APPENDIX.

[A.]

_Sketch of the Proceedings of the Troy and Greenfield Railroad

Corporation, from its organization to the surrender of the Road

under the mortgage, and the adoption of the work by the

Commonwealth._

The charter of the Troy and Greenfield Railroad, was granted in 1848,

and authorized the construction of a railroad with one or more tracks,

from a point on the Vermont and Massachusetts Railroad, at or near

Greenfield, to some point on the line of New York or Vermont, convenient

to meet or connect with any railroad that may be constructed from any

point at or near the city of Troy, on the Hudson River in the State of

New York. Its capital stock was limited at $3,500,000.

The corporation was authorized to contract with the owners of any

contiguous railroad leading into or from either of the States of Vermont

or New York, for the use of the whole or any part thereof, or for the

running and operating the two railroads conjointly, or for the leasing

of such contiguous road, or for any other road, or for the letting or

hiring of their own road to the owners of such contiguous road, or of

any other road which composes a part of the railroad line between the

cities of Boston and Troy, of which the Troy and Greenfield Railroad

shall be a part.

The first meeting under the charter was held June I, 1848, at which

subscription papers were voted to be issued and circulated, in order to

organize the corporation. In 1849, March 16, the subscribers to the

stock held their first meeting, and organized under the charter.

At the annual meeting, February 6, 1850, the stock was apportioned among

the neighboring towns as follows:-

Ashfield, 60 shares.

Charlemont, 400 "

Colrain, 150 "

Conway, 50 "

Greenfield, 700 "

Hawley, 120 "

Heath, 120 "

Leyden, 30 "

Monroe, 50 "

Rowe, 100 "

Shelburne, 400 "

Buckland, 150 "

Florida, 120 "

Adams, 1,000 "

Williamstown, 800 "

Clarksburg, 40 "

Hancock, 50 "

Deerfield, 150 "

Bernardston, 40 "

Gill, 80 "

Whitingham, 00 "

Reedsborough, 00 "

Stansford, 00 "

0,000 shares.

It was also voted to apportion the directors among the towns in the

following manner, to wit:--

North Adams, 3; Florida, Rowe, Heath and Monroe, 1; Colrain, Buckland

and Hawley, 1; Shelburne, 1; Greenfield, Deerfield and Conway, 3;

Williamstown and Whitingham, 2; Charlemont, 1; and one director at

large.

Before the annual meeting in 1850, the directors had voted to assess

three per cent. upon each share of the capital stock. This vote was

passed April 11, 1849, and on the first day of October in the same year,

they voted that the construction of the road from the State line at

Pownal, Vermont, to Adams, and from Greenfield to Shelburne Falls, be

put under contract as soon as sufficient subscription shall have been

obtained therefore, and that the two ends aforesaid shall be constructed

simultaneously.

1850, January 28, the treasurer had received the sum of $2,203.94, and

had paid out on bills approved by the president, $2,203.57, leaving a

balance in the treasury of $0.37.

Sundry assessments amounting in all to 75 per cent. upon the

subscriptions, were afterwards voted, the last on the 6th of May, 1852.

These assessments were rescinded by a vote passed July 23, 1858, and it

also voted that the several amounts heretofore paid by individual

stockholders, except on assessment laid April 11, 1849, be credited to

their several accounts on assessments now or hereafter to be made.

1850, October 28, the contract with Messrs. Gilman and Carpenter, was

ratified, and on the 29th, the president was authorized to execute it.

The Committee have not found this contract nor any record stating its

provisions.

December 27, 1850, a committee reported that the whole amount of stock

subscribed, was $250,800, of which $7,200 was payable in land damages

and materials for the road; and that Messrs. Gilmore and Carpenter had

subscribed for 500 shares of stock, to wit, $50,000.

On the 7th day of January, 1851, the directors voted to break ground the

next day, and on the 27th of May in the same year, they voted to expend

a sum not exceeding $25,000, in experiments upon the east side of the

mountain, at or near the mouth of the proposed tunnel.

