Type of│ Location │ Clear │ Screenings

Screen │ │ Opening, │

│ │in Inches │

│ │ │

│ │ │

│ │ │

───────┼──────────┼──────────┼────────────┬─────────────

│ │ │Per Million │ Per 1000

│ │ │ Gallons, │ Population

│ │ │_y_ = Cubic │ Daily,

│ │ │ Yard │ _y_ = Cubic

│ │ │ _t_ = Tons │ Yard

│ │ │ │ _t_ = Tons

───────┼──────────┼──────────┼────────────┼─────────────

Band │Hamburg │ 0.6 │ 0.34_y_ │ 0.018_y_

│Göttingen │ 0.4 │ 0.35_y_ │ 0.026_y_

│Sutton │0.375[141]│ 0.6_y_ │

│Chicago │ │ 2.4–3.1_t_ │

Wing │Frankfort │ 0.40 │ 0.7_y_ │ 0.040_y_

│Elberfeld │ 0.40 │ 1.15_y_ │ 0.053_y_

│Stralsund │ 0.20 │ │ 0.079_y_

│Wiesbaden │ 0.60 │ 1.1_y_ │ 0.033_y_

Shovel │Strassburg│ 0.10 │ 1.6_y_ │ 0.043_y_

vane │ │ │ │

│Gleiwitz │ 0.12 │ │ 0.192_y_

│Temesvar │ 0.12 │ 0.9–1.7_y_ │0.067–.133_y_

Drum │Bromberg │ 0.08 │ 4.75_t_ │

│Mainz │ Note 6 │ 0.52_y_ │

│Trier │ 0.10 │0.39–0.42_y_│ 0.13_y_

│Osnabruck │ 0.08 │ 3.2–4.0_y_ │ 0.08–.10_y_

Weand │Reading, │ 36[141] │ 1.0_y_ │

│ Pa. │ │ │

│Brockton │ 36[141] │ 1.4_t_ │

Reinsch│Dresden │ 0.08 │ 0.97_t_ │ 0.09_y_

Wurl │ │ │ │

───────┴──────────┴──────────┴────────────┴─────────────

───────┬────────┬───────────┬─────────┬────────────

Type of│Per Cent│Horse-Power│ Cost of │ Remarks

Screen │Moisture│Per Screen │Operation│

│ │ │ Per │

│ │ │ Million │

│ │ │Gallons, │

│ │ │ Dollars │

───────┼────────┼───────────┼─────────┼────────────

│ │ │ │

│ │ │ │

│ │ │ │

│ │ │ │

│ │ │ │

│ │ │ │

───────┼────────┼───────────┼─────────┼────────────

Band │ 87 │ 2.5 │ │Note 1

│ │ 2.0 │ │

│ │ │ │

│ 79 │ │ │Stock Yard

Wing │ │ 5.0 │ │Note 2

│ 75 │ │ │Note 3

│ │ 4.5 │ │

│ │hand power │ 1.64 │Note 4

Shovel │ 89.3 │ 3.35 │ │Note 5

vane │ │ │ │

│ │ │ 0.90 │

│ 60–70 │ │ small │

Drum │ 40–60 │ │ 2.45 │Experimental

│ 75 │ 5.2–6.8 │0.89–3.42│

│ 50–60 │ │ 2.41 │Experimental

│ │ 9.00 │ │Note 7

Weand │ 89.5 │ 2.0 │ 1.00± │

│ │ │ │

│ │ │ │

Reinsch│ 84 │ 2.5 │.325–1.76│

Wurl │ │ │ │

───────┴────────┴───────────┴─────────┴────────────

Notes:—1. After removal of ½ this volume of grit.

2. After removal of 16 per cent by the grit chamber.

3. Including 0.6 cubic yard grit per million gallons.

4. After passing 1.6 inch bar screen.

5. After removal of 0.132 cubic yard grit and coarse

screenings per 1000 population.

6. 0.12, 0.04–0.08.

7. Before removal of 0.4 cubic yard grit per million gallons.

[Illustration:

FIG. 153.—Screenings Collected on Different Sized Openings.

1921 Report on Industrial Wastes Disposal, Union Stock Yards District,

Chicago, Illinois, to the Sanitary District of Chicago.

]

=231. Design of Fixed and Movable Screens.=—The determination of the

size of the opening is the first step in the design of a sewage screen.

This is followed by the computation of the net area of openings in the

screen. The final steps are the determination of the overall dimensions

of the screen; the size of the bar, wire, or support; and the dimensions

of the screen chamber. The net area of openings is fixed by the

permissible velocity of flow through the screen and the quantity of

sewage to be treated. In determining the velocity of flow the general

principle should be followed that the velocity should not be reduced

sufficiently to allow sedimentation in the screen chamber. The velocity

of grit bearing sewage in passing through coarse screens should not be

reduced below 2 or 3 feet per second. If the sewage contains no grit, or

the screen is placed below a grit chamber the velocity through a medium

or fine screen should be from ½ to 1½ feet per minute. The velocity

through the screen in a direction normal to the plane of the screen can

be reduced without reducing the horizontal velocity of the sewage by

placing the screen in a sloping position.

The final steps are the design of the screen bar and the determination

of the dimensions of the screen and of the screen chamber. The size of

the bar in a bar screen, or as a support to a wire mesh, is dependent on

the unsupported length of the bar. The stresses in the bars are the

results of impact and bending, caused by cleaning, and of the load due

to the backing up of the sewage when the screen is clogged. Allowance

should be made for a head of 2 or 3 feet of sewage against the screen. A

generous allowance should be made in addition for the indeterminate

stresses due to cleaning. The screen should be supported only at the top

and bottom, as intermediate supports in a bar screen are undesirable

unless they are so arranged as not to interfere with the teeth of the

cleaning devices.

Fixed screens should be placed at an angle between 30° and 60° with the

horizontal, with the direction of slope such that the screenings are

caught on the upper portion of the screen. A small slope is desirable in

order to obtain a low velocity through the screen. The slope is limited

since the smaller the slope the longer the bars of the screen and the

greater the difficulty of hand cleaning. Small slopes will tend to make

the screens self cleaning. As the screen clogs, the increasing head of

sewage will push the accumulated screenings up the screen. The use of

flat screens in a vertical position is not desirable because of the

difficulty of cleaning and the accumulation of material at inaccessible

points. If a flat screen is placed in a horizontal position with the

flow of sewage downward difficulties are encountered in cleaning and

solid matter is forced through the screen as clogging increases. An

upward flow through a horizontal screen is undesirable as the material

is caught in a position inaccessible for cleaning. Movable screens are

more easily handled when placed in a vertical position.

In the construction of small screens, round bars are sometimes used

where the unsupported length of the bar is less than 3 or 4 feet. They

are not recommended, however, as the efficient area and the amount of

material removed by the screen are diminished. Bars which produce

openings with the larger end upstream are undesirable as particles

become wedged in the screen, and are either forced through or become

difficult to remove.[142] Rectangular bars are easily obtained and give

satisfactory service except where they are of insufficient strength

laterally. For greater lateral thickness a pear-shaped bar is sometimes

used, with the thicker side upstream. Fine mesh screens or perforated

plates are supported on grids or parallel bars of stronger material

designed to take up the heavy stresses on the screen.

The dimensions of the bar may be selected arbitrarily. The length and

width of the screen are fixed to give desirable dimensions to the screen

chamber and to give the necessary net opening in the screen. The width

of the screen chamber and the screen should be the same. The screen

chamber should be sufficiently long to prevent swirling and eddying

around the screen. If the dimensions thus fixed permit an undesirable,

velocity in the screen chamber they should be changed. A sufficient

length of screen should be allowed to project above the sewage for the

accumulation of screenings. The bars may be carried up and bent over at

the top as shown in Fig. 151 to simplify the removal of screenings.

Coarse screens are usually placed above all other portions of a

treatment plant. They may be followed by grit chambers or finer screens.

Coarse screens are occasionally placed as a protection above medium or

fine screens. In sewage containing grit the smaller screens are

sometimes placed below the grit chamber. It is desirable to provide some

means of diverting the sewage from a screen chamber to allow of repairs

to the screen and the cleaning of the chamber. Screen chambers are

sometimes designed in duplicate to allow for the cleaning of one while

the other is operating.

PLAIN SEDIMENTATION

=232. Theory of Sedimentation.=—Sedimentation takes place in sewage

because some particles of suspended matter have a greater specific

gravity than that of water. All particles do not settle at the same

rate. Since the weights of particles vary as the cubes of their

diameters, whereas the surface areas (upon which the action of the water

takes place) vary only as the squares of the diameters, the amount of

the skin friction on small particles is proportionally greater than that

on large particles, because of the relatively greater surface area

compared to their weight. As a result the smaller particles settle more

slowly. The velocity of sedimentation of large particles has been found

to vary about as the diameter and of small particles as the square root

of the diameter. The change takes place at a size of about 0.01 mm.

Sedimentation is accomplished by so retarding the velocity of flow of a

liquid that the settling particles will be given the opportunity to

settle out. The slowing down of the velocity is accomplished by passing

the sewage through a chamber of greater cross-sectional area than the

conduit from which it came. The time that the sewage is in this chamber

is called the period of retention. Although the shape of a basin, the

arrangement of the baffles and other details have a marked effect on the

results of sedimentation, the controlling factors are the period of

retention and the velocity of flow. Another factor affecting the

efficiency of the process is the quality of the sewage. Usually the

greater the amount of sediment in the sewage the greater the per cent of

suspended matter removed. A method for the determination of the proper

period of sedimentation has been developed by Hazen in Transactions of

the American Society of Civil Engineers, Volume 53, 1904, page 45. The

results of his studies are summarized in Fig. 154 which shows the per

cent of sediment remaining in a treated water after a certain period of

retention. This period of retention is expressed in terms of the

hydraulic coefficient[143] of the smallest size particle to be removed.

Table 77 shows the hydraulic coefficients of various particles. In Fig.

154 _a_ represents the period of retention and _t_ the time that it

would take a particle to fall to the bottom of the basin. The different

lines of the diagram represent the results to be expected by various

arrangements of settling basins. The meaning of these lines is given in

Table 78.

TABLE 77

HYDRAULIC VALUES OF SETTLING PARTICLES IN MILLIMETERS PER SECOND

───────────────────────────────────┬───────────────────────────────────

Diameter in mm. │ Hydraulic Value

───────────────────────────────────┼───────────────────────────────────

1.00 │ 100

0.80 │ 83

0.60 │ 63

0.50 │ 53

0.40 │ 42

0.30 │ 32

0.20 │ 21

0.15 │ 15

0.10 │ 8

0.08 │ 6

0.06 │ 3.8

0.05 │ 2.9

0.04 │ 2.1

0.03 │ 1.3

0.02 │ 0.62

0.015 │ 0.35

0.010 │ 0.154

0.008 │ 0.098

0.006 │ 0.055

0.005 │ 0.0385

0.004 │ 0.0247

0.003 │ 0.0138

0.002 │ 0.0062

0.0015 │ 0.0035

0.001 │ 0.00154

0.0001 │ 0.0000154

───────────────────────────────────┴───────────────────────────────────

An example will be given to illustrate the method of using the diagram

and tables to determine the size of a sedimentation basin to perform

certain required work.

Let it be required to determine the period of retention in a

continuously operated sedimentation basin with good baffling,

corresponding to two properly baffled sedimentation basins in

series. The basins are to remove 60 per cent of the finest

particles which are to have a size of .01 mm. The quantity to be

treated daily is 3,000,000 gallons.

1st. Entering Table 77, we find that the hydraulic value of the

finest particles is .154 mm. per second.

2d. Since we wish to remove 60 per cent of the finest particles,

40 per cent will remain. Since Fig. 154 shows the per cent

remaining after the time _a_⁄_t_ we enter Fig. 154 at 40 per cent

on the ordinates and run horizontally until we encounter Line 4

corresponding to good baffling in Table 78. We then run down

vertically from this intersection and find that the ratio of

_a_⁄_t_ is 1.0.

Then _a_ equals _t_, which means that the period of retention

should equal the time that it takes a particle 0.01 mm. in

diameter to drop from the top to the bottom of the basin. Since

this depends on the depth of the basin it is necessary to

determine the depth before the other dimensions of the basin can

be fixed.

Although this method is seldom used in practice for the final design of

a sedimentation basin, it is a guide to judgment and can be used to

supplement the data obtained from tests.

[Illustration:

FIG. 154.—Hazen’s Diagram, Showing the Relation between the Time of

Settling and the Period of Retention in Various Types of

Sedimentation Basins.

Trans. Am. Society Civil Engineers, Vol. 53, 1904, p. 45.

]

TABLE 78

COMPARISON OF DIFFERENT ARRANGEMENTS OF SETTLING BASINS

(From Hazen)

────────────────────────────────────────┬────────────┬─────────────────

Description of Basins │Line in Fig.│ Values of

│ 154 │ _a_⁄_t_.

────────────────────────────────────────┼────────────┼─────────────────

│ │ Per Cent of

│ │ Matter Removed

────────────────────────────────────────┼────────────┼─────┬─────┬─────

│ │ 50 │ 74 │87.5

────────────────────────────────────────┼────────────┼─────┼─────┼─────

Theoretical maximum. Cannot be reached.│ A │ 0.50│ 0.75│0.875

Surface skimming. Rockner Roth system. │ B │ 0.54│ 0.98│ 1.37

Intermittent basins, reckoned on time of│ C │ │ │

service only. │ │ 0.63│ 1.26│ 1.89

Continuous basin. Theoretical limit. │ D │ 0.69│ 1.38│ 2.08

Close approximation to the above. │ 16 │ 0.71│ 1.45│ 2.23

Very well baffled basin. │ 8 │ 0.73│ 1.62│ 2.37

Good baffling. │ 4 │ 0.76│ 1.66│ 2.75

Two basins, tandem. │ 2 │ 0.82│ 2.00│ 3.70

One long basin, well controlled. │ 1.5 │ 0.90│ 2.34│ 4.50

Intermittent basin in service half time.│ E │ 1.26│ 2.50│ 3.80

One basin, continuous. │ 1 │ 1.0│ 3.00│ 7.00

────────────────────────────────────────┴────────────┴─────┴─────┴─────

The design of sedimentation basins should be based on experimental

observations made upon the quantity of sediment removed at certain rates

of flow and periods of retention in different types of basins. Hazen’s

mathematical analysis is serviceable in making preliminary estimates and

in checking the results. The shape of the tank, period of retention and

rate of flow producing the most desirable results should be duplicated

with the expectation of obtaining similar results or results but

slightly modified from those obtained in the tests. This is the most

satisfactory method of determining the proper period of retention.

=233. Types of Sedimentation Basins.=—A sedimentation basin is a tank

for the removal of suspended matter either by quiescent settlement or by

continuous flow at such a velocity and time of retention as to allow

deposition of suspended matter.[144] The difference between

sedimentation tanks and other forms of tank treatment is that no

chemical or biological action is depended on for the successful

operation of the tank. Sedimentation tanks may be divided into two

classes, grit chambers and plain sedimentation basins.

A grit chamber is a chamber or enlarged channel in which the velocity of

flow is so controlled that only heavy solids, such as grit and sand, are

deposited while the lighter organic solids are carried forward in

suspension. If the velocity of flow is more than about one foot per

second, the tank is a grit chamber and below this velocity it is a plain

sedimentation basin.

There are six general types of plain sedimentation basins:

1st. Rectangular flat-bottom tanks operated on the continuous-flow

principle.

2nd. Rectangular flat-bottom tanks operated on the fill and draw

principle.

3rd. Rectangular or circular hopper-bottom tanks operated on the

continuous-flow principle, with horizontal flow.

4th. Rectangular or circular hopper-bottom tanks operated on the

fill and draw principle, with horizontal flow.

5th. Rectangular or circular hopper-bottom tanks operated on the

continuous-flow principle with vertical flow.

6th. Circular hopper-bottom tanks operated on the continuous-flow

principle with radial flow.

