One of the most notable features of the engineering and commercial

development of to-day is the movement, elsewhere alluded to, for making

ship canals with the view of converting inland towns into seaports. The

Manchester Ship Canal, now well advanced towards completion, undoubtedly

gave the first impulse and has since supplied the impetus to this

movement. Whether the movement will proceed much farther than plans

and prospectuses remains to be seen. But at the present moment the

principal proposals affecting the United Kingdom are—

1. The construction of a National canal, passing right

through from the Bristol Channel to the Humber on the one

side, and from the Thames to the Mersey on the other.

2. The conversion of the existing waterways into a ship

canal, between Sheffield and Goole.

3. The construction of a ship canal between the Forth and

the Clyde.

4. The construction of a canal from the Irish Sea to

Birkenhead through Wallasey Pool and the Wirral Peninsula.

5. The construction of a ship canal between the Mersey and

the city of Birmingham, connecting with the Manchester Ship

Canal and the Mersey, by way of the Weaver Navigation.

6. A canal to connect the city and district of Birmingham,

with the river Trent, and thereby with the North Sea.

7. An improved waterway between the Midlands and the Thames.

8. The improvement of the Wiltshire and Berkshire canal, so

as to give better inland water transport between Bristol and

London.

THE FORTH AND CLYDE CANAL.

The most probable, and at the same time one of the most important of

the foregoing proposals, is that designed to connect the Forth with the

Clyde, thereby enabling vessels of considerable tonnage to pass from

the one sea to the other, without passing round the further extremity

of the island. There is already a canal between the two seas, but this

waterway is too contracted to be of much use for vessels of any size,

and it is not, therefore, proposed to utilise the existing canal in the

new scheme.

The greatest height of the present canal is 141 feet. It is crossed by

about 30 drawbridges, and passes over 10 considerable aqueducts, and 30

small ones, the largest being that over the Kelvin, at Maryhill, near

Glasgow. The canal is supplied with water from eight reservoirs, which

cover 721 acres. The original cost of the canal was about 300,000_l._,

and 50 years after its opening the annual revenue amounted to about

100,000_l._, and the expenditure to about 40,000_l._ In 1869, the canal

passed into the possession of the Caledonian Railway Company, when,

with the adjoining Monkland Canal, it was valued at 1,141,000_l._ The

Caledonian Company undertook to pay an annuity of 91,333_l._, being a

guaranteed dividend of six and a quarter per cent. It was, however,

like many other similar arrangements made by railway companies in Great

Britain, a very bad bargain for the new proprietors, since the profits

from the working of the canal are now much less than they were.

Messrs. Stevenson, of Edinburgh, who have been consulted as to the most

practicable route for the proposed canal, have recommended that the

canal proper should begin at Alloa on the Forth, where vessels would

be raised by a lock to the level of Loch Lomond, 13 feet above high

water, which would be the summit level of the canal. The canal would

proceed thence along the valley of the Forth to Loch Lomond, through

that loch to Tarbet, and would afterwards be carried along the narrow

neck of land to Loch Long, or, alternatively, across to the opposite

shore of Loch Lomond, near Arden, and thence into the Forth of Clyde,

near Helensburgh. The average depth of cutting is stated at 47 feet,

but there would be a heavy cutting, some three miles long and 203 feet

deep on an average, which the engineers propose to make a tunnel,

with 150 feet of headway. The estimated cost of the work is about

8,000,000_l._, or much the same as the cost of the Manchester Ship

Canal. The traffic is calculated at 9,516,000 tons, and it is estimated

that at 1_s._ 6_d._ per ton, this traffic would yield a gross annual

income of 713,748_l._ which would be sufficient to yield 8 per cent.

after deducting working expenses, &c. It is proposed to make the canal

30 feet deep, and 72 feet wide at the bottom.

And the route has been recommended for the proposed ship canal, which

is termed the direct route, and which is 27 miles shorter from Greenock

than the proposed Loch Lomond route _viâ_ Tarbet. This route would

start from the Clyde at a point near to Whiteinch, join the line of the

present Forth and Clyde Canal near Maryhill, and thereafter proceed

in the same direction to the junction of the canal with the Firth

of Forth. The shorter route would, however, be the most difficult,

inasmuch as there is a very steep hill immediately after leaving the

Clyde, between Whiteinch and Maryhill. The height to be surmounted

here is not less than 150 feet; and for a ship canal, which ought to

be a tide-level waterway, in order to be satisfactory, this would be a

serious drawback.

