It is a curious fact that the battery did not receive an off

Produced by Colin Bell, Louise Pattison, Joseph Cooper and

the Online Distributed Proofreading Team at

http://www.pgdp.net

[Transcriber's Notes:

This is Paper 39 from the Smithsonian Institution United States National

Museum Bulletin 240, comprising Papers 34-44, which will also be

available as a complete e-book.

The front material, introduction and relevant index entries from the

Bulletin are included in each single-paper e-book.

Note that several Figures in this paper consist of two images separated

from each other in the original layout, with separate labels. These

separate labels are preserved in this text only version.

Typographical errors have been corrected as follows:

P152: "the _Simon & Jude_, later called _Invention I_" (was "latter").

P159: "Its importance is that it..." (was "is that is").

Index: "Emmet, ----, 144" (was Emmett).]

SMITHSONIAN INSTITUTION

UNITED STATES NATIONAL MUSEUM

BULLETIN 240

[Illustration]

SMITHSONIAN PRESS

MUSEUM OF HISTORY AND TECHNOLOGY

CONTRIBUTIONS

FROM THE

MUSEUM

OF HISTORY AND

TECHNOLOGY

_Papers 34-44_

_On Science and Technology_

SMITHSONIAN INSTITUTION . WASHINGTON, D.C. 1966

_Publications of the United States National Museum_

The scholarly and scientific publications of the United States National

Museum include two series, _Proceedings of the United States National

Museum_ and _United States National Museum Bulletin_.

In these series, the Museum publishes original articles and monographs

dealing with the collections and work of its constituent museums--The

Museum of Natural History and the Museum of History and

Technology--setting forth newly acquired facts in the fields of

anthropology, biology, history, geology, and technology. Copies of each

publication are distributed to libraries, to cultural and scientific

organizations, and to specialists and others interested in the different

subjects.

The _Proceedings_, begun in 1878, are intended for the publication, in

separate form, of shorter papers from the Museum of Natural History.

These are gathered in volumes, octavo in size, with the publication date

of each paper recorded in the table of contents of the volume.

In the _Bulletin_ series, the first of which was issued in 1875, appear

longer, separate publications consisting of monographs (occasionally in

several parts) and volumes in which are collected works on related

subjects. _Bulletins_ are either octavo or quarto in size, depending on

the needs of the presentation. Since 1902 papers relating to the

botanical collections of the Museum of Natural History have been

published in the _Bulletin_ series under the heading _Contributions from

the United States National Herbarium_, and since 1959, in _Bulletins_

titled "Contributions from the Museum of History and Technology," have

been gathered shorter papers relating to the collections and research of

that Museum.

The present collection of Contributions, Papers 34-44, comprises

Bulletin 240. Each of these papers has been previously published in

separate form. The year of publication is shown on the last page of each

paper.

FRANK A. TAYLOR

_Director, United States National Museum_

CONTRIBUTIONS FROM

THE MUSEUM OF HISTORY AND TECHNOLOGY:

PAPER 39

FULTON'S "STEAM BATTERY":

BLOCKSHIP AND CATAMARAN

_Howard I. Chapelle_

SURVIVING DESIGNS FOR FLOATING BATTERIES 145

CONTROVERSIAL DESCRIPTIONS 147

COPENHAGEN PLANS 150

HISTORY OF DOUBLE-HULL CRAFT 152

SAIL AND INBOARD PLANS 157

RECONSTRUCTING THE PLANS 161

APPENDIX 167

[FOOTNOTES]

[INDEX]

[Illustration: Figure 1.--SCALE MODEL of Fulton's _Steam Battery_ in

the Museum of History and Technology. (Smithsonian photo P-63390-F.)]

_Howard I. Chapelle_

FULTON'S "STEAM BATTERY": BLOCKSHIP and CATAMARAN

_Robert Fulton's "Steam Battery," a catamaran-type blockship, was built

during the War of 1812. Until recently, not enough material has been

available to permit a reasonably accurate reconstruction of what is

generally acknowledged to be the first steam man-of-war._

_With the discovery, in the Danish Royal Archives at Copenhagen, of

plans of this vessel, it is now possible to prepare a reconstruction and

to build a model._

_This article summarizes the history of the vessel, describes the plans

and the reconstruction, and also evaluates its design with particular

attention to the double-hull construction._

THE AUTHOR: _Howard I. Chapelle is curator of transportation in the

Smithsonian Institution's Museum of History and Technology._

The identity of the first steam man-of-war has been known for many

years, and a great deal has been written and published on the history of

this American vessel. Until recently, the only available drawing of the

ship has been a patent drawing made for Robert Fulton. This does not

comply with contemporary descriptions of the steamer and the drawing or

plan is out of proportion with the known dimensions. The lack of plans

has heretofore made it impossible to illustrate the vessel with any

degree of precision, or to build a scale model.

The discovery in 1960 of some of the plans of this historic ship in the

Danish Royal Archives at Copenhagen now makes possible a reasonably

accurate reconstruction of the vessel and also clarifies some of the

incomplete and often confusing descriptions by contemporary writers.

Of the numerous published accounts of the ship that are available, the

most complete is David B. Tyler's "Fulton's Steam Frigate."[1] A

contemporary description of the vessel by the British Minister to

Washington, 1820-23, Stratford Canning, was published by Arthur J.

May.[2] In _Naval and Mail Steamers of the United States_, by Charles B.

Stuart,[3] and _The Steam Navy of the United States_, by Frank M.

