MAKING AND TAKING IN SAIL.
To loose a sail. To set a course--Topsail--Topgallant
sail--Royal--Skysail--Jib--Spanker--Spencer. To take in a
course--Topsail--Topgallant sail or royal--Skysail--Jib--Spanker. To
furl a royal--Topgallant sail--Topsail--Course--Jib. To stow a jib in
cloth. To reef a topsail--Course. To turn out reefs. To set a
topgallant studdingsail. To take in do. To set a topmast studdingsail.
To take in do. To set a lower studdingsail. To take in do.
TO LOOSE A SAIL.--Lay out to the yard-arms and cast off the gaskets,
beginning at the outermost and coming in.[2] When the gaskets are cast
off from both yard-arms, then let go the bunt gasket, (and jigger, if
there be one,) and overhaul the buntlines and leechlines. In loosing a
topsail in a gale of wind, it is better to cast off the
quarter-gaskets, (except the one which confines the clew,) before those
at the yard-arms. Royals and topgallant sails generally have one long
gasket to each yard-arm; in which case it is not necessary to go out
upon the yard, but the gaskets, after being cast off, should be
fastened to the tye by a bowline.
[2] If only one yard-arm is loosed at a time, let the lee one
be loosed first.
TO SET A COURSE.--Loose the sail and overhaul the buntlines and
leechlines. Let go the clew-garnets and overhaul them, and haul down on
the sheets and tacks. If the ship is close-hauled, ease off the lee
brace, slack the weather lift and clew-garnet, and get the tack well
down to the water-ways. If it is blowing fresh and the ship
light-handed, take it to the windlass. When the tack is well down,
sharpen the yard up again by the brace, top it well up by the lift,
reeve and haul out the bowline, and haul the sheet aft.
If the wind is quartering, the mainsail is carried with the weather
clew hauled up and the sheet taken aft. With yards squared, the
mainsail is never carried, but the foresail may be to advantage,
especially if the swinging booms are out; in which case the heavy tack
and sheet-blocks may be unhooked, and the _lazy sheets_ hooked on and
rove through a single tail-block, made fast out on the boom. This
serves to extend the clews, and is called a _pazaree_ to the foresail.
TO SET A TOPSAIL.--Loose the sail, and keep one hand in the top to
overhaul the rigging. Overhaul well the buntlines, clewlines, and
reef-tackles, let go the topgallant sheets and topsail braces, and haul
home on the sheets. Merchant vessels usually hoist a little on the
halyards, so as to clear the sail from the top, then belay them and get
the lee sheet chock home; then haul home the weather sheet, shivering
the sail by the braces to help it home, and hoist on the halyards until
the leeches are well taut, taking a turn with the braces, if the wind
is fresh, and slacking them as the yard goes up.
After the sail is set, it is sometimes necessary to get the sheets
closer home. Slack the halyards, lee brace, and weather bowline, clap
the watch-tackle upon the lee sheet first, and then the weather one,
shivering the sail by the braces if necessary. Overhaul the clewlines
and reef-tackles, slack the topgallant sheets, and hoist the sail up,
taut leech, by the halyards.
TO SET A TOPGALLANT SAIL OR ROYAL.--Haul home the lee sheet, having one
hand aloft to overhaul the clewlines, then the weather sheet, and hoist
up, taut leech, by the halyards. While hauling the sheets home, if on
the wind, brace up a little to shake the sail, take a turn with the
weather brace, and let go the lee one; if before the wind, let go both
braces; and if the wind is quartering, the lee one.
TO SET A FLYING SKYSAIL.--If bent in the manner described in this book,
let go the brails and royal stay, and hoist on the halyards.
TO SET A JIB, FLYING-JIB, OR FORE TOPMAST STAYSAIL.--Cast off the
gasket, hoist on the halyards, and trim down the sheet.
TO SET A SPANKER.--Hoist on the topping-lifts, make fast the weather
one, and overhaul the lee one. Let go the brails, and haul out on the
outhaul. Be careful not to let the throat brail go before the head and
foot. Trim the boom by the sheets and guys, and the gaff by the vangs.
TO SET A SPENCER.--Take the sheet to the deck on the lee side of the
stay, let go the brails, haul on the sheet, and trim the gaff by the
vangs.