In 1851, the corporation petitioned the legislature for a loan of the

State credit for two million dollars; but the application was

unsuccessful.

The failure to secure the aid of the Commonwealth, appears not to have

discouraged the corporation, for on the 7th of August, 1851, the

directors voted that they would proceed forthwith from Adams to the New

York line, and simultaneously incur all the necessary expenses to make

thorough experiments with such machines as promise to facilitate the

construction of the tunnel, and when the road is begun from Greenfield,

it shall be after an arrangement is made to construct it to the foot of

the mountain in Florida and connect in some way with the road at North

Adams.

The Troy and Greenfield Railroad Corporation having directed its

attention to a connection with the Troy and Boston Railroad Company

through a portion of the State of Vermont, and a charter having been

obtained from the legislature of Vermont, incorporating the Southern

Vermont Railroad Company, whereby such connection could be made, a

committee of the directors of the Troy and Greenfield Railroad Company

and of the Southern Vermont Railroad Company made an agreement, subject

to the modification or ratification of the stockholders of each company,

"that the stock of both of said companies and their franchises from said

Greenfield to the west line of Pownal, in the State of Vermont, shall

become and be one joint, consolidated stock and interest, with equal and

common rights and privileges to the stockholders of both companies;" it

being understood that an application shall be made to the legislature of

Vermont for a change of the name and style of the joint corporation

mentioned in the said Act of the Vermont legislature. This report was

made to the board of directors, and it was voted that the same "be

accepted and adopted, recorded and placed on file." Subsequently the

Southern Vermont Railroad was leased to the Troy and Greenfield

Corporation on a perpetual lease for $12,000 per year; and the 21st of

April, 1860, it was purchased by the Troy and Greenfield Corporation for

the sum of two hundred thousand dollars, with money advanced to the last

named corporation by the Commonwealth. In the report of the

commissioners on the Troy and Greenfield Railroad and Hoosac Tunnel, the

Southern Vermont Railroad is estimated to have cost from $110,000 to to

$125,000 only.

In 1858, another application was made to the legislature for a loan, but

with the same result as in 1851. In both instances, committees reported

in favor of the application.

In 1854, the application was renewed, and was successful. The Act was

passed on the fifth day of April, 1854. By the first section, the

treasurer was authorized to issue scrip, as certificates of debt, for

the sum of two million dollars, to be expressed in the currency of Great

Britain or in federal currency, as the directors of the Troy and

Greenfield Railroad should elect, to bear an interest of five per cent.,

payable semi-annually, and redeemable in thirty years, for the purpose

of enabling the Troy and Greenfield Company to construct a tunnel and

railroad under and through the Hoosac Mountain, in some place between

the "Great Bend" in Deerfield River, in the town of Florida, at the base

of Hoosac Mountain, on the east, and the base of the western side of the

mountain, near the east end of the village of North Adams, on the west.

The scrip was to be delivered to the treasurer of said Troy and

Greenfield Railroad Company in the manner and upon the conditions

following:--$100,000, when it should appear to the satisfaction of the

governor and council that said company had obtained subscriptions to

their capital stock in the sum of $600,000, and twenty per cent. upon

each and every share of said six: hundred thousand dollars should have

actually been paid in, and seven miles of their railroad and one

thousand lineal feet of their said tunnel under the Hoosac, in one or

more sections, of size sufficient for one or more railroad tracks,

should have been completed.

$100,000, when ten miles of their said railroad, in one or two sections,

and ten thousand lineal feet of their said tunnel, in one or more

sections, should be completed.

$100,000, when fifteen miles of their said railroad, in one or two

sections, and three thousand lineal feet of their said tunnel, in one or

more sections, should be completed.

$100,000, when twenty miles of their said railroad, in one or two

sections, and four thousand lineal feet of their said tunnel, in one or

more sections should be completed.

$100,000, when twenty-five miles of their said railroad, in one or two

sections, and five thousand lineal feet of their said tunnel, in one or

more sections, should be completed.

$100,000, when thirty miles of their railroad, in one or two sections,

and six thousand lineal feet of their tunnel, should be completed.