Bennett,[4] the history of the ship and some descriptive facts are

given. Stuart, in an appendix, gives in full the report of the

Supervisory Committee (set up to administer the building contract).

Tyler and Stuart, and the Committee Report are the principal sources

from which the following summary of the ship's history is drawn.

[Text of Illustration: Plate N^o. 1.

"DEMOLOGOS"

Figure 1^st. _Transverse section A her Boiler. B the steam Engine. C the

water wheel. E E her wooden walls 5 feet thick, diminishing to below the

waterline as at F.F draught of water 9 feet D D her gun deck_

_Scale 1/12 inch=1 foot_

Waterline

_Scale 1/24 inch=1 foot_

Figure II^d. _This shews her gun deck, 140 feet long 24 feet wide,

mounting 20 guns. A the Water wheel_

Figure III^d

_Side View_

_Scale 1/24 inch=1 foot_

ROBERT FULTON

_November 1813._

_S M^c Elroy del._

_"Stuart's Naval & Mail Steamers U.S."_

_Sarony & Major. Eng. N.Y._]

[Illustration: Figure 2.--"DEMOLOGOS," A WOOD ENGRAVING based on the

sketch which Robert Fulton showed to President Madison in 1813. This

wood engraving appears as plate 1 in Charles B. Stuart's _Naval and Mail

Steamers of the United States_, and illustrates the section on Naval

Steamers, from which the account "The Demologos; or, Fulton the First,"

is here reproduced (pp. 167-171). Stuart obtained the sketch, assumed to

have been made for Fulton's patent on the design of the _Steam Battery_,

from the files of the U.S. Navy Department.]

On December 24, 1813, Robert Fulton invited a group of

friends--prominent merchants, professional men and naval officers--to

his home in New York City and there presented a proposal for a project

of great local interest. At that time the War of 1812 was in its second

year and the economic effect of the British naval blockade was being

felt severely. The blockade cut off seaborne trade and posed a constant

threat of attack upon New York and other important ports, particularly

Baltimore. To defend the ports, it had been proposed to build mobile

floating batteries or heavily built and armed hulks with small sailing

rigs, but the high cost of these and their doubtful value in helping to

break the blockade, compared to the value and action of a very heavy,

large frigate, or a 74-gun ship, caused authorities to hesitate to

proceed with the construction of any blockships or floating batteries.

Fulton's proposal concerned a floating battery propelled by steam

power. He believed that steam propulsion not only would give it

effective maneuverability with no loss of gunpower, but also would allow

a successful attack upon the Royal Navy blockading ships during periods

of protracted calm, when sailing men-of-war were nearly helpless. The

blockaders then could be attacked and picked off, one by one, by the

heavily armed steamboat.

Among those present at the meeting was Major General Henry Dearborn, a

leading citizen and soldier who was later to become noted in American

political history. The first step taken during this meeting was the

founding of the Coast and Harbor Defense Company with Dearborn as

president, Fulton as engineer, and Thomas Morris as secretary. Next, a

committee was established to raise funds from Federal, State, and New

York City governments as well as from individual contributors to build

the battery. The members of this committee consisted of General

Dearborn, Commodore Stephen Decatur, U.S.N.; General Morgan Lewis;

Commodore Jacob Jones; U.S.N.; Noah Brown, shipbuilder; Samuel L.

Mitchill; Henry Rutgers; and Thomas Morris.

The committee proved cumbersome and was reduced to General Lewis, Issac

Bronson, Henry Rutgers, Nathan Sanford, Thomas Morris, Oliver Wolcott,

and John Jacob Astor. Known as the Coast Defense Society and with the

name of _Pyremon_ given the ship in prospectus, they attempted,

unsuccessfully, to raise funds privately.

The estimated sums to build a battery 130 feet long, with a 50-foot

beam, capable of a speed of 5 mph, and carrying 24 long guns (18-pdr.),

was $110,000. Fulton, still the chief engineer, in an effort to interest

the Federal Government, built a model of the proposed vessel and

submitted it to some prominent naval officers--Commodore Stephen

Decatur, Jacob Jones, James Biddle, Samuel Evans, Oliver Perry, Samuel

Warrington, and Jacob Lewis. All gave their support to the Society in a

written statement and this recommendation proved helpful to the project

in Congress and in the Navy Department. In the process of passing a bill

which went to the Senate Naval Affairs Committee calling for $250,000

for the construction of the floating battery, the sum was raised to

$1,500,000 for the construction of "one or more" floating batteries and

passed on March 9, 1814.

To supervise the start of construction, the Coast Defense Society

appointed a committee consisting of Dearborn, Wolcott, Morris, Mitchill,

and Rutgers, with Fulton as engineer, and a model and drawing of the

proposed vessel was submitted to the Patent Office. The Secretary of the

Navy, although supporting the project, delayed action until he had

weighed the importance of the batteries in relation to other war needs,

for at this time the naval shipbuilding program on the Great Lakes was

considered of prime importance. He also raised some technical questions

concerning the design of the batteries, which Fulton answered with a

description of the vessel as 138 feet on deck, 120 feet on the keel, 55

feet beam (each hull to have a 20-foot beam and the "race" between to be

15 feet wide), draft 8 or 9 feet loaded, and the intended speed was to

be 4-1/2 to 5 mph. The ship was to carry 24 long guns (32-pdr.), the

engine was to be 130 hp, and the total cost, $200,000. In his letters to

the Secretary of the Navy, Fulton stated that Adam and Noah Brown would

build the hull for $69,800 and that he would build the engine, machinery

and boilers for $78,000, a total of $147,800. He intended to have the

boilers, valves, fastenings, and air pumps of brass or copper, which

would raise the machinery costs 59 percent above that of stationary

engines and boilers then in use.

