A. P. H.

_July_, _1898_.

I.

INTRODUCTION.

AT the outset I must offer an apology for making use, throughout this

pamphlet, of the first person. I do so partly for convenience of

expression, and partly because almost all that I have to advance is

derived from my own experience. In doing so I am far from desiring to

undervalue the work of others in the same direction. I have, however,

little hesitation in saying that, with the exception of the late Mr.

Charles Spooner, the able Engineer of the Festiniog Railway, most of

those, so far as I know, who are responsible for the design of plant for

these small lines have been manufacturers whose productions, though often

of fair workmanship, are clearly indicative of a failure to grasp many of

the leading principles involved. This shortcoming is the natural result

of a want of sufficient time for the consideration of details, and a

consequent tendency to imitate established customs in regard to railway

work which by no means apply with equal advantage to very narrow gauges,

where the conditions involved are wholly different. This is especially

true of small locomotive building, the specimens of which evidence in

their design not only ignorance on important points, but also a

deplorable absence of the sense of well-balanced proportion.

I venture to think that, in the twenty-five years during which I have

devoted much of my time to the subject, I have succeeded in bringing to

considerable perfection both permanent way and rolling stock suitable for

these diminutive lines, and more especially the locomotives, which are

probably, for their weight, the most powerful and flexible ever built to

work by simple adhesion. Whether this conceit be well founded or no I

leave to the judgment of those who may be at the pains to acquaint

themselves with the details and result of my work, which has been

undertaken wholly as a labour of love with the sole desire to promote

improvement in what I believe to be an entirely special branch of

engineering. I have never wasted my money on patents, and, so long as my

designs are not imitated in a bungling manner, I am glad to see them made

use of by anyone to whom they may be of service.

It must be understood that I do not here attempt to enter upon the

comparative merits of narrow gauge railways generally, but merely to give

particulars of what has come within my own experience. To facilitate a

comprehension of the conditions under which I have worked, it will be

well to explain that I make no pretension to be considered a professional

engineer, and that I speak rather as a self-taught mechanic and surveyor.

My father possessed a beautiful Holtzappfel lathe, with elaborate tools

for ornamental turning in wood and metal. As a boy of seven or eight I

can recall watching him as he worked. At ten years old I was promoted to

stand on a box and turn candlesticks, but, a year or two later, a few

lessons—the only direct practical instruction I ever had—from an old

fishing-rod maker in chasing metal screw-threads begot in me an ardent

desire to construct machinery, particularly anything pertaining to

railways, for which from my childhood I had an absorbing craze.

By my father’s kindness I, by-and-bye, fitted up a workshop in which the

tools were driven by a half-horse steam engine; and at eighteen had

completed my first locomotive, weighing 56 lbs., which, with a dozen or

so of small wagons, made a fine show on some 40 yards of brass-railed

permanent way of 4 in. gauge. Locomotive driving was my hobby when I went

up to Cambridge, and many were the tips that I learned in my illicit

journeyings on the footplate. The new degree of “Applied Science” had

just made its appearance, in which, in 1871, I had the doubtful credit of

appearing alone in the first class. Doubtful, because the papers were

absurdly simple, and the examiners hardly educated beyond the bare

theories of the mechanical processes; for it was long anterior to the

days of Professor Stuart and his engineering laboratory, where,

by-the-bye, I once remember seeing the “demonstrator” supervising the

reduction of a 4 in. shaft on a stout 9 or 10 in. lathe by a young turner

whose nervous and thread-like shavings would have ensured his speedy

dismissal from any commercial machine-shop.

When I settled at Duffield in 1872, I at once began to put into practice

the views I had formed in regard to the possibility of advantageously

superseding horse traction, in cases where a traffic, though heavy, was

wholly insufficient to justify a more costly railway, by a line of the

narrowest and consequently the cheapest gauge compatible with safety. It

is to a setting forth of the results of my experiments during the years

that have since elapsed, that the following pages are devoted. My claim

to a hearing is chiefly based upon having always been my own draughtsman,

and, for my first two larger locomotives, also moulder, machinist, and

fitter. Owing to the increasing number of experiments, and to other calls

upon my time, assistance eventually became necessary, and, though I am

still conceited enough to keep the more delicate manipulations in my own

hands, so far as I can find time to execute them, it has gradually come

about that I have seven or eight artisans in the little workshops.