TO TAKE IN A COURSE.--If the wind is light and there are hands enough,
let go the tack, sheet, and bowline, and haul up on the clew-garnets,
buntlines, and leechlines, being careful not to haul the buntlines taut
until the clews are well up. If light-handed, or the wind fresh, let go
the bowline and ease off the tack, (being careful to let the bowline go
before the tack,) and haul up the weather clew. Then ease off the sheet
and haul up on the lee clew-garnet, and the buntlines and leechlines.
TO TAKE IN A TOPSAIL.--The usual mode of taking in a topsail when
coming to anchor in light winds, is to lower away on the halyards and
haul down on the clewlines and reef-tackles, (if the latter run in the
way described in this book,) until the yard is down by the lifts,
rounding in on the weather brace, and hauling taut to leeward, when the
yard is square. Then let go the sheets and haul up on the clewlines and
buntlines. A better way is to start the sheets, clew about one third
up, then let go the halyards and take the slack in.
If the wind is fresh, and the yard braced up, lower away handsomely on
the halyards, get the yard down by the clewlines and reef-tackles,
rounding in on the weather brace, and steadying the yard by both
braces. Then let go the weather sheet and haul up to windward first.
The weather clew being up, let go the lee sheet and haul up by the
clewline and buntlines, keeping the clew in advance of the body of the
sail.
Sometimes, if the weather brace cannot be well rounded in, as if a ship
is weak-handed, the sail may be clewed up to leeward a little, first.
In which case, ease off the lee sheet, and haul up on the clewline;
ease off the lee brace and round the yard in; and when the lee clew is
about half up, ease off the weather sheet and haul the weather clew
chock up. Haul the buntlines up after the weather clew, and steady the
yard by the braces. There is danger in clewing up to leeward first that
the sail may be shaken and jerked so as to split, before the weather
clew is up; whereas, if clewed up to windward first, the lee clew will
keep full, until the lee sheet is started.
When coming to anchor, it is the best plan to haul the clews about half
up before the halyards are let go.
In taking in a close-reefed topsail in a gale of wind, the most general
practice is to clew up to windward, keeping the sail full; then lower
away the halyards, and ease off the lee sheet; clew the yard down, and
haul up briskly on the lee clewline and the buntlines, bracing to the
wind the moment the lee sheet is started.
TO TAKE IN A TOPGALLANT SAIL OR ROYAL.--If the wind is light, and from
aft or quartering, let go the halyards and clew down, squaring the yard
by the braces. Then start the sheets and clew up, and haul up the
buntlines. If the yard is braced up, the old style was to let go the
halyards, clew down and round in on the weather brace; clewing up to
windward first, then start the lee clew, and haul up the lee clewline
and the buntlines. But the practice now is to clew up to leeward first,
which prevents the slack of the sail getting too much over to leeward,
or foul of the clewline block under the yard, as it is apt to, if the
weather clew is hauled up first.
If the wind is very fresh, and the vessel close-hauled, a good practice
is to let go the lee sheet and halyards, and clew down, rounding in at
the same time on the weather brace. Then start the weather sheet, and
haul the weather clew chock up. Haul up the buntlines and steady the
yard by the braces.
TO TAKE IN A SKYSAIL.--If bent in the way described in this book, which
is believed to be the most convenient, let go the halyards, haul down
on the brails, and haul taut the royal stay.
TO TAKE IN A JIB.--Let go the halyards, haul on the downhaul, easing
off the sheet as the halyards are let go.
TO TAKE IN A SPANKER.--Ease off the outhaul, and haul well up on the
lee brails, taking in the slack of the weather ones. Mind particularly
the lee throat-brail. Haul the boom amidships and steady it by the
guys, lower the topping lifts, and square the gaff by the vangs.
