Most septic tanks are built of concrete cast in place, since in this

way there is a minimum possibility of cracks developing. Concrete

blocks, however (not cinder blocks), stone, brick, or structural tile

are sometimes used. Prefabricated commercial tanks of concrete and

various other materials also are available.

[Illustration]

+--------------------------------------------------------------+

| SIPHON |

+--------------------------+-----------------------------------+

|_Diameter of siphon |_Clearance under bell |

| A - 3" or 4"_ | E - 2"_ |

+--------------------------+-----------------------------------+

|_Diameter of bell |_Distance across U-trap |

| B - 10"or 12"_ | F - 10" or 12"_ |

+--------------------------+-----------------------------------+

|_Bottom of outlet |_Bottom of outlet |

| to discharge line | to bottom of U-trap |

| C - 20-1/2" to 25-3/4"_| G - 12" or 13"_ |

+--------------------------+-----------------------------------+

|_Drawing depth |_Height above floor |

| D - 13" to 17"_ | H - 7-1/4"to 11-3/4"_ |

+--------------------------+-----------------------------------+

| DIMENSIONS OF DOSING CHAMBER |

+-----------------+-------------------+------------+-----------+

| _Number of |_Depth below | | |

| persons served_ | discharge line_[3]| _Width_[4] | _Length_ |

+-----------------+-------------------+------------+-----------+

| 4 or less | 16-1/4" to 20-1/4"| 3'-0" | 6'-0" |

+-----------------+-------------------+------------+-----------+

| 6 | " | 3'-0" | 7'-0" |

+-----------------+-------------------+------------+-----------+

| 8 | " | 3'-6" | 7'-6" |

+-----------------+-------------------+------------+-----------+

| 10 | " | 3'-6" | 8'-6" |

+-----------------+-------------------+------------+-----------+

| 12 | " | 4'-0" | 8'-6" |

+-----------------+-------------------+------------+-----------+

| 14 | " | 4'-0" | 9'-0" |

+-----------------+-------------------+------------+-----------+

| 16 | " | 4'-6" | 10'-0" |

+-----------------+-------------------+------------+-----------+

[3] Depending upon depth C of siphon.

[4] Same as single chamber tank fig. 4.

Figure 5.--Typical design for a concrete septic tank with a dosing

chamber and a siphon.

Masonry units should be laid in full beds of 1:3 cement mortar and

the walls and floor plastered with at least a 1/2-inch coat of 1:2

mortar. Cells of concrete blocks and tile must be filled with concrete.

Masonry walls are generally 8 inches thick, and care must be taken to

follow _inside_ dimensions given for concrete tanks. Directions for

laying structural tile, brick, and concrete blocks can be obtained from

dealers or trade associations.

Commercial tanks are suitable if they embody the essential features

given in this bulletin. Capacities should be as recommended in figure

4 for concrete tanks. Proper installation and periodic servicing also

are essential. Tanks badly damaged in handling should not be used.

Rapid corrosion of steel tanks will result if the asphalt coating is

impaired. Minor defects in precast masonry tanks may often be overcome

by plastering the interior with cement mortar.