Practical acquaintance with every detail both in survey, design, and

construction of narrow-gauge railways has given me something of a pull

over the professional engineer. Thus it happens that, without the credit

of any exceptional ability, I have had advantages that fall to few of

acquiring information which I desire to lay before those who are

interested in the rapid and economical transport of a moderate annual

tonnage.

The first three sections of this pamphlet comprise a brief sketch of the

purposes, origin, and construction of my own line. In Section IV. is

given a detailed account of the construction, working, and cost of the

similar line which I made to connect Eaton Hall with the Great Western

Railway. Sections V., VI., VII., and VIII. are more technical, and may be

passed over by those not interested in the mechanical details, although

it is to the care that has been bestowed on these that my success is

chiefly attributable. Section IX. deals, from such experience as I have

acquired, with the conditions under which these small railways may be

profitably installed. In Section X. I have appended a few further items

of possible interest.

II.

OBJECTS OF THE 15 IN. GAUGE.

WHEN, in 1874, I started on the construction of my experimental railway,

the more notable narrow-gauge lines in our own country were those of 18

in. at Crewe, Woolwich, Chatham, and Aldershot—the latter a sad failure

and the admirable 23½ in. from Portmadoc to the Festiniog Slate Quarries.

The Festiniog Railway, which owed its success as a locomotive-worked line

to the persistent energy and ability of the late Mr. Charles Spooner,

opened the eyes of the transport-interested world to the extraordinary

capacity of a very narrow gauge. But here the marvel lies in the manner

in which the work was adapted to the gauge, not in the suitability of the

gauge to the work. No one but an enthusiast would dare to contend that a

two-foot gauge was the ideal width for a line employing twenty-ton

locomotives and hauling about 100,000 passengers and some 150,000 tons of

minerals and goods per annum. If this development could have been

foreseen, the selected gauge would doubtless have been wider. Such a

traffic, however, is quite outside the scope of this pamphlet, the logic

of which is directed to shewing how a much smaller annual tonnage than

has been hitherto deemed worthy of a railway may be profitably thus

conveyed.

An 18 in. line, such as one of those above referred to, would, if of not

more than three or four miles in length and tolerably level, be capable

of transporting, with one locomotive, 60,000 tons of minerals annually,

reckoning the traffic as in one direction only. There are, however, up

and down the country, a number of cases where a traffic of from 5,000 to

10,000 tons is annually hauled between two fixed points over the public

highways by a single employer. Such cases may be classified as large

mansions, public institutions, mines, quarries, &c. Now it is clear that,

unless there is a prospect of large increase in the traffic, it would be

absurd to employ for a maximum of 10,000 tons a railway equal to 60,000

tons, and so the question arises:—What is the smallest and therefore the

cheapest railway capable of being practically and advantageously worked?

This is the question to which I venture to think I can give a reliable

answer.

In the year 1874, after various preliminary trials, I determined to

construct a line of 15 in. gauge, as the smallest width possessing the

necessary stability for practical use, although I once laid down one of 9

in. gauge for my younger brothers, which proved by no means deficient in

carrying power.

The stability of this 9 in. line was perfect enough so long as persons

did not attempt to ride on the ends and edges of the carriages and

wagons, but man being an article of approximately standard size, it is

clear there must be a minimum gauge which will be stable enough to be

independent of such liberties.

Rolling stock properly proportioned to a 15 in. gauge seems the smallest

that will thoroughly insure safety in this respect, and indeed in France

the late M. Décauville, who did so much to develop lines of this class,

arrived at nearly similar conclusions in adopting a minimum width of 16

in.

It must not, of course, be understood that gauges of such small

proportions are to be advocated except where the traffic is unlikely to

increase beyond their capacity, and where the material to be moved can

conveniently be loaded in moderate sized wagons.

