MITTENS

With Flame and No. 6 needles, cast on 51 sts. 1st ROW: K across row. 2nd

ROW: K, dec 1 st at beg of row and inc 1 st at end of row. Repeat 1st

and 2nd rows 6 times more. 15th ROW: GUSSET: K 12, inc 1 st in each of

next 2 sts, K 1, inc 1 st in next st, K 2 tog, K 33; (53 sts). 16th ROW:

Repeat 2nd row. 17th ROW: K 14, inc in each of next 2 sts, K 3, inc in

next st, K 2 tog, K 31; (55 sts). 18th ROW: Repeat 2nd row. 19th ROW: K

16, inc in each of next 2 sts, K 5, inc in next st, K 2 tog, K 29; (57

sts). 20th ROW: Repeat 2nd row. 21st ROW: K 18, inc in each of next 2

sts, K 7, inc in next st, K 2 tog, K 27; (59 sts). 22nd ROW: Repeat 2nd

row. 23rd ROW: K 20, inc in each of next 2 sts, K 9, inc in next st, K 2

tog, K 25; (61 sts). 24th ROW: Repeat 2nd row. 25th ROW: K 22, inc in

each of next 2 sts, K 11, inc in next st, K 2 tog, K 23; (63 sts). 26th

ROW: Repeat 2nd row. 27th ROW: K across 24 sts, place next 15 sts on st

holder (thumb), K across remaining 24 sts (48 sts on needle). 28th ROW:

Repeat 2nd row, cut yarn. Attach White, repeat 1st and 2nd rows

alternately for 28 rows, bind off. Place sts from st holder on needle,

attach Flame, and complete thumb as follows: Work in garter st (k each

row) for 1¾ inches more. NEXT ROW: K 2, * sl 1, K 1, p.s.s.o., K 1,

repeat from * ending K 2. NEXT ROW: K 2 tog, repeat from beg ending K 1,

cut yarn leaving a length long enough to draw through remaining sts,

fasten tightly. Sew thumb seam.

CUFF: With right side of work toward you and matching colors, pick up 20

sts on side of the 2 stripes closest to thumb gusset, work in K 1, P 1

ribbing for 1¾ inches, bind off loosely.

FINISHING: Sew side of ribbing and bound off edge to cast on edge. With

matching colors overcast top loosely, draw tightly and fasten securely.

Work other mitten in same manner but work 29 rows of Flame, cut yarn.

This extra row reverses thumb. Attach White, repeat 2nd and 1st rows

alternately for 28 rows, bind off.

Hit & Miss

Hat & Scarf

[Illustration: Hat and Scarf]

Materials Required:

AMERICAN THREAD “DAWN” KNITTING WORSTED

1—3½ oz. skein Rainbow or Autumn Sunset for Hat

3—3½ oz. skeins Rainbow or Autumn Sunset for Scarf

1 Pr. Knitting Needles No. 9 OR ANY SIZE NEEDLES WHICH WILL RESULT IN

STITCH GAUGE BELOW

GAUGE: 9 sts = 2 in.

Knitted and Crocheted Boutique · 第 21 / 36 题