TABLE 79

CRITICAL VELOCITIES FOR THE TRANSPORTATION OF DEBRIS

Sedimentation will not Occur at Higher Velocities

───────────┬───────────────────────────────────┬──────────────────────

Diameter of│Critical Velocity, Feet per Second.│ Size of Screen or

Particle in│ │ Number of Meshes per

Millimeters│ │ Inch

───────────┼───────────────────────────────────┼──────────────────────

│ Specific Gravity │

───────────┼────────┬────────┬────────┬────────┼──────────────────────

│ 1.5 │ 2.0 │ 3.0 │ 5.0 │

───────────┼────────┼────────┼────────┼────────┼──────────────────────

0.010 │0.13 │0.20 │0.22 │0.28 │

0.050 │0.23 │0.34 │0.39 │0.50 │More than 200

0.100 │0.30 │0.42 │0.50 │0.65 │More than 150

0.500 │0.55 │0.73 │0.91 │1.15 │More than 28

1.0 │0.71 │0.92 │1.18 │1.50 │More than 14

1.25 │0.77 │1.00 │1.30 │1.60 │

2.0 │0.92 │1.20 │1.50 │1.90 │More than 10

5.0 │1.30 │1.70 │2.20 │2.60 │More than 4

10 │1.70 │2.20 │2.8 │3.4 │

│ │ │ │ │

Diameter in Millimeters for a Velocity of 1 Foot per Second

│ │ │ │ │

│2.5 │1.25 │0.65 │0.32 │

───────────┴────────┴────────┴────────┴────────┴──────────────────────

=234. Limiting Velocities.=—Sand, clay, bits of metal and other

particles of mineral matter will commence to deposit in appreciable

quantities when the velocity of flow falls below 3 feet per second. The

amount deposited will increase as the velocity decreases. In Table 79

are given the approximate horizontal velocities at which certain size

particles of mineral matter will deposit. At a velocity of about one

foot per second organic matter will commence to deposit. It will be

noticed by interpolation in Table 79,[145] that particles with the same

specific gravity as sand (2.6), larger than one mm. in diameter will

deposit at a velocity of about one foot per second or less, and that

smaller and lighter particles will not deposit at velocity of one foot

per second or greater. It will also be noticed that a velocity of one

foot per minute is sufficiently slow to permit the deposit of the

smallest and lightest particles. For this reason velocities of 1 or 2 or

even 3 feet per second have been adopted as the velocities in grit

chambers and velocities less than 1 foot per minute in plain

sedimentation basins.

=235. Quantity and Character of Grit.=—The amount of material deposited

in grit chambers varies approximately between 0.10 and 0.50 cubic yard

per million gallons. It is to be noted that grit chambers are used only

for combined and storm sewage and for certain industrial wastes. They

are unnecessary for ordinary domestic sewage. The material deposited in

grit chambers operating with a velocity greater than one foot per second

is non-putrescible, inorganic, and inoffensive. It can be used for

filling, for making paths and roadways, or as a filtering material for

sludge drying beds. An analysis of a typical grit chamber sludge is

shown in Table 80.

TABLE 80

ANALYSIS OF GRIT CHAMBER SLUDGE

───────────┬───────────┬───────────┬───────────────────────────────────

Velocity │ Specific │ Per Cent │Calculated to Dry Weight, Per Cent

Feet per │ Gravity │ Moisture │

Second │ │ │

───────────┼───────────┼───────────┼──────────┬──────────┬─────────────

│ │ │ Nitrogen │ Fixed │Miscellaneous

│ │ │ │ Matter │

───────────┼───────────┼───────────┼──────────┼──────────┼─────────────

1.0 │ 1.5 │ 45 │ 20 │ 78 │ 2

───────────┴───────────┴───────────┴──────────┴──────────┴─────────────

=236. Dimensions of Grit Chambers.=—The quantity of sewage to be treated

and the amount and character of the settling solids which it contains

should be determined by measurement and analysis, and the amount of

settling solids to be removed should be determined by a study of the

desired conditions of disposal, in order that a grit chamber that will

accomplish the desired results may be designed. The period of retention

and the velocity of flow are the controlling features in the successful

operation of any grit chamber. These should be determined by experiment

or as the result of experience. Where neither are available, Hazen’s

method can be followed or a decision made based on a study of other grit

chambers. In general, the period of retention in grit chambers is from

30 to 90 seconds, and the velocity of flow is about one foot per second.

After having determined the quantity of sewage to be treated, the

quantity of grit to be stored between cleanings, the period of

retention, the arrangement of the chambers, and the velocity of flow to

be used, the overall dimensions of the chambers are computed. The

capacity of the chamber is fixed as the sum of the quantity of sewage to

be treated during the period of retention and the required storage

capacity for grit accumulated between cleanings. The length of the

chamber is fixed as the product of the velocity of flow and the period

of retention. The cross-sectional area of the portion of the chamber

devoted to sedimentation is fixed as the quotient of the quantity of

flow of sewage per unit time and the velocity of flow. Only the relation

between the width and depth of the portion devoted to sedimentation and

the portion devoted to the storage of grit remain to be determined.

These should be so designed as to give the greatest economy of

construction commensurate with the required results. They will be

affected by the local conditions such as topography, available space,

difficulties of excavation, etc. Common depths in use lie between 8 and

12 feet, although wide variations can be found. A study of the

proportions of existing grit chambers will be of assistance in the

design of other basins.

=237. Existing Grit Chambers.=—The details of some typical grit chambers

are shown in Figs. 155 and 156. The grit chamber at the foot of 58th

Street, in Cleveland, Ohio, is shown in Fig. 155. The special feature of

this structure is the shape of the sedimentation basin, the bottom of

which is formed by sloping steel plates forming a 6–inch longitudinal

slot above the grit storage chamber. Flows between 8,000,000 and

16,000,000 gallons per day are controlled by the outlet weir so that the

velocity of flow remains at one foot per second. This is accomplished by

increasing the depth of flow in the same ratio as the increase in the

rate of flow. The bottoms of the two chambers differ, one having a

special hopper for grit and the other a flat bottom. This is due to the

method of cleaning the chambers, it being necessary in the one with a

flat bottom to shut off the flow when removing the grit while in the one

with the hopper bottom it is hoped to remove the grit by the use of sand

ejectors without stopping the sewage flow. The details of the chamber at

Hamilton, Ontario, are shown in Fig. 156. In studying these drawings the

following features should be noted: 1st, the smooth curves in the

channel to prevent eddies, undue deposition of organic matter, and

difficulties in cleaning; 2nd, the hopper in the upper end of the grit

storage chamber and the slope of the bottom of at least 1:20; and 3rd,

the simplicity of the inlet and outlet devices which may be either stop

planks or cast-iron sluice gates.

[Illustration:

FIG. 155.—Grit Chamber at Cleveland, Ohio.

Eng. Record, Vol. 73, 1916, p. 409.

]

[Illustration:

FIG. 156.—Grit Chamber at Hamilton, Ontario.

Eng. News, Vol. 73, 1915, p. 425.

]

The drawings shown are merely representative of some satisfactory types.

The number and variety of grit chambers in existence is great. In

designing grit chambers consideration must be given to the method of

cleaning. They are ordinarily cleaned by such methods as have been

described for the cleaning of catch-basins in Chapter XII. Continuous

bucket scrapers similar to excavating machines are sometimes used for

the cleaning of large grit chambers. The period between cleanings is

variable. The design should be such as not to require more frequent

cleanings than twice a month under the worst conditions. The

fluctuations in quality and quantity of grit will vary the period

between cleanings.

=238. Number of Grit Chambers.=—The period of retention in grit chambers

is so short and the velocity of flow so near the maximum and minimum

limitations that the wide fluctuations in the rate of discharge in storm

and combined sewers necessitates the construction of a number of

chambers which should be operated in parallel in order to maintain the

velocity between the proper limits. Unless arrangements are made

permitting the cleaning of grit chambers during operation, more than one

grit chamber should be installed in order that when one is being cleaned

the others may be in operation. The number of grit chambers must be

determined by the desired conditions of operation and the cost of

construction. The larger the number of basins the more nearly the flow

in any one basin can be maintained constant, but the more expensive the

construction. The increase in velocity of flow with increasing quantity

is dependent on the outlet arrangements. In a shallow chamber with

vertical sides and a standard sharp-crested rectangular weir at the

outlet the velocity will vary approximately as the cube root of the rate

of flow. Similarly if the outlet is a V notch the velocity will vary as

the fifth root of the rate of flow. In all cases the deeper the basin

the more nearly the velocity varies directly as the rate of flow. The

outlet weir can be arranged as at Cleveland, so that the velocity

remains constant for all rates of flow within certain limits. It is

seldom that more than three grit chambers are necessary to care for the

fluctuations in flow.

=239. Quantity and Characteristics of Sludge from Plain

Sedimentation.=—The sludge removed from plain sedimentation basins is

slimy, offensive, not easily dried, and is highly putrescible and

odoriferous. It contains about 90 per cent moisture and has a specific

gravity from 1.01 to 1.05. The amount removed varies between 2 and 5

cubic yards per million gallons of sewage. The percentage of suspended

matter removed varies between 20 and 60. The total amount removed and

the percentage removal depend on the character of the sewage, the type

of basin, and the period of detention.

=240. Dimensions of Sedimentation Basins.=—The dimensions of a

sedimentation basin are determined by a method similar to the one given

for the determination of the dimensions of a grit chamber in Art. 236.

The capacity of the basin is first fixed upon to give the required

period of sedimentation and sludge storage capacity. The length of the

basin is the product of the velocity and the period of retention. The

length, width, and depth of the basin are normally fixed by

considerations of economy and the limitations of the local conditions,

such as available area, topography, foundations, etc., and examples of

good practice. A study of basins in use shows the relation between

length and width to vary normally between 2:1 and 4:1. Widths greater

than 30 to 50 feet are undesirable because of the danger of cross

currents and back eddies which will reduce the efficiency of the

sedimentation. Depths used in practice vary too widely to act as guides

for any particular design. Theoretically the shallower the basin the

better the result. Tanks abroad have been built as shallow as 3 feet and

some in this country as deep as 16 feet. The economical dimensions can

be determined by trial or by calculus. They will serve as a guide in the

adoption of the final dimensions.

The method to be pursued in determining the economical dimensions of any

engineering structure are:

I. Express the total cost of the structure in terms of as few

variables as possible.

II. Express all of the variables in terms of any one and rewrite

the expression for the total cost in terms of this one variable.

III. Equate the first derivative of the expression with regard to

this variable to zero and solve for the variable. The result will

be the economical value of the variable. The values of the other

variables can be computed from the relations already expressed.

[Illustration:

FIG. 157.—Diagram for the Computation of Economical Basin Dimensions.

]

For example, let it be desired to determine the dimensions of two

continuous-flow sedimentation basins as shown in Fig. 157, in which the

period of retention in each is to be 2 hours, the velocity of flow is

not to exceed one foot per second, and the sludge accumulated will be 3

cubic yards per million gallons of sewage treated. The quantity of

sewage to be treated is 18,000,000 gallons per day. The shortest time

between cleanings will be 2 weeks.

The capacity of each basin must be 2/24 of 18,000,000 gallons, or

200,000 cubic feet in order to allow a period of retention of 2 hours.

To this volume should be added sufficient capacity to allow for the 2

weeks of sludge storage between cleanings. When a basin is being cleaned

the load must be put on the remaining basins. Then if _Q_ represents the

rate of accumulation of sludge per day, _n_ represents the number of

days between cleanings, _m_ represents the number of basins, and _S_ the

sludge capacity of one basin, then

_S_ = (_Q_(_n_ − 1))⁄_m_ + _Q_⁄(_m_ − 1)

The sludge storage capacity for the example given will be approximately

11,000 cubic feet.

In expressing the total cost of the basins let

_h_ = the depth in feet.

_l_ = the length in feet.

_b_ = the width in feet.

The cost of land, floor, etc., per square foot = _p_ dollars.

The cost of wall per foot length = _qh_^2 dollars.

The cost of pipes, valves and appurtenances = _P_ dollars.

Then the total cost _C_ = (3_l_ + 4_b_)_qh_^2 + 2_plb_ + _P_.

It is now necessary to express the three variables _b_, _l_, and

_h_, in terms of one of them. From the relation _Q_ = 2_blh_ it is

possible to rewrite the expression for the total cost as:

_C_ = (3_Q_⁄(2_bh_) + 4_b_)_qh_^2 + (_pQ_)⁄_h_ + _P_.

_C_ = (3_l_ + 2_Q_⁄(_lh_))_qh_^2 + (_pQ_)⁄_h_ + _P_.

Holding _h_ constant and differentiating with regard to _b_ in the

first expression and with regard to _l_ in the second expression,

equating to zero and solving we get:

_b_ = √((3_Q_)⁄(8_h_)) and _l_ = √((2_Q_)⁄(3_h_)).

The economical relation between _b_ and _l_ is therefore

_b_ = 0.75_l_

regardless of the value of _h_.

Substituting these values of _l_ and _b_ in the original

expression for the total cost, it becomes

_C_ = (3√((2_Q_)⁄(3_h_)) + 4√((3_Q_)⁄(8_h_)))_qh_^2 + (_pQ_)⁄_h_ +

_P_.

Differentiating with regard to _h_, equating to zero, and solving

_h_ = 0.45((_pQ_^½)⁄_q_)^⅔.

In the example given if _q_ = 0.2 and _p_ = 1.0 then

_h_ = 11.6 feet, _b_ = 120 feet and _l_ = 160 feet.

Since these are reasonable dimensions and in accord with good practice

they should be used, unless other conditions are unsuitable or the

velocity of flow is too great. A width of channel of 120 feet as

compared to a length of 160 feet is conducive to a poor distribution of

velocity across the basin. A ratio of width to length of about 1:4 is

desirable. In this case, by the use of three baffles parallel to the

length of the basin, thus dividing it into channels 40 feet wide and

11.6 feet deep, the ratio of width to length is changed to 1:4 and the

velocity will be increased only to 0.06 foot per second or 3.6 feet per

minute, which is a reasonable velocity. It could be reduced by

increasing the spacing of the baffles or the depth of the chamber.

Complicated baffling is undesirable. Two or three overflow baffles may

be used to permit quiescent sedimentation in the space thus formed, and

hanging baffles may be placed before the inlet and outlet to break up

surface currents, or to prevent the movement of scum. The hanging

baffles should not extend more than 12 to 18 inches below the water

surface. The inlet and outlet are sometimes arranged to permit the

reversal of flow, and the connecting channels between basins to allow

the operation of any number of basins in series or in parallel, although

such arrangements are more important in water purification. Sewage

should enter and leave at the top of the basin.

[Illustration:

FIG. 158.—Section through a Dortmund Tank.

Depth 20 to 30 feet.

]

Cleaning is facilitated by the location of a central gutter in the

bottom of the basin with the slope of the bottom of the basin towards

the gutter from 1:25 to 1:80 or steeper. A pipe, 2 inches or larger in

diameter, containing water under pressure with connections for hose

placed at frequent intervals is a useful adjunct in flushing the sludge

from the sedimentation basins. For equal capacity, deep vertical flow

tanks are more expensive and difficult to construct than the shallower

rectangular type. Deep tanks are advantageous, however, in that sludge

can sometimes be removed by gravity or by pumping without stopping the

operation of the tank. They will also operate successfully with shorter

periods of detention and higher velocities. The upward velocity should

not be greater than the velocity of sedimentation of the smallest

particle to be removed. The efficiency of sedimentation in them will be

increased by the sedimentation of the larger particles which drag some

of the smaller particles down with them. The Dortmund tank shown in Fig.

158 is an example of this type.

Ordinarily it is not necessary to roof sedimentation basins as the odors

created are not strong, and difficulties with ice are seldom serious.

CHEMICAL PRECIPITATION

=241. The Process.=—Chemical precipitation consists in adding to the

sewage such chemicals as will, by reaction with each other and the

constituents of the sewage, produce a flocculent precipitate and thus

hasten sedimentation. The advantages of this process over plain

sedimentation are a more rapid and thorough removal of suspended matter.

Its disadvantages include the accumulation of a large amount of sludge,

the necessity for skilled attendance, and the expense of chemicals. The

process is not in extensive use as the conditions under which the

advantages outweigh the disadvantages are unusual. Sewage containing

large quantities of substances which will react with a small amount of

an added chemical to produce the required precipitate are the most

favorable for this method of treatment.