On May 23, 1814, the Secretary of the Navy authorized the Coast Defense

Society and its committee to act as Navy agents and to enter into the

contracts required to build a vessel, and to draw on the Navy

storekeepers or Navy Yard commandants for such stores or articles on

hand needed for construction. The contracts were prepared and the

committee now was officially empowered to act for the Society, with

Rutgers, Wolcott, Morris, Dearborn, Mitchill, and Fulton. On June 4,

Dearborn asked the Navy Department for $25,000 advance, for work had

started. On the 6th, he informed the Secretary that he had been ordered

to assume command of the defenses of Boston and that Rutgers had been

appointed chairman of the construction committee in his place.

It is apparent that the Navy Department was pressed for funds, due to

the very extensive shipbuilding programs on Lakes Erie, Ontario, and

Champlain in addition to the seagoing vessels being built in some of the

coastal ports. This was certainly one cause for the Secretary of the

Navy's reluctance to carry out the requirements of the bill passed by

Congress immediately after its signature and, also, this reluctance

caused the supervisory committee much embarrassment in its

administration of the contract.

Another factor which caused difficulty in the administration of the

contract was the position of Adam and Noah Brown. The brothers were

deeply involved in the shipbuilding program on the Lakes, in which they

were associated at times with Henry Eckford. The Browns constructed a

blockhouse, shops, and quarters at Erie; in addition to Perry's two

brigs and five of his schooners, they also built some of the Lake

Ontario vessels and, later, the _Saratoga_ on Lake Champlain. In their

New York yard, whose operation continued throughout the war, they built

some large letter-of-marques: the _General Armstrong_, _Prince de

Neufchatel_, _Zebra_, _Paul Jones_, and some smaller vessels. They also

cut down the 2-decked, merchant ship _China_ into a single flush-deck

letter-of-marque, renamed _Yorktown_; and they had a contract to build

the sloop-of-war _Peacock_. It is remarkable that the Browns could

undertake and complete so much work between 1813 and 1815 and still be

able to build the steam battery in a very short time.

With the contracts in order, the Browns began building. The keels of the

battery were laid June 20, 1814. It is apparent that the Browns prepared

the original hull plans, undoubtedly before the building authority was

obtained. The vessel required only about four months to build; she was

launched October 29, 1814, at 9 a.m. This was an excellent performance,

considering the size of the vessel, the amount of timber required and

handled in her massive construction, and the other work being done by

the builders. During the ship's construction, sightseers were a nuisance

and finally guards had to be obtained. During the building of the steam

battery, work had to be practically stopped on the sloop-of-war

_Peacock_ at one period after she had been partially planked.

There were difficulties in obtaining metalwork for the vessel during her

construction, due to the blockade and the demand for such material for

other shipbuilding at New York. On November 21, 1814, the ship was towed

from the Browns' yard on the East River by Fulton's _Car of Neptune_ and

_Fulton_, each lashed to the sides of the battery, and taken to Fulton's

works on the North River. There Fulton supervised in person the

completion of the vessel and construction of her machinery. Undoubtedly

only a little of his time was required in inspection of the Browns' work

on the battery, for the shipbuilders had been closely associated with

Fulton throughout the life of the project and were fully capable as ship

designers. The work on the machinery was another matter, however, for

men capable of working metal were scarce and few workmen could read

plans. Fulton had some of the work done outside of his own plant,

particularly the brass and copper work (mostly by John Youle's foundry).

As a result, Fulton was required to move from plant to plant, keeping

each job under almost constant observation and personally supervising

the workmen. The equipment then available for building a large engine

was inadequate in many ways. The large steam cylinder presented a

problem: it had to be recast several times and some of the other parts

gave trouble, either in casting or in machining and fitting.

[Illustration: Figure 3.--SCALE MODEL of _Steam Battery_, showing double

hull, in the Museum of History and Technology. (Smithsonian photo

P-63390-D.)]

Guns for the battery were another problem. Only 3 long guns (32-pdr.),

were available at the Navy Yard. The Secretary of the Navy promised some

captured guns then at Philadelphia. Because of the blockade, these had

to come overland to New York. The captured guns thus obtained were

probably English, part of the cargo of the British ship _John of

Lancaster_ captured by the frigate _President_ early in the war.

Apparently 24 guns were obtained this way; only 2 were obtained from the

Navy Yard. In July the Supervising Committee carried out some

experimental damage studies, in which a 32-pdr. was fired at a target

representing a section of the topsides of the battery. Drawings of the

result were sent to the Secretary of the Navy.

Further problems arose over the delays of the government in making

payments: the banks discounted the Treasury notes, so the Committee

members had to advance $5,000 out of their own pockets. There was fear

that British agents might damage the vessel, and although the project

was undoubtedly known to the British, no evidence of any act of sabotage

was ever found. Captain David Porter was assigned to the command of the

battery in November, and it was upon his request that the vessel was

later rigged with sails.

With the _Steam Battery_ approaching completion, the Secretary of the

Navy became more enthusiastic and the construction of other batteries of

this type was again proposed. Captain Stiles, a Baltimore merchant,

offered to build a steam battery, the hull to cost $50,000; the entire

cost of the vessel, $150,000, was raised in Baltimore and the frames of

a battery erected. Another battery was projected at Philadelphia and the

Secretary of the Navy wanted one or more built at Sackett's Harbor, but

naval officers and Fulton objected. A bill put before Congress to

authorize another half million to build steam batteries passed the first

reading January 9, 1815, went to the House February 22, 1815, but the

end of the war prevented any further action on it.