Feeling, however, convinced of the eventual recognition of the utility of

lines of minimum gauge, I took some pains to become acquainted with what

had been already achieved in this direction, with the result that,

excepting only the Festiniog railway, where every detail was most ably

worked out by the late Mr. Spooner, I found generally both road and

rolling-stock constructed as mere imitations of those of the standard

gauge, and showing a want of apprehension of the totally different

conditions to be satisfied. To endeavour to solve the various problems

involved in the successful design of engines, carriages, wagons, and

roadway for a minimum gauge is, therefore, the main object of my little

railway. The chief ends in view are the application of such lines to

agricultural or commercial purposes on large estates, or where quarries,

brick yards, and other industrial establishments need better connection

with the pier or railway station from which their productions are

forwarded. An excellent example of such a line is now to be found in the

one I have constructed at Eaton Hall, particulars of which are given in

Section IV. There were also problems relating to adhesion and friction,

particularly from the narrow-gauge point of view, which I was desirous of

solving, some remarks on which will be found in Section VIII.

III.

CONSTRUCTION OF THE DUFFIELD BANK LINE.

THE construction of my line of 15 in. gauge was commenced in 1874, and

various additions were made up to 1881, when the length laid amounted to

a little over a mile, inclusive of sidings. Since the latter date there

has been no material extension, but the permanent way and its accessories

have been gradually improved.

The line runs from the farm and workshops, up a gradient varying from 1

in 10 to 1 in 12 about a quarter-of-a-mile long, to a level 80 ft. above,

where the experimental course is laid out in the shape of a figure 8, so

as to admit of continuous runs. This part, somewhat more than half-a-mile

in length, has a level stretch of a quarter-of-a-mile, the remainder

consisting of gradients, of which 1 in 20 is the most severe. The minimum

curve on the main line is 25 ft. radius, but in the sidings some occur as

sharp as 15 ft. radius.

The permanent way was at first laid with 14 lb. rails, without

fish-plates, spiked to elm and Spanish chestnut sleepers fallen and sawn

on the premises, 5 in. wide, 2 in. thick, and 2 ft. 6 in. long, set at 1

ft. 6 in. centres. The maximum load did not exceed 12 cwt. per axle, but,

although the work was well done, the road was not equal to the weight,

and required incessant attention. The line was then re-laid on sleepers

6½ in. wide, 4 in. thick, and 3 ft. long, with various sections of rails,

12 lbs., 14 lbs., 18 lbs., and 22 lbs. per yard. These were all fitted

with fish-plates, the joints being on a sleeper. The spacing of the

sleepers was varied with the rails, from 1 ft. 6 in. for the 12 lb. to 3

ft. for the 22 lb. section. Any part of this road carries comfortably 25

cwt. per axle. The fish-plates and larger area of sleeper more than

doubled the original carrying power of the rails.

Six years being about the life of these small sleepers, it soon became

necessary to renew them. Seeing that the rails, owing to the light

traffic, remained perfectly good, to have to pull the road to pieces for

the sake of new sleepers only was a serious annoyance. I then determined

to try a light cast-iron sleeper with the same bearing area. After some

years of experiment, a thoroughly satisfactory one was perfected, in

which the rail is held to its place by a curved steel spring key that

cannot work out. The greater part of the line is now laid on these

cast-iron sleepers, which weigh 28 lbs. each, inclusive of the chairs,

which are cast on. This pattern has now had some eighteen years’ test,

and has proved entirely satisfactory. With a 14 lb. steel rail, the

sleepers being spaced 2 ft. 3 in., and at the suspended fish-joint 1 ft.

3 in., the road, under the load of 25 cwt. per axle, requires very little

repair, some parts having stood for five or six years without being

touched, though constantly run over.

The length of the sleeper is a very material point. It should project

beyond the rail a distance of rather more than half the gauge of the line

thus the rail is equally supported inside and out. When the projection is

reduced, the centre of the sleepers cannot be packed up solid, because

the support would then be greatest between the rails, with the result

that the ballast below would assume a convex form lengthwise of the

sleepers, and thus produce an unstable road. On lines of the standard

gauge, if sleepers of this proportion were adopted, and of sufficient

thickness to distribute the load more widely without bending, a great

saving in repairs would be effected; but it is not likely that any

permanent way official will be bold enough to suggest such a radical

change. On the Festiniog Railway of 23½ in. gauge, a sleeper 4 ft. 6 in.

long has been adopted with excellent results.

