weight on its haunches.”
“Haunches! you mean the two side-curves of the arch were too heavy.”
“Ay; you’ve heard the proverb no doubt that ‘An arch never sleeps.’
That is, should too great a weight fall on the crown or top part, the
arch will fall at the sides outwardly, and the crown will sink; while,
curiously enough, if it be built with too little weight on the crown,
as this was, the crown will be forced upwards, and the sides will fall
inwards.”
“Then you mean to build your third bridge with less weight
proportionately on its haunches?”
“Exactly so.”
“Well, I wish you good luck, friend Edwards, for we need a bridge
sorely over the brawling Taff.”
“You shall have it, neighbour. I shall succeed this time. I have
gripped the right principle at last.”
He had indeed, for the bridge he then built lasts to this day. It was
the famous Pontypridd bridge over the Taff on the Llantrissant and
Merthyr road, and was called the Pont y du Prydd, or the bridge by the
earthen house, for a mud hut stood near.
[Illustration:
PONTYPRIDD BRIDGE. _From Encyclopædia Britannica._ ]
About the year 1745 it was determined to build a bridge over the
rushing Taff, and William Edwards, a self-taught mason of the country,
undertook the task. The first bridge he built was of three arches,
which, in less than three years, was dashed away by a great flood. The
water rose so high as to surge over the parapet.
It must have been a sore disappointment to the hard worker to see his
structure suddenly swept to ruins. But he was a shrewd, common-sense,
observing man, and, nothing daunted, he tried again. This time he
determined to build one bold arch of 140 feet. The object was to
obviate the necessity of raising piers for more arches, and so
obstructing the water; these former piers having caused, or assisted
in causing, the destruction of his first bridge.
But the second gave way from the proportionally heavy weights on the
haunches, as Edwards, we imagine, told his friend, and once more he had
to face ruins. Yet a third time he tried, and the third time he was
successful. Generations have come and gone, the children who played
about its abutments have grown grey and have passed away, but still the
country mason’s bridge of 140 feet span stands its ground and serves
the community.
He reduced the heavy weight on the sides by making openings in the
spandrels—that is, the part above the curve of the arch; while, instead
of filling up the interior space with rubble, he used charcoal. But the
arch is very steep, and a chain and drag is kept to assist any horse
when descending.
These bridges illustrate the principle of the arch. Passing by the
fact that it is evidently safer to span a swelling river by a bridge
of wide, rather than of several narrow arches, three powers or forces
act on the row of stones or bricks forming the arch. There is first the
force that would carry the stone downward—that is, the force of its own
weight and of anything that might be placed upon it. But then there are
stones or bricks pressing against it on either side, and in its turn it
presses upon them. When, therefore, every part presses equally, one not
heavier or weaker than the others, a support for all is gained by the
contiguous pressure and by the balance of forces.
Long bridges were sometimes built in this way, and the longest in
England in the Middle Ages was at Burton, over the Trent. It was 1545
feet long, and had 36 arches. It was not superseded till 1864, when a
new bridge was built.
In an arched bridge, the higher it rises in proportion to the width of
the arch, the easier is its construction, and the less is the stress
upon its parts; moreover, any inaccuracy in design or in building is
likely to be less harmful. We are not surprised, therefore, that
Edwards, in his third attempt, decided upon that form.
One of the widest arches in the world is that of the famous Grosvenor
Bridge at Chester. It has a span of 200 feet, with a rise of 42 feet.
An arch, however, in the Washington Aqueduct extends to 220 feet span,
while the central span in the Southwark Bridge, designed by Rennie, is
240 feet. This last, however, is of cast-iron.
The principle of the arch, however, does not appear first in the
history of bridge building. Bridges are as old as mankind; that is, no
one knows when first men began to cross streams and chasms by placing
the trunk of a tree from one side to the other, and thus bridging the
gulf.
Then, possibly, the next step was to build up a pile of stones in the
centre of the stream—taking the stones there by coracle or canoe—and
placing a tree trunk from the side to the central heap.
Yet another development would most likely be a simple cantilever
bridge—though these early builders would not have known that
Frenchified word. But they knew that after embedding a tree trunk
firmly on each side of the bank so that a considerable portion should
project over the stream, they could place a third log from one end to
the other, and thus get a bridge much longer than when made of one tree
trunk alone.
This principle, known so long ago, was used and immensely developed in
the construction of the famous Forth Bridge, one of the most remarkable
structures of the nineteenth century. This cantilever principle is
very important in bridge building, and it is said that there exists an
ancient bridge on this principle across the Sutlej in India with a span
of 200 feet.
[Illustration: THE POST BRIDGE, DARTMOOR.
(_An example of an early bridge, of “slab” construction._)]
A further variety of early bridges was the “slab” bridge, consisting
of slabs of granite placed from side to side, or from the sides of
the bank to heaps of stones piled up in the stream. A good example
of such a bridge may be seen at “Post Bridge” over the Dart on
Dartmoor. Ages ago this bridge was built, and as we study it and
compare it with the modern structure not far distant, we wonder how the
ancient Britons—if those sturdy individuals are really responsible for
it—could raise and place those huge slabs of stone without engineering
apparatus. Probably it was done with levers and rollers, and there must
have been many shoulders to the wheel in the process. Certainly they
had plenty of granite at hand on wild Dartmoor.
But passing by all these early forms of bridges—which it will be
noticed are built of a few large pieces of material—it was left to
the Romans, at all events in Europe, to largely adopt the arch as a
principle of construction.
Now, here we are dealing with an altogether different principle. The
arch is made up of a number of comparatively small pieces of material
bound together by mortar, or cement, or even clamps, and by the power
of gravitation.
We doubt if that idea is realised by half the people using the
multitudinous arches abounding to-day; yet it is true. Or to put it in
another way, the various parts are arranged so that they keep up each
other by pressure.
If you take two cards, or bricks, or slabs of stone and lean them
together at the top, while the other ends may be far apart, you will
find they will bear a certain amount of weight. Here you have the
principle of the arch in its simplest form; and it may be that out of
that primitive performance the arch has grown. This kind of triangular
arch is to be met with in ancient structures in Great Britain. The
flanks or haunches of an arch are its sides, from the first stone to
the keystone; and the crown is its highest part; while the central
wedge-shaped piece of stone or brick is called the keystone.
The stones or bricks are cemented together when being built over a
framework of timber, called the centering, and when the keystone is
placed and the arch is complete it ought to remain firm.
But should too great a weight fall on the crown the bridge will fall
outwardly at the sides, and the crown will sink; while, curiously
enough, if it be built with too little weight on the crown, it will be,
as it were, forced upwards, and the sides will fall inwards, as in the
case of the second of the famous Pontypridd bridges, which actually did
this. The material in the middle of the arch was less in proportion
than that over the sides or “haunches,” and these heavier weights on
the sides caused the crown to be forced upwards.
Two causes combined to make changes in bridge building. These were the
needs of railways and the introduction of iron as a building material.
The first iron bridge was constructed over the Severn, near an
appropriately named place, Ironbridge, in 1779. It had an arch of near
upon a hundred feet span.
When, however, very wide span bridges were required, the question
arose of the superiority of wrought-iron over cast-iron for such
structures. The Menai Strait had to be crossed for the Chester and
Holyhead Railway, and the greatest existing cast-iron span was Rennie’s
Southwark Bridge, where 240 feet had been reached. But over the Conway
and the Menai Strait, spans of 400 feet were involved. How were these
yawning gulfs to be bridged?
CHAPTER II.
A NEW IDEA—THE BRITANNIA TUBULAR.
“We must cross the Strait at the Britannia Rock—that is settled.”
“And where is the Britannia Rock?”
“Nearly in mid-channel. It seems placed there for the purpose.”
And the great engineer smiled.
“What are the distances?”
“From coast to coast the span of the Strait is some 1100 feet, with
that rock in the centre. Now the problem is, to build a bridge across
that gulf of surging water strong enough to bear heavy trains at high
speeds, and sufficiently above the water to prevent any interference
with navigation.”
“And how will you manage it?”
“First I thought of large cast-iron arches, but they will not do. I
doubt if they would stand the strain; and moreover we should impede
navigation by raising scaffolding during the building. At length I came
to the idea of a tube bridge.”
“What! a tube bridge! I’ve never heard of it!”
“No, it is a new idea. By reconsidering a design I had made for a small
bridge over the Lea at Ware in 1841, and thinking over the matter, I
came to the idea that a bridge consisting of a hollow beam or tube
might solve the difficulty.”
“A huge hollow girder, so to speak!” exclaimed his friend.