It is contended that, being the shortest route between America and the

Baltic, the Continent, and the east coast of Scotland and England, the

through traffic would be considerable. This may be true, but the gain

in time would be reduced materially by the fact that vessels in coming

off the Atlantic would be required to sail up the long forth (Clyde),

and would probably require, particularly if deeply laden, to wait on

the tide to get to Bowling, which is some distance up the river, or

the channel would need to be deepened and broadened, thus adding to

the cost. For channel steamers going from Ireland, or the west coast

of Scotland, England or Wales to the east coast or the Continent, the

canal would be a decided benefit, for not only would their voyage be

shortened, but the rocky and dangerous coast of the north of Scotland

would be avoided. The canal would pass through the coal and oil

districts of Scotland, a fact which has been adduced in favour of the

scheme.

Another consideration which carries much weight is the facility gained

for the rapid passage of battleships from one shore to another,

rendering defence in time of war more effective.

THE PROPOSED SHEFFIELD AND GOOLE CANAL.

The town of Sheffield, with a population of some 300,000, and extremely

important and diversified industries, has hitherto been practically

landlocked. There is, however, a system of canals actually in existence

which gives communication with the sea. This system embraces the

Sheffield and Tinsley Canal, 4 miles long; the Dun Navigation, 28¼

miles; the Stainforth and Keadby Canal, 12¾ miles; and the Dearne and

Dove Canal, 14 miles, giving a total of 59 miles of navigation.

In this chain of communication the most important link is the Dun River

Navigation, which begins near the village of Tinsley, and proceeds

thence by the Tinsley Cut, which was made to avoid a bend in the river,

under powers of the Act of 12th George I. There are several other cuts

in the river which have been constructed at various times, their total

length, from Mexborough Church to the Dearne river, being not less

than 2220 yards. The river has passed through the hands of Vermueden,

who, in the reign of Charles I., used it to drain the low lands in the

vicinity of Hatfield Chase. The total rise of the Dun Navigation, by

sixteen locks, from low-water mark in the river, is 92¼ feet. Writing

in 1831, Priestley stated that “the Dun Navigation is of the utmost

importance for exporting the produce of the extensive coal and iron

works which abound at its western extremity; also, the vast quantity

of manufactured iron goods and cutlery which is annually produced in

the populous town and neighbourhood of Sheffield.” This, however, was

before the present system of railways was completed, and before the

waterways on this route fell into the hands of their great rivals.

Not more than half a million tons now annually pass through the port

of Keadby, which is the connecting point between the Dun Navigation

and the Stainforth and Keadby Canal, the latter being a continuation

thereof, and the river Trent.

[Illustration: MAP SHOWING THE PRESENT AND THE PROPOSED CONNECTION

BETWEEN SHEFFIELD AND THE SEA.

Sheffield to Goole, _viâ_ Dutch river 40¼ miles.

” ” ” Trent and Ouse 35 ”]

It is not proposed to do more than improve the existing navigations to

the extent of enabling them to take barges with a carrying capacity of

700 tons, and sea-going steamers capable of carrying 300 to 400 tons,

whereas at present they cannot carry boats of more than 80 tons. Such

vessels could carry coal cargoes from the South Yorkshire collieries

situated upon this waterway, and London or any other large consuming

centre on the British shores. The existing waterways are, however,

in the hands of the Manchester, Sheffield, and Lincolnshire Railway

Company, which, of course, will have to be consulted as to their

acquisition. The accompanying diagram shows the route of the proposed

improved navigation.

THE PROPOSED IRISH SEA AND BIRKENHEAD SHIP CANAL.

A company was established in 1888 for the purpose of cutting a canal,

through the Wallasey Pool, from the Irish Sea to Birkenhead, The

object of this undertaking is to improve the approach to the port

of Liverpool, which is at present greatly prejudiced by the shifty

channel, the numerous sandbanks on either side of the bar, and the

risks and delays that are thereby entailed. The scheme is not a new

one entirely. On the contrary, Telford, Nimmo, and Robert Stephenson,

in 1838, reported upon a kindred project, and estimated its cost at

1,400,000_l._ The sum named, however, was too much for the promoters to

raise, and a modified plan was submitted, calculated to cost about half

the money. The Corporation of Liverpool, however, opposed the scheme,

and privately bought up the land on either side of the Wallasey Pool,

with a view to frustrate its accomplishment. Telford’s plans have,

however, quite recently been revived, and it is now proposed to make a

cut from an arm of the Wallasey Pool—which, running for about half

a mile inland, has, notwithstanding the enormous extension of dock

accommodation all around, been left in its natural condition—to the

west end of the Leasowe embankment, near Dove Point, whence a tidal

channel would be formed through the foreshore to the Rock Channel, the

ancient entrance to the port of Liverpool. This tidal channel would

be protected by a breakwater running from the Leasowe embankment to a

point in the Rock Channel west of the Dove Spit. An outer breakwater

would also run in an easterly and south-easterly direction for a

distance of 5000 feet, sheltering the greater part of the Rock Channel,

which is to be dredged for upwards of a mile to a depth of 30 feet

below low-water mark. The scheme does not appear to be either difficult

or costly, but as it is objected to by the Corporation of Liverpool

and by the Mersey Harbour Board, it may not come to maturity. That it

would, if carried out, be a great convenience to the many thousands who

annually arrive at or depart from Liverpool for the United States and

other countries, is sufficiently manifest.

