BRIDGE BUILDERS AND SOME OF THEIR ACHIEVEMENTS

In the old days when Rome was supreme a Caesar decreed that a bridge

should be built to carry a military road across a valley, or ordered

that great stone arches should be raised to conduct a stream of water to

a city; and after great toil, and at the cost of the lives of unnumbered

labourers, the work was done--so well done, in fact, that much of it is

still standing, and some is still doing service.

In much the same regal way the managers of a railroad order a steel

bridge flung across a chasm in the midst of a wilderness far from

civilisation, or command that a new structure shall be substituted for

an old one without disturbing traffic; and, lo and behold, it is done in

a surprisingly short time. But the new bridges, in contrast to the old

ones, are as spider webs compared to the overarching branches of a great

tree. The old type, built of solid masonry, is massive, ponderous, while

the new, slender, graceful, is built of steel.

One day a bridge-building company in Pennsylvania received the

specifications giving the dimensions and particulars of a bridge that an

English railway company wished to build in far-off Burma, above a great

gorge more than eight hundred feet deep and about a half-mile wide. From

the meagre description of the conditions and requirements, and from the

measurements furnished by the railroad, the engineers of the American

bridge company created a viaduct. Just as an author creates a story or a

painter a picture, so these engineers built a bridge on paper, except

that the work of the engineers' imagination had to be figured out

mathematically, proved, and reproved. Not only was the soaring structure

created out of bare facts and dry statistics, but the thickness of every

bolt and the strain to be borne by every rod were predetermined

accurately.

And when the plans of the great viaduct were completed the engineers

knew the cost of every part, and felt so sure that the actual bridge in

far-off Burma could be built for the estimated amount, that they put in

a bid for the work that proved to be far below the price asked by

English builders.

And so this company whose works are in Pennsylvania was awarded the

contract for the Gokteik viaduct in Burma, half-way round the world

from the factory.

[Illustration: BUILDING AN AMERICAN BRIDGE IN BURMAH

This structure stretches 820 feet above the bottom of the Gokteik Gorge.

The viaduct was built entirely from above, as shown in this picture.]

In the midst of a wilderness, among an ancient people whose language and

habits were utterly strange to most Americans, in a tropical country

where modern machinery and appliances were practically unknown, a small

band of men from the young republic contracted to build the greatest

viaduct the world had ever seen. All the material, all the tools and

machinery, were to be carried to the opposite side of the earth and

dumped on the edge of the chasm. From the heaps of metal the small band

of American workmen and engineers, aided by the native labourers, were

to build the actual structure, strong and enduring, that was conceived

by the engineers and reduced to working-plans in far-off Pennsylvania.

From ore dug out of the Pennsylvania mountains the steel was made and,

piece by piece, the parts were rolled, riveted, or welded together so

that every section was exactly according to the measurements laid out on

the plan. As each part was finished it was marked to correspond with the

plan and also to show its relation to its neighbour. It was like a

gigantic puzzle. The parts were made to fit each other accurately, so

that when the workmen in Burma came to put them together the tangle of

beams and rods, of trusses and braces should be assembled into a

perfect, orderly structure--each part in its place and each doing its

share of the work.

With men trained to work with ropes and tackle collected from an Indian

seaport, and native riveters gathered from another place, Mr. J.C. Turk,

the engineer in charge, set to work with the American bridgemen and the

constructing engineer to build a bridge out of the pieces of steel that

lay in heaps along the brink of the gorge. First, the traveller, or

derrick, shipped from America in sections, was put together, and its

long arm extended from the end of the tracks on which it ran over the

abyss.

From above the great steel beams were lowered to the masonry foundations

of the first tower and securely bolted to them, and so, piece by piece,

the steel girders were suspended in space and swung this way and that

until each was exactly in its proper position and then riveted

permanently. The great valley resounded with the blows of hammers on

red-hot metal, and the clangour of steel on steel broke the silence of

the tropic wilderness. The towers rose up higher and higher, until the

tops were level with the rim of the valley, and as they were completed

the horizontal girders were built on them, the rails laid, and the

traveller pushed forward until its arm swung over the foundation of the

next tower.

And so over the deep valley the slender structure gradually won its way,

supporting itself on its own web as it crawled along like a spider.

Indeed, so tall were its towers and so slender its steel cords and beams

that from below it appeared as fragile as a spider's web, and the men,

poised on the end of swinging beams or standing on narrow platforms

hundreds of feet in air, looked not unlike the flies caught in the web.