On February 24, 1815, Fulton died. He had been to Trenton, New Jersey,

to attend a hearing on the steamboat monopoly and, on the way back, the

ferry on North River was caught in the ice. Fulton and his lawyer,

Emmet, had to walk over the ice to get ashore. On the way, Emmet fell

through and Fulton got wet and chilled while helping him. After two or

three days in bed Fulton went to his foundry to inspect the battery's

machinery causing a relapse from which he died. This resulted in some

delay in completing the machinery and stopped work on the _Mute_, an

80-foot, manually propelled, torpedo boat that Fulton was having built

in the Browns' yard.

It was decided to suspend work on the Baltimore battery after an

expenditure of $61,500, but the New York battery was to be completed to

prove the project was practical. The final payment of $50,000 was made

four months after it was requested.

Charles Stoudinger, Fulton's foreman or superintendent, was able to

complete and install the ship's machinery. On June 10, 1815, the vessel

was given a short trial run in the harbor with Stoudinger and the Navy

inspector, Captain Smith, on board. This trial revealed the need of some

mechanical alterations; sails were not used, and it was found she could

stem the strong tide and a fresh headwind. The vessel also was visited

by the officers of French men-of-war at anchor in the harbor.

On July 4, 1815, she was given another trial. She left Fulton's works at

Corlear's Hook at 9 a.m., ran out to Sandy Hook Lighthouse, bore west

and returned, a total of 53 miles under steam, reaching her slip at 5:20

p.m. She was found to steer "like a pilot boat." This prolonged trial

revealed that the stokehold was not sufficiently ventilated and more

deck openings were required. The windsails used in existing hatches were

inadequate. The paddle wheel was too low and had to be raised 18 inches,

and there were still some desirable modifications to be made in the

machinery.

On September 11, 1815, she was again given a trial run. All alterations

had been made, including the addition of hatches and raising the paddle

wheel, and her battery was on board with all stores, supplies, and

equipment. She had 26 long guns (32-pdr.), mounted on pivoted carriages,

and now drew 10 feet 4 inches. On this day she left her slip at 8:38

a.m. and went through the Narrows into the Lower Bay, where she

maneuvered around the new frigate _Java_ at anchor there. The battery

then was given a thorough trial under steam and sail and, with the ship

underway, her guns were fired to see if concussion would damage the

machinery. The vessel was found to be a practical one, capable of

meeting the government's requirements in all respects; her speed was

5-1/2 knots. However, the stokehold temperature had reached 116 deg.

Fahrenheit! She returned to her slip at 7:00 p.m.

On December 28, 1815, the Committee in a written report to the

Secretary of the Navy,[5] gave a description of the vessel and praised

her performance. At this time a set of plans was made by "Mr. Morgan,"

of whom no other reference has appeared, and sent to the Navy

Department. These cannot now be found. The Committee recommended the

battery be commissioned and used for training purposes. This suggestion

was not followed.

The ship remained in her slip during the winter, and in June 1816 she

was turned over to the Navy and delivered to Captain Samuel Evans,

commandant of the New York Navy Yard. Captain Joseph Bainbridge was

assigned to her command. However, she was not commissioned and soon

after her delivery she was housed over and placed "in ordinary," that

is, laid up. The final settlement showed that the Committee, as Navy

agents, had paid out $286,162.12 with $872.00 unpaid, as well as a claim

for $3,364.00 by Adam and Noah Brown, making a total of $290,398.12.

The following year, on June 18, 1817, she was unroofed and put into

service with a small crew. With President James Monroe on board, she

left the Navy Yard about noon for a short trip to the Narrows and then

to Staten Island and returned in the evening. The next day she was again

placed "in ordinary."

Four years later, in 1821, when her guns and machinery were removed, it

was found that she was rapidly becoming rotten. She was then utilized as

a receiving ship. At 2:30 p.m. on June 4, 1829, she blew up, killing 24

men and 1 woman, with 19 persons listed as injured. Among those killed

was one officer, Lt. S. M. Brackenridge. Two lieutenants and a Sailing

Master were hurt, four midshipmen were severely injured, and five

persons were listed as missing. The explosion of 2-1/2 barrels of

condemned gunpowder was sufficient, due to her rotten condition, to

destroy the ship completely. A Court of Inquiry blamed a 60-year-old

gunner, who supposedly entered a magazine with a candle to get powder

for the evening gun. It was stated to the court that about 300 pounds of

powder in casks and in cartridges was on board the ship at the time.[3]

She was not replaced until the coast-defense steamer _Fulton_ was built

in 1837-38, though in 1822 the Navy purchased for $16,000 a "steam

galliot" of 100 tons, the _Sea Gull_, to be used as a dispatch boat for

the West Indian squadron engaged in suppressing piracy during 1823. In

1825 she was laid up at Philadelphia, and in 1840 she was sold for

$4,750.

It is a curious fact that the battery did not receive an official name,

as did the sailing blockship on the ways at New Orleans, which at the

end of the War of 1812 was officially listed as the _Tchifonta_. Nor was

the battery given a number, as were the gunboats. In official

correspondence and lists, the steam battery is referred to as the

"Fulton Steam Frigate," or as the "Steam Battery," but in later years

she was referred to as the "Fulton" or "Fulton the First." Perhaps the

explanation is that as she was the only one of her kind she was not

numbered, and as she was not considered fit for coastal or extended

ocean voyages, she was not given a name.