“Exactly so. Accordingly,” the engineer continued, “I had drawings
prepared and calculations made, by which to ascertain the strength
of such a bridge, and they were so satisfactory that I decided on
attempting one.”
“It is like constructing one huge hollow beam of iron by rivetting
plates together. Can it be done?” remarked his friend.
“The making of the high-level bridge over the Tyne, in which I had
a part—the bridge between Newcastle and Gateshead, you know—was a
transition between an arched bridge and a girder bridge. A girder of
course is a beam, it may be of iron or wood, and the little bridge at
Ware has been built of girders made of plates of wrought-iron rivetted
together. Therefore, you see, I am not unused to wrought-iron girders,
and what they will bear.”
“Why, it is like a huge extension of the primitive log-bridge of our
ancestors.”
“If you like,” replied the engineer, laughing.
Robert Stephenson—for he it is whom we suppose to be speaking to his
friend on this gigantic engineering enterprise—became satisfied by
reflection that the principles involved in constructing an immense
tubular beam were but a development of those commonly in use; and Sir
William Fairbairn was entrusted with the duty of experimenting as to
the strength of tubes, the directors of the Railway Company voting a
sum of money for the purpose.
Sir William, then Mr., Fairbairn concluded that rectangular tubes were
the strongest, and a model was made of the suggested bridge. It proved
successful, and indicated that the tube would be able to stand the
strain of a heavy train passing rapidly over it.
In September, 1846, Mr. Fairbairn read a paper on the subject at
the meeting of the British Association at Southampton, as also did
Professor Hodgkinson, a mathematician, who had verified Fairbairn’s
experiments. Not long afterwards Stephenson became satisfied that
chains were not needed to assist in supporting the bridge, and that his
tubes would be strong enough to support themselves entirely between the
piers.
Work therefore went forward. Some 1500 men were engaged on the
Britannia Bridge, and the quiet shores of the Menai Straits resounded
with the busy hum of hammers and machinery. Cottages of wood were built
for the men, and workshops for the punching and rivetting of the plates
for the gigantic tubes.
The design included two abutments of masonry on either side of the
Strait, and three towers or huge piers, one of which, the centre pier,
was to rise from the Britannia Rock, 230 feet high. There are four
spans, two over the water of 460 feet each, and two of 230 feet each
over the land. Two tubes, quite independent of each other, but lying
side by side, form the bridge across. Each tube or beam is 1510 feet
long, and weighs 4680 tons. Its weight at one of the long spans is
1587 tons.
Now how could these gigantic tubes be put together and raised to their
positions? Here was a problem almost as great as the original one of
the bridge itself, and it troubled the engineer sorely.
[Illustration: ROBERT STEPHENSON.]
“Often at night,” he declared, “I would lie tossing about, seeking
sleep in vain. The tubes filled my head. I went to bed with them, and
got up with them. In the gray of the morning, when I looked across
Gloucester Square, it seemed an immense distance across to the houses
on the opposite side. It was nearly the same length as the span of my
tubular bridge.”
The principle adopted was to construct the shorter tubes on scaffolds
in the places which they were to occupy. This could be done, for such
scaffolding would not impede navigation. But scaffolding could not be
built for the large tubes across the great spans of water. What then
was to be done?
It was decided to build them on platforms on the shore quite close
to the water, and float them when ready on pontoons to their places
between the piers, raising them to their position by hydraulic power.
Such a task would be hazardous enough. It was first tried at Conway,
where a similar bridge was being built by Robert Stephenson, being
indeed part of the same railway. The Britannia was, however, a much
greater enterprise, though the span of the Conway is 400 feet. The
Conway bridge, indeed, is but of one span, and contains two tubes.
The experience at Conway was of great benefit to the gigantic
undertaking at the Menai Strait. The floating of the first tube was to
take place on the 19th of June, 1849, in the evening; but owing to some
of the machinery having given way, the great event was put off to the
next night. The shores were crowded with spectators. When the tube was
finished it could be transferred to the pontoons; for the tubes had
been built at high-water mark. When the pontoons were fairly afloat on
this fateful evening, they were held and guided by leading strings of
mighty strength. Stephenson himself directed in person, from a point
of vantage at the roof of the tube. Thence he gave the signals which
had been agreed upon, whilst a crew of sailors, directed by Captain
Claxton, manned the strange barque.
A pontoon is a light, buoyant boat, and the tube was supported on sets
of these, their speed increasing terribly as they approached their
place by the towers. The idea was, as related by Mr. Edwin Clark,
Stephenson’s assistant, that they should strike a “butt” properly,
underneath the Anglesey Tower, “on which, as upon a centre, the tube
was to be veered round into its position across the opening. This
position was determined by a twelve-inch line, which was to be paid
out to a fixed mark from the Llanfair capstan. The coils of the rope
unfortunately over-rode each other upon this capstan, so that it could
not be paid out.”
Destruction seemed imminent. The capstan was actually dragged from the
platform, and the tube seemed likely to be swept away. Then Mr. Rolfe,
the captain of the capstan, shouted to the spectators, and threw out a
spare twelve-inch rope. Seizing this, the crowd, with right good-will,
rushed it up the field, and clung tightly to it, checking the voyage of
the mighty tube. It was brought to the “butt,” and duly turned round.
A recess had been left in the masonry of the tower, and the end near
the Britannia pier was drawn into it by means of a chain. The Anglesey
end followed. Then the tide gradually sank, the pontoons sank with it,
and the tube subsided also to a shelf which had been made at either
end. The first stage was accomplished; the mighty tube was in position
to be raised.
Shouts of rejoicing burst from the sympathetic crowds, and the boom of
cannon joined its congratulatory note at the grand success. But the
further stages remained. At midnight the pontoons were all cleared
away, and the huge, hollow beam hung silent over the surging water.
It rested on the shelves or beds prepared for it at either end. The
second great operation, of course, was to haul it up the towers to its
permanent position. This was to be performed by hydraulic machinery of
great power, and Mr. Stephenson’s instructions were to raise it a short
distance at a time, and then build under it.
He took every imaginable precaution against accident or failure; and
well was it that he did so, for an accident happened which, but for the
careful building under the tube in the towers as it was raised, would
have been most calamitous. The accident occurred while Mr. Stephenson
was absent in London. One day, suddenly, while the machinery was at
work raising the tube, the bottom burst from one of the hydraulic
presses, and down fell the tube on to the bed provided for it.
Though the fall was but nine inches, tons weight of metal castings were
crushed, and the mighty tube itself was strained and slightly bent. But
it was serviceable still, and the fact that it stood the strain so well
showed its great strength. It weighed some five thousand tons, and for
such an immense weight to fall even three-quarters of a foot was a very
severe test.
But for Stephenson’s wise precaution in lifting it slowly, and building
underneath it as it was raised, the tube would have crashed to the
bottom of the water. As it was, the accident cost £5000; but the tube
was soon being hauled upward again. In due course the others followed,
and on the 5th of March, 1850, Robert Stephenson inserted the final
rivet in the last tube, and the bridge was complete. He crossed over
with about a thousand persons, three locomotives whirling them along.
The tubes of the bridge are made of iron plates, and at the top and
bottom are a number of small cells or tubes—instead of thick iron
plating—which assist in giving strength to the whole gigantic tube.
Thus it may be said the floor and roof are tubular, as well as the
body. These hollow cells appear to have been Fairbairn’s invention. The
size of the tube grows slightly larger at the middle by the Britannia
tower, where externally the tubes are 30 feet high, and 26 internally,
while they are 22¾ feet and 18¾ feet at the abutments. The width is 14
feet, 8 inches externally, and 13 feet 5 inches inside.
At the Britannia tower the tubes are placed solidly on their bed,
but at the abutments, and at the land towers, the tubes rest on
roller-beds. This arrangement was adopted to permit of expansion and
contraction. Iron, of course, solid and unyielding as it appears, is
yet very susceptible to warmth, and the effect of the sun’s rays on
this massive iron structure is very marked. A rise of temperature
causes it to expand in a comparatively short time, and it is said that
the tubes occasionally move two and a-half inches as the sun gleams
upon them. Mr. Edwin Clark observed the effect of the sun on the iron,
which appears in a small degree to be always moving as the temperature
varies. Well, therefore, that the able engineer planned an arrangement
allowing for this constant expansion and contraction of the iron mass.
[Illustration: THE BRITANNIA TUBULAR BRIDGE.]
The Britannia Bridge was a great triumph for Robert Stephenson. He
appears first to have seized the idea, and, assisted no doubt by
Fairbairn’s experiments and by able coadjutors, he carried it through
to a successful completion. He was of course the son of George
Stephenson, who had done so much for the locomotive, and according to
Smiles, “he almost worshipped his father’s memory, and was ever ready
to attribute to him the chief merit of his own achievements as an
engineer.”