$100,000, when thirty-two miles of their railroad, in one or two

sections, including all the line east of Florida, and seven thousand

lineal feet of their tunnel, in one or more sections, should be

completed; and for each additional portion or portions of said tunnel of

fifteen hundred feet, in one or more sections, completed by said

company, $100,000, subject to the condition that the last $200,000

should be reserved until said company, or their successors, should open

their railroad for use from Greenfield to the line of the State in

Williamstown; and subject also to the condition, that, prior to the

second delivery of scrip, thirty per cent. of the same shall have been

paid in cash to the treasurer of the company by the stockholders

thereof, in addition to the $120,000 to be paid prior to the delivery of

any scrip; and that upon each application for scrip, in pursuance of the

law, and prior to the delivery thereof, thirty per cent. of the scrip

then applied for shall have been paid by the stockholders to the

treasurer of the company until the $600,000 subscribed for has been paid

by the stockholders.

The Act further provided, that the treasurer of the company, within

three months from the receipt of any scrip, should pay to the

commissioners of the sinking fund created by the Act, ten per cent. on

the amount of scrip so taken as a sinking fund; and after the road

should be opened for use, twenty-five thousand dollars should be

annually paid to said commissioners for the same purpose.

The Act further provided, that the said company should execute an

assignment, as a pledge or mortgage on the railroad, with its franchise

property and income, conditioned to pay the principal sum of said scrip,

or so much thereof as the sinking fund should be insufficient to pay,

and the interest, as the same became due; and that said company should

assign all the interest it then had, or might afterwards obtain, in the

Southern Vermont Railroad Company.

In 1855, the legislature authorized certain towns on the line,--to wit:

Ashfield, Buckland, Conway, Colrain, Charlemont, Deerfield, Greenfield,

Hawley, Heath, Rowe, Shelburne, Adams, Florida, and Williamstown,--to

subscribe three per cent. on their valuation, respectively, to the

capital stock. This Act was not fully complied with on the part of the

towns, and $125,000 only is reported to have been realized from that

source.

In 1855 a contract with E. W. Serrell to construct the work was reported

to and accepted by the directors. This contract does not appear among

the papers of the corporation, and its terms cannot be stated.

At the same time the capital stock of the corporation was by a vote

increased to $1,500,000, and a location designated as the east line on

the railroad near Cheapside was adopted. This singular resolution was

also passed:--

_Resolved_, That the direction of the engineering operations within the

Hoosac Tunnel after the location of the line is adopted, and plans

perfected for the same, be left with the contractor, excepting the

measurements for monthly and final estimates and the final acceptance of

the work.

1855, July 18. Mr. Serrell having proposed to subscribe the sum of

$600,000 (less the amount of the new subscription made by others,)

provided the company would make such allowances as would enable him to

dispose of the proposed issue of $900,000 of bonds advantageously, the

directors voted to add $300,000 to the contract prices of the work, and

that said $900,000 bonds as provided by the contract should be issued as

soon as authorized by the stockholders, and placed in bank by the

trustees to the credit of such persons as shall deposit against the same

cash or railroad iron equal in value to sixty-five cents on the dollar.

The said bonds to be taken by said Serrell at par and so estimated in

his contract.

At this time sixteen hundred and thirty-five shares of new stock had

been subscribed, amounting to $163,500.

The trustees alluded to in the foregoing vote were selected by a

committee appointed for the purpose, and with power to execute to them a

mortgage. They were J. V. C. Smith, Paul Adams and John G. Davis, all of

Boston. The mortgage was executed, and is known in the history of the

road as the "Smith mortgage." A resolution explanatory of this

transaction was passed August 16, 1855, in the following words:--

"_Resolved_, That, whereas by the terms of the provisions of the

resolution of July 18, 1855, by which it is provided that the bonds of

the company to be issued, are to be placed in bank, &c.; therefore, as

explanatory thereto, be it

_Resolved_, That it is not intended thereby to prevent the operation of

the contract, but that the said bonds are to be delivered to Serrell &

Co., on the warrant of the engineer, countersigned by the president and

treasurer, whenever the engineer shall draw therefore on monthly or

final estimates."

