CHAPTER V.

THE EDDYSTONE AS A TYPE OF ENGLISH LIGHTHOUSES.

A Stone Lighthouse proposed--Smeaton's first Visit to the

Rock--Operations of the First Season--Second Season--Structure

of the Foundation--Ingenious Mode of securing the Stones--Third

Season--State of the Work--Progress and Description of the

Work--Accidents to the Engineer--Proposal to exhibit a Light

before the completion of the Building refused--Fourth Season--

Completion of the Work--Appearance of the Lighthouse during a

Storm--Situation of the Light-keepers.

To return to the history of the Eddystone Lighthouse. When the

proposal relating to the rebuilding of this edifice was made to

Smeaton, and when he had duly weighed the subject in his own mind, he

delivered his decided opinion that the building ought to be

constructed _entirely of stone_. Some opposition was at first raised

against this idea, but the proprietors were at length so well

satisfied with the plans submitted to their inspection, and with the

plain, straightforward reasoning of Smeaton on the matter, that they

left the whole affair in his hands. Their chief objection had arisen

from the opinion, supported by that of the best judges, that the

safety and continuance of Rudyerd's lighthouse during so many years,

had in a great measure depended on the elasticity of the materials of

which it was composed, which enabled it to give way to the shocks of

the sea. Indeed it was affirmed, that in violent storms the motion of

that wooden edifice was so great that trenchers and other articles

were thrown from the shelves in the upper rooms. Smeaton answered to

this, that the great agitation of the late building arose from its

want of _weight_, as well as want of strength; that the edifice he had

in view would be much _heavier_ and much stronger, so that the

building would not give way to the sea, but the sea would give way to

the building.

In the spring of 1756 Smeaton first visited and examined the Eddystone

rock, proving, as his predecessors had done, the extreme difficulty of

gaining a landing, or of remaining long enough on the rock to carry on

his observations. These difficulties suggested to him the important

and valuable expedient of keeping a vessel fixed within a quarter of a

mile of the rock, which should be capable of lodging the workmen and

their tools, and thus enable them to take immediate advantage of any

favourable opportunity of putting out their boat and conveying

materials at once to the Eddystone, instead of having to take the

voyage from Plymouth on each occasion.

The first actual work done on the rock was in August, 1756. Two

companies of workmen were employed, each remaining at the work a week,

that every opportunity might be made the most of, and the men relieved

by visits to the shore. A sloop, a large yawl with sails and oars, and

a boat, were employed to expedite the work. The sloop formed the

lodging for the company working at the rock, and was anchored at a

short distance from it. The sloop was afterwards replaced by a larger

store vessel, called the Neptune Buss. The weather from the 27th of

August to the 14th of September happened to be favourable to the work,

so that the companies were employed on it at every tide. After this,

unsettled weather began to prevail, so that Smeaton was obliged to be

satisfied with the progress already made, which consisted in the mere

preparation of the House-rock for the intended edifice, by cutting two

new steps in the lowest part of the sloping side of the rock, and

forming anew the five steps which remained of the efforts of Rudyerd.

Dove-tailed recesses were also cut in all these steps for the

reception of the stone-work. The remaining part of the autumn was

spent in expediting necessary work on shore, such as completing the

work-yard with its machinery and conveniences, and then preparing the

granite and Portland stone, of which the lighthouse was to be made.

The desirability of doing as much of the work as possible on shore,

became more and more apparent, as experience showed the dangers and

accidents likely to occur at the rock. During this winter Smeaton

began seriously to consider the great importance to his work, of

getting the most perfect cement possible, to resist the extreme

violence of the sea. He found that nothing of the resinous or oily

kind would answer, as it was impossible to get a dry surface at the

rock. He therefore went through a complete set of experiments on

cements with a view to produce one which would, in despite of water

almost continually driven against it with every degree of violence,

become so firm in its consistence and adhesion to the stone, that it

should compose one even regular surface with the stone, without

needing hoops of iron or copper to surround the horizontal joints. In

this endeavour he considered himself at length completely successful.