“It was his thorough training,” Mr. Smiles once heard him remark, “his
example, and his character, which made me the man I am.” Further, in an
address as President of the Institution of Civil Engineers, in January,
1856, he said: “All I know, and all I have done is primarily due to the
parent whose memory I cherish and revere.”
That father had died before the Britannia Bridge was completed, though
he had been present at the floating of the first tube at Conway. The
great engineer passed away on the 12th of August, 1848, at the age of
sixty-seven, and his distinguished son Robert, who had no children,
only survived him by eleven years.
But before he died he had designed, and Mr. A. M. Ross, who had
assisted at the Conway Bridge, had assisted in carrying out the
celebrated Victoria Tubular Bridge over the great St. Lawrence River at
Montreal.
This bridge was for the Grand Trunk Railway of Canada, and for immense
length and vastness of proportions, combined with magnificent strength,
is one of the wonders of the world. It is five times as long as the
Britannia Bridge, being not far short of two miles. It has a big
central span of 330 feet, and twenty-four spans of 242 feet. The iron
tubes are suspended sixty feet above the water beneath.
[Illustration: VICTORIA TUBULAR BRIDGE, MONTREAL.]
One great difficulty in the problem was the ice. Immense quantities
come down in the spring, and to resist this enormous pressure the piers
are most massive, containing thousands of tons each of solid masonry.
These piers are based on the solid rock, the two central towers being
eighteen feet in width and the others fifteen feet. To protect them
from the ice, huge guards made of stone blocks clamped with rivets
built up in the form of an incline were placed before the piers on the
up-stream side. The bridge was begun in July, 1854, and occupied four
and a-half years in construction, it being completed in December,
1859, about two months after its designer had died.
Gigantic though this structure is, and great as is the honour which it
reflects on Robert Stephenson and the resident and joint engineer Mr.
Ross, yet with the exception of the remarkable and massive ice-guards
to the piers, it does not differ materially from the Britannia and
Conway Tubular Bridges. These were the first famous examples of the new
principle.
Why, then, are massive tubular bridges not more generally built?
Because they led to another and very natural development in
bridge-building, a development whereby great strength for long spans is
gained, with, however, a marked saving both in labour and in material.
That development was the lattice bridge.
CHAPTER III.
LATTICE AND SUSPENSION BRIDGES.
“The expense of a tubular bridge would be too great.”
“But if we could get the strength without the expense.”
“What mean you?”
“By iron lattice work we could, I think, gain the stiffness and support
needed, without such great cost of labour and material. In other words,
I propose a lattice or trellis work girder, instead of a solid sided,
or a tubular girder.”
“That is, you would have the sides of lattice or trellis work, instead
of solid plates?”
“Exactly. I would use bars of iron placed diagonally. These lattice or
trellis bridges are developed from the tubular bridges, also from the
loose wooden lattice bridges of America. We make a web of iron instead
of a solid sheet. The same kind of structures are largely used over the
wide rivers of India. Sir John MacNeill designed the first in iron, and
it was built in 1843 on the Dublin and Drogheda Railway with a span
of eighty-four feet. I consider they will be among the most popular
bridges of the future for longish spans.”
The engineer’s prediction has come true; for lattice bridges have
undoubtedly been very widely adopted. We may suppose that he was
advising the directors of a proposed railway, and we doubt not but that
he carried the day.
A fine specimen of a lattice bridge is that across the Thames near
Charing Cross, for the South-Eastern Railway. It has a total length
of more than a quarter of a mile—viz., 1365 feet, and six of its nine
spans are 154 feet wide. Two principal girders, fourteen feet deep,
are connected transversely by other girders which carry the rails and
project on the other side to support a footpath. The two main girders
are nearly fifty feet apart and one weighs 190 tons.
The sides have upper and lower booms made of plate iron connected by
perpendicular bars, between which are a couple of bars crossing each
other diagonally at an angle of forty-five degrees, and fixed to the
booms by bolts of five and seven inches in diameter.
The old Hungerford Bridge stood here previously, and its two piers of
brickwork were used for the new bridge. Other piers are huge cylinders
of cast iron ten feet across, but fourteen feet in diameter in the
ground. Thus they are broadly based. These piers are filled with
concrete and also brickwork, and are topped with bearing-blocks of
granite. They are formed of plates of cast iron bolted together, and
they were sunk into the ground many feet below high-water by combined
forces; divers scooped out the mud and gravel and clay from within the
cylinders; water was pumped out and heavy weights pressed them down.
The piers became fixed on the London clay, but when filled were heavily
weighted to drive them down again, and finally they were forced to a
depth of over sixty-two feet below high-water mark.
But before lattice girder bridges had become so popular, another class
had come into use, and afford some splendid specimens of engineering
skill. These are suspension bridges, and, perhaps of all kinds, they
are the most picturesque. Their graceful sweeps and curves yield
perhaps a more pleasing sight for the eye than the solid, rigid,
straight lines of the girder bridges.
It was the genius of Thomas Telford which gave a great impetus to
this class of bridge. Like Stephenson after him, he had to bridge the
surging Menai Straits, but for a carriage road, not a line of rails;
and at length, after various plans had been suggested and abandoned, he
proposed the Suspension Bridge.
Now, in its simplest form, a suspension bridge has been known for ages.
It is merely a pathway, or even a small movable car, suspended from a
rope or ropes across a chasm. Ulloa describes suspension bridges built
by the Peruvians in South America. Four stout cables span a river, and
on these four is placed the platform of sticks and branches, while two
other ropes connected with the platform are useful as hand rails. Such
bridges sway with the wind and move with the passenger, but for light
loads they appear to be perfectly safe.
In Telford’s Menai Bridge the carriage-way is hung from four huge
chains or cables, each chain made up of four others, and passing over
high piers. The chains are anchored on the landward side, sixty feet
in pits, and grafted by iron frames to the rocks. The chains are so
complex and so strong, that parts may be removed for repair without
imperilling the safety of the structure. The length of the span thus
gained is 560 feet, and it is 150 feet above high-water. The remainder
of the bridge is composed of arches of stone, of 52½ feet span.
The piers from which the great span is suspended rise above the
carriage-way fifty-two feet, and are topped by blocks of cast-iron,
which can move on rollers to permit the chains passing over them
to expand and contract freely with the temperature. There are two
carriage-roads, and also a footpath. The roads are separated by iron
lattice work, which also gives them stability and decreases vibration.
[Illustration: THE CLIFTON BRIDGE.]
In its day, this stupendous bridge was as great a wonder as its later
companion over the same Straits—the Britannia Tubular. Six years were
occupied in building, and it was opened in 1825. Why, then, did not
Stephenson construct a similar bridge when, twenty years or so later,
he had to solve a similar problem?
The answer is, that suspension bridges are not—or were not—considered
sufficiently strong and rigid for railway work. In America, however,
they have been used for this purpose; witness the famous Niagara
Suspension Bridge, 2⅓ miles below the Falls, and with a superb span
of 822 feet; but American engineers appear to stiffen the roadway
considerably, so as to distribute the stress of the rushing train over
a large portion of the cable. The Niagara Bridge is not supported by
plate-link chains, but by four immense wire cables, stretching from
cliff to cliff over the roaring rapids. Four thousand distinct wires
make up each cable, which pass over lofty piers, and from them hangs
the railway by numerous rods.
[Illustration: THE BROOKLYN BRIDGE.]
Probably the famous Brooklyn Bridge is the largest suspension bridge in
the world, even as the Clifton Suspension Bridge, in England, is one
of the most interesting. The Brooklyn Bridge has a magnificent central
span of 1595½ feet over the East River between Brooklyn and New York;
further, there are two land spans of 930 feet, which, together with the
approaches, make up a total of about a mile and a furlong. The cables,
four in number, are each composed of 5000 steel wires, and measure
15¾ inches in diameter. They are anchored to solid stone structures
at either end, measuring 119 feet by 132 feet, and weighing 60,000
tons; while the towers from which the main span is suspended rise to
the height of 276 feet, and are embedded in the ground 80 feet below
high-water. It has been estimated that the weight hung between these
towers is nearly 7000 tons.
The roadway of the bridge is divided into five thoroughfares. Those on
the outer sides are for vehicles, and are 19 feet wide; the centre is
for foot passengers, and is 15½ feet in width; while the two others are
for tramway traffic. The bridge was opened in 1883, and affords a great
triumph of engineering skill.