A detail of importance in laying rails is that the joints should be

opposite one another. For this purpose it is necessary to order a

proportion of the rails 3 in. to 6 in. shorter than the rest, according

to the gauge and radius of curves. In this way the joints can be kept

practically square. A cross-jointed road is not only unpleasant to travel

on, but is also exceedingly difficult to set up true, particularly on

sharp curves.

Steel rails are now almost universally employed, but it is worth

attention that on any part of a line that is either very damp or rarely

used, iron rails will long outlast steel ones, as every mining engineer

knows.

In regard to the most suitable length of rail, I have found 15 ft. very

convenient for weights up to 18 lbs. per yard. A good deal depends upon

whether the rails come from the makers properly straightened. The longer

the rail, the more difficult it is to straighten; as a rule even the most

careful specification will fail to bring them on the ground in a fit

condition for use. It is a very usual thing to look at rails only in

regard to their horizontal truth, but in reality the vertical correction

is of far more importance, and, to detect this, the rail must be turned

on its side. I cannot too strongly insist on the vital importance of

laying only straight and level rails. A good running road can never be

made if any humpy rails are laid, and it is quite impossible to

subsequently rectify the defect without taking up such rails and treating

them under the press. Rail-straighteners should be directed to level a

rail before straightening it, that is, to correct it vertically first,

then horizontally; the reason being that vertical pressing disturbs the

horizontal truth, while the horizontal pressing does not affect the

vertical accuracy.

I have employed a rail-press fitted up on a wagon, specially arranged

with drilling machine for fish bolt holes, with tool boxes, and a brake.

The screw works horizontally, and the rail runs on adjustable rollers at

each end of the wagon. The amount of curve is thus readily appreciated by

the eye as the process proceeds, while with a vertical screw it is

scarcely possible to judge correctly. For sharp curves I use a roller

bender of a type I designed many years ago for the use of the Royal

Engineers in their field railway experiments. In this machine, which

consists of the usual three rollers with the centre one adjustable by a

screw, two men wind the rail through, and, except at the extreme ends,

effect a perfect curve. This machine, however, is of little use for the

ordinary straightening, and, though saving some time on a long curve, is

laborious to work. A curve made under the ordinary screw-press is of

course really a succession of what are technically termed “dog-legs,”

but, unless it be of smaller radius than one chain, these are

imperceptible if the successive pressures are not applied more than about

14 ins. apart. By pressing at still smaller intervals it is possible to

produce sharper curves of reasonable truth, but I find the rails on such

curves work smoother and wear better if bent with the roller machine.

Rails can be laid round moderate curves without requiring to be bent, by

screwing up the fish plates tight and then springing the rail. The extent

to which this can be effected depends on the weight of the rail and on

its length; the longer rail being the more accommodating. It is not

advisable to attempt to spring a 14 lb. rail round a sharper curve than

five chains, or an 18 lb. rail beyond ten chains radius.

The result of attempting too much springing is that the rails, under the

traffic and changes of temperature, work outwards at the joints and make

“dog legs” more or less serious. Where the ballast is of a loose dry

nature very little, if anything, can be done with springing. I have

enlarged upon this subject of rail-laying because it is of prime

importance to a good road, and a matter that, on narrow-gauge lines, does

not receive the attention it requires.

To return to a description of my line, there are on it three tunnels, two

bridges, and a viaduct 91 feet long and 20 feet high. The latter was

erected in 1878, as an improvement upon one at Aldershot, put up by a

gentleman who induced the War Office to sanction a short experimental

line for army transport upon a hopelessly inconvenient and ridiculous

plan.

My structure is of pitch pine, and stood for 16 years without repair. It

is a trestle bridge, the trestles being so designed that each member is a

multiple of the height. The roadway is carried on four timbers; formerly,

for a 8 ton engine, 11 in. deep and 8 in. wide; now, for one of 5 tons,

13 in. deep and 3½ in. wide. These are bolted together in pairs, one pair

under each rail, the two being kept parallel by stretchers and through

bolts at every 5 feet. In each pair the timbers break joint with one

another on alternate trestles, the latter being 15 ft. apart, and each

timber 30 ft. long. The advantages of this arrangement are two-fold, the

timbers can be run forward from trestle to trestle as the work advances

without scaffolding or lifting tackle, and, should one trestle sink out

of line, the continuity of the upper work checks it, and obviates the

dangerous “dog legs” to be almost invariably observed in this class of

bridge. The original cost with the lighter timbers was £30, including

every item of expenditure—equal to £1 per yard. The average height is 15

ft. The details are arranged to require but little skilled labour, the

connections being made entirely by bolts and cast angle-plates. Two

carpenters, in five days framed the five trestles including cutting the

timber to length; and in three more days, with the assistance of three

labourers, the whole was erected and the rails laid ready for traffic. A

platform and railing were, however, subsequently added for the

convenience of foot passengers, thus materially increasing the cost. When

rebuilt in 1894 with stronger timbers, the original trestles were

retained.