At the beginning of June, 1757, Smeaton renewed his work at the

Eddystone rock. The first proceedings were to fix some timbers to the

east side of the rock merely as a defence to the boats, which were

frequently damaged by running against the sharp edges; and also to

erect shears, windlass, &c. The first stone was laid in its place on

the 12th of June. This stone weighed two tons and a quarter, though

the ordinary weight of the stones did not exceed one ton each. The

first course consisting of four stones was finished during the next

day. By Smeaton's plan the stones were most ingeniously dove-tailed

together and into the rock, so that when once fixed, it was impossible

for one stone to be separated from the rest. The second course of

stones was not completed until the 30th of the same month; several

accidents having occurred to hinder the progress of the work; yet

Smeaton was in no wise disheartened, for in establishing these two

courses he considered the most difficult and arduous part of the work

to be already accomplished, since these courses brought him up to the

same level where his predecessor Mr. Rudyerd had begun. On the 11th of

July the third course, consisting of twenty-five pieces, was

completed, and on the 31st the fourth course of twenty-three pieces.

The fifth course was closed in on the 5th of August. When the sixth

course was completed, which was on the 11th of that month, Smeaton had

the satisfaction to find that the sea did not now invariably wash over

every part of their work at each tide, which had always hitherto been

the case in the course of laying the previous courses. The greatest

difficulties were now considered to be successfully surmounted, as

each succeeding course gave them more time and more room, and they had

brought their work to a level with the highest part of the rock.