Much smaller, but none the less interesting, is the Suspension Bridge
at Clifton. As far back as 1753, Alderman William Vick, of Bristol,
left a sum of £1000 to build a bridge at Clifton. The sum was to lie
at compound interest until £10,000 was reached. However, the money
was increased by subscriptions, and in 1830 an Act of Parliament was
obtained for its construction.
The work coming into the hands of Mr. I. K. Brunel, he designed a
bridge of 702 feet span, and 250 feet above high-water. The piers and
abutments were built, but lack of cash, which forms an obstacle to so
many brilliant enterprises, stopped the progress of the bridge for
nearly fourteen years.
Then it occurred that the Hungerford Suspension Bridge was to be
removed to make way for the Charing Cross Railway Bridge, so the chains
were purchased at a comparatively small cost, and the work at Clifton
proceeded, and was finally completed.
Three chains on either side suspend long wrought-iron girders, which
help to stiffen the platform; and cross girders between support the
floor. The chains pass over rollers on the piers, and are ultimately
anchored to plates bedded in brickwork abutting on rock. The platform
is hung by upright rods from the chains, and hand-railing is used with
lattice-work, to assist in rendering it rigid. The roadway, twenty
feet wide, is made of creosoted wood, five inches thick, while the
pathways on either side are made with wood half as thick. Between the
piers the weight of the structure, including the chains, amounts to
nearly a thousand tons.
In all these suspension bridges, however large, the principles are much
the same. The platform, or roadway, is hung from chains or cables,
which pass over piers and are anchored fast at the ends. Some are
stiffened with girders and bracing to prevent undue undulation. The
chains take a graceful and definite curve, that of the Menai Bridge
dipping fifty-seven feet. The strain is the greatest at the lower part,
and is increased, should the chain be drawn flatter over the same
space. These bridges became widely adopted.
But there came a time when none of the bridges in vogue seemed to give
what was required. A new principle was wanted. Where was it to be found?
CHAPTER IV.
THE GREATEST BRIDGE IN THE WORLD.
“Have you heard the news? The Tay Bridge is blown down!”
“Yes. A terrible disaster. I should think they would give up their
scheme of bridging the Firth of Forth after that.”
“Not they! The scheme may be altered, but bridge it they will.
Engineers never give in.”
The comments of these newspaper readers were right. The Tay Bridge,
the longest in the world, had been blown down one wild December night
in 1879, and girders, towers, and the train which was rushing over it,
were suddenly hurled into the surging flood.
At that time a scheme was in hand to bridge the Forth for the North
British Railway system, and Sir Thomas Bouch had proposed two
suspension bridges hung by steel chains. But ultimately a new design
altogether was adopted, the plan being by Sir Benjamin Baker and Sir
John Fowler.
It was the new principle—or, rather, a remarkable development of an old
principle—for which the bridge-making world was waiting: the principle,
namely, of the cantilever.
A cantilever is, in fact, a bracket; and Sir Benjamin Baker has
described it as such. It is a strong support, built out from a firm
base, and is like a powerful and magnified bracket upholding a shelf.
In the Forth Bridge there are two huge spans, 1700 feet wide, crossed
by these cantilevers; bridging channels of some 200 feet deep.
The longest spans on the Tay Bridge were 245 feet; it was over two
miles long, and had ninety spans. It was an iron girder bridge, and was
opened on the 31st of May, 1878. Not to be beaten, however, after the
panic had subsided, another and more stable bridge was constructed,
also a girder, but not so high in elevation, and sixty feet further
up the river. It was opened in 1887, and is 10,779 feet long, with 85
piers, the navigable channel being under four of the spans, the centre
spans being 245 feet wide.
It will be seen at once that the cantilevers at the Forth Bridge cover
very much wider spans; and the channel being so deep, the impossibility
of building piers will also be obvious. The best place for the bridge
was marked by the projection of the Inverkeithing peninsula on the
north shore, and also the Inchgarvie rock in the channel itself. The
peninsula brought the two shores together, reducing the space to be
bridged, and the rock gave firm support for a pier. Still there were
the two immense spans of 1700 feet to be crossed, and the engineers
decided on the cantilever principle. Thus, though the Tay Bridge was
the longest in the world, the Forth presented by far the greatest
spans—viz., the two main spans of 1700 feet each, in addition to which
there are two of 675 feet each, and fifteen of 168 feet each.
The total length of this magnificent bridge, which Sir Benjamin Baker
rightly claimed was the most wonderful in the world, is somewhat over
1½ miles in length, or 8296 feet, including the piers, while almost a
mile is bridged by the huge and superb cantilevers. This is, perhaps,
the great marvel. The clear space under the centre is no less than 152
feet at high-water, while the highest portion is 361 feet above the
same mark.
And now, how was this great bridge constructed? Workshops were erected
at South Queensferry, and the mammoth cantilevers were put up there
piece by piece. They were fitted together and then taken plate by plate
to the bridge itself. The shops were lit by electricity, and furnished
with appliances for bending, cutting, moulding, holing, and planing
plates. The workshops were surrounded by quite a maze of railways.
But what of the piers, without which all these preparations would be
unavailing? Now the foundations of piers are usually laid by means of
cofferdams; that is, piles of timber are driven down through the water
into the bed of the river close together, and the interstices filled
with clay; or a casing of iron may be used instead. The water in the
enclosure thus formed can be pumped out and excavation proceeded with,
and the foundations laid. Cofferdams are sometimes made of iron boxes
or caissons with interstices fitted with felt, and caissons of this
kind about 12½ feet long and 7 feet wide were used in constructing the
Victoria Embankment on the Thames.
But with certain of the piers for the Forth Bridge the water was
too deep for timber cofferdams, and the usual diving-bell was not
sufficiently large. The piers were to be of immense size, no less than
55 feet in diameter, and the diving-bell of ordinary size would not
cover that great width.
Huge caissons were therefore made, 70 feet wide, constructed of iron
plates and rising in height, according to the depth of water, up to 150
feet. The lower part of the immense caisson or tank was fitted as a
water-tight division and filled with compressed air, the object being
to resist the pressure of the water. Two shafts communicated with this
air-tight division or mining chamber, one for the removal of the earth
excavated, and the other for the men to pass up and down. The escape
of the air through the shafts was prevented by the use of an air-lock,
working on the same principle as a water-lock on rivers or canals.
There were two doors in the lock, one communicating with the shaft and
the other with the outside air. When the latter was closed and the lock
filled with compressed air by opening a valve or tap, the door of the
shaft could be opened and the man could descend to his work below.
That work consisted chiefly of excavation in the bed of the river.
Drills, hydraulic cutters, and dynamite blasting were all utilised
until huge holes, many feet below the river bed, were hollowed out. As
the caisson was filled with concrete above the air-tight chamber where
the men worked it was exceedingly heavy, and sank by its own weight
into the space prepared.
The mining chamber was lit by electricity, and was about seven feet
high. The mud of the river bed was mixed with water and blown away by
the compressed air which seems to have been about 33 lbs. to the square
inch. The caissons were sunk down to rock or boulder clay, and when
they had reached the required distance the mining chamber was filled
with concrete, and the same material used to the level of the water;
the piers were then built up with huge stones placed in cement, the
whole forming a magnificent mass of concrete and masonry, carried down
in some cases to about 40 feet below the bed of the river.
[Illustration: THE FORTH BRIDGE.]
The three chief piers consist of groups of four columns of masonry,
each gradually tapering from 55 feet in diameter to 49 feet at the top,
and about 36 feet high. From these rise the huge cantilevers connected
together by girders 350 feet in length.
The centre of these three main piers rests on the island of Inchgarvie;
the two others are known as the Fife and the Queensferry piers
respectively, and are placed on the side of the deep water channels. In
addition to these three main piers are several others, some in shallow
water and some on land. The part of the bridge which they carry is
an ordinary girder of steel leading to the immense cantilevers. For
founding the shallow water piers, cofferdams were used; the caissons
with compressed air chambers being for the deep water structures.
They were put together on shore, launched, floated, steered to the
desired position, and sunk. One proved cranky and turned over, and was
only brought right after much expense and difficulty.
The cantilevers are bolted down to each pier by numbers of huge steel
ties, 24 feet in length and 2½ inches in diameter, embedded in the
masonry, there being 48 of these bolts or ties to each column. And now
as to these cantilevers.
Four huge tubular shafts, two on each side, rise from the group of
columns forming each pier, to the height of 350 feet. From these
shafts, which slope slightly inward, project the cantilevers, the upper
and lower parts being strongly braced together by diagonal ties. In
shape the gigantic brackets taper towards a point, the width decreasing
as much as from 120 feet at the commencement of the piers to 32 feet at
the ends. The wind, it is believed, will be more effectually resisted
by this means.