Chemical precipitation accomplishes the same result as plain

sedimentation, although the effluent from the chemically precipitated

sewage may be of better quality than that from a plain sedimentation

basin.

=242. Chemicals.=—Lime is practically the only chemical used for the

precipitation of the solid matter in sewage. Commercial lime used for

precipitation consists of calcium oxide (CaO), with large quantities of

impurities. It should be stored in a dry place and protected from undue

exposure to the air to prevent the formation of calcium carbonate

(CaCO_{3}), the formation of which is commonly known as air slacking.

The active work in the formation of the precipitate is performed by the

lime (CaO) or calcium hydroxide (Ca(OH)_{2}). The lime should therefore

be purchased on the basis of available CaO, which may be as low as 10 to

15 per cent in some commercial products. The amount of lime necessary

depends on the quality of the sewage, the period of retention in the

sedimentation basin, the method of application, the required results,

and other less easily measured factors. Full scale tests for the amount

of lime needed to produce certain results are the most satisfactory. In

practice the amount of lime necessary when lime alone is used as a

precipitant has been found to be about 15 grains per gallon. This may be

markedly different, dependent on the quality of the sewage. For acid

sewages, lime alone is not suitable as a precipitant since it is

necessary to add sufficient lime to neutralize the sewage before the

calcium carbonate will be precipitated.

The use of copperas (FeSO_{4}) together with lime, leads to economy in

the use of chemicals as the flocculent precipitate of ferrous hydroxide

(Fe(OH)_{2}) is more voluminous than the precipitate of calcium

carbonate. This is commonly known as the lime and iron process. The

presence of iron in certain trade wastes may reduce the cost of chemical

precipitation, as the necessary amount of copperas is reduced. Where 15

grains of lime alone will be needed per gallon of sewage, the total

amount of chemicals used will be reduced to 8 to 10 grains per gallon

with the use of lime and iron. This combination is less expensive than

the use of lime alone, and is even cheaper where the iron is already

present in the sewage. Such a condition is well illustrated by the

sewage at Worcester, Mass., where the oldest and best known chemical

precipitation plant in the United States is located. The amount of lime

used at this plant has varied between 6 and 10 grains per gallon of

sewage, the normal amount being about 7 grains. No iron is added because

of the amount already in solution.

The results of a series of experiments on the chemical precipitation of

sewage by Allen Hazen, are given in the 1890 Report of the Massachusetts

State Board of Health, on p. 737 of the volume on the Purification of

Water and Sewage. Hazen concludes as the result of his experiments:

concerning lime,

There is a certain definite amount of lime ... which gives as good

or better results than either more or less. This amount is that

which exactly suffices to form normal carbonates with all the

carbonic acid of the sewage. This amount can be determined in a

few minutes by simple titration.

Concerning lime and iron (copperas) he states:

Ordinary house sewage is not sufficiently alkaline to precipitate

copperas, and a small amount of lime must be added to obtain good

results. The quantity of lime required depends both upon the

composition of the sewage and the amount of copperas used, and can

be calculated from titration of the sewage. Very imperfect results

are obtained from too little lime, and, when too much is used, the

excess is wasted, the result being the same as with a smaller

quantity.

In precipitation by ferric sulphate and crude alum, the addition

of lime was found unnecessary, as ordinary sewage contains enough

alkali to decompose these salts. Within reasonable limits the more

of these precipitants used the better is the result, but with very

large quantities the improvement does not compare with the

increased cost.

Using equal values of different precipitants, applied under the

most favorable conditions for each, upon the same sewage, the best

results were obtained from ferric sulphate. Nearly as good results

were obtained from copperas and lime used together, while lime and

alum each gave somewhat inferior effluents.... When lime is used

there is always so much lime left in solution that it is doubtful

if its use would ever be found satisfactory except in case of an

acid sewage.

It is quite impossible to obtain effluents by chemical

precipitation which will compare in organic purity with those

obtained by intermittent filtration through sand.

It is possible to remove from one-half to two-thirds of the

organic matter by precipitation ... and it seems probable that ...

a result may be obtained which will effectually prevent a public

nuisance.

=243. Preparation and Addition of Chemicals.=—Lime is not readily

soluble in water. Therefore, it is not best to add the lime as a powder

to the sewage, but to form a milk of lime, that is, a supersaturated

solution containing from 2,000 to 4,000 grains per gallon, although dry

slaked lime has sometimes been applied directly. The solution is

prepared in tanks in a quantity sufficient for some part of the day’s

run, commonly sufficient to last through one shift of 8 or 10 hours. The

lime is prepared by placing the amount necessary to fill one storage

tank into a slaking tank containing some cold water. Sufficient water is

added to keep the solution just at the boiling point, or steam may be

added to make it boil. After slaking, it is run into the milk-of-lime

solution tank and sufficient water added to bring to the proper

strength. The milk of lime is added in measured quantities, being

controlled by a variable head on a fixed orifice or weir, so that it may

be varied with the amount of sewage flowing through the plant. The

amount of lime to be added is determined by titration with

phenolphthalein, experience indicating the color to be obtained when the

proper amount of lime has been added.

The use of either copperas or alum has been so rare, for the

precipitation of sewage, that a description of the methods of handling

these chemicals as a sewage precipitant is not warranted. An excellent

description of the methods of handling these chemicals in water

purification will be found in “Water Purification” by Ellms.

TABLE 81

RESULTS OF CHEMICAL PRECIPITATION AT WORCESTER, MASSACHUSETTS[146]

──────────────────────────────────────┬──────────┬──────────┬──────────

│ 1900 │ 1910 │ 1920

──────────────────────────────────────┼──────────┼──────────┼──────────

Amount of sewage treated, million │ 4,781 │ 5,317 │ 8,893

gallons │ │ │

Amount of sewage chemically treated, │ 3,650 │ 3,574 │ 7,300

million gallons │ │ │

Gallons of wet sludge per million │ 4,450 │ 4,185 │

gallons of sewage treated │ │ │

Per cent of solids in sludge │ 4.42 │ 8.20 │4.64[147]

Tons of solids │ 7,294 │ 4,182 │6,431[147]

Pounds of lime added per million │ 999[148] │ 762[147] │ 534

gallons of sewage pumped │ │ │

Per cent of organic matter removed: │ │ │

By albuminoid ammonia: │ │ │

Total │52.7[149] │ 58.4 │ 51.9

Suspended │90.0[149] │ 88.7 │ 83.6

By oxygen consumed: │ │ │

Total │62.8[149] │ 61.1 │ 62.5

Suspended │86.6[149] │ 89.7 │ 86.2

──────────────────────────────────────┴──────────┴──────────┴──────────

=244. Results.=—The results of Hazen’s experiments indicate that a

greater amount of suspended matter can be removed in the same time by

chemical precipitation than by plain sedimentation. The percentage of

removal of suspended matter may be as high as 80 to 90 per cent with a

period of retention of 6 to 8 hours and the addition of a proper amount

of chemical. That the method is not always a success is shown by the

results of some tests at Canton, Ohio.[150] The report states:

... lime treatment removes about 50 per cent of the suspended

matter, and in the main about 50 per cent of the organic

matter.... These data are instructive as indicating that the

addition of lime to the Canton sewage in quantities as previously

stated does not materially improve the character of the resulting

effluent over and above that which could be produced by plain

sedimentation alone.

The plant at Worcester, Mass., is the largest in the United States and

information from it is of value. A summary of the results at Worcester

for 1900, 1910, and 1920 are shown in Table 81.

CHAPTER XVI

SEPTICIZATION

=245. The Process.=—Septic action is a biological process caused by the

activity of obligatory or facultative anaërobes as the result of which

certain organic compounds are reduced from higher to lower conditions of

oxidation, some of the solid organic substances are rendered soluble,

and a quantity of gas is given off. Among these gases are: methane,

hydrogen sulphide, and ammonia. The biologic process in the septic tank

represents the downward portion of the cycle of life and death, in which

complex organic compounds are reduced to a more simple condition

available as food for low forms of plant life. The disposal of sewage by

septic action, when introduced, promised the solution of all problems in

sewage treatment. Septic action is now better understood, and it is

known that some of the early claims were unfounded.

The principal advantage of septic action in sewage treatment is the

relatively small amount of sludge which must be cared for compared to

that produced by a plain sedimentation tank. The sludge from a septic

tank may be 25 to 30 per cent and in some cases 40 per cent less in

weight, and 75 to 80 per cent less in volume than the sludge from a

plain sedimentation tank. The most important results of septic action

and the greatest septic activity occur in the deposited organic matter

or sludge. The biologic changes due to septic action which occur in the

liquid portion of the tank contents are of little or no importance. The

installation of a septic tank, although it may fail to prevent the

nuisance calling for abatement, has a remarkable psychological effect in

stilling complaints. Among other advantages are the comparative

inexpensiveness of the tanks and the small amount of attention and

skilled attendance required. The tanks need cleaning once in 6 months to

a year. If properly designed no other attention is necessary.

The septic tank has fallen into some disrepute because of the better

results obtainable by other methods, the occasional discharge of

effluents worse than the influent, the occasional discharge of sludge in

the effluent caused by too violent septic boiling, and on account of

patent litigation. This last difficulty has been overcome as the Cameron

patents expired in 1916. Occasionally the odors given off by the septic

process are highly objectionable and are carried for a long distance.

These odors can be controlled to a large extent by housing the tanks.

Over-septicization must be guarded against as an over-septicized

effluent is more difficult of further treatment or of disposal than a

comparatively fresh, untreated sewage. An over-septicized or stale

sewage is indicated by the presence of large quantities of ammonias,

either free or albuminoid, frequently accompanied by hydrogen sulphide

and other foul-smelling gases. The oxygen demand in an over-septicized

sewage is greater than that in a fresh or more carefully treated sewage.

=246. The Septic Tank.=—A septic tank is a horizontal, continuous-flow,

one-story sedimentation tank through which sewage is allowed to flow

slowly to permit suspended matter to settle to the bottom where it is

retained until anaërobic decomposition is established, resulting in the

changing of some of the suspended organic matter into liquid and gaseous

substances, and a consequent reduction in the quantity of sludge to be

disposed of.[151] It is to be noted that a continuous flow is essential

to a septic tank. Small tanks containing stagnant household sewage are

called cesspools, although sometimes erroneously spoken of as septic

tanks.

Septic and sedimentation tanks differ in their method of operation only

in the period of storage and the frequency of cleaning. The period of

flow in a septic tank is longer and it is cleaned less frequently. The

results obtained by the two processes differ widely. A septic tank can

be converted into a sedimentation tank, or vice versa, by changing the

method of operation, no constructional features requiring alteration.

The purpose of the tank is to store the sludge for such a period of time

that partial liquefaction of the sludge may take place, and thus

minimize the difficulty of sludge disposal. For this reason the sludge

storage capacity of a septic tank is sometimes greater than would be

necessary for a plain sedimentation tank.

TABLE 82

EFFICIENCIES AND PERFORMANCE OF SEPTIC TANK AT COLUMBUS, OHIO

(Report of Sewage Purification, by G. A. Johnson, Nov. 10, 1905)

──────────────┬────┬─────┬────┬────┬────┬────┬────┬─────┬─────┬───┬────┬────

Month, │Aug.│Sept.│Oct.│Nov.│Dec.│Jan.│Feb.│March│April│May│June│Avg.

1904–1905 │ │ │ │ │ │ │ │ │ │ │ │

──────────────┼────┼─────┼────┼────┼────┼────┼────┼─────┼─────┼───┼────┼────

Temperature, │ │ │ │ │ │ │ │ │ │ │ │

degrees F. │ │ │ │ │ │ │ │ │ │ │ │

Influent │ 69 │ 70 │ 65 │ 60 │ 54 │ 51 │ 48 │ 50 │ 57 │61 │ 67 │

Effluent │ 69 │ 68 │ 64 │ 59 │ 52 │ 48 │ 45 │ 49 │ 57 │62 │ 68 │

Oxygen │ │ │ │ │ │ │ │ │ │ │ │

consumed, │ │ │ │ │ │ │ │ │ │ │ │

parts per │ │ │ │ │ │ │ │ │ │ │ │

million: │ │ │ │ │ │ │ │ │ │ │ │

Influent │ 49 │ 50 │ 52 │ 47 │ 43 │ 51 │ 44 │ 47 │ 53 │33 │ 40 │ 47

Effluent │ 40 │ 36 │ 40 │ 39 │ 37 │ 35 │ 37 │ 39 │ 50 │34 │ 33 │ 38

Per cent │ 18 │ 28 │ 23 │ 15 │ 16 │ 31 │ 16 │ 17 │ 6 │–3 │ 18 │ 19

removal │ │ │ │ │ │ │ │ │ │ │ │

Organic │ │ │ │ │ │ │ │ │ │ │ │

nitrogen, │ │ │ │ │ │ │ │ │ │ │ │

parts per │ │ │ │ │ │ │ │ │ │ │ │

million: │ │ │ │ │ │ │ │ │ │ │ │

Influent │6.5 │ 8.2 │9.3 │8.4 │8.8 │8.5 │6.7 │ 6.4 │ 7.9 │6.1│6.7 │7.8

Effluent │7.3 │ 5.5 │6.0 │7.4 │8.2 │7.0 │5.4 │ 5.5 │ 5.2 │ │ │

Per cent │–12 │ 32 │ 35 │ 12 │ 7 │ 18 │ 19 │ 14 │ 25 │30 │ 19 │ 19

removal │ │ │ │ │ │ │ │ │ │ │ │

Free ammonia, │ │ │ │ │ │ │ │ │ │ │ │

parts per │ │ │ │ │ │ │ │ │ │ │ │

million: │ │ │ │ │ │ │ │ │ │ │ │

Influent │9.7 │12.2 │12.4│16.3│14.7│10.8│8.3 │ 9.9 │12.3 │6.9│8.3 │11.7

Effluent │10.5│11.5 │12.4│17.2│14.3│11.1│8.9 │10.7 │14.9 │9.0│8.7 │12.1

Per cent │ –8 │ 6 │ 0 │ –6 │ 3 │ –3 │ –7 │ –8 │ –21 │–23│ –5 │ –3

removal │ │ │ │ │ │ │ │ │ │ │ │

│ │ │ │ │ │ │ │ │ │ │ │

Residue on │ │ │ │ │ │ │ │ │ │ │ │

Evaporation,│ │ │ │ │ │ │ │ │ │ │ │

parts per │ │ │ │ │ │ │ │ │ │ │ │

million: │ │ │ │ │ │ │ │ │ │ │ │

Total: │ │ │ │ │ │ │ │ │ │ │ │

Influent │990 │ 952 │993 │961 │989 │949 │890 │ 850 │1067 │912│945 │946

Effluent │935 │ 891 │893 │916 │925 │886 │843 │ 782 │ 895 │800│835 │873

Per cent │ 6 │ 6 │ 10 │ 5 │ 6 │ 6 │ 5 │ 8 │ 16 │12 │ 12 │ 8

removal │ │ │ │ │ │ │ │ │ │ │ │

Volatile: │ │ │ │ │ │ │ │ │ │ │ │

Influent │231 │ 184 │162 │175 │156 │167 │156 │ 168 │ 212 │122│162 │166

Effluent │206 │ 160 │129 │148 │137 │137 │134 │ 137 │ 147 │103│144 │139

Per cent │ 11 │ 13 │ 20 │ 15 │ 12 │ 18 │ 14 │ 18 │ 31 │16 │ 11 │ 16

removal │ │ │ │ │ │ │ │ │ │ │ │

Mineral: │ │ │ │ │ │ │ │ │ │ │ │

Influent │759 │ 768 │831 │786 │833 │782 │734 │ 682 │ 855 │700│783 │780

Effluent │729 │ 731 │764 │768 │788 │749 │709 │ 645 │ 748 │697│691 │734

Per cent │ 4 │ 5 │ 8 │ 2 │ 5 │ 4 │ 3 │ 5 │ 11 │ 1 │ 12 │ 6

removal │ │ │ │ │ │ │ │ │ │ │ │

Cubic yards │ │ │0.10│1.24│1.09│1.17│0.65│0.63 │0.57 │ │1.34│

wet sludge │ │ │ │ │ │ │ │ │ │ │ │

per million │ │ │ │ │ │ │ │ │ │ │ │

gallons: │ │ │ │ │ │ │ │ │ │ │ │

Per cent │ │ │ │ │ │ │ │ │ │ │ │

removal of │ │ │ │ │ │ │ │ │ │ │ │

suspended │ │ │ │ │ │ │ │ │ │ │ │

matter: │ │ │ │ │ │ │ │ │ │ │ │

Total │ 59 │ 54 │ 56 │ 51 │ 42 │ 48 │ 32 │ 47 │ 56 │67 │ 53 │ 50

Volatile │ 60 │ 41 │ 48 │ 52 │ 44 │ 55 │ 47 │ 47 │ 62 │80 │ 15 │ 48

Fixed │ 75 │ 65 │ 60 │ 51 │ 40 │ 38 │ 19 │ 48 │ 53 │64 │ 67 │ 51

Gas evolved, │ │ │ │ │ │ │ │ 29 │ 14 │41 │ 50 │

cubic feet │ │ │ │ │ │ │ │ │ │ │ │

per day: │ │ │ │ │ │ │ │ │ │ │ │

──────────────┴────┴─────┴────┴────┴────┴────┴────┴─────┴─────┴───┴────┴────

=247. Results of Septic Action.=—The results obtained from the septic

tanks at the Columbus Sewage Experiment Station are given in Table 82.