Up to this point all the courses had been begun by the stones that

were securely dove-tailed into the rock, and further made fast by

oak-wedges and cement. To receive these wedges, two grooves were cut

in the waist of each stone, from the top to the bottom of the course,

of an inch in depth and three inches in width. The care with which the

foundation-work was carried on may be gathered from Smeaton's

description of the manner of laying each stone. 'The stone to be set

being hung in the tackle, and its bed of mortar spread, was then

lowered into its place, and beat with a heavy wooden maul, and

levelled with a spirit level; and the stone being accurately brought

to its marks, it was then considered as set in its place. The business

now was to retain it exactly in that position, notwithstanding the

utmost violence of the sea might come upon it, before the mortar was

hard enough to resist it. The carpenter now dropped into each groove

two of the oaken wedges, one upon its head, the other with its point

downwards, so that the two wedges in each groove would lie heads and

points. With a bar of iron about two inches and a half broad, a

quarter of an inch thick, and two feet and a half long, the ends being

square, he could easily (as with a rammer) drive down one wedge upon

the other; very gently at first, so that the opposite pairs of wedges

being equally tightened, they would equally resist each other, and the

stone would therefore keep place. A couple of wedges were also, in

like manner, pitched at the top of each groove; the dormant wedge, or

that with the point upward, being held in the hand, while the

drift-wedge, or that with its point downward, was driven with a

hammer. The whole of what remained above the upper surface of the

stone was then cut off with a saw or chisel: and generally, a couple

of thin wedges were driven very moderately at the butt-end of the

stone; whose tendency being to force it out of its dove-tail, they

would, by moderate driving, only tend to preserve the whole mass

steady together, in opposition to the violent agitation that might

arise from the sea.' In addition to this, a couple of holes having

been bored through every piece of stone, one course was bound to

another by oak trenails driven stiffly through, and made so fast that

they could more easily be torn asunder than pulled out again. 'No

assignable power,' says Smeaton, 'less than what would by main stress

pull these trenails in two could lift one of these stones from their

beds when so fixed, exclusive of their natural weight, as all

agitation was prevented by the lateral wedges.' The stone being thus

fixed, a proper quantity of mortar was liquefied; and the joints

having been carefully pointed, up to the upper surface, this mortar or

cement was poured in with iron ladles so as to occupy every void

space. The more consistent parts of this cement naturally settled to

the bottom, and the watery parts were absorbed by the stone: the

vacancy thus left at the top was repeatedly refilled, until all

remained solid; the top was then pointed, and, when necessary,

defended by a coat of plaster. When the whole of the foundation was in

this manner brought to a level, some other means was necessary of

attaining the like degree of security. For this purpose the central

stone of the sixth course had a hole of one foot square cut quite

through the middle. Eight other depressions of one foot square and six

inches deep were also sunk at equal distances in the circumference. A

plug of strong hard marble, from the rocks near Plymouth, one foot

square and twenty-two inches in length, was set with mortar in the

central cavity, and fixed firmly therein with their wedges. This

course was thirteen inches in height, so that the marble plug, which

reached through it, stood nine inches above the surface. Upon this the

centre-stone of the seventh course was fixed, having a similar hole

made in its centre, bedded with mortar and wedged as before. By this

means no force of the sea acting horizontally upon the centre-stone,

less than what was capable of cutting the marble plug in two, was able

to move it from its place; and to prevent the stone the more

effectually from being lifted, in case its bed of mortar should happen

to be destroyed, it was fixed down by four trenails. The stones

surrounding the central stone were dove-tailed to it in the same

manner as before, and thus the courses proceeded with no other

interruption than arose from the nature of the situation.

Smeaton tells us that when the work had proceeded so far as to afford

a level platform, the pleasure he took in it, and the novelty of the

thing, led him to walk to and fro upon it with much complacency. But

making a false step, and not being able to recover himself, he tumbled

over the brink of the work down among the rocks on the west side. The

tide had then retreated, so that no serious result happened, but in

his fall he dislocated his thumb, and as no medical aid could be

procured, he set it himself, and then returned to his work. It was

more than six months, however, before he recovered the full use of his

thumb.

Owing to very boisterous weather, and repeated losses of the necessary

materials left on the rock, the seventh course was not laid until the

7th of September. But Smeaton had the satisfaction to find that all

the work actually completed, stood the utmost severity of the weather

unmoved. At this time the sea became so calm that the work proceeded

rapidly, and for three days in succession the top of the work was not

wetted. The eighth course was completed on the 13th, but the weather

again becoming unfavourable, the ninth was not finished until the

30th, and here Smeaton found it desirable to close the operations for

this year.

The ensuing winter was of so stormy a nature as severely to test the

strength of the work at the Eddystone. Smeaton went early in the

spring to view it, and says, 'I was much surprised, notwithstanding

what had been reported of the soundness of the work, to find it so

perfectly entire, for, except a small spawl which had been washed from

the rock itself, the whole did not seem to have suffered a diminution

of so much as a grain of sand since I left it on the 1st of October:

on the contrary, the cement, and even the grouted part, appeared to be

as hard as the stone itself, the whole having become one solid mass,

and, indeed, it had quite that appearance, as it was covered with the

same coat of sea-weed as the rock, the top of the work excepted, which

was washed clean and white.'

Various disasters to the vessels, moorings, &c. near the rock retarded

the work in the spring of 1758. It was not till the 10th of July that

the eleventh course was finished. Twelve days afterwards the twelfth

course was laid down. After this the work went on better, so that on

the 8th of August the fourteenth course was completed, and with it

what was called the fundamental solid. From hence begins the building

also called the Solid, which includes the passage from the entry-door

to the well-hole for the stairs. It was now necessary for the sake of

the well-hole to omit the centre-stone. The four stones surrounding

the centre were therefore fastened together by what are called

hook-scarf joints, so as to compose, in effect, one stone. Means were

also taken to prevent them from shifting, or being lifted out of their

position.