TO FURL A ROYAL.--This sail is usually furled by one person, and is
that upon which green hands are practised. For the benefit of
beginners, I will give particular directions. When you have got aloft
to the topgallant mast-head, see, in the first place, that the yard is
well down by the lifts, and steadied by the braces; then see that both
clews are hauled chock up to the blocks, and if they are not, call out
to the officer of the deck, and have it done. Then see your yard-arm
gaskets clear. The best way is to cast them off from the tye, and lay
them across, between the tye and the mast. This done, stretch out on
the weather yard-arm, get hold of the weather leech, and bring it in to
the slings taut along the yard. Hold the clew up with one hand, and
with the other haul all the sail through the clew, letting it fall in
the bunt. Bring the weather clew a little over abaft the yard, and put
your knee upon it. Then stretch out to leeward and bring in the lee
leech in the same manner, hauling all the sail through the clew, and
putting the clew upon the yard in the same way, and holding it there by
your other knee. Then prepare to make up your bunt. First get hold of
the foot-rope and lay it on the yard and abaft; then take up the body
of the sail, and lay it on the yard, seeing that it is all fairly
through the clews. Having got all the sail upon the yard, make a _skin_
of the upper part of the body of the sail, large enough to come well
down abaft and cover the whole bunt when the sail is furled. Lift the
skin up, and put into the bunt the slack of the clews (not too taut,)
the leech and foot-rope, and the body of the sail; being careful not to
let it get forward under the yard or hang down abaft. Then haul your
bunt well upon the yard, smoothing the skin, and bringing it down well
abaft, and make fast the bunt-gasket round the mast, and the jigger, if
there be one, to the tye. The glut will always come in the middle of
the bunt, if it is properly made up. Now take your weather yard-arm
gasket and pass it round the yard, three or four times, haul taut, and
make it fast to the mast; then the lee one in the same manner. Never
make a long gasket fast to its own part round the yard, for it may work
loose and slip out to the yard-arm. Always pass a gasket _over_ the
yard and down abaft, which will help to bring the sail upon the yard.
A TOPGALLANT SAIL is furled in the same manner, except that it usually
requires two men, in a large vessel; in which case, each man takes a
yard-arm, and they make the bunt up together. If there are buntlines
and a jigger, the bunt may be triced well up, by bending the jigger to
the bight of a buntline, and having it hauled taut on deck.
TO FURL A TOPSAIL OR COURSE.--The sail being hauled up, lay out on the
yard, the two most experienced men standing in the slings, one on each
side of the mast, to make the bunt up. The light hands lay out to the
yard-arms, and take the leech up and bring it taut along the yard. In
this way the clews are reached and handed to the men in the bunt, and
the slack of the sail hauled through them and stowed away on and abaft
the yard. The bunt being made up fairly on the yard against the mast,
and the skin prepared, let it fall a little forward, and stow all the
body of the sail, the clews, bolt-rope, and blocks, away in it; then,
as many as can get hold, lend a hand to haul it well upon the yard.
Overhaul a buntline a little, bend the jigger to it, and trice up on
deck. Bring the skin down well abaft, see that the clews are not too
taut, pass the bunt gasket, cast the jigger off, and make it fast slack
to the tye. Then pass the yard-arm gaskets, hauling the sail well upon
the yard, and passing the turns over the yard, and down abaft. If the
sail has long gaskets, make them fast to the tye; if short, pass them
in turns close together, and make them fast to their own parts, jammed
as well as possible.
TO FURL A JIB.--Go out upon the weather side of the boom. See your
gasket clear for passing. The handiest way usually is, to make it up on
its end, take a hitch over the whole with the standing part, and let it
hang. Haul the sail well upon the boom, getting the clew, and having
the sheet pennant hauled amidships. Cast the hitch off the gasket, take
it in your hand, and pass two or three turns, beginning at the head;
haul them taut; and so on to the clew. Pass the turns over and to
windward. This will help to bring the sail upon the boom and to
windward. Make the end fast to the stay, to the withe, or to the boom
inside the cap, in any way that shall keep it from slipping back, which
it might do if made fast to its own part round the boom. If there is
but one hand on the boom, the first turns may be hauled taut enough to
keep the sail up for the time; then, after the gasket is fast, go out
to the head, and haul each turn well taut, beating the sail down with
the hand. Be careful to confine the clew well.
TO STOW A JIB IN CLOTH.--Haul the jib down snugly, and get it fairly up
on the boom. Overhaul the after leech until you come to the first
straight cloth. Gather this cloth over the rest of the sail on the
boom, stopping the outer end of the cloth with a rope-yarn round the
jib stay. If the jib halyards are double, stop the block inside the
sail. Cover the sail well up with the cloth, stopping it at every two
feet with rope-yarns round the sail and boom. If you are to lie in port
for a long time, cast off the pennant, stow the clew on the boom,
snugly under the cloth, which will be stopped as before with
rope-yarns.
TO REEF A TOPSAIL.--Round in on the weather brace, ease off the
halyards, and clew the yard down by the clewlines and reef-tackles.