The effluent is higher than the influent in free ammonia, but the

reduction of other constituents, particularly suspended matter, is

marked.

Septic action is sensitive to temperature changes, and to certain

constituents of the incoming sewage. Cold weather or an acid influent

will inhibit septicization. In winter the liquefaction of sludge may

practically cease, whereas in summer liquefaction may exceed deposition.

The amount of gas generated is a measure of the relative amount of

septic action. The rapid generation of gas in warm weather disturbs the

settled sludge and may cause a deterioration of the quality of the

effluent because of the presence of decomposed sludge. The results in

Table 82 show the effect of cold weather on the process. In warm weather

the violent ebullition of gas sometimes causes the discharge of sludge

in the effluent, resulting in a liquid more difficult of disposal than

the incoming sewage. Since septic action is dependent on the presence of

certain forms of bacteria, where these are absent there will be no

septic action. Sewage generally contains the forms of bacteria necessary

for this action but it has occasionally been found necessary to seed new

tanks in order to start septic action.

The sludge from septic tanks is usually black, with a slight odor,

though in some cases this odor may be highly offensive. The sludge will

flow sluggishly. It can be pumped by centrifugal pumps and it will flow

through pipes and channels. It has a moisture content of about 90 per

cent and a specific gravity of about 1.03. It is dried with difficulty

on open-air drying beds, and it is worthless as a fertilizer. The

composition of some septic sludges are shown in Table 83.

=248. Design of Septic Tanks.=—The sedimentation chambers of a septic

tank are designed on the same principles as the sedimentation basins

described in Art. 240. The velocity of flow should not exceed one foot

per minute. The channels should be straight and free from obstructions

causing back eddies. The ratio of length to width of channel should be

between 2 : 1 to 4 : 1 with a width not exceeding 50 feet, and desirably

narrower. The depths used vary between 5 and 10 feet, exclusive of the

sludge storage capacity. Hanging baffles should be placed, one before

the inlet and the other in front of the outlet, so as to distribute the

incoming sewage over the tank, and to prevent scum from passing into the

outlet. The baffles should hang about 12 inches below the surface of the

sewage. Intermediate baffles are sometimes desirable to prevent the

movement of sludge or scum towards the outlet. The placing of baffles

must be considered carefully as injudicious baffling may lessen the

effectiveness of a tank by so concentrating the currents as to prevent

sedimentation or the accumulation of sludge. Baffles should be built of

concrete or brick, as wood or metal in contact with septic sewage

deteriorates rapidly. In designing the sludge storage chambers it may be

assumed that one-half of the organic matter and none of the mineral

matter will be liquefied or gasified. The net storage volume allowed is

about 2 to 3 cubic yards per million gallons of sewage treated.

Variations between 0.1 and 10.0 cubic yards have been recorded, however.

If grit is carried in the sewage to be treated, it should be removed by

the installation of a grit chamber before the sewage enters the septic

tank.

TABLE 83

ANALYSIS OF TANK SLUDGES

──────────┬────────┬────────┬────────────────────────────

Place │Specific│Per Cent│ Per Cent in Terms of Dry

│Gravity │Moisture│ Matter

│ │ │

│ │ │

│ │ │

──────────┼────────┼────────┼────────┬─────┬────────┬────

│ │ │Volatile│Fixed│Nitrogen│Fat

──────────┼────────┼────────┼────────┼─────┼────────┼────

Mansfield,│ 1.11│ 80.8│ │ │ │

O. │ │ │ │ │ │

│ │ │ │ │ │

│ │ │ │ │ │

Chicago, │ 1.03│ 90│ 40│ 60│ 1.9│ 7.0

Ill. │ │ │ │ │ │

│ │ │ │ │ │

Columbus, │ 1.09│ 83.3│ 4.4│ 16.7│ 0.25│0.94

O. │ │ │ │ │ │

│ │ │ │ │ │

│ │ │ │ │ │

Atlanta, │ 1.02│ 87.1│ 39.1│ 60.9│ 1.25│6.11

Ga. │ │ │ │ │ │

│ │ │ │ │ │

Baltimore,│ 1.02│ 91.9│ 66.2│ │ 2.45│4.02

Md. │ │ │ │ │ │

│ │ │ │ │ │

│ │ │ │ │ │

│ │ │ │ │ │

Baltimore,│ 1.02│ 92.4│ 62.7│ │ 2.75│

Md. │ │ │ │ │ │

Baltimore,│ │ 79.2│ 73.8│ │ 2.64│9.00

Md. │ │ │ │ │ │

Baltimore,│ │ 92.4│ 58.0│ 3.19│ │

Md. │ │ │ │ │ │

──────────┴────────┴────────┴────────┴─────┴────────┴────

──────────┬────────┬────────┬─────────┬────────────

Place │ Cubic │ Pounds │ Kind of │ Reference

│Yard per│ per │ Sludge │

│Million │Million │ │

│Gallons,│Gallons,│ │

│ Wet │ Dry │ │

──────────┼────────┼────────┼─────────┼────────────

│ │ │ │

──────────┼────────┼────────┼─────────┼────────────

Mansfield,│ │ │Septic │1908 Report,

O. │ │ │ │ State

│ │ │ │ Board of

│ │ │ │ Health

Chicago, │ 1.0│ 200│Septic │

Ill. │ │ │ │

│ 1.5│ 300│ │

Columbus, │ │ │Septic │G. A.

O. │ │ │ │ Johnson

│ │ │ │ 1905

│ │ │ │ Report

Atlanta, │ │ │Imhoff │Eng. Rec.,

Ga. │ │ │ │ V. 72,

│ │ │ │ 1915, p. 4

Baltimore,│ │ │Digestion│Eng.

Md. │ │ │ Tank │ News-Rec.,

│ │ │ │ V. 87,

│ │ │ │ 1921, p.

│ │ │ │ 98

Baltimore,│ │ │Imhoff │ do.

Md. │ │ │ │

Baltimore,│ │ │Raw │ do.

Md. │ │ │ Sludge │

Baltimore,│ │ │Settling │ do.

Md. │ │ │ Basin │

──────────┴────────┴────────┴─────────┴────────────

Two or more tanks should be constructed to allow for the shut down of

one for cleaning and to increase the elasticity of the plant. The number

of tanks to be used is dependent on the total quantity of sewage and the

fluctuations in rate of flow. An average period of retention of about 9

to 10 hours with a minimum period of 6 hours during maximum flow is a

fair average to be assumed for design. The period of retention should

not exceed about 24 hours, as the sewage may become over-septicized. The

sludge storage period should be from 6 to 12 months.

A cover is not necessary to the successful operation of a septic tank.

Covers are sometimes used with success, however, in reducing the

dissemination of odors from the tank. They are also useful in retaining

the heat of the sewage in cold weather and thus aid in promoting

bacterial activity. Types of covers vary from a building erected over

the tank to a flat slab set close to the surface of the sewage. In the

design of a cover, good ventilation should be provided to permit the

escape of the gases, and easy access should be provided for cleaning.

Tightly covered tanks or tanks with too little ventilation have resulted

in serious explosions, as at Saratoga Springs in 1906 and at

Florenceville, N. C., in 1915.[152]

The sludge may be removed through drains in the bottom of the tank as

described for sedimentation basins, or where such drains are not

feasible the sludge and sewage are pumped out. For this purpose a pump

may be installed permanently at the tank, or for small tanks portable

pumps are sometimes used. Septic tanks should be cleaned as infrequently

as possible without permitting the overflow of sludge into the effluent.

The less frequent the cleaning the less the amount of sludge removed

since digestion is continuous throughout the sludge. It is necessary to

clean when the tank becomes so filled with sludge, that the period of

retention is materially reduced, or sludge is being carried over into

the effluent.

The details of the septic tank at Champaign, Illinois, are shown in Fig.

159. This tank was designed by Prof. A. N. Talbot, and was put in

service on Nov. 1, 1897. It was among the first of such tanks to be

installed in the United States. The tank shown in Fig. 159 is an example

of present day practice in single-story septic tank design.

[Illustration:

FIG. 159.—Septic Tank at Champaign, Illinois.

]

[Illustration:

FIG. 160.—Design for a Residential Septic Tank for a Family of Ten.

Illinois State Board of Health.

]

Small septic tanks for rural homes of 5 to 15 persons, or on a slightly

larger scale for country schools and small institutions, are little more

than glorified cesspools. Nevertheless much attention has been given to

the construction of such tanks by the National Government and by state

boards of health.[153] The recommendations of some of these boards have

been compiled in Table 84. A typical method for the construction of such

tanks, as recommended by the Illinois State Board of Health, is shown in

Fig. 160. A subsurface filter, into which the effluent is discharged, is

an important adjunct where no adequate stream is available to receive

the discharge from the tank.

TABLE 84

CAPACITIES OF SEPTIC TANKS FOR SMALL INSTALLATIONS

──────────────┬─────────────┬─────────┬─────────┬──────────────────────

Rule │ Number, │Capacity,│Period of│ Remarks

Recommended by│ Persons │ Gallons │Retention│

State Board of│ │ per │ │

Health │ │ Person │ │

──────────────┼─────────────┼─────────┼─────────┼──────────────────────

Wisconsin │ │ 30 │24 hours │

Ohio │ 4 to 10 │ 50 │ │Not less than 560

│ │ │ │ gallons

Kentucky │ │ │24 to 48 │Not more than 5 feet

│ │ │ hours │ deep

Texas │ │ │24 hours │

Illinois │ │ 45 │24 hours │

U.S. Dept. │ │ 40 │24 hours │25 per cent additional

Agriculture.│ │ │ │

│ │ │ │capacity for sludge

North Carolina│Large Schools│ 15 │ │Not less than 500

│ │ │ │ gallons

North Carolina│ 20 pupils │ 25 │ │

North Carolina│Medium School│ 20 │ │

North Carolina│ Homes │25 to 30 │ │

──────────────┴─────────────┴─────────┴─────────┴──────────────────────

=249. Imhoff Tanks.=—In the discussion of septic tanks it has been

brought out that one of the objections to their use is the unloading of

sludge into the effluent which occasionally causes a greater amount of

suspended matter in the effluent than in the influent. The Imhoff tank

is a form of septic tank so arranged that this difficulty is overcome.

It combines the advantages of the septic and sedimentation tanks and

overcomes some of their disadvantages. An Imhoff tank is a device for

the treatment of sewage, consisting of a tank divided into 3

compartments. The upper compartment is called the sedimentation chamber.

In it the sedimentation of suspended solids causes them to drop through

a slot in the bottom of the chamber to the lower compartment called the

_digestion_ chamber. In this chamber the solid matter is humified by an

action similar to that in a plain septic tank. The generated gases

escape from the digestion chamber to the surface through the third

compartment called the _transition_ or _scum_ chamber. Sections of

Imhoff tanks are shown in Fig. 161. It is essential to the construction

of an Imhoff tank that the slot in the bottom of the sedimentation

chamber does not permit the return of gases through the sedimentation

chamber, and that there be no flow in the digestion chamber.

[Illustration:

FIG. 161.—Typical Sections through Imhoff Tanks.

Eng. News, Vol. 75, p. 15.

]

The Imhoff tank was invented by Dr. Karl Imhoff, director of the Emscher

Sewerage District in Germany. Its design is patented in the United

States, the control of the patent being in the hands of the Pacific

Flush Tank Co. of Chicago, which collects the royalties which are

payable when construction work begins. The fee for a tank serving 100

persons is $10, for 1,000 persons is $80 and for 100,000 persons is

$2550. The rate of the royalty reduces in proportion as the number of

persons served increases.[154] As designed by Imhoff and used in Germany

the tanks were of the radial flow type and quite deep. The depth, as

explained by Imhoff, is one of the chief requirements for the successful

operation of the tank. As adapted to American practice the tanks are

generally of the longitudinal flow type and are not made so deep. An

isometric view of a radial flow Imhoff tank is shown in Fig. 162. The

sewage enters at the center of the tank near the surface and flows

radially outward under the scum ring and over a weir placed near the

circumference of the tank. One type of longitudinal flow tank is shown

in isometric view in Fig. 163.

[Illustration:

FIG. 162.—Sketch of Radial Flow Imhoff Tank at Baltimore, Maryland.

Eng. Record, Vol. 70, p. 5.

]

[Illustration:

FIG. 163.—Isometric View of Longitudinal Flow Imhoff Tank at Cleburne,

Texas.

Eng. News, Vol. 76, p. 1029.

]

=250. Design of Imhoff Tanks.=—The velocity of flow, period of

retention, and the quantity of sewage to be treated determine the

dimensions of the _sedimentation chamber_ as in other forms of tanks.

The velocity of flow should not exceed one foot per minute, with a

period of retention of 2 to 3 hours. A greater velocity than one foot

per minute results in less efficient sedimentation. A longer period of

retention than the approximate limit set may result in a septic or stale

effluent, and a shorter period may result in loss of efficiency of

sedimentation. The bottom of the sedimentation chamber should slope not

less than 1½ vertical to 1 horizontal, in order that deposited material

will descend into the sludge digestion chamber. Provision should be made

for cleaning these sloping surfaces by placing a walk on the top of the

tank from which a squeegee can be handled to push down accumulated

deposits. It is desirable to make the material of the sides and bottom

of the sedimentation chamber as smooth as possible to assist in

preventing the retention of sludge in the sedimentation chamber. Wood,

glass, and concrete have been used. The latter is the more common and

has been found to be satisfactory. The length of the sedimentation

chamber is fixed by the velocity of flow and the period of retention.

Tanks are seldom built over 100 feet in length, however, because of the

resulting unevenness in the accumulation of sludge. Where longer flows

are desired two or more tanks may be operated in series. The width of

the chamber is fixed by considerations of economy and convenience. It

should not be made so great as to permit cross currents. In general a

narrow chamber is desirable. Satisfactory chambers have been constructed

at depths between 5 and 15 feet. The depth of the sedimentation chamber

and the depth of the digestion chamber each equal about one-half of the

total depth of the tank. This should be made as deep as possible up to a

limit of 30 to 35 feet, with due consideration of the difficulties of

excavation. C. F. Mebus states:[155]

In 9 of the largest representative United States installations,

the depth from the flow line to the slot varies from 10 feet 10

inches to 13 feet 6 inches.

Imhoff states, concerning the depth of tanks:

Deep tanks are to be preferred to shallow tanks because in them

the decomposition of the sludge is improved. This is so because in

the deeper tanks the temperature is maintained more uniformly and

because the stirring action of the rising gas bubbles is more

intense.

The stirring action of the gas bubbles is desirable as it brings the

fresh sludge more quickly under the influence of the active bacterial

agents. The greater pressure on the sludge in deep tanks also reduces

its moisture content.

Two or more sedimentation chambers are sometimes used over one sludge

digestion chamber in order to avoid the depths called for by the sloping

sides of a single sedimentation chamber. An objection to multiple-flow

chambers is the possibility of interchange of liquid from one chamber to

another through the common digestion chamber.