The towers, however, were designed to sustain a heavy train and

locomotive and to withstand the terrific wind of the monsoon. The

pressure of such a wind on a 320-foot tower is tremendous. The bridge

was completed within the specified time and bore without flinching all

the severe tests to which it was put. Heavy trains--much heavier than

would ordinarily be run over the viaduct--steamed slowly across the

great steel trestle while the railroad engineers examined with utmost

care every section that would be likely to show weakness. But the

designers had planned well, the steel-workers had done their full duty,

and the American bridgemen had seen to it that every rivet was properly

headed and every bolt screwed tight--and no fault could be found.

The bridge engineer's work is very diversified, since no two bridges are

alike. At one time he might be ordered to span a stream in the midst of

a populous country where every aid is at hand, and his next commission

might be the building of a difficult bridge in a foreign wilderness far

beyond the edge of civilisation.

Bridge-building is really divided into four parts, and each part

requires a different kind of knowledge and experience.

First, the designer has to have the imagination to see the bridge as it

will be when it is completed, and then he must be able to lay it out on

paper section by section, estimating the size of the parts necessary for

the stress they will have to bear, the weight of the load they will have

to carry, the effect of the wind, the contraction and expansion of cold

and heat, and vibration; all these things must be thought of and

considered in planning every part and determining the size of each. Also

he must know what kind of material to use that is best fitted to stand

each strain, whether to use steel that is rigid or that which is so

flexible that it can be tied in a knot. On the designer depends the

price asked for the work, and so it is his business to invent, for each

bridge is a separate problem in invention, a bridge that will carry the

required weight with the least expenditure of material and labour and at

the same time be strong enough to carry very much greater loads than it

is ever likely to be called upon to sustain. The designer is often the

constructor as well, and he is always a man of great practical

experience. He has in his time stepped out on a foot-wide girder over a

rushing stream, directing his men, and he has floundered in the mud of a

river bottom in a caisson far below the surface of the stream, while the

compressed air kept the ooze from flowing in and drowning him and his

workmen.

The second operation of making the pieces that go into the structure is

simply the following out of the clearly drawn plans furnished by the

designing engineers. Different grades of steel and iron are moulded or

forged into shape and riveted together, each part being made the exact

size and shape required, even the position of the holes through which

the bolts or rivets are to go that are to secure it to the neighbouring

section being marked on the plan.

The foundations for bridges are not always put down by the builders of

the bridge proper; that is a work by itself and requires special

experience. On the strength and permanency of the foundation depends the

life of the bridge. While the foundries and steel mills are making the

metal-work the foundations are being laid. If the bridge is to cross a

valley, or carry the roadway on the level across a depression, the

placing of the foundations is a simple matter of digging or blasting out

a big hole and laying courses of masonry; but if a pier is to be built

in water, or the land on which the towers are to stand is unstable, then

the problem is much more difficult.

For bridges like those that connect New York and Brooklyn, the towers of

which rest on bed-rock below the river's bottom, caissons are sunk and

the massive masonry is built upon them. If you take a glass and sink it

in water, bottom up, carefully, so that the air will not escape, it will

be noticed that the water enters the glass but a little way: the air

prevents the water from filling the glass. The caisson works on the same

principle, except that the air in the great boxlike chamber is highly

compressed by powerful pumps and keeps the water and river ooze out

altogether.

The caissons of the third bridge across the East River were as big as a

good-sized house--about one hundred feet long and eighty feet wide. It

took five large tugs more than two days to get one of them in its proper

place. Anchored in its exact position, it was slowly sunk by building

the masonry of the tower upon it, and when the lower edges of the great

box rested on the bottom of the river men were sent down through an

air-lock which worked a good deal like the lock of a canal. The men, two

or three at a time, entered a small round chamber built of steel which

was fitted with two air-tight doors at the top and bottom; when they

were inside the air-lock, the upper door was closed and clamped tight,

just as the gates leading from the lower level of a canal are closed

after the boat is in the lock; then very gradually the air in the

compartment is compressed by an air-compressor until the pressure in the

air-lock is the same as that in the caisson chamber, when the lower door

opened and allowed the men to enter the great dim room. Imagine a room

eighty by one hundred feet, low and criss-crossed by massive timber

braces, resting on the black, slimy mud of the river bottom; electric

lights shine dimly, showing the half-naked workmen toiling with

tremendous energy by reason of the extra quantity of oxygen in the

compressed air. The workmen dug the earth and mud from under the

iron-shod edges of the caisson, and the weight of the masonry being

continually added to above sunk the great box lower and lower. From time

to time the earth was mixed with water and sucked to the surface by a

great pump. With hundreds of tons of masonry above, and the watery mud

of the river on all sides far below the keels of the vessels that passed

to and fro all about, the men worked under a pressure that was two or

three times as great as the fifteen pounds to the square inch that every

one is accustomed to above ground. If the pressure relaxed for a moment

the lives of the men would be snuffed out instantly--drowned by the

inrushing waters; if the excavation was not even all around, the balance

of the top-heavy structure would be lost, the men killed, and the work

destroyed entirely. But so carefully is this sort of work done that such

an accident rarely occurs, and the caissons are sunk till they rest on

bed-rock or permanent, solid ground, far below the scouring effect of

currents and tides. Then the air-chamber is filled with concrete and

left to support the great towers that pierce the sky above the waters.