Brace the yard in nearly to the wind, and haul taut both braces. Haul
out the reef-tackles, make fast, and haul taut the buntlines. Before
going upon the yard, see that it is well down by the lifts. Let the
best men go to the yard-arms, and the light hands remain in the slings.
Cast adrift the weather earing, pass it _over_ the yard-arm outside the
lift, down abaft and under the yard, and _up_ through the reef-cringle.
Haul well out, and take a round-turn with the earing round the cringle.
Then pass several turns round the yard and through the cringle, hauling
them well taut, passing the turns _over_ the yard, down abaft and
under, and _up_ through the cringle.[3] Having expended nearly all the
earing, hitch the remainder round the two first parts, that go outside
the lift, jamming them together and passing several turns round them
both to expend the rope. The bare end may be hitched to these two parts
or to the lift. The men on the yard light the sail out to windward by
the reef-points, to help the man at the weather yard-arm in hauling out
his earing. As soon as the weather earing is hauled out and made secure
by a turn or two, the word is passed--"Haul out to leeward," and the
lee earing is hauled out till the band is taut along the yard, and made
fast in the same manner. Then the men on the yard tie the reef-points
with square knots, being careful to take the after points clear of the
topgallant sheets.
[3] Be careful to pass the turns clear of the topgallant
sheets.
In reefing, a good deal depends upon the way in which the yard is laid.
If the yard is braced too much in, the sail catches flat aback and
cannot be hauled out, besides the danger of knocking the men off the
foot-ropes. The best way is to shiver the sail well till the yard is
down, then brace it in with a slight full, make the braces fast, and
luff up occasionally and shake the sail while the men are reefing. If
you are going before the wind, you may, by putting your helm either
way, and bringing the wind abeam, clew the yard down as the sail lifts,
and keep her in this position, with the yard braced sharp up, until the
sail is reefed; or, if you are not willing to keep off from your
course, and the wind is very fresh, clew down and clew up, and reef as
before directed.
All the reefs are taken in the same way except the _close reef_. In
close reefing, pass your earing _under_ the yard, up abaft and over,
and _down_ through the cringle. Pass all your turns in the same manner;
and bring the reef-band well under the yard in knotting, so as to cover
the other reefs.
As soon as the men are off the yard, let go the reef-tackles,
clewlines, buntlines, and topgallant sheets; man the halyards, let go
the lee brace, slack off the weather one, and hoist away. When well up,
trim the yard by the braces, and haul out the bowlines. A reefed sail
should never be braced quite sharp up, and if there is a heavy sea and
the vessel pitches badly, ease the braces a little, that the yard may
play freely, and do not haul the leech too taut.
TO REEF A COURSE.--As a course generally has no reef-tackle, you must
clew it up as for furling, according to the directions before given,
except that the clews are not hauled chock up. Lay out on the yard and
haul out the earings, and knot the points as for the first reef of a
topsail, seeing them clear of the topsail sheets. If a long course of
bad weather is anticipated, as in doubling the southern capes, or
crossing the Atlantic in winter, reef-tackles are rove for the courses.
If there are any studdingsail booms on the lower or topsail yards, they
must be triced up before reefing.
TO TURN OUT REEFS.--For a topsail, haul taut the reef-tackles and
buntlines, settle a little on the halyards, if necessary; lay aloft,
and cast off all the reef-points, beginning at the bunt and laying out.
Be careful to cast all off before slacking up the earing; for, when
there is more than one reef, a point may be easily left, if care is not
taken. Have one hand at each earing, cast off all the turns but enough
to hold it, and when both earings are ready, ease off both together.
Pass the end of the earing through the cringle next above its own, and
make it fast slack to its own part by a bowline knot. Lay in off the
yard, let go reef-tackles, clewlines, buntlines, and topgallant sheets;
overhaul them in the top and hoist away, slacking the braces and
trimming the yard. The reefs of a course are turned out a good deal in
the same manner; slacking up the sheet and tack, if necessary, and,
when the earings are cast off, let go clew-garnets, buntlines and
leechlines, board the tack, and haul aft the sheet.