Surviving Designs for Floating Batteries

The designs of American blockships that have survived are those of the

_Tchifonta_,[6] 145 feet long, 43-foot moulded beam, 8-foot 6-inch depth

in hold, and about 152 feet 9 inches on deck. She was to carry a battery

of 22 long guns (32-pdr.), on the main deck 12 carronades (42-pdr.), on

forecastle and quarter decks. She was to have been rigged to rather

lofty and very square topgallant sails, and would have been capable of

sailing fairly well, though of rather shoal draft, drawing only about 8

feet 6 inches when ready for service. She was sold on the stocks at the

end of the war and her later history is not known.

Another and earlier design for a blockship, or floating battery, was

prepared by Christian Bergh for Captain Charles Stewart in 1806. This

was a sailing vessel for the defense of the port of New York, planned to

mount 40 guns (32-pdr.), on her two lower decks and 14 carronades

(42-pdr.), on her spar deck. She was to be 103 feet 6 inches between

perpendiculars, a 44-foot moulded beam, 10-foot depth of hold, and

drawing about 9 feet when ready for service. She was intended to be

ship-rigged, but was never built.[7] A few small sloop-rigged block

vessels also were built during Jefferson's administration. The

sloop-of-war _Saratoga_, built on Lake Champlain by the Browns, in 1813,

was practically a blockship. A plan for a proposed "Guard Ship," or

"Floating Battery," was made by James Marsh at Charleston, South

Carolina, in 1814. This was an unrigged battery, 200 feet extreme

length, 50-foot moulded beam, 9-foot depth of hold, to mount 32 guns

(42-pdr.), on a flush deck, with a covering deck above.[8]

[Illustration: Figure 4.--DESIGN FOR AN UNRIGGED FLOATING BATTERY

proposed by James Marsh, Charleston, South Carolina, March 14, 1814.]

Through the courtesy of the trustees of the National Maritime Museum,

Greenwich, England, the Rigsarkivet, Copenhagen, Denmark, and the

Statens Sjoehistoriska Museum, Stockholm, Sweden, the author has been

able to illustrate in this article the designs of some of the early

floating batteries.

In the last quarter of the 18th century and later, the Danes had built

sail-propelled floating batteries or blockships, which were employed in

the defense of Copenhagen. The British built at least one sail-propelled

battery, the _Spanker_, in 1794. This was a scow of very angular form

with overhanging gun-deck, bomb-ketch-rigged, and about 120 feet overall

42-foot 4 inches moulded beam and 8-foot depth of hold. She is said to

have been a failure due to her unseaworthy proportions and form; the

overhanging gun deck and sides were objected to in particular. She is

called a "Stationary Battery" in her plans, which are in the Admiralty

Collection of Draughts, National Maritime Museum, Greenwich.

Controversial Descriptions

The contemporary descriptions of the Fulton _Steam Battery_ do not

agree. This was in part due to differences between the dimensions given

out by Fulton during the negotiations with the Federal Government, and

after the ship's construction was authorized. From the context of

various statements concerning the projected vessel, such as that of the

naval officers, the changes in the intended dimensions of the ship can

be seen. For example, the officers state the model and plan shown them

would produce a battery carrying 24 guns (24- and 32-pdrs.), and a letter

from Fulton to Jones,[9] shows she was to be 138 feet on deck and

55-foot beam. The final reported dimensions, given by the Supervisory

Committee,[10] are 156 feet length, 56 feet beam, and 20 feet depth.

In addition there are a few foreign accounts which give dimensions and

descriptions. The most complete was probably that of Jean Baptiste

Marestier, a French naval constructor who visited the United States soon

after the end of the War of 1812 and published a report on American

steamboats in 1824.[11] The _Steam Battery_ is barely mentioned though a

drawing of one of her boilers is given. Marestier made another report on

the American Navy, however. Extensive searches have been made for this

in Paris over the last 14 years, but this paper has not been found in

any of the French archives. References to the original text indicate

that the naval report dealt very extensively with the _Steam Battery_.

Some of his comments on the battery appeared in _Proces-verbaux des

Seances de l'Academie des Sciences_.[12] Marestier considered the powers

of the battery to have been overrated due to fanciful accounts of some

laymen writers. He was aware of the shortcomings of the double hull in a

steam vessel at the then-possible speeds, but he apparently thought two

engines, one in each hull and each with its boilers would be better than

Fulton's arrangement of boilers in one hull and engine in the other. He

noted that the paddle wheel turned 16-18 rpm and that steam pressure

sustained a column of mercury 25 to 35 centimeters. The safety valve was

set at 50 centimeters. Fuel consumption was 3-5/8 cords of pine wood per

hour.

In view of the access Marestier is known to have had to American naval

constructors, shipbuilders, and engineers, it is highly probable that he

not only obtained the building plan of the ship but also some of the

earlier project plans from the builders and from Fulton's

superintendent, Stoudinger. It is, therefore, a great misfortune that

his lengthy report on the _Battery_ cannot be produced.

A French naval officer who investigated the ship, M. Montgery, also

wrote a description, published in "Notice sur la Vie et les Travaux de

Robert Fulton."[13]

[Illustration: Figure 5.--FLOATING BATTERY _Spanker_ built, in England

by William Barnard, at Deptford on the Thames, and launched June 14,

1794. Rigged as a bomb ketch, its length is 111 feet 7 inches in the

keel, extreme beam 42 feet 4 inches, depth of hold 8 feet. Upper deck

plan also shown.]