The inlet and outlet devices should be so constructed that the direction

of flow in the tank can be reversed in order that the accumulated sludge

may be more evenly distributed in the hoppers of the digestion chamber.

The sewage should leave the sedimentation chamber over a broad crested

weir in order to minimize fluctuations in the level of sewage in the

tank. The gases in the digesting sludge are sensitive to slight changes

in pressure. A lowering of the level of sewage will release compressed

gas and will too violently disturb the sludge in the digestion chamber.

Hanging baffles, submerged 12 to 16 inches and projecting 12 inches

above the surface of the sewage, should be placed in front of the inlet

and outlet, and in long tanks intermediate baffles should be placed to

prevent the movement of scum or its escape into the effluent. An Imhoff

tank which is operating properly should not have any scum on the surface

of the sewage in the sedimentation chamber.

The _slot_ or opening at the bottom of the sedimentation chamber should

not be less than 6 inches wide between the lips. Wider slots are

preferable, but too wide a slot will involve too much loss of volume in

the digestion chamber. One lip of the slot should project at least 3

inches horizontally under the other so as to prevent the return of gases

through the sedimentation chamber. A triangular beam may be used as

shown in Fig. 161 A. This method of construction is advantageous in

increasing the available capacity for sludge storage.

The _digestion chamber_ should be designed to store sludge from 6 to 12

months, the longer storage periods being used for smaller installations.

In warm climates a shorter period may be used with success. The amount

of sludge that will be accumulated is as uncertain as in other forms of

sewage treatment. A widely quoted empirical formula, presented in

“Sewage Sludge” by Allen, states:

_C_ = 10.5 _PD_ for combined sewage;

_C_ = 5.25 _PD_ for separate sewage,

in which _C_ = the effective capacity of the digestion chamber in

cubic feet;

_P_ = the population served, expressed in thousands;

_D_ = the number of days of storage of sludge.

The effective capacity of the chamber is measured as the entire volume

of the chamber approximately 18 inches below the lower lip of the slot.

The capacity as computed from the above formula is assumed as

satisfactory for a deep tank. Frank and Fries[156] recommend the

increase of the capacity for shallow tanks to compensate for the

decreased hydrostatic pressure. In any event the formula can be no more

than a guide to design. No formula can be of equal value to data

accumulated from tests on the sewage to be treated. The Illinois State

Board of Health requires 3 cubic yards of sludge digestion space per

million gallons of sewage treated. Frank and Fries recommend an

allowance of 0.007 cubic foot of storage per inhabitant per day for

combined sewage and one-half that amount for separate sewage. If this is

based on 80 per cent moisture content, the volume for other percentages

of moisture can be easily computed. An average figure used in the

Emscher District is one cubic foot capacity for each inhabitant for the

combined system, and three-fourths of this for the separate system.

Metcalf and Eddy[157] recommend the following method for the

determination of the sludge storage capacity: (1) From analyses of the

sewage or study of the sources ascertain the amount of suspended matter.

(2) Assume, or determine by test, the amount which will settle in the

period of detention selected, say 60 per cent in 3 hours. (3) Estimate

the amount which will be digested in the sludge chamber at about 25 per

cent, leaving 75 per cent to be stored. (4) Estimate the percentage

moisture in the sludge conservatively, say 85 per cent. The total volume

of sludge can then be computed. This method is more rational than the

use of empirical formulas, but because of the estimates which must be

made its results will probably be of no greater accuracy than those

obtained empirically.

The digestion chamber is made in the form of an inverted cone or pyramid

with side slopes at most about 2 horizontal to 1 vertical and preferably

much steeper without necessitating too great a depth of tank. The

purpose of the steep slope is to concentrate the sludge at the bottom of

the hopper thus formed. Concrete is ordinarily used as the material of

construction as a smooth surface can be obtained by proper workmanship.

Where flat slopes have been used, a water pipe perforated at intervals

of 6 to 12 inches may be placed at the top of the slopes, and water

admitted for a short time to move the sludge when the tank is being

cleaned.

A cast-iron pipe, 6 to 8 inches in diameter, is supported in an

approximately vertical position with its open lower end supported about

12 inches above the lowest point in the digestion chamber. This is used

for the removal of sludge. A straight pipe from the bottom of the tank

to a free opening in the atmosphere is desirable in order to allow the

cleaning of the pipe or the loosening of sludge at the start, and to

prevent the accumulation of gas pockets. The sludge is led off through

an approximately horizontal branch so located that from 4 to 6 feet of

head are available for the discharge of the sludge. A valve is placed on

the horizontal section of the pipe. A sludge pipe is shown in Fig. 162

and 163. Under such conditions, when the sludge valve is opened the

sludge should flow freely. The hydraulic slope to insure proper sludge

flow should not be less than 12 to 16 per cent. Where it is not possible

to remove the sludge by gravity an air lift is the best method of

raising it.

The volume of the _transition_ or _scum_ chamber should equal about

one-half that of the digestion chamber. The surface area of the scum

chamber exposed to the atmosphere should be 25 to 30 per cent of the

horizontal projection of the top of the digestion chamber. Some tanks

have operated successfully with only 10 per cent, but troubles from

foaming can usually be anticipated unless ample area for the escape of

gases has been provided.

All portions of the surface of the tank should be made accessible in

order that scum and floating objects can be broken up or removed. The

gas vents should be made large enough so that access can be gained to

the sludge chamber through them when the tank is empty.

Precautions should be taken against the wrecking of the tank by high

ground water when the tank is emptied. With an empty tank and high

ground water there is a tendency for the tank to float. The flotation of

the tank may be prevented by building the tank of massive concrete with

a heavy concrete roof, by underdraining the foundation, or by the

installation of valves which will open inwards when the ground water is

higher than the sewage in the tank. Dependence should not be placed on

the attendant to keep the tank full during periods of high ground water.

Roofs are not essential to the successful operation of Imhoff tanks.

They are sometimes used, however, as for septic tanks, to assist in

controlling the dissemination of odors, to minimize the tendency of the

sewage to freeze, and to aid in bacterial activity. In the construction

of a roof, ventilation must be provided as well as ready access to the

tank for inspection, cleaning, and repairs.

=251. Imhoff Tank Results.=—The Imhoff tank has the advantage over the

septic tank that it will not deliver sludge in the effluent, except

under unusual conditions. The Imhoff tank serves to digest sludge better

than a septic tank and it will deliver a fresher effluent than a plain

sedimentation tank. Imhoff sludge is more easily dried and disposed of

than the sludge from either a septic or a sedimentation tank. This is

because it has been more thoroughly humified and contains only about 80

per cent of moisture. As it comes from the tank it is almost black,

flows freely and is filled with small bubbles of gas which expand on the

release of pressure from the bottom of the tank, thus giving the sludge

a porous, sponge-like consistency which aids in drying. When dry it has

an inoffensive odor like garden soil, and it can be used for filling

waste land, without further putrefaction. It has not been used

successfully as a fertilizer.

Offensive odors are occasionally given off by Imhoff tanks, even when

properly operated. They also have a tendency to “boil” or foam. The

boiling may be quite violent, forcing scum over the top of the

transition chamber and sludge through the slot in the sedimentation

chamber, thus injuring the quality of the effluent. The scum on the

surface of the transition chamber may become so thick or so solidly

frozen as to prevent the escape of gas with the result that sludge may

be driven into the sedimentation chamber.

Some chemical analyses of Imhoff tank influents and effluents are given

in Table 86 and the analyses of some sludges from Imhoff tanks are given

in Table 83. It is to be noted that the nitrites and nitrates are still

present in the effluent, whereas they are seldom present in the effluent

from septic tanks. The per cent of moisture in the Imhoff sludge is less

than that in the septic tank sludge, and its specific gravity is higher.

It is heavier and more compact because of the longer time and the

greater pressure it has been subjected to in the digestion chamber of

the Imhoff tank.

=252. Status of Imhoff Tanks.=—The introduction of the Imhoff tank into

the United States, like the introduction of the Burkli-Ziegler Run-Off

Formula, and Kutter’s Formula, is to be credited to Dr. Rudolph Hering.

He advised Dr. Imhoff to come to the United States to introduce his tank

and gave him material aid through recommendations and introductions to

engineers. Shortly after its introduction, in 1907, the tank became very

popular and installations were made in many cities. This popularity was

caused by a growing dissatisfaction with the septic tank, the litigation

then progressing over septic patents, the production of inoffensive

sludge, and the promising results which had been obtained in Germany. As

a result of the extended experience obtained in the use of Imhoff tanks

American engineers have learned that, like all other sewage treatment

devices introduced up to the present time, the Imhoff tank requires

experienced attention for its successful operation. These tanks are now

being installed in the place of septic tanks, and they are frequently

used in conjunction with sprinkling filters.

=253. Operation of Imhoff Tanks.=—The important feature in the

successful operation of an Imhoff tank is the proper control of the

sludge and transition chambers. During the ripening process, which may

occupy 2 weeks to 3 months after the start of the tank, offensive odors

may be given off, the tank may foam violently, and scum may boil over

into the sedimentation chamber. This is usually due to an acid condition

in the digestion chamber which may possibly be overcome by the addition

of lime. A very fresh influent will have a similar effect. Too violent

boiling is not likely to occur where the area for the escape of gas has

been made large and the gas is not confined. Any accumulation of scum

should be broken up and pushed down into the digestion chamber, or

removed from the tank. The stream from a fire hose is useful in breaking

up scum. The side walls of the sedimentation chamber should be squeegeed

as frequently as is necessary to keep them free from sludge, which may

be as often as once or twice a week. Material floating on the surface of

the sedimentation chamber should be removed from the tank or sunk into

the digestion chamber through the gas vents in the transition chamber.

No sludge should be removed, except for the taking of samples, until the

tank is well ripened. The ripening of the sludge can be determined by

examining a sample and observing its color and odor. An odorless, black,

granular, well humified sludge is indicative of a ripened tank. After

the tank has ripened, sludge should be removed in small quantities at 2

to 3–week intervals, except in cold or rainy weather. The sludge should

be drawn off slowly to insure the removal of the oldest sludge at the

bottom of the digestion chamber. After the drawing off of the sludge has

ceased the pipe should be flushed with fresh water to prevent its

clogging with dried sludge in the interim until the next removal. Under

no circumstances should all the sludge in the tank be removed at any

time. The removal of some sludge during foaming after ripening may

reduce or stop the foaming. The ripening of a tank can be hastened by

adding some sludge from a tank already ripened.

Sludge should not be allowed to accumulate within 18 inches of the slot

at the bottom of the digestion chamber. The elevation of the surface of

the sludge can be located by lowering into the tank, a stoppered,

wide-mouthed bottle on the end of a stick. The stopper is pulled out by

a string when the bottle is at some known elevation. The bottle is then

carefully raised and observed for the presence of sludge. The process is

repeated with the bottle at different elevations until the surface of

the sludge has been discovered. Another method is to place the suction

pipe of a small hand pump at known points, successively increasing in

depth, and to pump in each position until one position is found at which

sludge appears in the pump. When the sludge in one portion of the

digestion chamber has risen higher than in another portion, the

direction of flow in the sedimentation chamber should be reversed if

possible. In the ordinary routine of operation it is never necessary to

shut down an Imhoff tank. Sludge is removed while the tank is operating.

The shut down of a tank will be caused by accidents and breaks to the

structure or control devices.

=254. Other Tanks.=—The Travis Hydrolytic Tank represents a step in the

development from the septic tank to the Imhoff tank. The Doten tank and

the Alvord tank are recent developments, and are somewhat similar in

operation to the Imhoff tank.

The Travis Hydrolytic Tank when first designed differed from the later

design of the Imhoff tank in the slot between the sedimentation chamber

and the digestion chamber which was not trapped against the escape of

gas from the latter to the former, and in operation a small quantity of

fresh sewage was allowed to flow through the digestion chamber. The tank

is called a hydrolytic tank because some solids are liquefied in it. The

tank is mainly of historic interest as designs similar to it are rarely

made to-day. Better results are obtained from the use of the Imhoff

tank. Recent developments have altered the original design of the Travis

tank so that it is hardly recognizable. The Travis tank at Luton, Eng.,

is shown in Fig. 164. The detailed description given in the _Engineering

News_ in connection with this illustration shows that the governing

object of the design is to separate as quickly as possible the sludge

deposited by the sewage without septic action being set up. To aid in

the collection and settlement of flocculent matter vertical wooden grids

or colloiders are used. The suspended matter strikes these and forms a

slimy deposit on them that in a short time slips off in pieces large

enough to settle readily.

[Illustration:

FIG. 164.—Plan and Section of Hydrolytic Tank at Luton, England.

Eng. News, Vol. 76, 1916, p. 194.

]

[Illustration:

FIG. 165.—Doten Tank for Army Cantonment Sewage Disposal.

Eng. News-Record, Vol. 79, 1917, p. 931.

]

The Doten tank[158] is a single-storied, hopper-bottomed septic tank,

views of which are shown in Fig. 165. It was devised by L. S. Doten for

army cantonments during the War. Its chief purpose was to avoid the

foaming and frothing so common to Imhoff tanks when overdosed with fresh

sewage. The first Alvord tank was constructed in Madison, Wis., in

1913.[159] As now constructed the tank consists of three deep,

single-story compartments with hopper bottoms. These compartments are

arranged side by side in any one unit. Sewage enters at the surface of

one of the compartments and is retained here during one-half of the

total period of retention. It leaves the first compartment over a weir

and passes in a channel over the top of the intermediate compartment to

the third or effluent compartment, where it is held for the remainder of

the period of detention. Accumulated scum and sludge are drawn off into

the intermediate compartment at the will of the operator, this

compartment being used for sludge digestion only. Such tanks as the

Doten and the Alvord have been used for plants receiving very fresh

sewages such as is discharged from military cantonments, in order to

assist in the prevention of the foaming to be expected from an Imhoff

tank receiving such a fresh influent. The tanks are suitable for small

installations, or where excavation to the depth required for an Imhoff

tank is not practicable.

CHAPTER XVII

FILTRATION AND IRRIGATION

=255. Theory.=—The cycle through which the elements forming organic

matter pass from life to death and back to life again has been described

in Chapter XIII. It has been shown in Chapter XVI that septic action

occupies that portion of the cycle in which the combinations of these

elements are broken down or reduced to simpler forms and the lower

stages of the cycle are reached. The action in the filtration of sewage

builds up the compounds again in a more stable form and almost complete

oxidation is attained, dependent on the thoroughness of the filtration.

In the filtration of sewage only the coarsest particles of suspended

matter are removed by mechanical straining. The success of the

filtration is dependent on biologic action. The desirable form of life

in a filter is the so-called nitrifying bacteria which live in the

interstices of the filter bed and feed upon the organic matter in the

sewage. Anything which injures the growth of these bacteria injures the

action of the filter. In a properly constructed and operated filter, all

matter which enters in the influent, leaves with the effluent, but in a

different molecular form. A slight amount may be lost by evaporation and

gasification but this is more than made up by the nitrogen and oxygen

absorbed from the atmosphere. The nitrifying action in sewage filtration

is shown by the analysis of sewage passing through a trickling filter,

as given in Tables 86 and 87. It is shown by the reduction of the

content of organic nitrogen, free ammonia, oxygen consumed, and the

increase in nitrites, nitrates, and dissolved oxygen. The reduction of

suspended matter is interrupted periodically when the filter “unloads.”

The suspended matter in the effluent is then greater than in the

influent.

The nitrifying organisms have been isolated and divided into two

groups—_nitrosomonas_, the nitrite formers, and _nitrobacter_, the

nitrate formers. Experiments indicate that the growth of the nitrobacter

organisms is dependent on the presence of the nitrosomonas organisms,

which are in turn dependent on the presence of the putrefactive

compounds resulting from the action of putrefying bacteria. The

existence of these organisms is an example of symbiotic action in

bacterial growth. The organisms have been found to grow best on rough

porous material on which their zoögleal jelly can be easily deposited

and affixed. Sewage filters were constructed to provide these ideal

conditions before the action of a filter was thoroughly understood.

The action in irrigation is similar to that in filtration. Although more

strictly a method of final disposal rather than preliminary treatment,

the similarity of the actions which take place, and the grading of sand

filtration into broad irrigation with no distinct line of difference has

resulted in the inclusion of the discussion of irrigation in the same

chapter with filtration.