[Illustration: THE SPIDER-WEB-LIKE VIADUCT ACROSS CANON DIABLO

The slender steel structure supporting a loaded train that stretches

along its entire length.]

The pneumatic tube, which is practically a steel caisson on a small

scale operated in the same way, is often used for small towers, and many

of the steel sky-scrapers of the cities are built on foundations of this

sort when the ground is unstable.

Foundations of wooden and iron piles, driven deep in the ground below

the river bottom, are perhaps the most common in use. The piles are

sawed off below the surface of the water and a platform built upon them,

which in turn serves as the foundation for the masonry.

The great Eads Bridge, which was built across the Mississippi at St.

Louis, is supported by towers the foundations of which are sunk 107 feet

below the ordinary level of the water; at this depth the men working in

the caissons were subjected to a pressure of nearly fifty pounds to the

square inch, almost equal to that used to run some steam-engines.

The bridge across the Hudson at Poughkeepsie was built on a crib or

caisson open at the top and sunk by means of a dredge operated from

above taking out the material from the inside. The wonder of this is

hard to realise unless it is remembered that the steel hands of the

dredge were worked entirely from above, and the steel rope sinews

reached down below the surface more than one hundred feet sometimes;

yet so cleverly was the work managed that the excavation was perfect all

around, and the crib sank absolutely straight and square.

It is the fourth department of bridge-building that requires the

greatest amount not only of knowledge but of resourcefulness. In the

final process of erection conditions are likely to arise that were not

considered when the plans were drawn.

The chief engineer in charge of the erection of a bridge far from

civilisation is a little king, for it is necessary for him to have the

power of an absolute monarch over his army of workmen, which is often

composed of many different races.

With so many thousand tons of steel and stone dumped on the ground at

the bridge site, with a small force of expert workmen and a greater

number of unskilled labourers, in spite of bad weather, floods, or

fearful heat, the constructing engineer is expected to finish the work

within the specified time, and yet it must withstand the most exacting

tests.

In the heart of Africa, five hundred miles from the coast and the source

of supplies, an American engineer, aided by twenty-one American

bridgemen, built twenty-seven viaducts from 128 to 888 feet long within

a year.

The work was done in half the time and at half the cost demanded by the

English bidders. Mr. Lueder, the chief engineer, tells, in his account

of the work, of shooting lions from the car windows of the temporary

railroad, and of seeing ostriches try to keep pace with the locomotive,

but he said little of his difficulties with unskilled workmen, foreign

customs, and almost unspeakable languages. The bridge engineer the world

over is a man who accomplishes things, and who, furthermore, talks

little of his achievements.

Though the work of the bridge builders within easy reach of the steel

mills and large cities is less unusual, it is none the less adventurous.

In 1897, a steel arch bridge was completed that was built around the old

suspension bridge spanning the Niagara River over the Whirlpool Rapids.

The old suspension bridge had been in continuous service since 1855 and

had outlived its usefulness. It was decided to build a new one on the

same spot, and yet the traffic in the meantime must not be disturbed in

the least. It would seem that this was impossible, but the engineers

intrusted with the work undertook it with perfect confidence. To any one

who has seen the rushing, roaring, foaming waters of unknown depth that

race so fast from the spray-veiled falls that they are heaped up in the

middle, the mere thought of men handling huge girders of steel above the

torrent, and of standing on frail swinging platforms two hundred or more

feet above the rapids, causes chills to run down the spine; yet the work

was undertaken without the slightest doubt of its successful fulfilment.

It was manifestly impossible to support the new structure from below,

and the old bridge was carrying about all it could stand, so it was

necessary to build the new arch, without support from underneath, over

the foaming water of the Niagara rapids two hundred feet below. Steel

towers were built on either side of the gorge, and on them was laid the

platform of the bridge from the towers nearest to the water around and

under the old structure. The upper works were carried to the solid

ground on a level with the rim of the gorge and there securely anchored

with steel rods and chains held in masonry. Then from either side the

arch was built plate by plate from above, the heavy sheets of steel

being handled from a traveller or derrick that was pushed out farther

and farther over the stream as fast as the upper platform was completed.