It should be noted in regard to what Montgery wrote about the

_Battery_, that in 1821 it had been considered desirable to disarm the

ship. The engineer in charge, William Purcell, had reported that as

there were not proper scuppers, dirt and water had entered the hull and

had collected under the engine and boilers, causing damage to the hull,

and also that with guns removed, the _Battery_ would float too high for

the paddle wheel to propel the vessel; so it had been decided to remove

all machinery as well as the armament.

Montgery's description, published in 1822, was taken from his report to

the Minister of Marine and Colonies. It noted the battery was made of

two hulls separated by a channel, or "race," 15-1/2 feet wide, running

the full length of the vessel. The two hulls were joined by a deck just

above the waterline, as well as by an upper deck, and also connected at

their keels by means of 12 oak beams each 1 foot square. The vessel was

152 feet long, 57 feet beam, and 20 feet deep. Sides were 4 feet 10

inches thick, and the ends of the hull were rounded and alike. There

were two rudders at each end, one on each hull, alongside the race. The

eight paddle blades, each 14-1/2 feet by 3 feet, turned in either

direction by stopping the engine piston at half-stroke and reversing the

flow of steam. Rigged with two lateen sails and two jibs, the ship

sailed either end first. The engine of 120 hp was in one hull and two

boilers were in the other. Other sources, Marestier, and Colden in

_Proces-verbaux des Seances de l'Academie des Sciences_,[14] gave

additional information (some of it incorrect): the engine was inclined,

with a 4-foot-diameter cylinder, 5-foot stroke, direct-connected to the

paddle wheel, which was turned at 18 rpm. The boilers were 8 x 22 feet

with the fireboxes in inside cylinders, each about 5 feet in diameter,

and extending about half the length of the boiler from the fire doors.

Two fire tubes, each about 3 feet in diameter, returned the gases from

the inside end of the fireboxes to the stacks at the firing end. Except

at the fire-door end, the firebox was completely surrounded by water.

The boiler pressure of about 6 psi was not maintained, varying somewhat

with each stroke of the engine.

Water level in the boilers was indicated by try cocks. The safety valve

was controlled by a counterbalanced lever. A jet of salt water was

injected into the exhaust trunk to form a vacuum by condensation. An air

pump transferred condensate and sea water into a tank from which it

passed overboard. Only about a tenth of this water was returned to the

boilers.

Montgery stated also that only the lower or gun deck was to be armed. No

bulwarks were on the spar deck, only iron stanchions to which were

fastened a breastwork of wet cotton bales when the _Steam Battery_ was

in action.

The _Battery_ was designed to carry 30 guns (32-pdr.), with 3 guns in

each end and 12 on each side, but no guns in the wake of paddle wheel

and machinery. Hatches to give air to the stokehold were located

amidships. The _Battery_ was to have been supplemented at the ends of

each hull by a Columbiad "submarine gun" (100-pdr.), Fulton's invention,

but these were not fitted. Provision was to be made in the fireboxes for

heating shot, and a force pump with a cylinder 33 inches in diameter was

employed to throw a stream of cold water, about 60-80 gallons per

minute, for a distance of about two hundred feet. This could be done

only when the paddle wheel was not in operation. The paddle wheel was

housed, the top fitted with stairs to the spar deck. The gun deck, over

the race, was used in part for staterooms, of which the bulkheads were

permanent. Hammocks for the complement of 500 men were to be slung on

the rest of the gun deck. The ship drew 10 feet 4 inches, with the port

sills about 5-1/2 feet above the loadline. Burning wood, the vessel

could carry about 4 days' supply of fuel; burning coal, she carried 12

days' supply.

Montgery said that the vessel would be vulnerable to bombshells and hot

shot, and that furthermore she could be boarded. The displacement of the

ship, at service draft, was 1,450 tons, a figure Montgery obtained from

a copy of the original plan given him by Noah Brown.

[Illustration: Figure 6.--FRENCH SKETCH, in Rigsarkivet, Copenhagen, of

inboard profile and arrangement of Fulton's _Steam Battery_, showing

details of the Fulton engine, probably taken from one of his preliminary

designs.]

In 1935, Lieutenant Ralph R. Gurley, USN, attempted a reconstruction in

sketches of the vessel published in his article "The U.S.S. _Fulton_ the

First" in the _U.S. Naval Institute Proceedings_.[15] This

reconstruction was based on the Patent Office drawing prepared for

Fulton, and published by Stuart and Bennett, and the foregoing French

sources. The Patent Office drawing showed the engine was an inclined

cylinder and Lt. Gurley shows this in his sketch; in his text (p. 323)

he says, "The engine was an inclined, single-cylinder affair with a

4-foot base and a 5-foot stroke." Gurley's attempt to reconstruct the

_Steam Battery_ is the only one known to the author.

Copenhagen Plans

In 1960, Kjeld Rasmussen, naval architect of the Danish Greenland

Company, was requested by the author to inspect in the Danish Royal

Archives at Copenhagen a folio of American ship plans, the index of

which had listed some Civil War river monitors. Mr. Rasmussen found the

monitor plans had been withdrawn but discovered that three plans of

Fulton's _Steam Battery_ existed, as well as plans of the first

_Princeton_, a screw sloop-of-war.

