Laying the Pipe

Begin laying the pipe at the tank with the bell end uphill. Joints in

clay-tile pipe are commonly made with portland cement mortar or grout.

Where root-proof joints are essential, sulfur-sand compounds may be

used or copper rings provided and used with cement-mortar joints.

Asphalt-mastic compounds, however, are more satisfactory. For cast-iron

soil pipe, lead is the standard joint material.

After the hub is pushed into the bell, oakum (or old hemp rope) is

packed with a calking iron or a piece of wood (fig. 3, _A_.) solidly

and evenly in the joint to a depth of about half an inch to center the

hub end in the bell and to keep the joint filler from getting inside

the pipe. Oil, grease, or dirt on the joint surfaces should be removed,

as it will prevent joint material from sticking. Figure 3 shows the

different jointing methods.

[Illustration: Figure 2.--Establishing grade for sewer. _A_,

2- by 4-inch stakes are set each side of the trench at convenient

distances _a_, _b_, _c_, and _d_. Then a board is nailed horizontally

on the stakes at _d_ at a convenient height above the bottom of the

trench, that is, the bottom of the sewer leaving the house. A board is

nailed likewise to the stakes at a the same height above the inlet to

the tank that _d_ is above the bottom of the trench. Similarly, boards

are set at _b_ and _c_ by sighting from _a_ to _d_ so the tops of the

intermediate boards will be in line. _B_, The exact grade of the sewer

is obtained by measuring from the grade cord with the 1- by 1-inch

stick, shown in detail. The length of the stick must equal the height

of the board above sewer at _d_.]

Bituminous, sulfur-sand, lead, and other commercial joint compounds are

poured while hot into the joint from a ladle (fig. 3, _F_), and when

the work is well done they form a joint that is practically root-proof.

They are more expensive than cement mortar.

For molding hot compounds, a clay dike, or funnel, built about 3 inches

high around the triangular opening at the top of the jointer greatly

aids in the rapid and complete filling of the joint space. A hot joint

must be poured continuously, otherwise a seam may develop between

successive pourings.

Bituminous compounds make a slightly elastic joint. A joint in 4-inch

pipe requires about 3/8 to 1/2 pound of compound and in 6-inch pipe

about 1 to 1-1/2 pounds.

Sulfur-sand joints are hard and inelastic. The compound is made by

mixing together equal volumes of ordinary powdered sulfur and very

fine clean sand, preferably the finest quicksand, and then heating

the mixture until the sulfur melts. A 4-inch joint takes about 3/4

pound and a 6-inch joint about 1-7/8 pounds of the mixture. Commercial

sulfur-joint compounds also are available.

[Illustration: Figure 3.--Jointing sewer pipe. _A_, Using

calking iron to force packing into joint. _B_, Making joint with 1:2

portland cement mortar. Use only enough water to dampen the mix. Recalk

after half an hour, to close shrinkage cracks. _C_, The completed

joint. Wrap finished joint with cloth and keep dampened, to aid

curing. _D_, Joint made by pouring 1:1 Portland cement grout of creamy

consistency into a form. This type of joint is not feasible unless the

metal forms shown are available. _E_, Use of asbestos runner clamped

around pipe, for pouring hot joint. _F_, Clay roll used in place of

asbestos runner. _G_, A completed bituminous joint. _H_, Use of swab,

to remove any joint material forced through to inside of pipe.]

Soft pig lead or old scrap lead is suitable for lead joints on

cast-iron pipe. About 3/4 pound per inch of pipe diameter is generally

required for each joint. The lead is hot enough to pour when it begins

to char the paddle used to skim off the impurities. When it cools it

must be calked tightly to take up shrinkage. The calking should be

uniform around the entire joint and should stop when the lead is tight.

Heavy pounding or continued calking may crack the bell of the pipe.

It is easier to get good, joints when the pipe is in a vertical

position. Therefore, two lengths of pipe are frequently joined and are

then laid as a single unit in the trench. In using terra cotta pipe,

this procedure may be followed only when the joint is made with a

mastic compound. Cement-mortar joints cannot be used in such cases.

Before filling the trench, the sewer should be tested to detect

possible leaks. Earth free from rubbish and large stones should then be

tamped around and about 1 foot above the pipe.