The cantilevers are hung back to back, one to some extent
counter-weighing the other. The component parts consist of cylinders
of steel or struts for resisting compression—these are the lower
parts; and ties of lattice-work made of steel plates for resisting
tension,—placed above.
Thus, then, from each of the three chief piers two pairs of gigantic
brackets project, each pair placed side by side and braced together,
and forming one composite cantilever jutting to the north and one to
the south. The rails run on sleepers placed lengthwise and fixed in
troughs of steel, so that should a train run off the line the wheels
will be caught by these supports.
It is calculated that there are about 45,000 tons of steel in the
bridge, and 120,000 cubic yards of masonry in the piers. The contract
price was £1,600,000, which works out at about £215 per foot; and the
contractors, who were able to obtain an admirable organisation of some
2000 men to carry out the magnificent design, were Messrs. Tancred,
Arrol, & Co. Some special tools for use in the work were planned by Sir
William Arrol. The bridge was opened by the Prince of Wales on the 4th
of March, 1890.
The success of this magnificent structure has assured the wider
adoption of the cantilever principle. Long-span bridges, in several
cases, have since been built on this design. Its engineers may claim
indeed to have widened the scope and possibilities of bridge-building.
Still, when another bridge was wanted over the Thames, at a busy spot,
crowded with shipping and near the historic Tower of London, another
kind of structure was adopted. What was it?
CHAPTER V.
THE TOWER BRIDGE.
“Why should they not have a drawbridge?”
“What! To draw up from each bank of the river?”
“No, I did not mean that exactly. Could they not get piers farther in
towards the centre of the stream, and let the drawbridge rise and fall
from them?”
“The river is too crowded for many piers.”
“It is. But I cannot help thinking a drawbridge—a bascule bridge as the
engineers call it—is the best solution of the difficulty.”
“Well, a bridge is wanted sufficiently low to spring from the flat
banks of the Thames for foot passengers and carriage traffic, and yet
sufficiently high to permit tall ships to pass underneath.”
“And apparently these two requirements are incompatible.”
“Not altogether,” remarks a third speaker.
“You are partly right in your idea of a drawbridge. That is Sir Horace
Jones’s idea. And, further, there is literally to be a high and also
a low-level bridge; for there are to be two levels—that is, two
roadways—one at a high, and one at a low, level across the middle span.”
“And is the low level to be a drawbridge—a roadway that can be drawn up
to permit vessels to pass? Is that so?”
“Exactly. And this drawbridge will be in two parts, one on either side;
they will be worked from two massive piers giving a clear span of 200
feet in the middle of the stream, through which span big vessels can
pass. The usual traffic of the river will be able to pass even when the
drawbridges are down.”
“And above the bascules or drawbridges will run the high-level bridge?”
“Yes, a girder bridge for footpaths, and people will reach it by lifts
and staircases in the piers—which, by-the-by, will be more like huge
towers. These towers will also contain the machinery for raising and
lowering the drawbridges.”
“And what sort of bridge will be used for the other spans—that is, to
cross the river between the piers and the shore?”
“Suspension bridges; so that the Tower Bridge as it will be called,
for it will cross the Thames by the Tower of London, will embody
the suspension, the bascule (or drawbridge), and the girder bridge
principles, while in the centre will be two levels.”
“It promises to be a splendid piece of work.”
“It does. And it is very much needed, for the congestion of traffic on
London Bridge is terrible.”
“And people have often to come round a long way to reach it.”
The promise of the Tower Bridge, as set forth by these speakers, has
been amply fulfilled. It is indeed a fine piece of work; and although
it does not embody any new idea, yet in its combination and development
of old principles and in its size it is very remarkable. It was opened
in June, 1894, and is, or was at the time of building, the biggest
bascule bridge in the world.
Within its handsome Gothic towers are steel columns of immense
strength, constituting the chief supports of the suspension bridges
and of the high-level footways. The architect was the late Sir Horace
Jones, and the engineer Mr. J. Wolfe Barry, while the cost was,
including land, about £1,170,000.
The problem was to combine a low-level bridge providing for ordinary
town traffic with a high level, under which ships could pass, and it
was accomplished by a union of principles. In its oldest shape the
drawbridge was probably a huge piece of timber, which was hauled up
and let down by chains over the moats of castles. In the Tower Bridge
there are two of such huge “flaps” or leaves, each about 100 feet long,
one rising and falling from each pier and meeting in the centre. Large
bascule bridges are usually constructed in this manner, and there is an
excellent specimen over the Ouse, for the passage of the North-Eastern
railway; one man at each half of the bridge can raise it in less than
two minutes. Another fine bascule may be seen at Copenhagen.
The bascules are raised and lowered by chains, which, in the case of
the Tower Bridge, are worked by superb hydraulic power from the massive
pier towers. When drawn up, which is done in less than five minutes,
the bascules are even with the sides of the towers, and full space is
given for the vessels to pass.
The two side spans of the bridge, crossed by the suspension bridges,
are wider than the centre, being 270 feet each, and the total length
of the whole bridge is 800 feet between the abutments. There are also
piers on the shoreward side for carrying the chains of the suspension
bridges at each extremity.
The massive tower piers, sunk 27 feet below the river bed, are built of
gray granite, and are also fitted with strong break-waters to resist
the action of the tide. The high-level bridges across the central
span are for foot passengers, and are 135 feet over high-water mark.
The bascule bridges, when closed for vehicular traffic, are 29½ feet
above high water, while the side suspension spans are 27 feet. The
roadway is 50 feet wide, which is also the width of the approaches. The
foot passenger traffic is never stopped, as persons can pass by the
hydraulic lifts or the stairways in the tower piers to the high-level
bridges above.
Sir Horace Jones died before the great work was completed, and was
succeeded by Mr. G. D. Stevenson, who had been his assistant. Sir
William Arrol & Co. supplied the iron and steel, and Sir William
Armstrong the hydraulic machinery. Various contractors carried out
different portions of the mighty work, which occupied about eight
years in building. Near by stands the ancient Tower of London, looking
not unkindly on the great constructive effort to which it has given its
name.
Sometimes a bridge is made movable by swinging it round on a pivot
instead of drawing it up on a hinge or axis; and sometimes, as in
the case of a bridge over the Arun for the Brighton and South Coast
Railway, it is made to slide on wheels backwards and forwards from
the abutment. Floating or pontoon bridges are made by placing planks
on pontoons, or boats anchored by cables. The longest in the world is
probably at Calcutta, across the Hooghly. It is 1530 feet in length,
there being twenty-eight pontoons in pairs. These are of iron, 160 feet
long, and with ends shaped like wedges; they support a road-way of
3-inch timbers, forty-eight feet wide, and raised on tressel work. An
opening can be made for ships by removing four pontoons and floating
them clear of the passage way.
Great bridges present some of the most remarkable triumphs of the
engineer. They rank beside the express locomotive and the ocean liner
as among the great constructive achievements of mankind. Daring in
design, and bold in execution and in sweep of span, they have been
developed along several principles; and so solidly have they been
built, so sound are the laws of their being, that it seems as though
they will live as long as the everlasting hills.
[Illustration]
[Illustration]
REMARKABLE TUNNELS AND THEIR CONSTRUCTION.
CHAPTER I.
HOW BRUNEL MADE A BORING-SHIELD.
“I watched the worm at work and took my idea from that tiny creature!”
“A worm! Was it an ordinary worm?”
“Oh no, it was the naval wood-worm—_Teredo Navalis_; it can bore its
way through the hardest timber. I was in a dockyard and I saw the
movements of this animal as it cut its way through the wood, and the
idea struck me that I could produce some machine of the kind for
successful tunnelling.”
“Well, it has been brilliantly successful.”
“I looked at the animal closely, and found that it was covered with
a couple of valvular shells in front; these shells seem to act as a
shield, and after many attempts I elaborated the boring-shield which
was used in hollowing out the Thames Tunnel.”
This statement, which we can imagine to have been made by Sir Marc
Isambard Brunel to a friend, is no doubt in substance quite true. A
writer in the “Edinburgh Encyclopædia” says, that Sir M. I. Brunel
informed him, “that the idea upon which his new plan of tunnelling is
founded, was suggested to him by the operations of the _Teredo_, a
testaceous worm, covered with a cylindrical shell, which eats its way
through the hardest wood.”
Two or three attempts had already been made to drive a tunnel under the
Thames, but they had ended in failure. In 1823, Brunel came forward
with another proposal, and he ultimately succeeded.
