Chapter XI, “Municipal Public Works,” by the author.

Footnote 73:

Concrete combined curb and gutter is suitable for use on the great

majority of residence streets, and others where the travel is not

excessive, or where it will not be subjected to specially severe use,

as on business streets where heavy vehicles are likely to be often

backed against the curb. If properly constructed it will have

sufficient hardness and strength to withstand all ordinary usage; it

makes a better appearance, particularly on residence streets, than any

other kind of curbing, is durable, and is usually less expensive than

any other suitable, equally durable and equally well-finished curbing

of natural stone, since the gutter displaces an equal area of

pavement.

Footnote 74:

The sketch here presented conforms pretty closely to usual practice

except in the width of the gutter. It is not uncommon to make the

gutter from two to three feet wide. This is not necessary or

desirable. A width of 15 to 18 inches forms a sufficient gutter to

carry away all drainage except during very heavy rainfalls. Where the

gutter projects out into the street sufficiently far to be exposed to

large numbers of heavily loaded wheels the outer corner is likely to

become broken off or unduly abraded.

Footnote 75:

Curbing of all kinds is more likely to be injured by freezing and the

heaving of frost under and around it than from any other cause. Good

drainage is the best protection against such injury. It is important

that these drains shall be connected with sewers, drains or other

outlets, so that water will not stand in them.

Footnote 76:

The most notable departure of these specifications from usual practice

is the use of a solid body of rich, homogeneous concrete for the whole

section of the structure, thus avoiding the use of two courses and

qualities of concrete—the core concrete and the facing. The most

common cause of failure of concrete curbs and gutters is the

separation, more or less, of the facing from the core concrete.

Without doubt this can be prevented by the use of proper materials,

careful work, and the strict observance of the rule that the facing

course must be applied before the core concrete has begun to set. But

it is difficult to always secure these favorable conditions.

Computation will show that the difference in cost of materials,

between the usual two-course construction and a single body of rich

concrete throughout, is not very great, while the saving in cost of

labor is so considerable as to make the actual difference in cost of

the two types very small. There can be no doubt that the simpler

construction and the consequent greater certainty of securing a

durable and satisfactory job is greatly in favor of the construction

here recommended.

Footnote 77:

The appearance of “hair cracks” on the surface of rich concrete,

finished by troweling, and the blotched appearance of the surface of

concrete curbing, are usually caused by improper finishing. The glazed

surface produced by troweling, particularly where pure, dry cement or

neat mortar is applied is almost sure to develop hair cracks, and the

varying texture of the surface is likely to absorb water unevenly and

thus produce, in time, the unevenly colored or blotched surface so

often seen.

Footnote 78:

The utility and durability of hydraulic concrete sidewalks depends

largely on the quality of materials and workmanship employed in the

work. Too frequently, specifications for this work are not

sufficiently full, or not prepared with the requisite care, or the

work is not properly supervised or inspected while in progress. The

aggregate importance and cost of this sidewalk work in our cities

warrants more care and attention than it generally receives.

Footnote 79:

Determined by the thickness of the drainage course adopted.

Footnote 80:

It is customary in many cities to require that the drainage course

under the concrete shall have a depth of twelve or more inches. This

deep-drainage is designed to prevent the heaving of the sidewalk by

freezing. Experience seems to prove that this is not necessary,

particularly if tile drains are provided to carry off the water from

the drainage course, as specified. Comparatively dry material, even

earth, does not heave with freezing; on the other hand, if the

material and the trench in which it is placed is wholly or partly

filled with water, heaving is liable to occur in severe freezing

weather, whatever the depth of the drainage course. Experience has

proven, however, that four inches of drainage material is sufficient

if the water is drained out of it, while if allowed to stand saturated

with water, deeper drainage will give little if any better results.

Where the soil is sandy or the natural drainage is otherwise good, no

drainage course is necessary.

Footnote 81:

Except in the matter of low first cost cinders are not desirable for

the drainage course. In time, this material is likely to slack, or

decompose, and shrink in volume more or less and to allow the sidewalk

to settle. The hollow sound one often notices when walking over a

sidewalk and the cracks that frequently appear, are usually caused by

the irregular settlement of the drainage course. The object of wetting

down the cinders several days before they are used is to cause as much

as possible of this slacking to take place before the cinders are used

in the drainage course.

Footnote 82:

There is a good deal of diversity of practice in the thickness of the

concrete to be used. For all ordinary sidewalks three inches of bottom

course and one inch of surface-course are ample, and in many cases the

thickness of the surface course has been reduced to one-half inch with

satisfactory results. Three-fourths inch of surface-course, if fairly

uniform in thickness and of good quality, will generally be ample for

ordinary sidewalks.

Footnote 83:

It is customary to make the surface-course concrete much richer than

this, but it is not necessary if the materials are good and the work

well done.

Footnote 84:

This requirement is very important and should be strictly enforced,

otherwise there is danger that by the action of water, frost, and

time, the two courses may separate and the surface-course break up—a

condition not infrequently observed.

Footnote 85:

The troweling not only helps to secure a true surface, but tends to

produce a dense surface on the concrete; but it is not desirable that

this surface shall be smooth and glassy, hence the slight roughening

of the surface with a wire brush.

Footnote 86:

Care must be taken to make and leave these expansion joints open to

their full width entirely through the concrete. The practice of

forming these expansion joints by partitions of iron plate, against

which the blocks of sidewalk are built is not advised, for the reason

that they are likely to prevent the thorough compression of the

concrete surface against or near the plates.

------------------------------------------------------------------------

TRANSCRIBER’S NOTES

1. Silently corrected obvious typographical errors and variations in

spelling.

2. Retained archaic, non-standard, and uncertain spellings as printed.

3. Re-indexed footnotes using numbers and collected together at the end

of the last chapter.

4. Enclosed italics font in _underscores_.

5. Enclosed bold font in =equals=.

6. Denoted subscripts by an underscore before a series of subscripted

characters enclosed in curly braces, e.g. H_{2}O.

Specifications for street roadway pavements with instructions to inspectors on street paving work · 第 7 / 7 章