Illustration: FIG. 14. (‡ ENGINE WHISTLE.)

Each engine is provided with a whistle (fig. 14) blown by steam

turned on from the boiler, which is used as a signal at any

particular time, especially in tunnels or when there is a fog; there

is also an arrangement by which each engine presses on a lever at

the side of the tram as it passes, and causes a bell to ring at the

station, to announce its approach, when about a quarter of a mile

off. In some cases, as in foggy weather, when the usual signals

cannot be seen, a packet of fulminating powder is placed on the rail,

and this being exploded by the wheel of the engine as it passes over

it, gives notice of its approach, &c. There are other signals, but

these are the chief.

The Boy's Book of Industrial Information · 第 357 / 388 题