1. HYDRAULIC ENGINEERING

Dredging is the name given by engineers to the process of excavating

materials under water, raising them to the surface and depositing them

in barges, or delivering them through a shoot, a longitudinal conveyor,

or pipes, to the place where it is desired to deposit them. It has long

been useful in works of marine and hydraulic engineering, and has been

brought in modern times to a state of high perfection.

The employment of dredging plant and the selection of special appliances

to be used in different localities and in varying circumstances require

the exercise of sound judgment on the part of the engineer. In rivers

and estuaries where the bottom is composed of light soils, and where the

scour of the tide can be governed by training walls and other works

constructed at reasonable expense, so as to keep the channel clear

without dredging, it is manifest that dredging machinery with its large

cost for working expenses and for annual upkeep should be as far as

possible avoided. On the other hand, where the bottom consists of clay,

rock or other hard substances, dredging must, in the first instance at

any rate, be employed to deepen and widen the channel which it is sought

to improve. In some instances, such as the river Mississippi, a deep

channel has for many years been maintained by jetties, with occasional

resort to dredging to preserve the required channel section and to

hasten its enlargement. The bar of the river Mersey is 11 m. from land,

and the cost of training works would be so great as to forbid their

construction; but, by a capital expenditure of L120,000 and an annual

expense of L20,000 for three years, the depth of water over the bar at

low tide has been increased by dredging from 11 ft. to 27 ft., the

channel being 1500 ft. wide.

_"Bag and Spoon" Dredger._--The first employment of machinery for

dredging is, like the discovery of the canal lock, claimed by Holland

and Italy, in both of which countries it is believed to have been in use

before it was introduced into Britain. The Dutch, at an early period,

used what is termed the "bag and spoon" dredger for cleansing their

canals. The "spoon" consisted of a ring of iron about 2 ft. in diameter

flattened and steeled for about a third of its circumference and having

a bag of strong leather attached to it by leathern thongs. The ring and

bag were fixed to a pole which was lowered to the bottom from the side

of a barge moored in the canal or river. The "spoon" was then dragged

along the bottom by a rope made fast to the iron ring actuated by a

windlass placed at the other end of the barge, the pole being prevented

from rising by a hitched rope which caused the "spoon" to penetrate the

bottom and fill the bag. When the "spoon" reached the end of the barge

where the windlass was placed, the winding was still continued, and the

suspended rope being nearly perpendicular the "bag" was raised to the

gunwale of the barge and the excavated material emptied into the barge.

The "bag" was then hauled back to the opposite end to be lowered for

another supply. This system is still in use, but is only adaptable to a

limited depth of water and a soft bottom; it has been largely used in

canals and frequently in the Thames. At the Fosdyke Canal in

Lincolnshire 135,000 tons were raised in the manner described. According

to J. J. Webster (_Proc. Inst. C. E._ vol. 89), the first application

of steam power for dredging operations was to a "spoon & bag" dredger

for cleansing Sunderland harbour, the engine being made by Messrs

Boulton & Watt of Soho, Birmingham.

_Dredging by Bucket between Two Lighters._--Another plan of dredging,

practised at an early period in rivers of considerable breadth, was to

moor two barges, one on each side of the river. Between them was slung

an iron dredging bucket, which was attached to both barges by chains

wound on the barrels of a crab winch worked by six men in one barge and

round a simple windlass worked by two men in the other barge. The

bucket, being lowered at the side of the barge carrying the windlass,

was drawn across the bottom of the river by the crab winch on the other

barge; and having been raised and emptied, it was hauled across by the

opposite windlass for repetition of the process. This process was in use

in the River Tay until 1833.