1856, February 7. The president reported to the directors that a

contract had been redrafted and concluded with Messrs. Serrell, Haupt &

Co., which was read, accepted and ratified, and the committee

discharged. This contract was probably dated January 31, 1856, but the

Committee have not been able to find it among the papers of the

corporation.

1856, May 22. The directors voted, that in case Messrs. Serrell, Haupt &

Co., would enter into an agreement to carry on the work of the Troy and

Greenfield Railroad Company, in compliance with the terms and conditions

of the loan Act, until 2,000 feet of the tunnel should be completed, the

corporation would substitute bonds instead of stock in all payments to

be made on account of work to be done to that time.

The treasurer was authorized to give the acceptance or notes of the

company, to an extent equal to the whole indebtedness of the company to

said contractors, upon which to raise money to carry on the work.

That the company would pay or allow to said contractors all discounts or

losses to which they might be required to submit, provided such

discounts or losses did not exceed the rate of 15 per cent. per annum.

That the trustees of the mortgage bonds should deliver to Mr. Herman

Haupt one hundred thousand dollars in the bonds of the company in

addition to payments due for work, said bonds to be sold or hypothecated

by him, and the proceeds applied to the work. The bonds to be charged on

account of the contract if not returned when the second payment from the

State shall have been made.

1856, July 28. H. Haupt and W. A. Galbraith notified a dissolution of

the firm of Serrell, Haupt & Co., and proposed to enter into a new

contract.

E. W. Serrell notified that Messrs. Haupt and Galbraith were authorized

to surrender the old contract.

The stock subscription of Edward W. Serrell and E. W. Serrell & Co., was

transferred to H. Haupt & Co., the latter to furnish a guarantee that

the assessments due and to become due should be paid.

E. W. Serrell resigned his office as a director in the company, and was

appointed consulting engineer. W. A. Galbraith was chosen a director.

1865, July 30. A contract was made with Herman Haupt, William A.

Galbraith, C. B. Duncan and Henry Cartwright for the construction of the

road and tunnel. The firm name of the contractors was H. Haupt & Co. By

the provisions of the contract all work done under previous contracts

with E. W. Serrell or Serrell, Haupt & Co., was to be credited to H.

Haupt & Co., and all payments under said contracts were to be charged to

H. Haupt & Co., and credited to the Troy and Greenfield Railroad. "The

road from the eastern terminus at or near Greenfield from some

convenient point on the Vermont and Massachusetts line, as the same now

is or hereafter be located," is assumed to be in all about forty-two

miles in length.

"This contract includes the graduation, tunneling, masonry and bridging,

superstructure, fencing, depot buildings, switches, turn-tables, water

and fixtures, and in fine all labor and materials necessary for the

construction of the road are included in this contract." The right of

way to be provided and paid for by the railroad company. The work to be

completed and finished in the best manner, for which the Troy and

Greenfield Railroad Company agreed to pay H. Haupt & Co., "the sum of

three millions eight hundred and eighty-three thousand dollars in manner

following, to wit: Two millions of dollars in the bonds of the State of

Massachusetts, to be issued under the Act by which the credit of the

said State is loaned to said corporation, nine hundred thousand dollars

in the six per cent. mortgage bonds of said company, five hundred and

ninety-eight thousand dollars in the capital stock of said Troy and

Greenfield Railroad Company, and three hundred and eighty-two thousand

dollars in cash." The work of constructing and completing the road was

to be done in compliance with the loan Act of April, 1854. One hundred

and fifty thousand dollars to be expended by the contractors in depot

buildings and necessary rolling stock, cars, engines, &c. under the

direction of the board of directors. The stock subscription of E. W.

Serrell and of Serrell & Co., amounting to five thousand nine hundred

and eighty-seven shares, was to be transferred and assumed by Haupt &

Co., payable in compliance with said Loan Act with the understanding

that the assessments on the stock were to be paid by the performance of

this contract in stock credits as provided in the contract, and the

stock taken by the contractors at par.

