CHAPTER XI

CONSTRUCTION

118. Elements. WORK OF THE ENGINEER. 119. Duties. 120.

Inspection. 121. Interpretation of Contract. 122. Unexpected

Situations. 123. Cost Data and Estimates. 124. Progress

Reports. 125. Records. EXCAVATION. 126. Specifications. 127.

Hand Excavation. 128. Machine Excavation. 129. Types of

Machines. 130. Continuous Bucket Excavators. 131. Cableway

and Trestle Excavators. 132. Tower Cableways. 133. Steam

Shovels. 134. Drag Line and Bucket Excavators. 135.

Excavation in Quicksand. 136. Pumping and Drainage. 137.

Trench Pump. 138. Diaphragm Pump. 139. Jet Pump. 140. Steam

Vacuum Pumps. 141. Centrifugal and Reciprocating Pumps. 142.

Well Points. 143. Rock Excavation. 144. Power Drilling. 145.

Steam or Air for Power. 146. Depth of Drill Hole. 147.

Diameter of Drill Hole. 148. Spacing of Drill Holes. SHEETING

AND BRACING. 149. Purposes and Types. 150. Stay Bracing. 151.

Skeleton Sheeting. 152. Poling Boards. 153. Box Sheeting.

154. Vertical Sheeting. 155. Pulling Wood Sheeting. 156.

Earth Pressures. 157. Design of Sheeting and Bracing. 158.

Steel Sheet Piling. LINE AND GRADE. 159. Locating the Trench.

160. Final Line and Grade. 161. Transferring Grade and Line

to the Pipe. 162. Line and Grade in Tunnel. TUNNELLING. 163.

Depth. 164. Shafts. 165. Timbering. 166. Shields. 167. Tunnel

Machines. 168. Rock Tunnels. 169. Ventilation. 170.

Compressed Air. EXPLOSIVES AND BLASTING. 171. Requirements.

172. Types of Explosives. 173. Permissible Explosives. 174.

Strength. 175. Fuses and Detonators. 176. Care in Handling.

177. Priming, Loading, and Firing. 178. Quantity of

Explosive. PIPE SEWERS. 179. The Trench Bottom. 180. Laying

Pipe. 181. Joints. 182. Labor and Progress. BRICK AND BLOCK

SEWERS. 183. The Invert. 184. The Arch. 185. Block Sewers.

186. Organization. 187. Rate of Progress. CONCRETE SEWERS.

188. Construction in Open Cut. 189. Construction in Tunnels.

190. Materials for Forms. 191. Design of Forms. 192. Wooden

Forms. 193. Steel-lined Wooden Forms. 194. Steel Forms. 195.

Reinforcement. 196. Cost of Concrete Sewers. BACKFILLING.

197. Method. 233–331

Sewerage and Sewage Treatment · 第 11 / 29 章