This illustrious engineer must not be confounded with his son—who was
also a celebrated engineer—Isambard Kingdom Brunel. There were two
Brunels, father and son, even as there were two Stephensons, George and
Robert.
Sir Marc Isambard Brunel, the father, whose most notable enterprise
was the Thames Tunnel, was a French farmer’s son, and after various
experiences in France and America settled in England in 1799, and
married the daughter of William Kingdom of Plymouth. He had already
succeeded as an engineer so well as to be appointed chief engineer of
New York, and a scheme for manufacturing block-pulleys by machinery for
vessels was accepted by the British Government, who paid him £17,000
for the invention. He was also engaged in the construction of Woolwich
Arsenal and Chatham Dockyard, etc., and in 1823 he came forward with
another proposal for the Thames Tunnel.
In that same year, his son, Isambard Kingdom Brunel, entered his
father’s office, and assisted in the construction of the tunnel. The
son subsequently became engineer to the Great Western Railway, and
designed the _Great Western_ steamship.
But though Brunel’s proposal for the tunnel was made public in 1823,
the work was not actually commenced until March, 1825. It was to cross
under the river from Wapping to Rotherhithe, and present two archways.
And if you had been down by the Rotherhithe bank of the Thames about
the latter date, you would have been surprised to see that instead of
hollowing out a shaft, proceedings began by raising a round tower.
A space was traced out, some 50 feet across, and bricklayers began to
build a circular hollow tower about 3 feet thick and 42 feet high.
This tower was strengthened by iron bars, etc., and then the excavation
commenced within. The soil was dug out and raised by an engine at the
top, which also pumped out water. And as the hollow proceeded, the
great shaft or tube of masonry sank gradually into it. Bricklayers
added to its summit until it reached a total height of 65 feet, which
in due course was sunk into the ground.
Thus, then, the engineer had, to commence with, a strong and reliable
brickwork shaft, 3 feet thick, by which men and materials could ascend
and descend in safety. A smaller shaft was also sunk deeper for
drainage.
And now the actual boring of the tunnel commenced. It was to be 38 feet
wide and 22½ feet in height. On New Year’s Day, 1826, the boring-shield
was placed below in the shaft. The shield was composed of 36 cells, 3
cells in height and 12 in breadth, with a workman to each.
The huge “shield” was placed before the earth to be excavated, and
a front board being removed, the soil behind it was dug out to a
specified extent, and the board was propped against the fresh surface
thus made. When the boards had all been placed thus, the cells were
pushed forward into the hollow then made. This was accomplished by
means of screws at the top and bottom of the shield, and which were set
against the completed brickwork behind.
For, while the labourers were working in front, the bricklayers behind
built up the sides and roof, and formed the floor of the tunnel, the
soil at the roof being supported by the shield until the masons had
completed their task.
For nine feet, the tunnel proceeded through clay, but then came an
unwelcome change. Wet, loose sand prevailed, and the work progressed
with peril for thirty-two days, when firmer ground was reached. Six
months passed and substantial headway was made, the tunnel being
completed to the extent of 260 feet.
Then, on the 14th of September, the startling intelligence came that
the engineer feared the river would burst in at the next tide. He had
found a cavity over the shield. Sure enough, at high tide, when the
river was brimming full, the workmen heard the ominous rattle of earth
falling on their shield, while gushes of water followed.
So excellent were the precautions, however, that no disastrous effects
followed, and Father Thames himself rolled earth or clay into the hole
and stopped it up. It was a warning, and emphasised the fear that
haunted the men’s minds all through the hazardous undertaking—the fear
that the river would break through and drown the tunnel.
In October, another small irruption took place, and was successfully
combated. Then, in the following January (1827), some clay fell, but
still no overwhelming catastrophe occurred. The ground grew so moist,
however, that it was examined on the other side. That is, the river
bed was inspected by the agency of a diving-bell, and some ominous
depressions were found. These were promptly filled by bags of clay.
It may be asked, Why had Brunel not gone deeper? Why had he not placed
a greater thickness of earth or clay between his work and the waters of
the Thames?
The answer is this—He had been informed by geologists that quicksand
prevailed lower down, and the shaft that he sank for drainage below
the level of the proposed tunnel, indicated that this view might be
correct. In fact, when he got down 80 feet, the soil gave way, and
water and sand rushed upwards. He was therefore apparently between the
Thames and the quicksand. The Tower Subway, constructed in 1869, and
driven through the solid London clay, is, however, 60 feet deep where
it commences at Tower Hill.
Work went steadily forward at Brunel’s tunnel until the 18th of May.
Mr. Beamish, the assistant engineer, was in the cutting on that day,
and as the tide rose he observed the water increase about the shield;
clay showed itself and gravel appeared. He had the clay closed up, and
went to encourage the pumpers. Suddenly, before he could get into the
cells, a great rush of sludge and water drove the men out of the cells,
extinguished the lights, floated the cement casks and boxes, and poured
forward and ever forward, filling the tunnel with the roaring of the
flood.
The Thames had broken in with a vengeance this time, and drowned the
tunnel.
CHAPTER II.
UNDER THE RIVER.
Happily no one lost his life.
The men retreated before the advancing wave, and as they went they met
Brunel. But the great engineer could do nothing just then, except,
like them, to retreat. The lights yet remaining flashed on the roaring
water, and then suddenly went out in darkness.
The foot of the staircase was reached, and it was found thronged with
the retreating workers. Higher and higher grew the surging flood;
Brunel ordered great speed; and scarcely were the men’s feet off the
lower stair when it was torn away.
On gaining the top, cries were heard; some calling for a rope, others
for a boat. Some one was below in the water! Brunel himself slipped
down an iron rod, another followed, and each fastening a rope to the
body of a man they found in the flood, he was soon drawn out of
danger. On calling the roll, every worker answered to his name. No life
was lost.
So far, good; but what was to be done now? The tunnel was full of
water. To pump it dry was impossible, for the tide poured in from the
Thames.
Again the diving-bell was used, and the hole was found in the bed of
the river. To stop it bags of clay, with hazel sticks, were employed;
and so difficult was the task that three thousand bags were utilised
in the process, and more than a month elapsed before the water was
subdued. Two months more passed before the earth washed in was removed,
and Brunel could examine the work.
He found it for the most part quite sound, though near the shield it
had been shorn of half its thickness of bricks. The chain of the shield
was snapped in twain, and irons belonging to the same apparatus had
been forced into the earth.
The men now proceeded with their task, and exhibited a cool courage
deserving of all praise. Earth and water frequently fell; foul gases
pervaded the stifling air, and sometimes exploded, or catching
fire, they would now and again dance over the water; and again and
again labourers would be carried away insensible from the poisonous
atmosphere. Complaints, such as skin eruptions, sickness, and
headaches, were common. Yet, in spite of every difficulty, the men
worked on in that damp and dripping and fœtid mine, haunted ever with
the dread of another flood.
And it came. On the 12th of August, 1828, some fifteen months after the
previous disaster, the ground bulged out, a large quantity fell, and a
violent rush of water followed; one man being washed out of his cell to
the wooden staging behind.
[Illustration: THE THAMES TUNNEL.]
The flow was so great that Brunel ordered all to retire. The water rose
so fast that when they had retreated a few feet it was up to their
waists, and finally Brunel had to swim to the stairs, and the rush of
water carried him up the shaft. Unhappily, about half-a-dozen lives
were lost at this catastrophe, and those who were rescued—about a dozen
in number—were extricated in an exhausted or fainting state. The roar
of the water in the shaft made a deafening noise; the news soon spread,
and the scene became very distressing as the relatives of the men
arrived.
Once more the hole in the bed of the Thames had to be stopped. Down
went the diving-bell, but it had to descend twice before the gap was
discovered. It was a hole some seven feet long, and four thousand tons
of earth, chiefly bags of clay, were used in filling it. Again the
tunnel was entered, and again the intrepid engineer found the work
sound.
But, alas, another difficulty had presented itself—one more difficult
to conquer even than stopping up huge holes in the bed of the Thames.
The tunnel was being cut by a Company, and its money had gone; nay,
more, its confidence had well nigh gone also. Work could not proceed
without money, and for seven years silence and desolation reigned in
those unfinished halls beneath the river.
Then the Government agreed to advance money, and work was again
commenced. But it proceeded very slowly, some weeks less than a foot
being cut, during others again three feet nine inches. The ground was
in fact a fluid mud, and the bed of the river had to be artificially
formed before the excavation could proceed in comparative safety.
Further, the tunnel was far deeper than any other work in the
neighbourhood, and all the water drained there—a difficulty which was
obviated by the construction of a shaft on the other side of the river.