This contract further provided, that on the receipt of the several

installments of State bonds, the contractors should pay to the sinking

fund the ten per cent. specified in the Loan Act, in consideration of

which Haupt & Co. should retain whatever sums was realized from the

exchange and premium on the bonds. The payments were to be made monthly,

on estimate of the company's engineer. The cost of the materials and

work upon the line, exclusive of the Hoosac Tunnel and its approaches,

was assumed to be one million eight hundred and eighty thousand dollars,

and the estimates were to be made in the relative proportion that the

part done bore "to the whole amount of materials and work to be

furnished, and done at the price named." The Hoosac Tunnel and its

approaches were estimated at two million dollars for a double track, and

the monthly estimates were to be in proportion to the amount of work

done on the approaches, and the length of tunnel excavated.

The contract further provided, that, with the assent of both parties,

the tunnel might be constructed for a single track, in which case no

abatement was to be made for the first three thousand feet; but for the

excavation beyond that point, the sum of twelve dollars per lineal foot

was to be deducted from the contract price.

The above are the essential provisions of the contract under which H.

Haupt & Co. performed their work upon the road and tunnel until February

18, 1858, except as the same was modified and changed by votes of the

directors. The contract was reported to the board of directors, and

approved by them August 6, 1856. On the same day the directors voted to

request the trustees to recognize H. Haupt & Co. as contractors, instead

of E. W. Serrell, and to issue the bonds to said H. Haupt & Co. on the

estimate of the engineer and the order of the trustees.

They also voted to change the location of the road at the West End, in

accordance with plans marked A and B.

Under date of July 10, 1857, there appears upon the records the

following:--

A preamble, "stating that the efforts to raise money for building the

road had proved unsuccessful; that no payments had been made the

contractors for more than a year, * * * *; that the work could only be

carried on by the continued efforts * * * * and personal credit of the

contractors.

"Therefore voted, that the whole of the State bonds that may be issued

in aid of the Troy and Greenfield Railroad Company shall be exclusively

appropriated to work done, or to be done, upon the tunnel, in compliance

with the terms and conditions of the Act authorizing the loan of credit,

and with such other conditions and modifications as the legislature may,

from time to time, make and establish; but said H. Haupt & Co. shall not

be held subject to any other conditions whatever, so far as respects the

work done upon the tunnel; and any State scrip that may at any time be

delivered to the treasurer of the company, shall be promptly handed to

the contractors; the contractors, on their part, to comply with the

conditions of the present Act, and with such other conditions or

modifications as may be introduced, and to have the benefit of any

extension of time or increase of compensation by the State.

Second. Any new or additional subscription that may be obtained, shall

be applied to payment of the present contractors for work done, or to be

done, by them, and to no other object; and any subscriptions that may be

collected west of the Hoosac Mountain, shall be applied exclusively to

the completion of that portion of the road.

Third. The present subscription east of the Hoosac Mountain may be

collected and applied to the payment of other liabilities of the

corporation, and the treasurer is requested to prepare, without delay, a

full and complete list of all such liabilities.

Fourth. Any commissions for procuring or collecting subscriptions shall

be paid by H. Haupt & Co., in consideration of which, and also of the

premises, the payment of graduation, masonry, bridging, and

superstructure on the road, exclusive of the tunnel, shall be two

million dollars, with the addition of such sums as may be required for

the right of way, if this item shall be paid by the contractors. Of this

amount, nine hundred thousand dollars shall be in mortgage bonds of the

company, and the balance in cash, to as great an extent as can be

procured, the remainder in stock at par; and the directors of the Troy

and Greenfield Railroad Company shall use their best endeavors to

increase the cash subscriptions as much as possible.

If new parties be introduced, or desired by H. Haupt & Co., the contract

may be redrafted, and these conditions and changes incorporated; the

committee for this purpose shall consist of the president and Alvah

Crocker, with power to execute it finally, if not inconsistent with the

present contract, or with the changes hereby authorized. It is further

agreed and understood, that nothing herein contained shall be so

constrained as to invalidate the existing contract with said Haupt &

Co., or vary its conditions, except so far as herein expressed or

necessarily implied."

