TEST NO. 3.

Marks on column--4-B.

Reinforcement--eight 7/8-in. round bars vertically.

Hoops--1-3/4 in. × 3/16 in. × 14 in. outside diameter.

Band spacing--13 in. vertically.

Ultimate load--900,000 lb.

Point of failure about 2 ft. from top.

Remarks.--Concrete, at failure, considerably disintegrated, probably due

to continuance of movement of machine after failure.

Some Mooted Questions in Reinforced Concrete Design American Society of Civil Engineers, Transactions, Paper No. 1169, Volume LXX, Dec. 1910 · 第 10 / 15 题