=256. The Contact Bed.=—A contact bed is a water-tight basin filled with

coarse material, such as broken stone, with which sewage and air are

alternately placed in contact in such a manner that oxidation of the

sewage is effected. A contact bed has some of the features of a

sedimentation tank and an oxidizing filter. As such it marks a

transitory step from anaërobic to aërobic treatment of sewage. A plan

and a section of a contact bed are shown in Fig. 166.

Because of its dependence on biologic action a contact bed must be

ripened before a good effluent can be obtained. The ripening or maturing

occurs progressively during the first few weeks of operation, the

earlier stages being more rapidly developed. The time required to reach

such a stage of maturity that a good effluent will be developed will

vary between one and six or eight weeks, dependent on the weather and

the character of the influent. During the period of maturing the load on

the bed should be made light.

The use of contact beds has been extensive where a more stable effluent

than could be obtained from tank treatment has been desired, yet the

best quality of effluent was not required. The sewage to undergo

treatment in a contact bed should be given a preliminary treatment to

remove coarse suspended matter. The efficiency of the contact treatment

can be increased by passing the sewage through two or three contact beds

in series. In double contact treatment the primary beds are filled with

coarser material and operate at a more rapid rate than the secondary

beds. Double contact gives better results than single contact, but

triple contact treatment, though showing excellent results, is hardly

worth the extra cost. An advantage which contact treatment has over all

other methods of sewage filtration is that the bed can be so operated

that the sewage is never exposed to view. As a result the odors from

well-operated contact beds are slight or are entirely absent and there

should be no trouble from flying insects. Such a method of treatment is

favorable to plants located in populous districts and to the fancies of

a landscape architect. Another advantage of the contact bed is the small

amount of head required for its operation, which may be as low as 4 to 5

feet. This low head consumption by a sewage filter is equaled only by

the intermittent sand filter.

[Illustration:

FIG. 166.—Plan and Section of Treatment Plant at Marion, Ohio, Showing

Septic Tank, Contact Bed, and Sand Filter.

1908 Report Ohio State Board of Health.

]

The quality of the effluent from some contact beds is shown in Table 85.

It is to be noted that nitrification has been carried to a fair degree

of completion, and that the reduction of oxygen consumed has been

marked. In comparison with the effluent from filters, contact effluent

contains a smaller amount of nitrogen as nitrites and nitrates, and

suspended solids. Contact effluent is usually clear and odorless, but it

is not stable without dilution. The absence of nitrites and nitrates is

sometimes advantageous as the effluent will not support vegetable

growths dependent on this form of nitrogen. The absence of suspended

solids obviates the use of secondary sedimentation basins which are

needed with trickling filters. The head of 5 to 8 feet required for

contact treatment is low in comparison to the 10 to 15 feet required for

trickling filters, but is slightly higher than the head required for

intermittent sand filtration. The cost of contact treatment is higher

than the cost of trickling filters but is lower than the cost of

intermittent sand filtration, as shown in Table 90.

TABLE 85

QUALITY OF EFFLUENTS FROM CONTACT BEDS

Report on Sewage Purification at Columbus, Ohio, by G. A. Johnson, 1905.

──────┬──────┬─────────┬───────┬────────┬─────────────────────────────────

Filter│Depth,│ Size of │ Rate, │ Oxygen │ Nitrogen as

│ Feet │Material │Million│Consumed│

│ │in Inches│Gallons│ │

│ │ │ per │ │

│ │ │ Acre │ │

│ │ │per Day│ │

──────┼──────┼─────────┼───────┼────────┼───────┬───────┬────────┬────────

│ │ │ │ │Organic│ Free │Nitrites│Nitrates

│ │ │ │ │ │Ammonia│ │

──────┼──────┼─────────┼───────┼────────┼───────┴───────┴────────┴────────

│ │ │ │ │ Parts per Million

│ │ │ │ │ │ │ │

A │ 5│0.25–1.00│ 0.953│ 23│ 3.5│ 8.7│ 0.20│ 1.6

B │ 5│0.25–2.00│ 1.514│ 21│ 4.0│ 8.4│ 0.15│ 1.4

C │ 5│0.25–1.50│ 1.222│ 24│ 3.5│ 10.8│ 0.11│ 0.6

D │ 5│0.50–1.50│ 1.405│ 22│ 3.3│ 9.5│ 0.13│ 0.9

│ │ │ │ │ │ │ │

│ │ │Per Cent Removal of Constituents of Applied Sewage

│ │ │ │ │ │ │ │

A │ 5│0.25–1.00│ 0.953│ 48│ 49│ 10│ │

B │ 5│0.25–2.00│ 1.514│ 52│ 40│ 11│ │

C │ 5│0.25–1.50│ 1.222│ 47│ 31│ 12│ │

D │ 5│0.50–1.50│ 1.405│ 46│ 37│ 19│ │

──────┴──────┴─────────┴───────┴────────┴───────┴───────┴────────┴────────

──────┬──────┬────────────────────┬─────────

Filter│Depth,│ Suspended Matter │Dissolved

│ Feet │ │ Oxygen

│ │ │

│ │ │

│ │ │

│ │ │

──────┼──────┼─────┬────────┬─────┼─────────

│ │Total│Volatile│Fixed│

│ │ │ │ │

──────┼──────┴─────┴────────┴─────┴─────────

│ Parts per Million

│ │ │ │ │

A │ 5│ 832│ 94│ 737│ 0.3

B │ 5│ 831│ 85│ 746│ 0.1

C │ 5│ 826│ 92│ 734│ 0.8

D │ 5│ 810│ 91│ 717│ 0.9

│ │ │ │ │

│ Per Cent Removal of Constituents of Applied Sewage

│ │ │ │ │

A │ 5│ 73│ 70│ 76│

B │ 5│ 80│ 77│ 83│

C │ 5│ 70│ 70│ 70│

D │ 5│ 67│ 61│ 72│

──────┴──────┴─────┴────────┴─────┴─────────

The depth of the contact bed is generally made from 4 to 6 feet. The

deeper beds are less expensive per unit of volume, to construct, as the

cost of the underdrains and the distribution system is reduced in

relation to the capacity of the filter. The increased depth reduces the

aëration, and the periods of filling and emptying are so increased as to

limit the depths to the figures stated. The other dimensions of the bed

are controlled by economy and local conditions, as the success of the

contact treatment is not affected by the shape of the bed. Contact units

are seldom constructed larger than one-half an acre in area, as larger

beds require too much time for filling and emptying. A large number of

small units is also undesirable because of the increased difficulty of

control. In general it is well to build as large units as are compatible

with efficient operation, elasticity of plant, and which can be filled

within the time allowed at the average rate of sewage flow, or from

dosing tanks in which the storage period is not so long as to produce

septic conditions.

The interstices in a contact bed will gradually fill up, due to the

deposition of solid matter on the contact material, the disintegration

of the material, and the presence of organic growths. The period of rest

allowed every five or six weeks tends to restore partially some of this

lost capacity through the drying of the organic growths. It is

occasionally necessary to remove the material from the bed and wash it

in order to restore the original capacity. It may be necessary to do

this three or four times a year, in an overloaded plant, or as

infrequently as once in five or six years in a more lightly loaded bed.

The period is also dependent on the character of the contact material

and the quality of the influent. This loss of capacity may reduce the

voids from an original amount of 40 to 50 per cent of voids to 10 to 15

per cent. If the bed is not overloaded the loss of capacity will not

increase beyond these figures.

The rate of filtration depends on the strength of the sewage, the

character of the contact material, and the required effluent. It should

be determined for any particular plant as the result of a series of

tests. For the purposes of estimation and comparison the approximate

rate of filtration should be taken at about 94 gallons per cubic yard of

filtering material per day on the basis of three complete fillings and

emptyings of the tank. This is equivalent to 150,000 gallons per acre

foot of depth per day, or for a bed 5 feet deep to a rate of 750,000

gallons per acre per day. The net rate for double or triple filtration

is less than these figures, but on each filter the rates are higher.

The material of the contact bed should be hard, rough, and angular. It

should be as fine as possible without causing clogging of the bed.

Materials in successful use are: crushed trap rock or other hard stone,

broken bricks, slag, coal, etc. Soft crumbling materials such as coke

are not suitable as the weight of the superimposed material and the

movement of the sewage crushes and breaks it into fine particles which

accumulate in the lower portion of the filter and clog it. Roughness,

porosity, and small size are desirable, as the greater the surface area

the more rapid the deposition of material. After a short time, however,

the advantages of roughness and porosity are lost, as the sediment soon

covers all unevenness alike. The minimum size of the material is limited

by the tendency towards clogging. The sizes in successful use vary

between ¼ and ¾ of an inch, ½ inch being a common size. The same size of

material is used throughout the depth of the bed except that the upper 6

inches may be composed of small white pebbles or other clean material,

which does not come in contact with the sewage and which will give an

attractive appearance to the plant. In double or triple contact beds 3

or 4–inch material is sometimes used for the primary beds, and ¼-inch

material in the final bed.

Sewage may be applied at any point on or below the surface. The sewage

is withdrawn from the bottom of the bed. It is undesirable to have too

few inlet or outlet openings as the velocity of flow about the openings

will be so great as to disturb the deposit on the contact material. The

distribution system and the underdrains for the bed at Marion, Ohio, are

shown in Fig. 166.

The cycle of operation of a contact bed is divided into four periods. A

representative cycle might be: time of filling, one hour; standing full,

2 hours; emptying, one hour; standing empty, 4 hours. The length of

these periods is the result of long experience based on many tests and

are an average of the conclusions reached. Wide variations from them may

be found in different plants, and tests may show successful results with

different periods. The combination of these four periods is known as the

contact cycle.

The period of filling should be made as short as possible without

disturbing the material of the bed nor washing off the accumulated

deposits. The sewage should not rise more rapidly than one vertical foot

per minute. During the contact or standing full period sedimentation and

adsorption of the colloids are occurring on the area of surface exposed

to the sewage. This period should be of such length that septic action

does not become pronounced, and long enough to permit of thorough

sedimentation. The period of emptying should be made as short as

possible without disturbing the bed, on the same basis that the period

of filling is determined. During the period of standing empty, air is in

contact with the sediment deposited in thin layers on the contact

material, and the oxidizing activities of the filter are taking place.

The filter is given a rest period of one or two days every five or six

weeks, in order that it may increase its capacity and its biologic

activity.

The control of a contact bed may be either by hand or automatic, the

latter being the more common. Hand control requires the constant

attention of an operator and results in irregularity of operation,

whereas automatic control will require inspection not more than once a

day and insures regularity of operation. A number of automatic devices

have been invented which give more or less satisfaction. The air-locked

automatic siphons, without moving parts, have proven satisfactory and

are practically “fool-proof.” The operation of these devices is

explained in Chapter XXI.

=257. The Trickling Filter.=—A trickling or sprinkling filter is a bed

of coarse, rough, hard material over which sewage is sprayed or

otherwise distributed and allowed to trickle slowly through the filter

in contact with the atmosphere. A general view of a trickling filter in

operation at Baltimore is shown in Fig. 167. The action of the trickling

filter is due to oxidation by organisms attached to the material of the

filter. The solid organic matter of the sewage deposited on the surface

of the material, is worked over and oxidized by the aërobic bacteria,

and is discharged in the effluent in a more highly nitrified condition.

At times the discharge of suspended matter becomes so great that the

filter is said to be unloading. The action differs from that in a

contact bed in that there is no period of septic or anaërobic action and

the filter never stands full of sewage.

The effluent from a trickling filter is dark, odorless, and is

ordinarily non-putrescible. Analyses of typical effluents are given in

Tables 86 and 87. The unloading of the filter may occur at any time, but

is most likely to occur in the spring or in a warm period following a

period of low temperatures. It causes higher suspended matter in the

effluent than in the influent and may render the effluent putrescible.

The action is marked by the discharge of solid matter which has sloughed

off of the filter material and which increases the turbidity of the

effluent. Where the diluting water is insufficient to care for the

solids so carried in the effluent, they can be removed by a 2–hour

period of sedimentation. The effluent may become septic during this

time, however. The nitrogen in the effluent is almost entirely in the

form of nitrates, and the percentage of saturation with dissolved oxygen

is high. The effluent is more highly nitrified than that from a contact

bed, and its relative stability is also higher, thus demanding a smaller

volume of diluting water.

[Illustration:

FIG. 167.—Sprinkling Filter in Operation in Winter at Baltimore.

]

The principal advantage of a trickling filter over other methods of

treatment is its high rate which is from two to four times faster than a

contact bed, and about seventy times faster than an intermittent sand

filter. The greatest disadvantage is the head of 12 to 15 feet or more

necessary for its operation. Sedimentation of the effluent is usually

necessary to remove the settleable solids. During the period of

secondary sedimentation the quality of the filter effluent may

deteriorate in relative stability. In winter the formation of ice on the

filter results in an effluent of inferior quality, but as the diluting

water can care for such an effluent at this time the condition is not

detrimental to the use of the trickling filter. In summer the filters

sometimes give off offensive odors that can be noticed at a distance of

half a mile, and flying insects may breed in the filter in sufficient

quantities to become a nuisance if preventive steps are not taken. The

dissemination of odors is especially marked when treating a stale or

septic sewage. The treatment of a fresh sewage seldom results in the

creation of offensive odors.

TABLE 86

ANALYSIS OF CRUDE SEWAGE, IMHOFF TANK, AND SPRINKLING FILTER EFFLUENTS

AT ATLANTA, GEORGIA

(Engineering Record, Vol. 72, p. 4)