The shield had also to be replaced. It had been so battered about by
the flood that another was necessary. As it kept up the earth above,
and also in front, the change was both arduous and perilous. But it was
accomplished without loss of life.
Three more irruptions of water occurred: the third in August, 1837,
the fourth in November, 1837, and the fifth in March, 1838. But the
engineer was more prepared for Father Thames’ unpleasant visits, and a
platform had been constructed by which the men could escape. Unhappily,
one life was lost, however, on the fourth occasion. A great rush of
soil also occurred in April, 1840, accompanied by a sinking of the
shore at Wapping over some seven hundred feet of surface. Happily this
occurred at low tide, and the chasm was filled with gravel and bags of
clay before the river rose high.
At length, on the 13th of August, 1841, Brunel descended the shaft at
Wapping, and entering a small cutting, passed through the shield in
the tunnel, amidst the cheers of the workmen. After all these years
of arduous toil, of anxious solicitude, and of hair-breadth escapes,
the end was near, and a passage under the Thames was cut. It was not
completed and open to the public, however, until the 25th of March,
1843, and then for foot passengers only.
The approaches for carriages remained to be constructed, and would have
been expensive works. They were to be immense circular roads, but they
were never made. Perhaps that deficiency contributed to the commercial
failure of the great engineering enterprise. In any case, the tunnel
never paid; the Company dissolved; and the tunnel passed over to the
East London Railway, who run trains through it. Its length is 1300
feet, while between it and the river there is a thickness of soil of
some fifteen feet.
Though a failure as a business, yet the tunnel was a great engineering
triumph. It was a marvel of perseverance, and of determined, arduous,
skilful toil against overwhelming difficulties. Eighteen years
passed before it was completed; and if the seven be deducted during
which the work was stopped, still eleven remain as the period of its
construction. Work occupying such a length of time must be costly.
Could it be shortened? Would tunnel-making machinery be developed and
improved so as to expedite the labour of years?
CHAPTER III.
THROUGH THE ALPS.
“Cut through the Alps? It is an impossibility; and it would never pay!”
“Yet they are about to do it. Sommeiller, an engineer, has invented, or
obtained, a rock-boring machine which promises to lighten the labour
considerably; and then, of course, they will shatter great quantities
of earth by explosives.”
“And what part of the Alps?”
“Through Mont Cenis. The tunnel will be about 7½ miles long, and the
mountain over it will rise 5400 feet at one point.”
“And when do they expect to finish it?”
“I cannot say. They will begin on the southern—that is, the
Italian—side first, and later on the French side. Through the tunnel
will pass one of the principal routes from the West to the East.”
This conversation, we may suppose, took place in 1857, the year when
the tunnel was commenced. For four years hand work was used, though
blasting was in operation from the first; but in 1861 drilling by
machinery was brought into play, and the rate of progress became much
greater.
The machine was the first practical boring apparatus for rock, and
was used first in making the Mont Cenis Tunnel. With explosives, as
gun-cotton, dynamite, etc., the time occupied in cutting tunnels has
been much reduced. Thus the Mont Cenis Tunnel occupied about thirteen
years, and cost three millions of pounds. The St. Gotthard—another
Alpine subway—occupied eight years, though it is 9¼ miles in length;
and the Arlberg—yet another Alpine tunnel—a little over 6 miles long,
occupied something more than three years.
Further, the railway of which the St. Gotthard Tunnel forms part, has
been commercially very successful. This tunnel was commenced in 1872
and completed in 1880, the same year that saw the beginning of the
Arlberg.
Tunnels through hard rock do not always need a lining of brickwork; but
if the soil be clay, or loose earth of any kind, the lining of brick
or stone must be brought up close to the scene of actual excavation.
The Mont Cenis is lined with stone or brick almost entirely, about 900
feet, however, being without such lining.
And now, how was the actual work of tunnelling carried on? It will be
seen at once that the problem was quite different from that of boring
fifteen feet under the Thames, and sometimes through watery mud. In
boring through mountains the quickest way of cutting and carting away
rock is one of the chief points to be considered. At the Mont Cenis
Tunnel the blasting took place by driving a series of shot holes into
the soil, all over the surface to be cut, filling them with explosives,
and firing them simultaneously in rings. Such explosives may be fired
by a time-fuse or by electricity, giving the workmen ample time to
escape out of reach. The shaken and shattered soil can then be cleared
away.
The blast holes in this small-shot system are about 1 to 1½ inch in
diameter, and from 1½ to 7 or 9 feet in the rock. The explosive is
forced to the end of each, and the hole is then tamped—that is, closed
with clay or sand—and fired in due time.
[Illustration: BORING MACHINE USED FOR THE MONT CENIS TUNNEL.]
The cutters for boring in rock are often diamond drills, the cutting
edges being furnished with a kind of diamond found in Brazil, of a
black colour and of great hardness. These are placed round the edge
of a cylinder of steel, to which iron pipes can be screwed as the
edge cuts its way deeper in the rock. The stuff cut out as the drill
revolves finds its way through the cylinder and the piping. There are,
however, a great number of boring machines of different kinds, hard
steel sometimes taking the place of the opaque diamonds for cutting
purposes. The compressed air with which many of the machines are
worked assisted in the St. Gotthard in the ventilation of the tunnel,
frequently a great consideration, as the space is so small and the gas
from explosions often so great.
The Mont Cenis Tunnel marks a transition period in tunnelling. During
the four years that hand labour was used, the average rate of progress
was but nine inches a-day on either side; but when the rock-drills
worked by compressed air were introduced, the speed was five times as
great. Still further, at the Arlberg Tunnel through the Tyrolese Alps
the average rate of progress was 9·07 yards per day, and the cost £108
per lineal yard; while the cost of the Mont Cenis was £226 per lineal
yard. These figures show immense progress in economy and in speed.
The St. Gotthard Tunnel was begun in 1872, and the machine drills were
used throughout. A heading was first cut about eight feet square, and
the hollow thus gained was afterwards enlarged and finally sunk to the
desired level. Several Ferroux drills were used, placed on a carriage,
and an average charge of 1¾ lbs. of dynamite placed in the holes made.
After firing, the compressed air was discharged and the shattered soil
was cleared away.
In the Arlberg Tunnel a chief heading was driven, and then shafts
opened up enabling smaller headings to be driven on both hands. Drills
worked by hydraulic power were used, as well as drills worked by air,
and, after the explosions, water spray was thrown out to assist in
clearing and purifying the air. Ventilators also were used, which
injected air at the rate of more than 8000 cubic feet per minute.
Speedy transit of the earth excavated and the materials for masonry
were also effected, it being estimated that some 900 tons of earth had
to be taken out of each end, and about 350 tons of masonry had to be
brought in, every day.
Tunnels through huge thicknesses of rock or under rivers can only
be cut from the two opposite ends. Where possible, however, other
shafts have been sunk along the line the subway was to take, and thus
excavation might continue at several places along the line of route,
the shafts being used for ventilation and for the conveyance of the
excavated soil.
But the use of machine drills and of blasting explosives, with improved
appliances for ventilation, have, with possibly some rare exceptions,
rendered these methods obsolete. According to Pliny the tunnel for
draining Lake Fucino was the greatest work of his day. It was over
3½ miles long, and cut under Monte Salviano. Forty shafts were sunk
in cutting it, also sloping galleries, and huge copper buckets were
used to carry away the earth. It is stated that this tunnel—some ten
feet high, by six wide—occupied 30,000 men eleven years. Compare this
with the Arlberg, or even the Gotthard, double and treble the length,
occupying much less time. Sir Benjamin Baker has calculated that the
Fucino tunnel could now be cut in eleven months.
Gunpowder gave some advance on old Roman methods of tunnelling. The
improved explosives and rock-drills have gone further.
Even as the Mont Cenis shows a transition period, so the Arlberg may
be said to emphasise a triumph of the methods then indicated. So great
have been the improvements of the rock-boring machinery, of the power
of the blasts, and the speedy ventilation following the explosions, and
of the quick transit of materials, that we shall most likely hear no
more of sinking numerous shafts along the route.
But what of subaqueous tunnels? Violent explosives are hardly suitable
for excavation a few feet under a turbid river. What is to be done,
when cutting under a full and treacherous stream?
CHAPTER IV.
UNDER WATER AGAIN.
“How to cross the Thames at Blackwall, far east of the Tower Bridge?”
That was a problem which the citizens of London had to face in the
latter part of the nineteenth century.
An immense population dwelt on either side, and some means of easy
communication became a pressing necessity. Should it be effected by
means of a bridge, fixed or floating, or by means of a tunnel?