Where the line crosses field-fences a dyke is dug about 5 to 6 ft. square

and 3 ft. deep, across which the rails are carried on two narrow girders,

thus effectually preventing the passage of cattle, and avoiding both the

delay of gates and the expense of side fencing.

The line is properly equipped with interlocking signals and points on a

very simple plan. These are for the most part worked from two

signal-boxes in telephonic communication.

Particulars of the cost of such a line will be found in Sections IV. and

IX. On my experimental course there are six stations, at three of which

are sheds for the accommodation of the rolling stock. When the line is

used on the occasion of a garden party, a regular service of passenger

trains is run, and several times trains of eight long bogie cars,

carrying 120 passengers, have been hauled up the gradient of 1 in 20, and

up the still more trying one of 1 in 47 situate on a three-quarter-circle

curve of 40 ft. radius.

In the year 1894 I exhibited the line to the engineering public during

three days. On this occasion a variety of experiments in haulage and

shunting were shewn, and for part of each day two trains were run

concurrently.

IV.

DETAILS OF THE EATON HALL LINE.

DURING the exhibition of my railway at Duffield in 1894, one of the

visitors was the Hon. Cecil Parker, agent to the Duke of Westminster, who

was desirous of laying some sort of light railway from Eaton Hall to the

Great Western Railway, three miles distant. It was necessary that the

line should be unobtrusive in appearance, of a thoroughly permanent

character, yet moderate in cost. The traffic was, as it proved, correctly

estimated at from 5,000 to 6,000 tons annually. Here was a perfect

opportunity for a practical experiment with the 15 in. gauge, which was

ample for five times that amount. I was asked to inspect the route, and

subsequently roughly estimated the cost, exclusive of buildings, at about

£6,000. I had some doubt at first whether it was possible for me to find

time to lay out and construct the whole line and rolling stock myself,

but the difficulty of getting special designs effectively carried out by

commercial firms at a reasonable cost decided me to undertake everything.

It was at my desire eventually agreed that I should have a free hand in

regard to all the designs, doing the work at cost price and without

charge for my own time.

The line will now be generally described, after which some of the more

interesting details will be enlarged upon.

The Eaton estate railway connects the Hall with the Great Western Railway

at Balderton, 3 miles distant. The total length of line laid is 4½ miles,

which includes, besides the main line, a branch ¾ mile in length to the

estate works near Pulford, together with several shorter branches to the

estate brickyard and other points. The traffic to be dealt with,

consisting chiefly of coal, road metal, and building material, was

computed at about 6,000 tons per annum. As it was desired that the line

should be as inconspicuous as possible, since it had to cross the park

and the three principal drives, and the required capacity being small, it

was decided to adopt the 15 in. gauge.

The line is laid with steel flat-bottomed rails, weighing 16½ lbs. per

yard, and, to reduce repairs to a minimum, these are carried throughout

on cast-iron sleepers, 3 ft. long, 6½ in. wide, weighing 28 lbs., and

coated with anti-corrosive. Steel spring-keys secure the rails in jaws

cast on the sleepers, which are spaced at 2 feet 3 inches centres, and,

at the joints, at 1 ft. 4 in. Steel girders, on cast-iron foundation

plates, are used for all the bridge-work. Thus no timber whatever is

employed in the permanent way, and the depreciation is practically

limited to wear of rails.