─────────┬───────────┬──────────────────────────────────────────

│Temperature│ Parts per Million

│Fahrenheit │

│ │

│ │

─────────┼───────────┼─────────────────────────────────┬────────

│ │ Nitrogen as │ Oxygen

│ │ │Consumed

─────────┼───────────┼───────┬───────┬────────┬────────┼────────

│ │Organic│ Free │Nitrites│Nitrates│

│ │ │Ammonia│ │ │

─────────┴───────────┴───────┴───────┴────────┴────────┴────────

_Crude Sewage_

─────────┬───────────┬───────┬───────┬────────┬────────┬────────

1913 │ │ │ │ │ │

Maximum │ 77│ 15.6│ 21.8│ 0.1│ 3.0│ 100.0

Minimum │ 61│ 10.4│ 16.5│ 0.1│ 1.4│ 78.3

Average │ 70│ 12.8│ 18.8│ 0.1│ 2.2│ 90.6

1914 (7 │ │ │ │ │ │

months)│ │ │ │ │ │

Maximum │ 74│ 16.0│ 33.4│ │ 2.3│

Minimum │ 60│ 9.5│ 18.1│ │ 1.6│

Average │ 66│ 13.4│ 27.1│ │ 2.0│

─────────┴───────────┴───────┴───────┴────────┴────────┴────────

_Imhoff Effluent_

─────────┬───────────┬───────┬───────┬────────┬────────┬────────

1913 │ │ │ │ │ │

Maximum │ 78│ 13.2│ 21.9│ 0.2│ 3.1│ 68.0

Minimum │ 58│ 6.5│ 16.8│ 0.1│ 1.1│ 53.1

Average │ 68│ 9.0│ 20.0│ 0.2│ 2.1│ 60.1

1914 (7 │ │ │ │ │ │

months)│ │ │ │ │ │

Maximum │ 77│ 10.3│ 30.3│ │ 2.0│

Minimum │ 59│ 4.1│ 18.0│ │ 1.5│

Average │ 65│ 7.7│ 25.9│ │ 1.8│

─────────┴───────────┴───────┴───────┴────────┴────────┴────────

_Sprinkling Filter Effluent_

─────────┬───────────┬───────┬───────┬────────┬────────┬────────

1913 │ │ │ │ │ │

Maximum │ 79│ 5.6│ 14.2│ 0.8│ 11.3│ 32.1

Minimum │ 55│ 2.6│ 6.2│ 0.5│ 5.8│ 23.6

Average │ 66│ 3.8│ 9.9│ 0.7│ 8.2│ 28.2

1914 (7 │ │ │ │ │ │

months)│ │ │ │ │ │

Maximum │ 77│ 8.5│ 20.7│ │ 11.2│

Minimum │ 55│ 4.4│ 8.8│ │ 3.6│

Average │ 63│ 5.7│ 15.2│ │ 7.2│

─────────┴───────────┴───────┴───────┴────────┴────────┴────────

─────────┬────────────────────┬──────────┬─────────

│ Parts per Million │ Per Cent │Relative

│ │Saturation│Stability

│ │Dissolved │

│ │ Oxygen │

─────────┼────────────────────┼──────────┼─────────

│ Suspended Matter │ │

│ │ │

─────────┼─────┬────────┬─────┼──────────┼─────────

│Total│Volatile│Fixed│ │

│ │ │ │ │

─────────┴─────┴────────┴─────┴──────────┴─────────

_Crude Sewage_

─────────┬─────┬────────┬─────┬──────────┬─────────

1913 │ │ │ │ │

Maximum │ 371│ 154│ 163│ 47│

Minimum │ 222│ 98│ 112│ 11│

Average │ 285│ 126│ 138│ 28│

1914 (7 │ │ │ │ │

months)│ │ │ │ │

Maximum │ 431│ │ │ 48│

Minimum │ 279│ │ │ 12│

Average │ 351│ │ │ 30│

─────────┴─────┴────────┴─────┴──────────┴─────────

_Imhoff Effluent_

─────────┬─────┬────────┬─────┬──────────┬─────────

1913 │ │ │ │ │

Maximum │ 90│ 50│ 41│ │

Minimum │ 35│ 42│ 21│ │

Average │ 68│ 46│ 33│ │

1914 (7 │ │ │ │ │

months)│ │ │ │ │

Maximum │ 73│ │ │ 48│

Minimum │ 49│ │ │ 34│

Average │ 65│ │ │ 43│

─────────┴─────┴────────┴─────┴──────────┴─────────

_Sprinkling Filter Effluent_

─────────┬─────┬────────┬─────┬──────────┬─────────

1913 │ │ │ │ │

Maximum │ 60│ 31│ 28│ 76│ 99

Minimum │ 33│ 26│ 28│ 52│ 88

Average │ 49│ 28│ 28│ 64│ 89

1914 (7 │ │ │ │ │

months)│ │ │ │ │

Maximum │ 106│ │ │ 79│ 99

Minimum │ 40│ │ │ 55│ 89

Average │ 62│ │ │ 65│ 95

─────────┴─────┴────────┴─────┴──────────┴─────────

TABLE 87

EFFICIENCY OF SPRINKLING FILTER CHICAGO, ILLINOIS

Depth of Filter 9 feet. Size of stone 2 in. to 3 in.

────────┬───────────────────────────┬───────────────────────────

Month │ Organic Nitrogen │ Free Ammonia

│ │

────────┼───────────────────────────┼───────────────────────────

│ │

────────┼─────────┬─────────┬───────┼─────────┬─────────┬───────

│Influent,│Effluent,│ Per │Influent,│Effluent,│ Per

│Parts per│Parts per│ Cent │Parts per│Parts per│ Cent

│ Million │ Million │Removed│ Million │ Million │Removed

────────┼─────────┼─────────┼───────┼─────────┼─────────┼───────

1910 │ │ │ │ │ │

October │ 5.1│ 2.8│ 45│ 12.0│ 4.6│ 62

November│ 5.9│ 2.5│ 58│ 12.0│ 5.9│ 51

December│ 4.6│ 3.0│ 35│ 12.0│ 6.9│ 42

│ │ │ │ │ │

1911 │ │ │ │ │ │

January │ 6.3│ 4.8│ 24│ 11.0│ 7.0│ 36

February│ 9.0│ 4.8│ 47│ 10.0│ 7.2│ 28

March │ 8.3│ 3.5│ 58│ 9.9│ 6.4│ 35

April │ 6.4│ 4.0│ 37│ 8.3│ 3.6│ 69

May │ 7.6│ 5.4│ 29│ 9.2│ 2.4│ 74

June │ 5.9│ 3.2│ 46│ 11.0│ 0.6│ 95

July │ 6.2│ 4.2│ 32│ 11.0│ 1.3│ 88

────────┴─────────┴─────────┴───────┴─────────┴─────────┴───────

────────┬───────────────────────────┬───────────────────────────

Month │ Oxygen Consumed │ Nitrites

│ │

────────┼───────────────────────────┼───────────────────────────

│ │

────────┼─────────┬─────────┬───────┼─────────┬─────────┬───────

│Influent,│Effluent,│ Per │Influent,│Effluent,│ Per

│Parts per│Parts per│ Cent │Parts per│Parts per│ Cent

│ Million │ Million │Removed│ Million │ Million │Removed

────────┼─────────┼─────────┼───────┼─────────┼─────────┼───────

1910 │ │ │ │ │ │

October │ 30│ 15│ 50│ │ .90│

November│ 35│ 15│ 57│ │ .76│

December│ 39│ 20│ 49│ .07│ .45│ 6.4

│ │ │ │ │ │

1911 │ │ │ │ │ │

January │ 42│ 20│ 52│ .08│ .15│ 1.9

February│ 46│ 20│ 56│ .09│ .15│ 1.7

March │ 47│ 21│ 56│ .09│ .15│ 1.7

April │ 38│ 21│ 45│ .16│ .21│ 1.3

May │ 33│ 31│ 6│ .08│ .38│ 4.8

June │ 28│ 16│ 43│ .00│ .30│ ∞

July │ 34│ 26│ 24│ .00│ .36│ ∞

────────┴─────────┴─────────┴───────┴─────────┴─────────┴───────

────────┬───────────────────────────┬───────────────────────────

Month │ Nitrates │ Dissolved Oxygen

│ │

────────┼───────────────────────────┼───────────────────────────

│ │

────────┼─────────┬─────────┬───────┼─────────┬─────────┬───────

│Influent,│Effluent,│ Per │Influent,│Effluent,│ Per

│Parts per│Parts per│ Cent │Parts per│Parts per│ Cent

│ Million │ Million │Removed│ Million │ Million │Removed

────────┼─────────┼─────────┼───────┼─────────┼─────────┼───────

1910 │ │ │ │ │ │

October │ │ 7.8│ │ 0.0│ 8.5│ ∞

November│ │ 5.9│ │ 0.0│ 8.1│ ∞

December│ .15│ 2.6│ 17│ 2.0│ 8.4│ 4.2

│ │ │ │ │ │

1911 │ │ │ │ │ │

January │ .27│ 2.2│ 8.2│ 3.0│ 7.8│ 2.9

February│ .50│ 2.6│ 5.2│ 2.6│ 8.0│ 3.1

March │ .34│ 3.2│ 9.4│ 2.2│ 6.6│ 3.0

April │ .53│ 4.5│ 8.5│ 2.1│ 7.1│ 3.4

May │ .15│ 7.5│ 4.3│ 0.1│ 7.7│ 77

June │ .16│ 8.3│ 5.2│ 0.0│ 7.6│ ∞

July │ .09│ 7.7│ 8.0│ 0.0│ 6.5│ ∞

────────┴─────────┴─────────┴───────┴─────────┴─────────┴───────

────────┬───────────┬───────────────────────────────────────────────────────

Month │ Per Cent │ Suspended Matter

│Putrescible│

────────┼───────────┼───────────────────────────┬───────────────────────────

│ │ Total │ Volatile

────────┼───────────┼─────────┬─────────┬───────┼─────────┬─────────┬───────

│ │Influent,│Effluent,│ Per │Influent,│Effluent,│ Per

│ │Parts per│Parts per│ Cent │Parts per│Parts per│ Cent

│ │ Million │ Million │Removed│ Million │ Million │Removed

────────┼───────────┼─────────┼─────────┼───────┼─────────┼─────────┼───────

1910 │ │ │ │ │ │ │

October │ 0│ 75│ 40│ 47│ 54│ 25│ 54

November│ 5│ 61│ 16│ 74│ 52│ 15│ 71

December│ 35│ 85│ 40│ 53│ 60│ 26│ 57

│ │ │ │ │ │ │

1911 │ │ │ │ │ │ │

January │ 38│ 112│ 43│ 63│ 68│ 29│ 57

February│ 29│ 100│ 49│ 51│ 64│ 32│ 50

March │ 28│ 106│ 37│ 65│ 63│ 22│ 65

April │ 9│ 113│ 68│ 40│ 59│ 35│ 41

May │ 6│ 88│ 150│ _1.7_│ 54│ 70│ _1.3_

June │ 1│ 92│ 77│ 18│ 56│ 36│ 36

July │ 4│ 155│ 130│ 16│ 74│ 61│ 18

────────┴───────────┴─────────┴─────────┴───────┴─────────┴─────────┴───────

────────┬───────────────────────────

Month │ Suspended Matter

│

────────┼───────────────────────────

│ Fixed

────────┼─────────┬─────────┬───────

│Influent,│Effluent,│ Per

│Parts per│Parts per│ Cent

│ Million │ Million │Removed

────────┼─────────┼─────────┼───────

1910 │ │ │

October │ 21│ 15│ 29

November│ 9│ 1│ 89

December│ 25│ 14│ 44

│ │ │

1911 │ │ │

January │ 44│ 13│ 70

February│ 37│ 17│ 53

March │ 43│ 15│ 65

April │ 54│ 33│ 39

May │ 34│ 80│ _2.4_

June │ 36│ 41│ _1.1_

July │ 81│ 69│ 15

────────┴─────────┴─────────┴───────

NOTE.—Italic figures represent increases.

Raw sewage cannot be treated successfully on a trickling filter. Coarse

solid particles should be screened and settled out, in order that the

distributing devices or the filter may not become clogged. The effluent

from an Imhoff tank has proven to be a satisfactory influent for a

trickling filter. A septic tank effluent may be so stale as to be

detrimental to the biologic action in the filter.

In the operation of a trickling filter the sewage is sprayed or

otherwise distributed as evenly as possible in a fine spray or stream,

over the top of the filtering material. The sewage then trickles slowly

through the filter to the underdrains through which it passes to the

final outlet. The distribution of the sewage on the bed is intermittent

in order to allow air to enter the filter with the sewage. The cycle of

operation should be completed in 5 to 15 minutes, with approximately

equal periods of rest and distribution. Cycles of too great length will

expose the filter to drying or freezing and will give poorer

distribution throughout the filter. Cycles which are too short will

operate successfully only with but slight variation in the rate of

sewage flow. In some plants it has been found advantageous to allow the

filters to rest for one day in 3 to 6 weeks or longer, dependent on the

quality of the effluent.

The rate of filtration may be as high as 2,000,000 gallons per acre per

day, which is equivalent to 200 gallons per cubic yard of material per

day in a bed 6 feet deep. This is more than double the rate permissible

in a contact bed. The exact rate to be used for any particular plant

should be determined by tests. It is dependent on the quality of the

sewage to be treated, on the depth of the bed, the size of the filling

material, the weather, and other minor factors.

The filtering material is similar to that used in a contact bed. It

should consist of hard, rough, angular material, about 1 to 2 inches in

size. Larger sizes will permit more rapid rates of filtration, but will

not produce so good an effluent. Smaller sizes will clog too rapidly.

The depth of the filter is limited by the possibility of ventilation and

the strength of the filtering material to withstand crushing. The deeper

the bed the less the expense of the distribution and collecting system

for the same volume of material, and the more rapid the permissible rate

of filtration. The depths in use vary between 6 and 10 feet, with 6 to 8

feet as a satisfactory mean. From a biologic standpoint the action of

the filter seems to be proportional to the volume of the filtering

material and therefore proportional to the depth of the bed, being

limited to a minimum depth of about 5 feet, below which sewage may pass

through the filter without treatment. The shape and other dimensions of

the filter depend on the local conditions and the economy of

construction. The filters need not be broken up into units by

water-tight dividing walls. One filter can be constructed sufficient for

all needs and various portions of it can be isolated as units by the

manipulation of valves in the distribution system. Ventilation is

provided by the air entrained with the sewage as it falls upon the

surface. If the sides of the filter are built of open stone crib work

the ventilation will be greatly improved, but it will not be possible to

flood the filters to keep down flies, and in cold climates these

openings must be covered in winter to prevent freezing. Filters have

been constructed without side walls, the filtering material being

allowed to assume its natural angle of repose. This has usually been

found to be more expensive than the construction of side retaining

walls, due to the unused filling material and the extra underdrains

required.

The distribution of sewage is ordinarily effected by a system of pipes

and spray nozzles as shown in Fig. 168 and 169. Other methods of

distribution have been used. At Springfield, Mo.,[160] a moving trough

from which the sewage flows continuously is drawn back and forth across

the bed by means of a cable. In England circular beds have been

constructed and the sewage distributed on them through revolving

perforated pipes. At the Great Lakes Naval Training Station[161] the

distributing pipes in the plant, now abandoned, were supported above the

surface of the filter. The sewage fell from holes in the lower side of

these pipes on to brass splash plates 14 inches above the filter. It was

deflected horizontally from these plates over the filter surface. Pipes

and spray nozzles have been adopted almost universally in the United

States. Splash plates, traveling distributors, and other forms of

distribution have been used only in exceptional cases. In a distributing

system consisting of pipes and nozzles, a network of pipes is laid out

somewhat as shown in Fig. 168, in such a manner that the head loss to

all points is approximately equal. The number of valves required should

be reduced to a minimum. The pipes may be laid out with the main feeders

leading from a central point and branches at right angles to them,

somewhat on the order of a spider’s web, or they may be laid out on a

rectangular or gridiron system. The radial system is advantageous

because of the central location of the control house, but it does not

always lend itself favorably to the local conditions, and the piping and

nozzle location are not so simple. The gridiron system lends itself

favorably to the equalization of head losses. The pipes used should be

larger than would be demanded by considerations of economy alone, both

for the purpose of reduction of head loss and ease in cleaning. No pipe

less than 6 inches in diameter should be used, and the average velocity

of flow should not exceed one foot per second. Cast-iron, concrete, or

vitrified clay pipe may be used, but cast iron is the material commonly

used. The system should be arranged for easy flushing and cleaning and

the pipes so sloped that the entire system can be drained in case of a

shut down in cold weather.

[Illustration:

FIG. 168.—Section through Sprinkling Filter at Fitchburg, Mass.,

Showing Distribution System.

Eng. Record, Vol. 67, p. 634.

]

The pipes are placed far enough below the surface of the filling

material so that the top of the spraying nozzle is 6 to 12 inches above

the surface of the filter. If the pipes are placed near the surface they

are accessible for repairs, but are exposed to temperature changes. If

the pipes are large their presence near the surface of the filter may

seriously affect the distribution of the sewage through the filter. If

the distributing pipes are placed near the bottom of the filter they are

inaccessible for repairs and the nozzles must be connected to them by

means of long riser pipes. The distributing pipes should be supported by

columns extending to the foundation of the filter bed, there being a

column at every pipe joint with such intermediate supports as may be

required. In some plants the pipes have been supported by the filtering

material. Although slightly less expensive in first cost the practice of

so supporting the pipes is poor, as settling of the material may break

the pipe or cause leaks, and if the bed becomes clogged, removal of the

material is made more difficult. Valves should be placed in the

distributing system in such a manner that different sets of nozzles can

be cut out at will, thus resting those portions of the filter and

permitting repairs without shutting down the entire filter.

The spacing of the nozzles is fixed by the type and size of the nozzle,

the available head, and the rate of filtration. Various types of

sprinkler nozzles are shown in Fig. 169 and the discharge rates, head

losses, and distances to which sewage is thrown for the Taylor nozzles,

are shown in Fig. 170. Nozzles are available which will throw circular,

square, or semicircular sprays. In the use of circular sprays there is

necessarily some portion of the filter which is underdosed if the

nozzles are placed at the corners of squares with the sprays tangent,

and there is an overdosing of other portions if the sprays are allowed

to overlap so that no portion of the filter is left without a dose.

Rectangular sprays will apparently overcome these difficulties, but

studies have shown that circular sprays with some overlapping, and the

nozzles placed at the apexes of equilateral triangles as shown in Fig.

172 will give as satisfactory distribution as other forms.

[Illustration:

FIG. 169.—Sprinkling Filter Nozzles.

Bulletin No. 3, Engineering Experiment Station, Purdue University.