From the 9th to the 20th of August there was an uninterrupted

continuance of fine weather, so that great progress was made. By the

latter day the eighteenth course was completed, which reunited the

building into a complete circle, by covering the passage to the

staircase. Over the head of the entry-door the figures 1758 were cut

in deep characters. During another month, by great exertions, the

twenty-fourth course was reached and completed. This course finished

the Solid, and formed the floor of the store-room, so that Smeaton had

every reason to be satisfied with the work of this season; yet as he

had been long meditating on the advantage to the public which would

accrue from setting up a light during that very winter, he resolved to

make a vigorous effort to get the store-room completed and a light

erected above it.

The building had hitherto been carried up solid as high as there was

any reason to suppose it exposed to the heavy stroke of the sea, _i.

e._ to thirty-five feet four inches above its base, and twenty-seven

feet above the top of the rock, on the common spring-tide high-water

mark. At this height it was reduced to sixteen feet eight inches

diameter; and it was necessary to make the best use of this space, and

make all the room and convenience therein that was possible,

consistent with the still necessary strength. The rooms being made

twelve feet four inches in diameter would leave twenty-six inches for

the thickness of the walls. These walls were made of single blocks in

the thickness, so shaped that sixteen pieces formed a complete circle,

and from their figure composed a stout wall. These pieces were cramped

together with iron, and also secured to the lower courses by marble

plugs as before. To hinder the passage of wet through the upright

joints, flat stones were introduced into each joint so as partly to be

lodged in one stone, partly in another, thus making it tolerably

certain that the rooms would be kept comfortable and dry in all

weathers. On the 30th of September the twenty-eighth course was

completely set. This and the next course received the vaulted floor,

which made the ceiling of the store-room and floor of the upper

store-room. For further security, therefore, there was a groove cut

round the upper surface of this course, in which was placed a circular

chain of great strength. Upon this chain, in the groove, was poured

melted lead, until the cavity was filled up. The next course was then

laid on, and this was also secured by a chain in like manner, it

being considered that the courses on which the floors rested demanded

every possible security. The formation of the floors, and the care

taken to avoid the danger of lateral pressure on the walls, is worthy

of notice. Each floor rested upon two courses; being firmly supported

by a triple ledge going circularly round the two supporting courses.

'Had each floor,' says the architect, 'been composed of a single

stone, this lying upon the horizontal bearings furnished by these

ledges, would, while it remained entire, have no lateral pressure or

tendency to thrust out the sides of the encompassing walls; and that

in effect the several pieces of which the floors were really composed

might have the same property as whole stones, the centre stone was

made large enough to admit of an opening, from floor to floor, to be

made through it; and being furnished with dove-tails on its four

sides, like those of the entire solid, it became the means by which

all the stones in each floor were connected together; and

consequently, the whole would lie upon the ledges like a single stone,

without any tendency to spread the walls. But if by the accident of a

heavy body falling, or otherwise, any of those stones should be

broken, though this might not destroy its use as a floor; yet the

parts would then exert their lateral pressure against the walls; and,

therefore, as a security against this, it became necessary that the

circle of the enclosing walls should be bound together, and the

building, as it were, _hooped_.' Thus assiduously did Smeaton urge

forward the work, yet without neglecting any of the necessary

precautions for its safety. By the 10th of October he had nearly

completed all the necessary arrangements for establishing a light and

light-keepers at the Eddystone during the same winter, when he

received an unexpected and painful refusal from the Corporation of

Trinity-House, to the effect that 'on reading the Acts of Parliament,

the application from the merchants and owners of ships, and

Winstanley's narrative of the first lighthouse erected there, they are

of opinion that a light cannot be exhibited on the Eddystone Rock till

the lighthouse is re-built.'

Smeaton employed the winter of 1758-9 in London, preparing everything

for the final work at the Eddystone the ensuing season. He formed and

made out designs for the iron rails of the balcony, the cast iron, the

wrought iron, and the copper-works of the lantern, &c. There was a

violent storm on the 9th of March, 1759, which it was supposed might

have damaged the unfinished lighthouse, as it had done very great

damage to the ships and houses at Plymouth. As soon as it was possible

to effect a landing the works were visited and a report sent to

Smeaton. From this he found, with pleasure, that not only the solid

but the hollow work remained perfectly sound and firm; all the mortar

having become quite hard, and every part of the work just as it was

left by the workmen in October.