On the 18th of February, 1858, another agreement was made by Herman

Haupt and Henry Cartwright with the Troy and Greenfield Railroad

Company, and such others as might be associated with them; and who upon

signing the contract were to be considered as parties to the same; as it

bears the signatures of D. N. Carpenter, President for the Troy and

Greenfield Railroad Company, and H. Haupt & Co., by H. Haupt, and no

others, it may be presumed that Messrs. Haupt and Cartwright are the

only persons comprising the party of the first part.

This contract recites that every attempt to procure new or to collect

old subscriptions to the capital stock of the company, since the

execution of the former contract with H. Haupt & Co., have proved

unsuccessful; that the contractors had prosecuted the work for more than

two years without any payment having been made to them as required by

existing contract; that there appeared no possibility of procuring means

for the further prosecution of the work, except by the continued

efforts, increased expenditures, and personal credit of the contractors

themselves; and that H. Haupt & Co. propose to release the Troy and

Greenfield Railroad Company from the cash payments required by the

contract, and to assume themselves the labor of procuring and collecting

subscriptions, and of carrying on and completing the Troy and Greenfield

Railroad and Hoosac Tunnel in such manner as will comply with all the

conditions of the Loan Act. The parties therefore agreed.

That H. Haupt & Co. should comply with all the conditions of the Act,

approved April 5th, 1854, whereby a loan of credit was given by the

State of Massachusetts in aid of the construction of the Hoosac Tunnel,

and should have the benefit of any changes that may hereafter be

obtained, or extensions of time that may be granted; but they shall be

subject to no other conditions or restrictions other than those

expressed in this contract.

That the road shall be so constructed that its gradients should not

exceed those in each direction which exist or may hereafter exist

permanently on other portions of the line between Troy and Boston; that

sharper curves than were in ordinary use in other parts of the line were

to be changed at the expense of the contractors, and trestle work or

temporary bridging was to be replaced by permanent structures at the

expense of the contractors as soon as practicable after the completion

and opening of the whole line.

That H. Haupt & Co. should have the benefit of all existing

subscriptions, and of all they might procure; also of any revenue that

might arise from the use of the road, or any portion of it when

completed, until their claims on the company were discharged and paid;

and to secure this end, the payment of all other debts of the

corporation was to be deferred until that of the contractors was

satisfied. The real estate of the corporation not required for the

purposes and use of the road, was to be sold or applied to meet present

liabilities of the company; and Haupt & Co. were to maintain the

organization of the corporation and pay its necessary printing expenses,

by paying to the treasurer annually a sum not less than five hundred

dollars.

The State bonds were to be appropriated exclusively to the construction

of the tunnel. The State scrip delivered to the treasurer of the company

was to be promptly handed to the contractors.

The compensation to be allowed to H. Haupt & Co. was to be as provided

in the resolutions of the directors, passed July 10, 1857.

The payment for graduation, bridging, masonry, and superstructure on the

road, exclusive of the tunnel, was fixed at two million dollars,

exclusive of any payments that might be made for the right of way. Of

this amount, nine hundred thousand dollars was to be paid in mortgage

bonds of the company; the balance in cash, to as great an extent as cash

subscriptions could be secured; the remainder in stock at par.

The bonds and stock of the company to be issued to H. Haupt & Co. when

required, to an amount equal to the work done, estimating it by the

proportion it bore to the whole amount performed and to be performed.

H. Haupt & Co. were authorized to collect subscriptions to the capital

stock of the company, and their receipt for money was to be accepted by

the company as evidence of payment. By the execution of this agreement

all former contracts between the same parties were agreed to be annulled

and cancelled.