Copies of the _Steam Battery's_ plans were obtained at Copenhagen in

September 1960 through the courtesy of the archivist, and were found to

consist of the lines, copied in 1817, an inboard profile and

arrangement, and a sail and rigging plan. From these the reconstruction

for a scale model was drawn and is presented here with reproductions of

the original drawings upon which the reconstruction is based.

It is apparent that Montgery's description is generally accurate. The

vessel is a catamaran, made of two hulls, double-ended and exactly

alike. The outboard sides are "moulded," with round bilges, the inboard

sides are straight and flat, as though a hull had been split along the

middle line and then planked up flat where split. The hulls are

separated by the race, in which the paddle wheel is placed at

mid-length. The topsides are made elliptical at the ends, and the

midsection shows a marked tumble-home over the thick topside planking

but less on the moulded lines.

[Illustration: Figure 6.]

The lines plan agreed rather closely to Montgery's description of the

hull. After careful fairing it was found the lines drawing would produce

a vessel 153 feet 2 inches overall outside the stems, or about 151 feet

over the planked rabbets, with a moulded beam of 56 feet and extreme

beam of 58 feet. The moulded depth was 22 feet 9 inches and the width of

the race was 14 feet 10 inches, plank to plank. The room and space of

framing shown was 2 feet. The designed draft appears to be 13 feet and

this would bring the port sills 5 feet 6 inches above the loadline and

the underside of the gun-deck beams about 2 feet 9 inches above the

loadline.

The lines plan is a Danish copy, probably of the building plan by Noah

Brown, and may be based on the plan Montgery obtained from Brown. The

spar deck has the iron stanchions (Gurley translated these as

"chandeliers") which are set inboard 4 feet from the plank-sheer. This

gives room for cotton bales, outboard the stanchions, to form a

barricade. As will be seen by comparing the original Danish drawing with

the model drawing, the construction indicates that the iron stanchions

should be carried around the ends of the hull in the same manner as

along the sides, since the lower ends of the iron stanchions pass

through the spar deck and are secured to the inside of the inner ceiling

of the gun deck. The rudders are as shown in the Danish drawing, and it

is supposed that they were operated ferryboat fashion, one at each end

of the vessel. Hence, each pair of rudders was toggled together by a

cross-yoke. This was probably operated by a tiller (possibly the

cross-yokes and tillers were of iron) pivoted under the beams of the gun

deck close to the ends of the ship. Tiller ropes led from a tackle under

the gun-deck through trunks to the spar deck, where the wheels were

placed. This allowed proper sweep to the tillers and operation of each

pair of rudders. The paddle wheel was apparently of iron, with wooden

blades, and agrees with Montgery's description. In the plan for the

model it is shown raised 18 inches above the original design position,

to agree with trial requirements.

[Illustration: Figure 7.--ORIGINAL LINES OF ROBERT FULTON'S _Steam

Battery_, a Danish copy dated September 12, 1817; found in Rigsarkivet,

Copenhagen.]

It should be observed that the close CL-to-CL frame spacing created a

hull having frames touching one another, at least to above the turn of

the bilge, so the vessel was almost solid timber, before being planked

and ceiled, from keel to about the loadline. The sides are not only

heavily planked but, after the frames were ceiled with extraordinarily

heavy, square timbering, a supplementary solid, vertical framing was

introduced inboard and another ceiling added. The sides scale about 5

feet from outside the plank to the inboard face of the inner ceiling at

the level of the gunports.

The hulls were tied together athwartship by the deck beams of the gun

deck and spar deck, except in the wake of the paddle wheel. Knees were

placed along the sides of the race at alternate gun-deck beams. In

addition, the 12 1-foot-square timbers, crossing the race at the rabbets

of the hulls, (mentioned by Montgery) are shown. These must have created

extraordinary resistance, even at the low speed of this steamer. The

deck details shown are the results of reconstruction of the inboard

works.

History of Double-Hull Craft

The use of catamaran hulls, or "double-hulls," has been periodically

popular with ship designers since the time of Charles II of England. The

earliest of such vessels known in the present day were four sloops or

shallops designed 1673-1687 by Sir William Petty, who was an inventor in

the field of naval architecture and received some attention from Charles

II and from the Royal Society.

The first Petty experiment, the _Simon & Jude_, later called _Invention

I_, was launched October 28, 1662. She was designed with two hulls

cylindrical in cross section, each 2 feet in diameter, and 20 feet long.

A platform connected the hulls, giving the boat a beam of a little over

9 feet. She had a 20-foot mast stepped on one of the crossbeams

connecting the hulls, with a single gaff sail. In sailing trials she

beat three fast boats: the King's barge, a large pleasure boat, and a

man-of-war's boat. This "double-bottom," also called a "sluiceboat" or

"cylinder," was later lengthened at the stern to make her 30 feet

overall.

[Illustration: Figure 7.]

The King did not support Petty, to the latter's great disappointment,

and Petty next built a larger double-bottom, _Invention II_. This

catamaran was lapstrake construction. Not much is known of this boat

except that she beat the regular Irish packet boat, running between

Holyhead and Dublin, in a race each way, winning a L20 wager. She was

launched in July 1663; what became of her was not recorded.

A third and still larger boat, the _Experiment_, launched December 22,

1664, appears to have been a large sloop. This vessel sailed by way of

the Thames in April 1665 and went to Oporto, Portugal. She left Portugal

October 20, 1665, for home, but apparently went down with all hands in a

severe storm.

[Illustration: Figure 8.--DANISH COPY OF ORIGINAL SAIL PLAN of Robert

Fulton's _Steam Battery_, dated September 12, 1817, in Rigsarkivet,

Copenhagen.]