The commencement of the work for the next and last season, took place

on the 5th of July. On the 21st of the same month the second floor was

finished, and by the 29th the fortieth course of stone was laid down,

and the third floor finished.

The main column of the lighthouse was completed on Friday, August

17th. It contained in all forty-six courses of stone, and reached the

height of seventy feet. The beds for the light-keepers were fixed in

the uppermost room, and the kitchen with its fire-place in the room

below it, whereas in the former house, the kitchen had been the upper

room, doubtless, because the funnel for the smoke would be shorter.

But Smeaton having been informed that with the former arrangement the

beds and bedding were in a very damp and disagreeable state, proposed

to remedy the evil by allowing the copper funnel to pass through the

bed-room, and thus to dry the air. This plan completely answered the

desired end; though it must be observed, that the whole edifice, even

those portions of it which were continually subject to the action of

the waves, were much more impervious to moisture than Rudyerd's

edifice; as may naturally be imagined from the difference of material

used in the building of the lighthouse, and the well-known quality of

granite to resist humidity. In the upper room, therefore, were fixed

three cabin-beds to hold one man each, with three drawers and two

lockers in each to hold his separate property. In the kitchen, besides

the fire-place and sink, were two settles with lockers, a dresser with

drawers, two cupboards and one platter-case. In the lantern a seat was

fixed to encompass it all round, except at the doorway, and this

served equally to sit upon, or to stand and snuff the candles; also to

enable a person to look through the lowest tier of glass-panes at

distant objects, without having occasion to go on the outside of the

lantern into the balcony.

Besides the windows of the lantern ten other windows were constructed

for the edifice, namely, two for the store-room, and four each for the

other two rooms. In fixing the bars for these windows, an accident

occurred which had nearly proved fatal to Smeaton, and which he thus

describes:--'After the boat was gone, and it became so dark that we

could not see any longer to pursue our occupations, I ordered a

charcoal-fire to be made in the upper store-room, in one of the

iron-pots we used for melting lead, for the purpose of annealing the

blank ends of the bars; and they were made red hot altogether in the

charcoal. Most of the workmen were set round the fire, and by way of

making ourselves comfortable, by screening ourselves and the fire from

the wind, the windows were shut; and, as well as I remember, the

copper cover or hatch put over the man-hole of the floor of the room

where the fire was; the hatch above being left open for the heated

vapour to ascend. I remember to have looked into the fire attentively

to see that the iron was made hot enough, but not over-heated: I also

remember I felt my head a very little giddy; but the next thing of

which I had any sensation or idea, was finding myself upon the floor

of the room below, half drowned with water. It seems, that without

being further sensible of anything to give me warning, the effluvia of

the charcoal so suddenly overcame all sensation that I dropped down

upon the floor; and had not the people hauled me down to the room

below, where they did not spare for cold water to throw in my face

and upon me, I certainly should have expired upon the spot.'

By unremitting exertions on the part of Smeaton and his work-people,

the balcony-rails, the lantern, with the cupola and gilt ball, the

lightning-conductor, and, in fact, all the remaining parts of the

lighthouse, with the stores and necessary furniture, were set in their

places by the 16th of October, on which day a light was once more

exhibited on the Eddystone Rock.

