CONSTRUCTION DETAILS OF CALORIMETER TABLES]

The entire building is ventilated by a force or blower fan in the

basement, and by an exhaust fan in the attic with sufficient capacity to

insure complete renewal of air in each laboratory once in 20 min.

The blower fan is placed in the center of the building, on the ground

floor, and is 100 in. in diameter. Its capacity is about 30,000 cu. ft.

of air per min., and it forces the air, through a series of pipes, into

registers placed in each of the laboratories.

The exhaust fan, in the center of the attic, is run at 550 rev. per

min., and has a capacity of 22,600 cu. ft. of air per min. It draws the

air from each of the rooms below, as well as from the hoods, through a

main pipe, 48 in. in diameter.

_Steaming and Combustion Tests._--The investigations included under the

term, fuel efficiency, relate to the utilization of the various types of

fuels found in the coal and oil fields, and deal primarily with the

combustion of such fuels in gas producers, in the furnaces of steam

boilers, in locomotives, etc., and with the efficiency and utilization

of petroleum, kerosene, gasoline, etc., in internal-combustion engines.

This work is under the general direction of Mr. R. L. Fernald, and is

conducted principally in Buildings Nos. 13 (Plate XVII) and 21.

For tests of combustion of fuels purchased by the Government, the

equipment consists of two Heine, water-tube boilers, each of 210 h.p.,

set in Building No. 13. One of these boilers is equipped with a Jones

underfeed stoker, and is baffled in the regular way. At four points in

the setting, large pipes have been built into the brick wall, to permit

making observations on the temperature of the gas, and to take samples

of the gas for chemical analysis.

The other boiler is set with a plain hand-fired grate. It is baffled to

give an extra passage for the gases (Fig. 15). Through the side of this

boiler, at the rear end, the gases from the long combustion chamber

(Plate XVIII) enter and take the same course as those from the

hand-fired grate. Both the hand-fired grate and the long combustion

chamber may be operated at the same time, but it is expected that

usually only one will be in operation. A forced-draft fan has been

installed at one side of the hand-fired boiler, to provide air pressure

when coal is being burned at high capacity. This fan is also connected

in such a way as to furnish air for the long combustion chamber when

desired. A more complete description of the boilers may be found in

Professional Paper No. 48, and Bulletin No. 325 of the U.S. Geological

Survey, in which the water-measuring apparatus is also described.[13]

On account of the distance from Building No. 21 to the main group of

buildings, it was considered inadvisable to attempt to furnish steam

from Building No. 13 to Building No. 21, either for heating or power

purposes. In view, moreover, of the necessity of installing various

types and sizes of house-heating boilers, on account of tests to be made

thereon in connection with these investigations, it was decided to

install these boilers in the lower floor of Building No. 21, where they

could be utilized, not only in making the necessary tests, but in

furnishing heat and steam for the building and the chemical laboratories

therein.

[Illustration: Fig. 15.

Transactions of the American Society of Civil Engineers, vol. LXX, Dec. 1910 Federal Investigations of Mine Accidents, Structural Materials and Fuels. Paper No. 1171 · 第 34 / 46 题