[Illustration: Figure 9.--LINES OF FULTON'S _Steam Battery_, as

reconstructed for a model in the Museum of History and Technology.]

[Illustration: Figure 10.--A RECONSTRUCTION OF INBOARD WORKS of the

_Steam Battery_, for construction of the model in the Museum of History

and Technology.]

For 18 years Petty did no more with the type, but finally, in July

1684, he laid down a still larger sloop with two decks and a mast

standing 55 feet above her upper deck. She was named _St. Michael the

Archangel_ and is probably the design in Pepys' _Book of Miscellaneous

Illustrations_ in Magdalene College, Cambridge, England. This vessel

proved unmanageable and was a complete failure.

[Illustration: Figure 11.--MODEL LINES REDRAWN to outside of plank to

show hydrodynamic form of the _Steam Battery_.]

Though the double canoes of the Pacific Islands were probably known to

some in Europe in 1662, there is no evidence that Petty based his

designs on such craft. He appears to have produced his designs

spontaneously from independent observations and resulting theories.

Before Petty concluded his experiments, a number of double-hull craft

had been produced by others; however, some "double" craft, such as

"double shallops" may have been "double-enders," as shown by a

"double-moses boat" of the 18th century and later.[16]

The use of two canoes, joined by a platform or by poles was common in

colonial times; in Maryland and Virginia, dugouts so joined were used to

transport tobacco down the tidal creeks to vessels' loading. Such craft

were also used as ferries. M. V. Brewington's _Chesapeake Bay Log

Canoes_[17] and Paul Wilstack's _Potomac Landings_[18] illustrate canoes

used in this manner. A catamaran galley, two round-bottom hulls, flat on

the inboard side (a hull split along the centerline and the inboard

faces planked up), 113 feet long and each hull a 7-foot moulded beam,

6-foot 6 inches moulded depth, and placed 13 feet apart, was proposed by

Sir Sidney Smith, R.N., in the 1790's, and built by the British

Admiralty. Named _Taurus_, she is shown by the Admiralty draught to have

been a double-ender, with cabins amidships on the platform, an iron

rudder at each end (between the hulls) steered with tillers (to unship),

and with a ramp at one end. The plans are undated, signed by Captain Sir

Sidney Smith, and a field-carriage gun is shown at the ramp end of the

boat. This, and the heavy rocker in the keels, suggests the _Taurus_ was

intended for a landing boat. No sailing rig is indicated, but tholes for

12 oars or sweeps on each side are shown. The oarsmen apparently sat on

deck, or on low seats, with stretchers in hatches between each pair of

tholes (Admiralty Collection of Draughts, The National Maritime Museum,

Greenwich, England).

[Illustration: Figure 12.--GENERAL PLAN of the _Taurus_, a catamaran

galley gunboat proposed by Sir Sidney Smith, R.N., to the British

Admiralty in the early years of the French Revolution. From the

Admiralty Collection of Draughts, National Maritime Museum, Greenwich.]

Another experimenter with the double-hull type of vessel was a wealthy

Scot named Patrick Miller who was particularly interested in manual

propulsion of vessels, employing geared capstans to operate paddle

wheels. In a letter dated June 9, 1790, Miller offered Gustav III of

Sweden a design for a double-hulled 144-gun ship-of-the-line (rating as

a 130-gun ship) propelled by manually operated capstans connected to a

paddle wheel between the hulls. She was rigged to sail, with five masts

and was to be 246 feet long, 63 feet beam, and 17 feet draft; the hulls

were 16 feet apart.

This project was submitted by the King to Fredrik Henrik af Chapman, the

great Swedish naval architect, who made an adverse report. Chapman

pointed out in great detail that the weight of the armament, the

necessary hull structure, the stores, crew, ammunition, spars, sails,

rigging and gear, would greatly exceed Miller's designed displacement.

He also pointed out the prime fault of catamarans under sail--slow

turning in stays. He suggested that the speed under sail would be

disappointing. He doubted that a double-hull ship of such size could be

built strong enough to stand a heavy sea. He remarked that English

records showed that a small vessel of the catamaran type had been built

between 1680 and 1700 which had sailed well (this may have been one of

Petty's boats), and that "36 years ago" he had seen 8 miles from London,

a similar boat that had been newly built by Lord Baltimore and was about

50 feet long; this was a failure and was discarded after one trial.

Therefore, said Chapman, the Miller project was not new but rather an

old idea. Chapman's final remark is perhaps the best illustration of his

opinion of the catamaran, "Despite all this, two-hull vessels are

completely sound when the theory can be properly applied; that is in

vessels of very light weight, and of small size, with crews of one or

two men."

A "model" of such a double-hull ship--the _Experiment_, built at Leith,

Scotland, in 1786 by J. Laurie--was sent to Sweden by Miller. She was

105 feet long, 31 feet beam, and cost L3000. This vessel arrived in the

summer of 1790 and King Gustav in a letter dated July 26 ordered Col.

Michael Anckerswaerd to welcome the vessel at Stockholm. The King

presented Miller with a gold snuffbox and a painting was made of the

vessel. The _Experiment_ had five paddle wheels in tandem between her

hulls, operated by geared capstans on deck. These gave her a speed of 5

knots but caused the crew to suffer from exhaustion in a short time. The

vessel was badly strained in a storm and was finally abandoned at St.

Petersburg, Russia.[19]

[Illustration: Figure 12.]

Fulton's "Steam Battery": Blockship and Catamaran · 第 1 / 3 段