It may be imagined that Smeaton took peculiar pleasure in this

beautiful monument of his skill and ingenuity. He slept in the

lighthouse, viewed it from sea and land, and made every observation

that an ingenious and clever man might be expected to make. The

account he gives of its appearance after a storm, as he viewed it with

his telescope from the garrison at Plymouth, is this: 'Though I had

had many opportunities of viewing the unfinished building, when buried

in waves in a storm at S. W., yet never having before had a view of it

under this circumstance in its finished state, I was astonished to

find that the account given by Mr. Winstanley did not appear to be at

all exaggerated. At intervals of a minute, and sometimes two or three,

I suppose when a combination happens to produce an overgrown wave, it

would strike the rock and the building conjointly, and fly up in a

white column, enwrapping it like a sheet, rising at least to double

the height of the house, and totally intercepting it from sight; and

this appearance being momentary, both as to its rising and falling,

one was enabled to judge of the comparative height very nearly, by the

comparative spaces alternately occupied by the house, and by the

column of water, in the field of the telescope.'

The year 1759 closed with a series of very stormy weather, and as this

was the first winter's trial of the lighthouse, it may be supposed

that there was some anxiety among the more timid and doubting of those

concerned in it. Especially was the courage of the light-keepers put

to the test. When a boat could come near them after one of these

storms, a letter was sent by Henry Edwards, one of the light-keepers,

to the manager of the works acquainting him that they had had such bad

weather, and that the sea ran over the house in such a manner, that

for twelve days together they could not open the door of the lantern

or any other. 'The house did shake,' says the poor light-keeper, 'as

if a man had been up in a great tree. The old men were almost

frightened out of their lives, wishing they had never seen the place,

and cursing those that first persuaded them to go there. The fear

seized them in the back, but rubbing them with oil of turpentine gave

them relief.'

Meanwhile the lighthouse itself bore the storm admirably, and suffered

nothing from it. Two years afterwards a tempest of unusual violence

occurred, causing much loss of life and property at Plymouth. Eighty

thousand pounds' worth of damage were done in the harbour and sound,

and a friend of Smeaton's, after writing a full description of the

several disasters, adds, 'In the midst of all this horror and

confusion, my friend may be assured that I was not insensible to his

honour and credit, yet in spite of the high opinion that I had of his

judgment and abilities, I could not but feel the utmost anxiety for

the fate of the Eddystone. Several times in the day I swept with my

telescope from the garrison, as near as I could imagine, the line of

the horizon, but it was so extremely black, fretful, and hazy, that

nothing could be seen, and I was obliged to go to bed that night with

a mortifying uncertainty. But the next morning early, I had great joy

to see that the gilded ball had triumphed over the fury of the storm,

and such an one as I had no conception of. I saw the whole so

distinctly from the bottom to the top, that I could be very sure the

lantern had suffered nothing. It is now my most steady belief, as well

as everybody's here, that its inhabitants are rather more secure in a

storm, under the united force of wind and water, than we are in our

houses from the former only.'

After this trial of the strength of the lighthouse, there seems no

longer to have been any apprehension concerning it. The light-keepers

even became attached to the spot, and found it a remarkably healthy

and comfortable abode. There were often as many as half a dozen

applications for the office, although the salary was only twenty-five

pounds per annum.

One of the light-keepers, after a residence of fourteen years on the

rock, became so much attached to the place, that for two summers he

gave up his turn of going on shore to his companions, and declared his

intention of doing so on the third; but being over-persuaded he went

on shore to take his month's turn. At the lighthouse he had always

been a decent, sober, well-behaved man; but he had no sooner got on

shore than he went to an alehouse and became intoxicated. This he

continued the whole of his stay; which being noticed, he was carried

in an intoxicated state on board the Eddystone boat and delivered in

the lighthouse, where he was expected to grow sober; but after

lingering for two or three days, he expired. Vacancies, however,

seldom occurred in the lighthouse. Smeaton mentions several men who

had served there to his knowledge ten, fifteen, or twenty years.

Having thus conducted our readers to the close of Smeaton's arduous

undertaking, and noticed its complete success, we may proceed to

describe the more remarkable lighthouses erected in other portions of

the kingdom subsequent to the labours of this celebrated engineer.

Smeaton and Lighthouses A Popular Biography, with an Historical Introduction and Sequel · 第 5 / 9 章