The rails for the points are rivetted on to flat-topped cast-iron

sleepers, and were built up in my workshops, and forwarded ready for

laying down. A set of points with seven sleepers carrying them, and with

lever, counterweight, base plate, and the necessary rods, weighs about 4

cwts., and costs £7 15s. 0d. All the switches are planed out of the

solid, and the crossings are of cast steel. Special cast-iron sleepers

are employed on the girder bridges. These are of bar form, having below a

cross-piece which is tightened up to the sleeper by two bolts, and which

grips the inner flange of each girder. It is thus possible to set the

rails to any moderate curve, on straight girders. For crossing roads a

short and very strong sleeper, only 2 feet in length, is employed, with

jaws fitted to take a second rail on each side to act as a guard-rail to

the running one. These sleepers have a concrete foundation, and are

packed to the required level with tarred macadam. The spaces are then

filled in with the same material, and the road finished to a surface

level with the top of the rails with a mixture of tar, pitch, and

screenings. The flange space is of course left free; this is 1½ in. wide

so as to avoid any chance of the shoes of draft horses jamming therein.

The field crossings, to permit of carts crossing the line at convenient

points in the various fields, are arranged with a similar double rail,

but on a specially strong sleeper of the standard length, packed with

ordinary ballast.

The ballast is red furnace cinder, 5 to 6 in. in depth below the

sleepers. The surface width is 4 ft., and through the park the top of the

ballast is level with the turf, the drainage here being effected by a

central 4 in. pipe. The appearance is thus that of a narrow garden walk.

For the remainder of the route, which is entirely over grass land with a

stiff clay subsoil, the ballast is above ground.

The railway is unfenced throughout, and passes from field to field on

short open girders with a dyke excavated below, thus preventing the

passage of cattle. Two high roads besides the three drives are crossed on

the level, and several brooks by girder bridges, the longest span being

28 ft. The line is practically a surface one, there being few noticeable

cuttings and embankments. The cost of the earthwork has been £205 per

mile. The maximum gradient against the load is 1 in 70, the highest point

of the line is 63 ft. above the lowest, and the Eaton terminus is 51 ft.

above the junction with the Great Western Railway. The curves on the main

line do not run below 300 ft. in radius, but curves of 60 ft. radius,

and, at difficult points, of still less, occur at some of the termini and

on the branches. At Eaton a large covered coal stove 80 ft. long and 33

ft. wide has been erected, so arranged that the little wagons run in at a

high level and readily discharge their contents.

The rolling stock, which is all capable of traversing a minimum curve of

25 ft. radius, is fitted throughout with self-acting coupler-buffers, and

all similar parts are interchangeable. It comprises the following:—

One four-coupled locomotive weighing 3 tons in working order, and

carrying enough water and fuel for an hour’s running.

Thirty wagons 6 ft. long, 3 ft. wide, 1 ft. 3 in. deep, weighing each 7½

cwts., and holding 16 to 17 cwts. of coal, or 20 to 22 cwts. of bricks

and road metal. The sides are of box form and removable, so that the

floors can be used as flat wagons for the conveyance of large stones,

castings, &c. Fittings are attachable to any wagon for carrying long

timber. Also one bogie passenger car 20 ft. long and 3 ft. 6 in. wide,

weighing 23 cwts. and seating 16 persons, and one parcel van, to carry 2

tons, of approximately similar construction.

Various other vehicles; among which are a brake van, 6 wagons capable of

carrying 1½ tons each, and 2 for 2 tons each. Full particulars of the

construction of the rolling-stock, now increased, will be found in

Sections V. and VI.

The gross load which the engine, exclusive of its own weight, will haul

in regular work is 40 tons on the level, and 20 tons up the ruling

gradient of 1 in 70; the speed being about 10 miles per hour. In an

experimental trip, however, a speed of 20 miles per hour was attained

without undue oscillation. This weight of train is by no means the limit

which can be hauled on the line, for, on the Duffield Bank railway, the

eight-wheel-coupled engine draws far more than this load, and on one

occasion took eight bogie passenger cars carrying 124 persons up a

gradient of 1 in 47 on which is a half-circle curve of only 40 ft.

radius.

The entire cost of construction has been £1,095 per mile, exclusive of

sheds. This figure would have been materially less but for the

considerable expense attending the extra levelling and turfing required

to avoid undue prominence. The cost of rolling stock has been £214 per

mile, thus bringing the total outlay to £1,309 per mile.

The annual expenses were computed thus:— £ s. d.