TO SET A TOPGALLANT STUDDINGSAIL.--This sail is always set from the
top; the sail, together with the tack and halyards in two coils, being
kept in the top. If there is but one hand aloft, take the end of the
halyards aloft, _abaft_ everything, and reeve it _up_ through the block
at the topgallant mast-head, and _down_ through the sheave-hole or
block at the topgallant yard-arm, _abaft_ the sheet, and bring it into
the top, forward of the rigging, and make it fast to the forward
shroud. Take the end of your tack out on the topsail yard, _under_ the
brace, reeve it _up_ through the block at the end of the topgallant
studdingsail boom, bring it in _over_ the brace, overhauling a plenty
of it so as to let the boom go out, and hitch it to the topmast rigging
while you rig your boom out. Cast off the heel-lashing and rig your
boom out to the mark, slue the boom with the block up and make fast
round the yard. (The easiest way of passing the boom-lashing is to take
it over the yard and put a bight up between the head-rope and yard;
then take the end back over the yard and boom and through the bight,
and haul taut. This may be done twice, if necessary, and then hitch it
round all parts, between the boom and the yard.) The boom being rigged
out and fast, take the end of your tack down into the top and hitch it
to the forward shroud. Then take the coil of the tack and throw the
other end down on deck, outside of the rigging and backstays. (It is
well, in throwing the coil down, to keep hold of the bight with one
hand, for otherwise, if they should miss it on deck, you will have to
rig in your boom.) Throw down the hauling end of your halyards abaft
and inside everything. Now get your sail clear for sending out. Lay the
yard across the top, forward of the rigging, with the outer end out.
Bend your halyards to the yard by a fisherman's bend, about one third
of the way out. Take your tack under the yard and bend it by a
sheet-bend to the outer clew, and pay down the sheet and downhaul
through the lubber-hole. All being clear for hoisting, sway away on the
halyards on deck, the men in the top guying the sail by the sheet and
downhaul, the latter being hauled taut enough to keep the outer clew up
to the inner yard-arm. (Sometimes it is well to make up the downhaul as
is done with the downhaul of the topmast studdingsail.) When the sail is
above the brace, haul out on the tack, sway the yard chock up by the
halyards, and trim the sheet down. Make the end of the downhaul fast
slack.
A weather topgallant or topmast studdingsail should be set abaft the
sail, and a lee one forward of the sail. Therefore, in setting a lee
topgallant studdingsail, it is well to send it out of the top with a
turn in it, that is, with the inner yard-arm slued forward and out, so
that when the tack and sheet are hauled upon, the inner yard-arm will
swing forward of the topgallant sail.[4]
[4] It will assist this operation to keep hold of the outer
leech until the sail is clear of the top.
Small sized vessels have no downhaul to the topgallant studdingsails.
This saves confusion, and is very well if the sail is small.
TO TAKE IN A TOPGALLANT STUDDINGSAIL.--Let go the tack and clew up the
downhaul, dipping the yard abaft the leech of the topgallant sail, if
it is forward. Lower away handsomely on the halyards, hauling down on
the sheet and downhaul. When the yard is below the topsail brace, lower
roundly and haul into the top, forward of the rigging.
If the sail is taken in temporarily, stand the yard up and down and
becket it to the middle topmast shroud; make the sail up, hitch the
bight of the tack and halyards to the forward shroud, and haul up the
sheet and downhaul. If everything is to be stowed away, unreeve the
tack and halyards, and coil them away separately in the top; also coil
away the sheets and downhaul, and stop all the coils down by hitches
passed through the slats of the top. Rig the boom in and make it fast
to the tye. Sometimes the halyards are unrove from the yard-arm and
rounded up to the span-block, with a knot in their end.