The great mass of metal on both sides of the Niagara hung over the

stream, and was only held from toppling over by the rods and chains

solidly anchored on shore. Gradually the two ends of the uncompleted

arch approached each other, the amount of work on each part being

exactly equal, until but a small space was left between. The work was so

carefully planned and exactly executed that the two completed halves of

the arch did not meet, but when all was in readiness the chains on each

side, bearing as they did the weight of more than 1,000,000 pounds, were

lengthened just enough, and the two ends came together, clasping hands

over the great gorge. Soon the tracks were laid, and the new bridge took

up the work of the old, and then, piece by piece, the old suspension

bridge, the first of its kind, was demolished and taken away.

Over the Niagara gorge also was built one of the first cantilever

bridges ever constructed. To uphold it, two towers were built close to

the water's edge on either side, and then from the towers to the shores,

on a level with the upper plateau, the steel fabric, composed of slender

rods and beams braced to stand the great weight it would have to carry,

was built on false work and secured to solid anchorages on shore. Then

on this, over tracks laid for the purpose, a crane was run (the same

process being carried out on both sides of the river simultaneously),

and so the span was built over the water 239 feet above the seething

stream, the shore ends balancing the outer sections until the two arms

met and were joined exactly in the middle. This bridge required but

eight months to build, and was finished in 1883. From the car windows

hardly any part of the slender structure can be seen, and the train

seems to be held over the foaming torrent by some invisible support, yet

hundreds of trains have passed over it, the winds of many storms have

torn at its members, heat and cold have tried by expansion and

contraction to rend it apart, yet the bridge is as strong as ever.

Sometimes bridges are built a span or section at a time and placed on

great barges, raised to just their proper height, and floated down to

the piers and there secured.

A railroad bridge across the Schuylkill at Philadelphia was judged

inadequate for the work it had to do, and it was deemed necessary to

replace it with a new one. The towers it rested upon, therefore, were

widened, and another, stronger bridge was built alongside, the new one

put upon rollers as was the old, and then between trains the old

structure was pushed to one side, still resting on the widened piers,

and the new bridge was pushed into its place, the whole operation

occupying less than three minutes. The new replaced the old between the

passing of trains that run at four or five-minute intervals. The Eads

Bridge, which crosses the Mississippi at St. Louis, was built on a novel

plan. Its deep foundations have already been mentioned. The great

"Father of Waters" is notoriously fickle; its channel is continually

changing, the current is swift, and the frequent floods fill up and

scour out new channels constantly. It was necessary, therefore, in order

to span the great stream, to place as few towers as possible and build

entirely from above or from the towers themselves. It was a bold idea,

and many predicted its failure, but Captain Eads, the great engineer,

had the courage of his convictions and carried out his plans

successfully. From each tower a steel arch was started on each side,

built of steel tubes braced securely; the building on each side of every

tower was carried on simultaneously, one side of every arch balancing

the weight on the other side. Each section was like a gigantic seesaw,

the tower acting as the centre support; the ends, of course, not

swinging up and down. Gradually the two sections of every arch

approached each other until they met over the turbid water and were

permanently connected. With the completion of the three arches, built

entirely from the piers supporting them, the great stream was spanned.

The Eads Bridge was practically a double series of cantilevers balancing

on the towers. Three arches were built, the longest being 520 feet long

and the two shorter ones 502 feet each.

Every situation that confronts the bridge builder requires different

handling; at one time he may be called upon to construct a bridge

alongside of a narrow, rocky cleft over a rushing stream like the Royal

Gorge, Colorado, where the track is hung from two great beams stretched

across the chasm, or he may be required to design and construct a

viaduct like that gossamer structure three hundred and five feet high

and nearly a half-mile long across the Kinzua Creek, in Pennsylvania.

Problems which have nothing to do with mechanics often try his courage

and tax his resources, and many difficulties though apparently trivial,

develop into serious troubles. The caste of the different native gangs

who worked on the twenty-seven viaducts built in Central Africa is a

case in point: each group belonging to the same caste had to be

provided with its own quarters, cooking utensils, and camp furniture,

and dire were the consequences of a mix-up during one of the frequent

moves made by the whole party.

[Illustration: BEGINNING AN AMERICAN BRIDGE IN MID-AFRICA]

And so the work of a bridge builder, whether it is creating out of a

mere jumble of facts and figures a giant structure, the shaping of

glowing metal to exact measurements, the delving in the slime under

water for firm foundations, or the throwing of webs of steel across

yawning chasms or over roaring streams, is never monotonous, is often

adventurous, and in many, many instances is a great civilising

influence.