Interest at 4 per cent, on gross 285 0 0

expenditure

Renewal of permanent way, 4 per cent 80 0 0

on £2,000 (25 years life)

Renewal of rolling stock, 8 per cent, 72 0 0

on £900 (12½ years life)

Working expenses £ s. d.

Driver 91 0 0

Brakesman (boy) 26 0 0

Two Platelayers 99 0 0

Fuel and oil 39 0 0

255 0 0

Total annual cost 642 0 0

The cost of loading being the same for railway wagons as for carts is not

considered. With a minimum traffic of 5,000 tons per annum over an

average distance of 2½ miles—equal to 12,500 ton-miles—the cost of

transport is almost precisely 1s. per ton per mile; which is materially

less than the cost of the cart haulage. The same rolling-stock and staff

could readily deal with 40 tons per working day of eight hours—equal, at

five days per week, to upwards of 10,000 tons a year. If the traffic were

to reach this amount, the cost per ton of transport would be greatly

reduced With a more powerful engine and additional rolling stock, such a

line is capable of conveying an annual traffic of 40,000 tons.

There are probably many localities in which a diminutive railway like

that at Eaton, ample in its capacity for estate requirements and

extremely flexible in threading existing buildings, would well repay

construction. The unobtrusiveness of so small a line and rolling stock,

the relief to the roads, and the convenience of constant connection with

the nearest railway, are points which are deserving of consideration

where the conditions make such an installation possible.

The laying of the line was begun in August, 1895. The earthwork was

already well advanced. On account of the large amount of game in the

neighbourhood of the line, it was considered wiser to employ no

contractor, nor were any men obtainable with a knowledge of such

diminutive platelaying. For the first fortnight I worked away myself with

beater, rammer, and crowbar, till I had taught a proportion of my staff

of 16 the use of these tools, and how to put the permanent way together.

My assistant engineer, new to railway work, soon picked up the right

ideas of what was required, and in a month, when I had to leave,

everything was going nicely. A bonus was paid on every rail-length beyond

a quarter-of-a-mile per week completed. This, compared with the fine work

done by the Royal Engineers in the Soudan, appears a poor performance,

but it must be remembered that we had to bring not only rails and

sleepers from our base, but also all the ballast, and that we left our

work thoroughly packed, the banks soiled and turfed, the road crossings

laid in concrete and asphalte with double rails and special sleepers, the

field-crossings for carts made good, the girder bridges and fence bridges

(cattle stops) erected, and all points and crossings permanently finished

off. About Christmas we reached Eaton Hall, and in the following May

(1896) had pretty well finished all the branches.

Of course work done with such care and by the day was costly, and it

would doubtless be possible to construct a similar line by contract at

two-thirds of the price. But it is a question whether much would have

been saved in the long run, for, except the usual platelayers’ work, no

repairs of any sort have been necessary since completion, nor has any

part of the mechanism failed or given trouble; a result not usually

attained in contract work.

It may interest those who have similar work to deal with if I explain

that in making this line all our material had to be hauled from our base

on the Great Western Railway at Balderton. The procedure was as

follows:—At the rail-end four 15 ft. lengths of light timber framing 9

in. deep were laid on the bare formation. A train then backed up with

eight wagons of ballast, and on top of them four lengths of rail ready

keyed to sleepers. The rails were lifted off alongside where they were to

be laid, the “tops” of the wagons were removed and the ballast shovelled

off on each side. The train then drew away to refill. The length of

framing next the rail-end was lifted forward to the end of furthest

framing, and so consecutively with the other three, thus leaving between

the rail end and the fresh laid framing a space of 60 ft. with the loose

ballast lying thereon. Four men with shovels and four with rammers then

put the ballast in shape and rammed it solid, and also true to a level

given by the engineer. The rails and sleepers were next lifted into

place, and the fish plates affixed. The sleepers next the joints were

temporarily packed, by which time a fresh train had arrived. The process

was then repeated. In this manner, with a staff of ten men at the

rail-end, a driver and boy with the train, six men loading ballast, three

men straightening and bending rails, and three fixing them in sleepers,

60 ft. were laid in about forty minutes, including delays for field

crossings and cattle-stop bridges. After a day or two of this work the

men were set to packing and finishing what had been laid. With a larger

staff the two processes might, but less conveniently, have proceeded at

the same time.