THE MERSEY RAILWAY TUNNEL.

The work of connecting Liverpool with Birkenhead by means of a railway

tunnel is now an almost certain success. It is probable that the entire

cost of the tunnel works will amount to about half a million sterling.

The first step was taken about three years ago, when shafts were sunk

simultaneously on both sides of the Mersey. The engineers intrusted

with the plans were Messrs. Brunlees & Fox, and they have now as their

resident representative Mr. A.H. Irvine, C.E. The contractor for the

entire work is Mr. John Waddell, and his lieutenant in charge at both

sides of the river is Mr. James Prentice. The post of mechanical

engineer at the works is filled by Mr. George Ginty. Under these chiefs,

a small army of nearly 700 workmen are now employed night and day at

both sides of the river in carrying out the tunnel to completion. On

the Birkenhead side, the landward excavations have reached a point

immediately under Hamilton Square, where Mr. John Laird's statue is

placed, and here there will be an underground station, the last before

crossing the river, the length of which will be about 400 feet, with up

and down platforms. Riverward on the Cheshire side, the excavators have

tunneled to a point considerably beyond the line of the Woodside Stage;

while the Lancashire portion of the subterranean work now extends to

St. George's Church, at the top of Lord street, on the one side, and

Merseyward to upward of 90 feet beyond the quay wall, and nearly to the

deepest part of the river.

When completed, the total length of the tunnel will be three miles one

furlong, the distance from wall to wall at each side of the Mersey being

about three-quarters of a mile. The underground terminus will be about

Church street and Waterloo place, in the immediate neighborhood of the

Central Station, and the tunnel will proceed from thence, in an almost

direct line, under Lord street and James street; while on the south side

of the river it will be constructed from a junction at Union street

between the London and Northwestern and Great Western Railways, under

Chamberlain street, Green lane, the Gas Works, Borough road, across the

Haymarket and Hamilton street, and Hamilton square.

Drainage headings, not of the same size of bore as the part of the

railway tunnel which will be in actual use, but indispensable as a means

of enabling the railway to be worked, will act as reservoirs into which

the water from the main tunnel will be drained and run off to both sides

of the Mersey, where gigantic pumps of great power and draught will

bring the accumulating water to the surface of the earth, from whence

it will be run off into the river. The excavations of these drainage

headings at the present time extend about one hundred yards beyond the

main tunnel works at each side of the river. The drainage shafts are

sunk to a depth of 180 feet, and are below the lowest point of the

tunnel, which is drained into them. Each drainage shaft is supplied

with two pumping sets, consisting of four pumps, viz., two of 20 in.

diameter, and two of 30 in. diameter. These pumps are capable of

discharging from the Liverpool shafts 6,100 gallons per minute, and from

the Birkenhead 5,040 gallons per minute; and as these pumps will be

required for the permanent draining of the tunnel, they are constructed

in the most solid and substantial manner. They are worked by compound

engines made by Hathorn, Davey & Co., of Leeds, and are supplied

with six steel boilers by Daniel Adamson & Co., of Dukinfield, near

Manchester.

In addition to the above, there is in course of construction still

more powerful pumps of 40 in. diameter, which will provide against

contingencies, and prevent delay in case of a breakdown such as occurred

lately on the Liverpool side of the works. The nature of the rock is

the new red sandstone, of a solid and compact character, favorable for

tunneling, and yielding only a moderate quantity of water. The engineers

have been enabled to arrange the levels to give a minimum thickness of

25 ft. and an average thickness of 30 ft. above the crown of the tunnel.

Barges are now employed in the river for the purpose of ascertaining the

depth of the water, and the nature of the bottom of the river. It is

satisfactory to find that the rock on the Liverpool side, as the heading

is advanced under the river, contains less and less water, and this the

engineers are inclined to attribute to the thick bed of stiff bowlder

clay which overlies the rock on this side, which acts as a kind of

"overcoat" to the "under garments." The depth of the water in one part

of the river is found to be about 72 ft.; in the middle about 90 ft.;

and as there is an intermediate depth of rock of about 27 ft., the

distance is upward of 100 ft. from the surface of low water to the top

of the tunnel.

It is expected that the work will shortly be pushed forward at a much

greater speed than has hitherto been the case, for in place of the

miner's pick and shovel, which advanced at the rate of about ten yards

per week, a machine known as the Beaumont boring machine will be brought

into requisition in the course of a day or two, and it is expected to

carry on the work at the rate of fifty yards per week, so that this year

it may be possible to walk through the drainage heading from Liverpool

to Birkenhead. The main tunnel works now in progress will probably be

completed and trains running in the course of 18 months or two years.

The workmen are taken down the shaft by which the debris is hoisted, ten

feet in diameter, and when the visitor arrives at the bottom he finds

himself in quite a bright light, thanks to the Hammond electric light,

worked by the Brush machine, which is now in use in the tunnel on both

sides of the river. The depth of the pumping shaft is 170 feet, and the

shaft communicates directly with the drainage heading. This circular

heading now has been advanced about 737 yards. The heading is 7 feet in

diameter, and the amount of it under the river is upward of 200 yards on

each side. The main tunnel, which is 26 feet wide and 21 feet high, has

also made considerable progress at both the Liverpool and Birkenhead

ends. From the Liverpool side the tunnel now extends over 430 yards, and

from the opposite shore about 590 yards. This includes the underground

stations, each of which is 400 feet long, 51 feet wide, and 32 feet

high. Although the main tunnel has not made quite the same progress

between the shafts as the drainage heading, it is only about 100 yards

behind it. When completed, the tunnel will be about a mile in length

from shaft to shaft. In the course of the excavations which have been so

far carried out, about 70 cubic yards of rock have been turned out for

every yard forward.

Ten horses are employed on the Birkenhead side for drawing wagons loaded

with debris to the shaft, which, on being hoisted, is tipped into the

carts and taken for deposit to various places, some of which are about

three miles distant. The tunnel is lined throughout with very solid

brickwork, some of which is, 18 inches thick (composed of two layers

of blue and two of red brick), and toward the river this brickwork is

increased to a thickness of six rings of bricks--three blue and three

red. A layer of Portland cement of considerable thickness also gives

increased stability to the brick lining and other portions of the

tunnel, and the whole of the flooring will be bricked. There are about

22 yards of brickwork in every yard forward. The work of excavation up

to the present time has been done by blasting (tonite being employed for

this purpose), and by the use of the pick and shovel. At every 45 ft.

on alternate sides niches of 18 in. depth are placed for the safety of

platelayers. The form of the tunnel is semicircular, the arch having a

13 ft. radius, the side walls a 25 ft. radius, and the base a 40 ft.

radius.

Fortunately not a single life has up to the present time been lost in

carrying out the exceedingly elaborate and gigantic work, and this

immunity from accident is largely owing to the care and skill which are

manifested by the heads of the various departments. The Mersey Tunnel

scheme may now be looked upon as an accomplished work, and there is

little doubt its value as a commercial medium will be speedily and fully

appreciated upon completion.

* * * * *