THE CANAL CONNECTION BETWEEN LONDON AND BRISTOL.

The Wiltshire and Berkshire Canal was acquired by some capitalists

towards the close of 1889, with a view to working it in competition

with the Great Western Railway between London and Bristol. The canal in

question leaves the Kennett and Avon Canal at Semington, a few miles

on the Bristol side of Devizes, and proceeds thence through Melksham,

Wootton Bassett, Swindon, and Challow to the Thames at Abingdon.

Although the Kennett and Avon Canal, which joins the Thames at Reading,

is 23 miles shorter between London and Avonmouth, it labours under

the disadvantage of rising to a much greater height, and therefore

requiring twenty-eight additional locks. It is also proposed to develop

the Thames and Severn Canal, which is connected by a short branch from

Swindon, through Cricklade, with the Wiltshire and Berkshire.

During the year 1888 attention was called to a project for the union

of the Bristol and English Channels by a ship canal, running from

Stolford, near Bridgwater, which has the advantage of being opposite

Cardiff, _viâ_ Bridgwater, Taunton, and Exeter, to Langstone Point, on

the west side of Exmouth Bight, where the southern harbour would be

formed.

This route is described as offering every facility for the work, the

chief elevation, White Ball Hill, which is 536 feet high, being turned

by following the course of the old Great Western Canal. A part of the

existing canals, or their remains, and the floating basin at Exeter,

with its 5½ miles of canal to the Exe, are intended to be acquired, and

the deepest cutting on the whole system will not exceed 200 feet. The

canal would be on the level of the sea, taking its supply chiefly from

that source, with sea-locks only at each end. The dimensions proposed

are: length, 62 miles; width at surface, 125 feet, at bottom, 36 feet;

and depth 21 feet, the figures being much the same as those of the ship

canal from Amsterdam to the Helder, which admits loaded vessels of 1000

to 1500 tons, drawing 18 feet. Coal from South Wales and adjoining

fields would be likely to provide a large revenue for a short cut to

the English Channel, and thence to London, say 355 miles, in order to

better compete with the North of England. The cost of the scheme has

been set down at 3,080,000_l._

PROPOSED WATERWAYS FROM BIRMINGHAM TO THE SEA.

Of all the towns in the United Kingdom that labour under the

disadvantage of being remote from the sea, none are so entirely

excluded from sea competition as the capital of the Midlands.