]

[Illustration:

FIG. 170.—Diagram Showing the Discharge and Spacing of Taylor Nozzles.

]

The nozzles should be selected to give the best distribution, to consume

all of the head available, and to give the proper cycle of operation.

The entire head available should be consumed in order that the fewest

number of nozzles may be used. An excellent study of the characteristics

of various types of nozzles has been published in Bulletin No. 3 of the

Engineering Experiment Station at Purdue University, 1920. As a result

of the tests on the nozzles shown in Fig. 169, it was determined for all

nozzles, except No. 8, that

_Q_ = _Ca_√(2_gh_);

in which _Q_ = the rate of discharge in cubic feet per second;

_C_ = a coefficient shown in Table 88;

_a_ = the net cross-sectional opening of the nozzle in square

feet;

_h_ = the pressure on the nozzle in feet of water.

TABLE 88

COEFFICIENTS OF DISCHARGE FOR SPRINKLER NOZZLES SHOWN IN FIG. 169

──────────────────────┬──────┬──────┬──────┬──────┬──────┬──────┬──────

Nozzle Number │ 1 │ 2 │ 3 │ 4 │ 5 │ 6 │ 7

──────────────────────┼──────┼──────┼──────┼──────┼──────┼──────┼──────

Coefficient │ .648 │ .756 │ .696 │ .666 │ .675 │ .598 │ .569

──────────────────────┴──────┴──────┴──────┴──────┴──────┴──────┴──────

It is evident that if the head on the nozzles is constant and the nozzle

throws a circular spray, the intensity of dosing at the circumference

will be greater than nearer the center. This difficulty is overcome by

so designing the dosing tank from which the sewage is fed that the head

on the nozzle and the quantity thrown will vary in such a manner that

the distribution over the bed is equalized. Intermittent action is

obtained by an automatic siphon which commences to discharge when the

tank is full and empties the tank in the period allowed for dosing.

Under such conditions the tank should discharge for a longer time at the

higher heads than at the lower heads as there is more territory to be

covered at the higher heads. The design of the tank to do this with

exactness is difficult, and the construction of the necessary curved

surfaces is expensive. Where a dosing tank is used for such conditions

it has been found satisfactory to construct the tank with plane sides

sloping at approximately 45 degrees from the vertical (or horizontal). A

tank with curved surfaces is shown in Fig. 171. The dosing siphon is

usually placed in the tank as shown in the figure. The head and quantity

of discharge through the nozzles can be varied also by maintaining a

constant depth in a dosing tank by means of a float feed valve, and

varying the head and quantity discharged to the nozzles by a butterfly

valve in the main feed line, or by the use of a Taylor undulating valve

designed for this purpose. The butterfly valve is opened and closed by a

cam so designed and driven at such a rate that the required distribution

is obtained. The Taylor undulating valve is opened and closed at a

constant rate, the shape of the valve giving the required variations in

head and discharge. Other methods of control have been attempted but

have not been used extensively.

[Illustration:

FIG. 171.—Section of 12–inch Siphon and Dosing Tank, for King’s Park,

Long Island.

]

An example of the design of the nozzle layout and dosing tank for a

sprinkling filter follows:

Let it be required to determine the nozzle layout for one acre of

sprinkling filters with 5 feet available head on the nozzles.

The selection of the type of nozzle and the size of opening is a

matter of judgment and experience. Nozzles with large openings are

less liable to clog and fewer nozzles are needed than where small

nozzles are used, but the distribution of sewage is not so even as

with the use of small nozzles. In this example Taylor circular

spray nozzles will be selected. Fig. 170 shows that a Taylor

circular spray nozzle will discharge 22.3 g.p.m. under a head of 5

feet, and that the economical nozzle spacing will be 15.3 feet.

The least number of nozzles at this spacing required for a bed of

one acre in area is found as follows: In Fig. 172, let _n_ equal

the number of nozzles in a horizontal row, counting half-spray

nozzles as ½, and let _m_ equal the number of rows counting rows

of half-spray nozzles as half rows.[162] Then the number of

nozzles, _N_, equals _mn_, and 15.3_m_ × 13.2_n_ equals 43,560 or

_mn_ equals 215.

[Illustration:

FIG. 172.—Typical Sprinkler Nozzle Layout.

]

The next step should be the design of the dosing tank and siphon. It is

possible to design a tank which will give equal distribution over equal

areas of filter surface. It has been found, however, that the expense of

this refinement is unwarranted as there are a number of outside factors

which tend to overcome the theoretical design. The effect of wind,

unequal spacing, and irregularities in the elevation of the nozzles have

a tendency to offset refinements in the design of a dosing tank. It is

therefore the general practice to slope the sides of the tank at an

angle of about 45 degrees as previously stated. The dosing tank is

generally designed to have a capacity which will give a complete cycle

of operation once in 15 minutes. In the ordinary design the factors

given are the rate of inflow and the given time of filling. In the

following example the time of filling will be taken as 10 minutes, the

time of emptying as 5 minutes, and the rate of flow as 1,000,000 gallons

per day. The capacity of the tank will therefore be (1,000,000)⁄24 x 6 =

7,000 gallons. The diameter of the siphon to be selected can be computed

as follows:

Let _Q_ = the capacity of the tank in cubic feet;

_q__{1} = the rate of discharge of the siphon in cubic feet per

second;

_q__{2} = the rate of inflow to the tank in cubic feet per second;

_q_ = the rate of emptying the tank in cubic feet per second =

(_q__{1} − _q__{2});

_A_ = the cross-sectional area of the free surface of the water

in the tank at any instant, in square feet;

_a_ = the cross-sectional area of the siphon in square feet;

_b_ = the small dimension of the base of the tank in feet;

_h_ = the head of water, in feet, on the discharge siphon;

_h__{1} = the initial head of water, in feet, on the siphon;

_h__{2} = the final head of water in feet, on the siphon;

_t_ = the time, in seconds, required to empty the tank,

then _dQ_ = -_Adh_ = _q__{1}_dt_ − _q__{2}_dt_,

and _dt_ = (_dQ_)⁄_q_ = − _Adh_⁄(_q__{1} − _q__{2}),

but _q__{1} = 0.4 _A_ √((2_gh_)),[163]

therefore _t_ = ∫_{_h__{2}}^{_h__{1}} -_Adh_⁄(0.4_a_√(2_gh_) −

_q__{2}),

but _A_ = 4_h_^2 + 4_bh_ + _b_^2,

therefore _t_ = ∫_{_h__{1}}^{_h__{2}} ((_b_^2 + 4_bh_ +

4_h_^2)_dh_)⁄0.4_a_√(2_gh_) − _q__{2}.

The integration of this expression is tedious. Its solution for siphons

between 6 inches and 12 inches operating under heads commencing from 3

feet to 6 feet, with a time of emptying of 5 minutes and time of filling

of 10 minutes is given in Fig. 173. In the example given the rate of

inflow is 1.55 sec. feet and the head is 5 feet. Then from Fig. 173 the

size of the siphon to be used is 12 inches. Where a siphon of the size

required to empty the tank in the time fixed is not available,

combinations of available sizes can sometimes be used.

[Illustration:

FIG. 173.—Diagram for the Determination of the Capacities of Dosing

Tanks for Trickling Filters.

Time of emptying, 5 minutes. Time of filling, 10 minutes. Shape of

tank is a right pyramid or a truncated right pyramid with all four

sides making an angle of 45 degrees with the vertical. All

horizontal cross-sections are squares.

]

For example, if the given head is 6 feet, and the rate of inflow

is 1.4 sec. feet, it is evident from Fig. 173 that a 6,300–gallon

dosing tank and two 8–inch siphons will give the required cycle.

The method used for the design of the setting of Taylor nozzles by the

Pacific Flush Tank Co., is less rational but more simple and probably as

satisfactory. In this method the steps are as follows:

(1) Divide the maximum daily rate of sewage flow by 1,000 to get

the maximum minute inflow.

(2) The number of nozzles required is determined by dividing the

preceding figure by 6. Generally a Taylor nozzle with an orifice

of ⅞ of an inch will discharge about 20 g.p.m. at the high head

and about 8 g.p.m. at the low head, and as the nozzles must have a

capacity which will take care of the inflow at the low head, the

divisor 6 is used as a factor of safety instead of using 8 as the

divisor.

(3) The type of nozzle to be used is selected from experience or

as a matter of judgment. Circular-spray nozzles are more generally

used.

(4) The spacings are determined from Fig. 170.

(5) The dosing tank of the shape described is then designed. The

capacity is such as to give a complete cycle once every 15

minutes. The method of this design is similar to that followed

previously.

(6) The dosing siphons are designed so that they will have a

capacity at the minimum head of from 40 to 50 per cent in excess

of the maximum minute inflow, and the draining depth of the siphon

will be limited to a maximum of 5 to 5½ feet. The siphons are all

made adjustable with a variation of 6 inches or more on either

side of the normal discharge line so that the spraying area and

cycle can be varied to secure the best results.

The underdrainage of a trickling filter should consist of some form of

false bottom such as the types shown in Fig. 174. Where possible the

underdrains should be open at both ends for the purpose of ventilation

and flushing. It is desirable that the drains be so arranged that a

light can be seen through them in order that clogging can be easily

located. The drains should be placed on a slope of approximately 2 in

100 towards a main collector. The length of the drains is limited by

their capacity to carry the average dose from the area drained by them.

The main collecting conduits must be designed in accordance with the

hydraulic principles given in Chapter IV. No valves, or other

controlling apparatus, are placed on the underdrains or outlets from the

filter.

Covers have been provided in winter for some trickling filters in cold

climates. The Taylor sprinkling nozzle has been found to work

successfully in extremely cold weather, and it is generally accepted

that the covering of filters is unnecessary, if the filter is not to be

shut down for any length of time in cold weather.

The operation of devices for automatically controlling the operation of

a trickling filter is explained in Chapter XXI.

[Illustration:

FIG. 174.—Types of False Bottoms for Trickling Filters.

Eng. News, Vol. 74, p. 5.

]

=258. Intermittent Sand Filter.=—An intermittent sand filter is a

specially prepared bed of sand, or other fine grained material, on the

surface of which sewage is applied intermittently, and from which the

sewage is removed by a system of underdrains. It differs from broad

irrigation in the character of the material, the care and preparation of

the bed, and the thoroughness of the underdrainage. A distinctive

feature of the intermittent sand filter is the quality of the effluent

delivered by it. In a properly designed and operated plant the effluent

is clear, colorless, odorless, and sparkling. It is completely

nitrified, is stable and contains a high percentage of dissolved oxygen.

It contains no settleable solids except at widely separated periods when

a small quantity may appear in the effluent. The percentage removal of

bacteria may be from 98 to 99 per cent. Some analyses of sand filter

effluents are given in Table 89. The dissolved solids, the remaining

bacteria, and the antecedents of the effluent are the only differences

between it and potable water. An effluent from an intermittent sand

filter is the most highly purified effluent delivered by any form of

sewage treatment. The effluent can be disposed of without dilution, on

account of its high stability. The treatment of sewage to so high a

degree is seldom required, so that the use of intermittent filters is

not common. Other drawbacks to their use are the relatively large area

of land necessary and the difficulty of obtaining good filter sand in

all localities.

TABLE 89

QUALITY OF EFFLUENTS FROM SAND FILTERS

(Report on Sewage Purification at Columbus, Ohio, by G. A. Johnson, 1905)

────────────┬───────────────────────────────────────────────────────┬───────

Source of │ Parts per Million │Rate of

Sample │ │Filtra-

│ │ tion

│ │Gallons

│ │ per

│ │ Acre,

│ │per Day

────────────┼────────────────────────────────────┬────────┬─────────┼───────

│ Nitrogen as │ Oxygen │ Oxygen │

│ │Consumed│Dissolved│

────────────┼───────┬──────────┬────────┬────────┼────────┼─────────┼───────

│ Free │Albuminoid│Nitrites│Nitrates│ │ │

│Ammonia│ Ammonia │ │ │ │ │

────────────┼───────┼──────────┼────────┼────────┼────────┼─────────┼───────

Filter │ 11.0 │ 8.6 │ │ │ 59. │ │

influent │ │ │ │ │ │ │

from grit │ │ │ │ │ │ │

chamber │ │ │ │ │ │ │

Filter │ 1.12 │ 0.88 │ 0.08 │ 11.5 │ 6.9 │ 6.3 │ 0.081

effluent │ │ │ │ │ │ │

Filter │ 0.81 │ 0.88 │ 0.10 │ 12.6 │ 6.5 │ 6.2 │ 0.118

effluent │ │ │ │ │ │ │

────────────┼───────┼──────────┼────────┼────────┼────────┼─────────┼───────

Filter │ 9.7 │ 5.4 │ │ │ 33. │ │

influent │ │ │ │ │ │ │

from plain│ │ │ │ │ │ │

settling │ │ │ │ │ │ │

tank │ │ │ │ │ │ │

Filter │ 0.62 │ 0.77 │ 0.11 │ 14.9 │ 6.0 │ 8.2 │ 0.139

effluent │ │ │ │ │ │ │

Filter │ 0.99 │ 1.10 │ 0.10 │ 12.6 │ 7.8 │ 6.5 │ 0.274

effluent │ │ │ │ │ │ │

Filter │ 2.61 │ 1.39 │ 0.09 │ 9.0 │ 9.7 │ 3.9 │ 0.357

effluent │ │ │ │ │ │ │

────────────┼───────┼──────────┼────────┼────────┼────────┼─────────┼───────

Filter │ 10.7 │ 5.6 │ │ │ 38. │ │

influent │ │ │ │ │ │ │

from │ │ │ │ │ │ │

septic │ │ │ │ │ │ │

tank │ │ │ │ │ │ │

Filter │ 1.63 │ 1.16 │ 0.09 │ 11.2 │ 8.0 │ 5.8 │ 0.357

effluent │ │ │ │ │ │ │

────────────┼───────┼──────────┼────────┼────────┼────────┼─────────┼───────

Filter │ 13.4 │ 4.7 │ │ │ 40. │ │

influent │ │ │ │ │ │ │

from coke │ │ │ │ │ │ │

strainer │ │ │ │ │ │ │

Filter │ 2.24 │ 1.35 │ 1.03 │ 14.6 │ 10.1 │ 6.9 │ 0.372

effluent │ │ │ │ │ │ │

────────────┼───────┼──────────┼────────┼────────┼────────┼─────────┼───────

Filter │ 8.6 │ 3.6 │ 0.19 │ 1.6 │ 24. │ 0.3 │

influent │ │ │ │ │ │ │

from │ │ │ │ │ │ │

contact │ │ │ │ │ │ │

bed │ │ │ │ │ │ │

Filter │ 2.62 │ 1.35 │ 0.31 │ 8.1 │ 8.3 │ 5.8 │ 0.516

effluent │ │ │ │ │ │ │

Filter │ 2.44 │ 2.41 │ 0.16 │ 9.4 │ 12.5 │ 5.0 │ 0.525

effluent │ │ │ │ │ │ │

Filter │ 3.40 │ 1.15 │ 0.20 │ 10.9 │ 9.7 │ 5.2 │ 0.525

effluent │ │ │ │ │ │ │

────────────┼───────┼──────────┼────────┼────────┼────────┼─────────┼───────

Filter │ 9.0 │ 4.8 │ 0.42 │ 1.3 │ 27. │ 3.4 │

influent │ │ │ │ │ │ │

from │ │ │ │ │ │ │

sprinkling│ │ │ │ │ │ │

filter │ │ │ │ │ │ │

after │ │ │ │ │ │ │

sedimen- │ │ │ │ │ │ │

tation │ │ │ │ │ │ │

Filter │ 2.95 │ 1.25 │ 0.19 │ 7.0 │ 8.8 │ 3.8 │ 0.675

effluent │ │ │ │ │ │ │

Filter │ 4.77 │ 2.63 │ 0.51 │ 4.6 │ 11.8 │ 2.5 │ 0.749

effluent │ │ │ │ │ │ │

Filter │ 3.47 │ 1.61 │ 0.31 │ 7.2 │ 11.9 │ 3.7 │ 1.129

effluent │ │ │ │ │ │ │

────────────┴───────┴──────────┴────────┴────────┴────────┴─────────┴───────

Sewerage and Sewage Treatment · 第 27 / 29 章