H. Haupt & Co. was recognized as the firm name under which the parties

of the first part were associated, and then to be conducted. Copies of

this and the preceding contract will be found printed verbatim in a

report of a committee of the House of Representatives in 1860, of which

Mr. Kimball, of Boston, was chairman. It was reprinted in 1861, and is

House document No. 406, of last year; and it may be profitably consulted

for other valuable information touching the doings of the Troy and

Greenfield Corporation and the contractors therewith.

1858, May 25, the directors assented that the iron delivered by the

Rensselaer Iron Company for the road should remain the property of the

iron company until the same was paid for, in accordance with an

agreement of H. Haupt & Co. with the iron company.

From a report of a committee of the directors made to the board July 23,

1858, it appears that at the date of the report, seven thousand four

hundred and fifteen, shares were subscribed for unconditionally by

parties who appeared to have been solvent at the time of subscribing.

That three thousand four hundred and fifty shares had been subscribed

for conditionally, or, by parties who were not solvent, or whose

subscriptions could not be collected.

That of the conditional subscriptions, the greater part had been or

would be complied with; of these nine hundred and thirty-nine were

subscribed by the towns not included in the published lists.

Upon two thousand four hundred and thirty shares of the unconditional

subscriptions, including those of Gilmore and Carpenter, twenty per

cent. only had been paid.

That upon six thousand five hundred and nine shares, subscribed for

unconditionally, twenty per cent. or more had been paid in cash.

At this date it appears that the whole number of shares subscribed for

conditionally and unconditionally, was ten thousand eight hundred and

sixty-five.

At this meeting of the board the clerk was directed to place upon the

record the names of all the stockholders, with the number of shares held

by each, on which twenty per cent. or more had been paid. The record

shows the number of shares to be six thousand six hundred and

forty-eight, and the amount paid on the same two hundred and sixty-seven

thousand five hundred and sixty-nine dollars. Against the name of H.

Haupt & Co. was set the number of five thousand shares. At this meeting

the directors also voted to fix the capital stock at one million five

hundred thousand dollars.

1858, September 3. The last vote was reconsidered, and it was voted that

the capital stock be fixed at [Note: amount missing] as represented by

the list of stock reported at the previous meeting.

The directors also voted as they had previously done, to rescind all the

assessments heretofore voted, except the assessment of three per cent.

laid April 11, 1849, and then voted an assessment of ten per cent. upon

each and every share in the capital stock of the company, payable in

thirty days. Between this date and September 14, 1859, nine other

assessments were voted, the whole amounting to eighty-eight per cent. of

the par value of the stock.

By another entry upon the records, under date of November 3, 1858, it

appears that Williamstown and Adams subscribed to the capital stock of

the Troy and Greenfield Railroad, ninety-three thousand dollars, upon

condition that the payment should be made in town scrip, maturing in

thirty years, and to be issued whim the road was completed between Adams

and Troy; half the interest on the scrip to be paid by the Troy and

Boston Railroad Company. Mortgage bonds of the Troy and Greenfield

Railroad Company, in amount equal to said subscription, were to be

deposited in the Adams Bank as security against loss of stock from such

a contingency as a sale of the road by the _bona fide_ holders.

Immediately following this entry upon the records are recorded these

votes:--

_Voted_, To accept the subscription on the condition stated, that the

contract with the Troy and Boston Railroad Company be altered to allow

said company to pay the interest on the scrip directly to the treasurers

of the towns; that bonds to the amount of ninety-three thousand dollars

be prepared ready for delivery, and that Mr. Haupt and the treasurer be

a committee to carry this vote into effect, as also any change of

contract with the Troy and Boston Railroad Company.

_Voted_, That the trustees of the mortgage bonds of this corporation be,

and hereby are, requested to deliver to Mr. H. Haupt and the treasurer,

ninety-three bonds of one thousand dollars each, to be deposited by them

in the Adams Bank, in compliance with the conditions and requirements of

the votes of towns of Adams and Williamstown, &c., &c.; sixty bonds to

be appropriated as security for Adams, and thirty-three for

Williamstown.

Report of the Hoosac Tunnel and Troy and Greenfield Railroad, by the Joint Standing Committee of 1866. · 第 40 / 51 题