Birmingham is unlike most of the other cities and towns of the country

in this respect, that it is neither built upon a navigable river, nor

upon any other waterway that would be likely to secure for traders some

relief from their almost abject dependence upon railway transport. And

yet the town and district of Birmingham are not altogether without

the means of water transport. The locality is, in point of fact, the

centre of a network of canals, which, if they were properly adapted

to its requirements, would place it in direct communication by water

with all the principal ports and markets in the kingdom. By the

Birmingham, Warwick and Birmingham, Warwick and Napton, Oxford, Grand

Junction, and Regent’s Canals it is placed in communication with the

metropolis, although the distance is 163½ miles, as against only 100

miles by the shortest railway route. It has two similar routes to the

great port of Liverpool—the first by the Birmingham, Staffordshire

and Worcestershire, North Staffordshire, and Bridgwater Canals, and

the river Mersey; the second route by the same route as regards the

Birmingham Canal, and thence _viâ_ the Staffordshire and Worcestershire

Canal for a mile and a quarter, until the Shropshire Canal is broached,

when the route is continued over this waterway for a distance of 68

miles, until the Mersey is reached. The distance by the first of these

routes is 106½, and by the second only 89¼ miles, against 90 miles

by railway. Hull is in water communication with Birmingham by way of

the Birmingham, the Coventry, and the North Staffordshire Canals,

and thence by the open navigation of the Trent and the Humber for a

distance of 120½ miles. Finally, Birmingham has three separate water

routes to the Severn ports, all of them terminating in the Gloucester

and Berkeley section, after traversing the Severn for 30 to 44

miles—the entire distance being 86 miles in two cases, and 95 miles in

another. The nearest means of getting at the sea available at present

to the people of Birmingham is, therefore, 86 miles. But neither this

nor any of the other routes indicated are of any real value to the

Midlands, owing to the limited size of the canals, and the difficulty

of working them as an unbroken chain of communication. Thus, taking

the water route to London, the three first canals—the Birmingham, the

Warwick and Birmingham, and the Warwick and Napton—have locks only

72 feet long by 7 feet broad and 4 feet draft. On the section of the

Oxford Canal to be passed over, only 5 miles in length, there is no

lock, but on the Grand Junction Canal, which has to be traversed for

a distance of 101 miles, the locks are 14 feet by 6 feet by 4 feet 6

inches, and on the Regent’s Canal, where the transport terminates,

the locks are 90 feet by 15 feet by 5 feet. The same condition of

things applies to the physical characteristics of the waterways

between Birmingham and Liverpool. Hull might be more readily reached

if only the Trent were a little deeper, but as the average draft of

the locks on that waterway does not exceed 3 feet 6 inches, it is

clear that no vessel of large size could navigate it, and to dredge

it to a reasonable depth for the whole distance of 102 miles would

be a most serious undertaking. The most promising means of reaching

the sea are therefore those provided by the Severn route. The river

itself is available for the greater part of the distance on this route

in one case, after traversing 26 miles of canal on the Birmingham,

Stourbridge, and Staffordshire and Worcestershire systems. The average

depths of the locks on the Severn over the 44 miles that it has to be

navigated by this route is about 6 feet, while they are 99 feet long

and 20 feet wide. These dimensions would allow of the passage of really

good-sized boats, but as it is, with the broken gauge of the other

canals, no boat can pass through to the Severn loaded beyond 33 tons.

Another matter that seriously militates against the water facilities of

Birmingham is that the different canals are, of course, under different

administrations, and each authority levies tolls capriciously and

disproportionately to the distance traversed and facilities afforded.

Thus, it was given in evidence before the Canal Committee of 1883[59]

that the Birmingham Canal Company charged in respect of bricks 11¼_d._

per ton for 6¾ or 7 miles, whereas the adjoining Warwick Canal Company

charged 6½_d._ for 37¼ miles, and the Grand Junction Canal Company only

charged 1_s._ 4½_d._ for 101 miles.

At different times during the last two or three years proposals have

been put forward, having for their object to place Birmingham in direct

connection with the sea, either—

1. By a ship canal, that would enable vessels of 200 tons at

least to proceed to the Bristol Channel.

2. By a canal that would enable canal boats to navigate the

lower Trent to the North Sea; and

3. By the construction of an improved canal, between the

Midlands and London.

Each of these routes has been canvassed and considered over the last

few years; and it is probable that some really effectual steps will

be taken before long, in order to realise the long cherished and

most desirable end of giving Birmingham a satisfactory outlet to the

sea. The people of the Midlands have really been more active in this

direction than those of any other locality. But they have apparently

sought too much from the State and trusted too little to themselves.

The Birmingham Town Council, in 1888, appointed a committee, with

instructions either to get clauses introduced into the Railway Rates

Bill, then under consideration, or to introduce a separate measure with

a view to the formation of Canal Trusts, &c. In May of 1889, again, the

Midlands sent a deputation to the Board of Trade, in order to urge upon

that department, the desirability of improving the canal communication,

between the Midlands and the sea. Besides this, the traders and

manufacturers of Birmingham, have met and passed resolutions, calling

upon the Government to inquire into the canal system without delay,

with a view to its acquisition by the State. More real good would be

done if the money were subscribed, to open up a first class waterway

to the sea, as has been done, with so much spirit, by the people of

Lancashire. Whether this waterway should connect with London, with

Bristol, or with the Mersey, or whether it would be worth while to

incur the expenditure required to connect all three, is a matter that

would have to be very carefully considered.

As regards the proposal to provide an improved canal, between London

and Birmingham, it is suggested that it should have a minimum top width

of 45 feet, and a depth of 8 feet. The number of locks proposed is 90

instead of 154, but by adopting a partially new route, so as to avoid

the depression in crossing the valley of the Avon, at Warwick, the

number may be reduced to 75. The time of transit between Birmingham

and London would thereby be shortened by 12 hours, and it is estimated

that the additional facilities afforded for the passage of steam-tugged

trains of boats, would enable the cost of haulage to be reduced nearly

one-half. The carrying capacity of the improved canal has been put at

two millions of tons annually, and the cost of the improvements at

a million and a quarter. A committee of traders in the Midlands has

recently had this project under consideration.