Finally a tunnel was decided upon, with sloping approaches on either
side. Its entire length was to be 6200 feet including the approaches;
but herein lay the danger and the difficulty—it was to be driven only
seven feet below the bed of the river, and through loose soil and
gravel.
How then was this perilous task to be accomplished? If the great river
burst through Brunel’s fifteen feet, would it not be much more likely
to rush through this seven feet of loose soil?
But the engineers in charge had an appliance in hand, which was unknown
to Brunel—viz., a compressed air chamber, a piece of apparatus which
has facilitated several great engineering achievements, besides the
Blackwall Tunnel.
When the excavation of the tunnel was commenced, a stout apartment
was formed at the end of the cutting, into which air was pumped until
it exerted a pressure of some thirty-five pounds to a square inch, in
addition to its usual weight.
This is generally reckoned at an average of 14·7 pounds to a square
inch. We are so used to this pressure that we do not feel it; but let
us enter a room where the air has been much more compressed, as in
this air-chamber, and serious consequences would be likely to ensue,
especially at first.
The human body, however, has a wonderful power of adaptability, and
after a time some men get used to the change and can work in the
compressed air without injury. But at first it may cause bleeding from
the nose and ears, sometimes indeed affecting the hearing more or less
seriously, and also causing great pain.
The reason for using this compressed air chamber was to keep out Father
Thames. The great pressure of the air resisted the great pressure of
the water, and held up the seven feet of soil between.
Powerful engines were maintained at work to provide for the pressure
of the air, and the chamber in which the compressed air was kept was
entered and left by the workmen through an “air-lock”—that is, a small
ante-chamber having two doors, one leading to the compressed air and
the other to the ordinary atmosphere, and neither being opened at the
same time.
The men, then, worked in this compressed air chamber, which prevented
irruptions of the river. But the method of excavation was also another
safeguard, both against irruptions of water and of earth.
In essence, it was much the same as that pursued in boring the tunnel
for the South London Electric Railway; that, however, was through thick
clay and about 10½ feet in diameter, and this was 27 feet across, and
through loose and stony stuff. The shield, instead of containing as in
Brunel’s time a number of cells, consisted of an immense iron cylinder,
weighing some 250 tons; closed in front, but having a door in the
closed part; the rim of the cylinder round this part having a sharp
edge for cutting into the soil.
[Illustration: THE ENTRANCE TO THE AIR-LOCK.
(_Men waiting to enter the Compressed Air-Chamber through the Door._)]
The door being opened, the men found themselves face to face with the
earth to be excavated. They cut away as well as they could, perhaps
about 2½ feet deep, throwing the earth into trucks in the compressed
air chamber; these trucks would be afterwards hauled away through the
air-lock by electricity, and the huge iron cylinder would be pushed
forward by means of hydraulic power. Twenty-eight hydraulic “jacks”
were employed, and they forced forward the 250 ton cylinder with its
cutting edge, when the men would resume working through the door as
before.
Behind them, the hole of the tunnel thus cut out was being lined.
First, it was built round with iron plates a couple of inches thick.
This plating was fixed in segments, and formed a huge pipe a little
smaller than the actual hollow in the earth. Through holes in the
immense piping, liquid cement was forced, thus plugging up the space
entirely between the earth and the iron, and forming an outer ring of
cement.
Within, the tunnel was completed by a facing of glazed tiles, placed on
a thickness of 14 inches of concrete. A road-way was laid 16 feet wide,
flanked by footpaths of 3 feet, 2 inches, on either side. The subway is
lighted by electricity, and staircases on the banks lead down to it for
foot passengers. The stairways give entrance to the tunnel not far from
the river, and much nearer than the commencement of the carriage-way
approaches.
At the northern side, the slope down commences near the East India
Dock entrance, and turns out of the East India Dock Road. The slope
is fairly gradual—about one in thirty-four—and it passes under the
Blackwall line of the Great Eastern Railway, and near to Poplar
Station. The part of the tunnel near to this point—that is the part
between the river and the open slope—was executed by what is called
“cut and cover” work—that is, a huge trench was dug, then arched in and
covered over.
“Cut and cover” work also took place on the south side; and there, at
the foot of an immense excavation ninety feet down, and with its sides
held up by huge timbers, might have been seen a river of water which
had drained in and was being pumped up quickly by powerful machinery.
Not far distant, the shaft was being sunk for the staircase. In
principle, the sinking of the shaft was conducted much as Brunel’s
shaft at the Thames Tunnel, only it was built up of iron instead of
brick. Imagine a big gasometer with a scaffold near the top, where men
are busy building the walls higher and higher by adding on plate after
plate of iron. On reaching the scaffold you find that there are two
great cylinders of iron, one standing inside the other, and concrete
is being filled in between them. Men also are down below digging out
the earth which is being swung up in iron buckets; and as the soil is
gradually removed, the immense double iron and concrete cylinder slowly
sinks by its own weight.
In this manner, the great shaft was sunk nearly ninety feet, and within
it the staircase has been built, giving entrance for foot passengers,
not far from the river. Thus, on either side are sloping entrances to
the tunnel, and also, nearer the water, stairways of descent down great
shafts.
Engineers have also found their way beneath other great English
rivers—the Severn and the Mersey. Much water had to be dealt with
in the cutting of the Severn Tunnel. This important work, four and
one-third miles long, was driven in some places forty-five feet under
sandstone, and at the Salmon Pool—a hollow in the river bed—the tunnel
was thirty feet under soil called trias marl. Much greater space,
therefore, exists here between the tunnel and river than at Blackwall.
But the river burst through. The work was begun in 1873, and completed
in 1886.
Six years after its commencement the tunnel was drowned, so to speak,
for a long time by a large spring of water which burst out from
limestone, and arrangements had to be made to provide for this flood.
It is now conducted by a subsidiary tunnel or channel to a huge shaft,
where it is raised by pumps of sufficient strength. Then there was the
perilous Salmon Pool to be dealt with. The river burst through here,
and the rent had to be stopped with clay. The tunnel is twenty-six
feet wide by twenty feet high, and is cut through Pennant stone,
shale, and marl. It is lined with Staffordshire vitrified bricks
throughout—seventy-five million bricks it is estimated being used. The
works are ventilated by a huge fan, and pumping continually proceeds,
something like twenty-six million gallons of water, it is said, being
raised in the twenty-four hours. The tunnel, of which the engineers
were Messrs. Hawkshaw, Son, Hayter & Richardson, and Mr. T. A. Walker,
Contractor, is for the use of the Great Western Railway, and saves
that Company’s Welsh and Irish trains to Milford a long way round by
Gloucester.
[Illustration: THE BORING MACHINE USED IN THE PRELIMINARY CONSTRUCTION
OF THE ENGLISH CHANNEL TUNNEL.]
In cutting the Mersey Tunnel, which was completed in 1886, machinery
was used for some of the work. The machine bored partly to a diameter
of seven feet four inches, but hand labour had to be largely depended
upon. The plan pursued was to sink a shaft on either side of the
river and drive a heading, sloping upward through the sandstone to
the centre; this heading acting as a drain for any water which might
appear. The thickness between the arch of the tunnel and the river bed
is thirty feet at its least, and the tunnel, which occupied about six
years in construction, and of which the engineers were Messrs. Brunlees
& Fox, is provided with pumps raising some thirteen million gallons
of water daily. As in the case of the Severn Tunnel, ventilation is
provided for by huge fans.
A boring machine was also used in the preliminary efforts for the
construction of a tunnel under the English Channel. Holes, seven
feet across and to the length of 2000 yards, have been bored by a
compressed air machine, working with two arms furnished with teeth of
steel. The construction of the tunnel is held to be quite feasible from
an engineering point of view, and it is believed that it would pass
through strata impervious to water, such as chalk marl and grey chalk.
Still, the huge tunnel at Blackwall, which was carried out by Mr.
Binnie, Chief Engineer of the London County Council, with Mr. Greathead
and Sir Benjamin Baker as Consulting Engineers, is probably one of the
most daring and stupendous enterprises of the kind ever undertaken. To
hollow out a subway hundreds of feet long under the Thames, only seven
feet from the bed of the great river, and through loose gravelly soil,
was a great triumph. It was achieved not by uncalculating bravery, but
by a wise combination of cool courage, superb skill, and admirable
foresight.
To design effectively, to provide for contingencies, to be daunted
by no difficulties—these qualities help to produce the Triumphs of
Engineers, as well as do great inventive skill, the power of adapting
principles to varying circumstances, and high-spirited enterprise in
planning and conducting noble and useful works. These works may well
rank among the great achievements of man’s effort and the wonders of
the world.
THE END.