaken, the nature of

the soil should be thoroughly examined by means of “borings,” sunk

down to the intended level, some soils being much less favourable

than others for this purpose. Quicksand, or sand percolated by

water, is one of the greatest impediments to tunnelling, while rock

(contrary to what would at first be thought) is one of the least, as

in this case there is no occasion to line the tunnel with brickwork,

which more than saves the extra expense of excavation, as that can

be rapidly done by blasting, where it is too hard to dig, while

in the former case the difficulty of draining off the water, and

the cost of brickwork of sufficient solidity to support such loose

earth, often prevent the undertaking. Tunnels of great length are

sometimes begun at several different parts by means of shafts sunk

down to the required level, and each made to unite into one, but

this depends upon where the earth is to be deposited; on railways it

is common that the “level” is so chosen that the earth from tunnels

and cuttings is always wanted to fill up hollows in their immediate

vicinity (see “Railways”), and when this is the case a series of

“trucks” drawn by an engine on temporary tramways remove the earth

from the tunnel as it progresses, to the next embankment, both works

proceeding at the same time.

When a small portion of the tunnel is excavated, the casing of

brickwork is begun from the mouth of it, and continued a small

piece at a time, following closely the excavation. The brickwork

is generally begun at each side, and carried up to the height at

which the arch springs; an inverted arch is then constructed from

one side to the other to form the floor, and “centreings” resting

upon uprights are placed, to “turn” the arch upon. These centreings

are only about two feet deep, and span the arch from side to side;

the men work with their backs to the part being excavated, and are

able to reach across the narrow centreing to lay the bricks. When

completed all round, and the spaces between the brickwork of the arch

and the surface of the excavation filled up with earth, the centreing

is shifted further in and a fresh ring of brickwork commenced,

the excavation going on at the same time. In many tunnels, large

perpendicular shafts are sunk down for the purposes of ventilation

and lighting.