TO SET A TOPMAST STUDDINGSAIL.--The topmast studdingsail halyards are
generally kept coiled away in the top. Take the end up, reeve it _up_
through the span-block at the cap, and _out_ through the block at the
topsail yard-arm, and pay the end down to the forecastle, forward of
the yard and outside the bowline. Pay the hauling end down through the
lubber-hole. Reeve your lower halyards. These are usually kept coiled
away in the top, with the pennant, which hooks to the cap of the lower
mast. Hook the pennant, reeve the halyards _up_ through the pennant
block, _out_ through the block on the boom-end, and pay the end down to
the forecastle. Pay the hauling end down _forward_ of the top. (Some
vessels keep their top-mast studdingsail tacks coiled away at the
yard-arm, and hitched down to the boom and yard. This is a clumsy
practice, and saves no time or trouble. The best way is to unreeve them
whenever the boom is to be rigged in, and coil them away in the bow of
the long-boat, or elsewhere. There is no more trouble, and less
liability to confusion, in reeving them afresh, than in coiling them
away and clearing again on the yard-arms.) Carry your tack outside the
backstays and lower rigging, clear of everything, out upon the lower
yard under the brace; reeve it _forward_ through the tack-block at the
boom-end, first sluing the block up, and pay the end down forward of
the yard. Rig the boom out to the mark and lash it. Get the
studdingsail on the forecastle clear for setting. Bend the halyards to
the yard, about one half of the way out. Hitch the end of the downhaul
over the inner yard-arm by the eye in its end, reeve it through the
lizard on the outer leech, and through the block at the outer clew
abaft the sail. Bend the tack to the outer clew, and take a turn with
the sheet. Clew the yard down by the downhaul, and make the downhaul up
just clear of the block, by a catspaw doubled and the bight of the
running part shoved through the bight of all the parts, so that hauling
on it may clear it and let the yard go up. Hoist on the halyards until
the sail is above the lower yard, guying it by the sheet and downhaul,
then haul out on the tack until the clew is chock out to the boom-end,
hoist on the halyards, jerking the downhaul clear, and trim down the
sheet.
TO TAKE IN A TOPMAST STUDDINGSAIL.--Lower away handsomely on the
halyards, clewing the yard down to the outer clew by the downhaul.
Slack up the tack, and lower away on the halyards, hauling down well on
the sheet and downhaul, till the sail is in upon the forecastle. The
sail may be made up on the forecastle, and the end of the tack and
halyards made fast forward, if it is to be soon set again. If not, cast
off all, unreeve your tack, hauling from aft, and coil it away. Unreeve
the halyards, or round them up to the block at the mast-head with a
knot in their end. Rig the boom in, and lash it to the slings.
TO SET A LOWER STUDDINGSAIL.--Before rigging out the top-mast
studdingsail boom, the lower halyards should always be rove, as before
directed. Reeve the inner halyards _out_ through a small single block
under the slings of the lower yard, and through another about two
thirds of the way out, and pay the end down upon the forecastle for
bending. Get the studdingsail clear, bend the outer halyards to the
yard, and the inner halyards to the inner cringle at the head of the
sail. Reeve the outhaul through the block at the swinging-boom-end, and
bend the forward end to the outer clew of the sail. Hook the
topping-lift and forward guy to the boom, and top up on it. Haul on the
forward guy, and ease off the after one, slacking away a little on the
topping-lift, until the boom is trimmed by the lower yard; then make
fast the guys and lift. Haul well taut the fore lift and brace, and
belay. Take a turn with one sheet, hoist away on the outer halyards,
and when about one third up, clear the downhaul, haul chock out on the
outhaul, and hoist well up by the halyards, which will serve as a lift
to the topmast studdingsail boom; and then set taut on the inner
halyards and trim down the sheet. The practice now is, and it is found
most convenient, to set the sail before rigging out the boom; then clap
on the outhaul and forward guy, and trim the boom by the lower yard.
TO TAKE IN A LOWER STUDDINGSAIL.--Let go the outhaul, and haul on the
clewline till the outer clew is up to the yard. Then lower away the
outer halyards, and haul in on the sheet and clewline. When the sail is
in over the rail, lower away the inner halyards. If the booms are to be
rigged in, cast off all the gear; making the bending end of the outhaul
fast in-board, and unreeving the outer and inner halyards, or running
the outer up to the pennant block, and the inner up to the yard block,
with knots in their ends. Ease off the forward guy with a turn, haul in
on the after guy, topping well up by the lift, and get the boom
alongside. Rig in the topmast studdingsail boom before unreeving the
outer halyards. It is a convenient practice, when the swinging boom is
alongside, to hook the topping-lift to a becket or thimble at the
turning in of the fore swifter, and the forward guy to a strap and
thimble on the spritsail yard.
In strong winds it is well to have a boom-brace-pennant fitted to the
topmast studdingsail boom-end with a single block, making a whip
purchase, the hauling part leading to the gangway, and belaying at the
same pin with the tack; or else, the brace may lead to the gangway, and
the tack be brought in through blocks on the yard, and lead down on
deck, beside the mast. The former mode is more usual.
The topmast studdingsail is sometimes made with a reef in it, to be
carried with a single reefed topsail; in which case it is reefed on
deck to the yard and sent out as before.