_Bucket Ladder Dredgers._--The earliest record of a bucket ladder

dredger is contained in the first paper of the first volume (1836) of

the _Transactions_ of the Institution of Civil Engineers. This machine

was brought into use at the Hull Docks about 1782. The bucket chain was

driven by two horses working a horse-gear on the deck of the vessel. The

buckets were constructed of 5/8 in. bars of iron spaced 1/8 in. apart,

and were 4 ft. long, 13 in. deep, 12 in. wide at the mouth and about 6

in. wide at the bottom. This dredger raised about 30 tons per hour at

the cost of 2-1/2d. per ton, which covered the wages of three men working

the dredger, eight men working the lighters and the keep of three

horses. A dredger of this kind and power would only work in ballast, mud

or other soft material, but the machine was gradually improved and

increased in capacity and power by different manufacturers until it

became a very efficient machine in skilful hands, excavating and raising

material from depths of 5 ft. to 60 ft. of water at a cost not very

different from, and in many cases less than, that at which the same work

could be performed on land. With the powerful dredgers now constructed,

almost all materials, except solid rock or very large boulders, can be

dredged with ease. Loose gravel is perhaps the most favourable material

to work in, but a powerful dredger will readily break up and raise

indurated beds of gravel, clay and boulders, and has even found its way

through the surface of soft rock, though it will not penetrate very far

into it. In some cases steel diggers alternating with the buckets on the

bucket frame have been successfully employed. The construction of large

steam dredgers is now carried on by many engineering firms. The main

feature of the machine is the bucket ladder which is hung at the top end

by eye straps to the frame of the vessel, and at the lower end by a

chain reived in purchase blocks and connected to the hoisting gear, so

that the ladder may be raised and lowered to suit the varying depths of

water in which the dredger works. The upper tumbler for working the

bucket chain is generally square or pentagonal in form and made of steel

with loose steel wearing pieces securely bolted to it. The tumbler is

securely keyed to the steel shaft which is connected by gearing and

shafting to the steam engine, a friction block being inserted at a

convenient point to prevent breakage should any hidden obstacle causing

unusual strain be met with in the path of the buckets. The lower tumbler

is similar in construction to the upper tumbler, but is usually

pentagonal or hexagonal in shape. The buckets are generally made with

steel backs to which the plating of the buckets is riveted; the cutting

edge of the buckets consists of a strong steel bar suitably shaped and

riveted to the body. The intermediate links are made of hammered iron or

steel with removable steel bushes to take the wear of the connecting

pins, which are also of steel. The hoisting gear may be driven either

from the main engine by frictional gearing or by an independent set of

engines. Six anchors and chains worked by powerful steam crabs are

provided for regulating the position of the dredger in regard to its

work.

_Barge-loading Dredgers_ used formerly to be provided with two ladders,

one on each side of the vessel, or contained in wells formed in the

vessel near each side. Two ladders were adopted, partly to permit the

dredger to excavate the material close to a quay or wall, and partly to

enable one ladder to work while the other was being repaired. Bucket

ladder dredgers are now, however, generally constructed with one central

ladder working in a well; frequently the bucket ladder projects at

either the head or stern of the vessel, to enable it to cut its own way

through a shoal or bank, a construction which has been found very

useful. In one modification of this method the bucket ladder is

supported upon a traversing frame which slides along the fixed framing

of the dredger and moves the bucket ladder forward as soon as it has

been sufficiently lowered to clear the end of the well. In places where

a large quantity of dredging has to be done, a stationary dredger with

three or four large hopper barges proves generally to be the most

economical kind of plant. It has, however, the disadvantage of requiring

large capital expenditure, while the dredger and its attendant barges

take up an amount of space which is sometimes inconvenient where traffic

is large and the navigable width narrow. The principal improvements made

in barge-loading dredgers have been the increase in the size of the

buckets and the strength of the dredging gear, the application of more

economical engines for working the machinery, and the use of frictional

gearing for driving the ladder-hoisting gear. It is very important that

the main drive be fitted with the friction blocks or clutches before

alluded to.

Up to the year 1877 dredgers were seldom made with buckets of a

capacity exceeding 9 cub. ft., but since that time they have been

gradually increased in capacity. In the dredger "Melbourne,"

constructed by Messrs William Simons & Co. to the design and

specification of Messrs Coode, Son & Matthews, about the year 1886,

the buckets had a capacity of 22 cub. ft., the dredger being capable

of making 37 ft. of water. The driving power consists of two pairs of

surface-condensing engines, each of 250 i.h.p., having cylinders 20

in. and 40 in. in diameter respectively, with a 30 in. stroke, the

boiler pressure being 90 lb. per sq. in. The vessel is 200 ft. long

by 36 ft. wide and 11 ft. 6 in. deep, and is driven by twin screw

propellers. The gearing is arranged so that either pair of engines can

be employed for dredging. The speed under steam is 7 knots, and in

free-getting material 800 tons per hour can be dredged with ease. On

one occasion the dredger loaded 400 tons in 20 minutes. The speed of

the bucket chain is 83 lineal ft. per minute. The draught of the

dredger in working trim is 7 ft. forward and 9 ft. aft. The efficiency

of the machine, or the net work in raising materials compared with the

power exerted in the cylinders, is about 25%. The dredged material is

delivered into barges moored alongside. Contrasting favourably with

former experience, the "Melbourne" worked for the first six months

without a single breakage. She is fitted with very powerful mooring

winches, a detail which is of great importance to ensure efficiency in

working.

The "St Austell" (Plate I. fig. 3), a powerful barge-loading dredger

195 ft. long by 35 ft. 6 in. beam by 13 ft. deep, fitted with

twin-screw compound surface-condensing propelling engines of 1000

i.h.p., either set of engines being available for dredging, was

constructed for H.M. Dockyard, Devonport, by Messrs Wm. Simons & Co.

in 1896. This dredger loaded thirty-five 500-ton hopper barges in the

week ending April 2, 1898, dredging 17,500 tons of material in the

working time of 29 hours 5 minutes.

An instance of a still larger and more powerful dredger is the

"Develant," constructed by Messrs Wm. Simons & Co., for Nicolaiev,

South Russia. She is a bow-well, barge-loading, bucket ladder dredger,

with a length of 186 ft., a breadth, moulded, of 36 ft., and a depth,

moulded, of 13 ft. The bucket ladder is of sufficient length to dredge

36 ft. below the water level. The buckets are exceptionally large,

each having a capacity of 36 cub. ft., or fully two tons weight of

material, giving a lifting capacity of 1890 tons per hour. At the

dredging trials 2000 tons of spoil were lifted in one hour with an

expenditure of 250 i.h.p. The propelling power is supplied by one pair

of compound surface-condensing marine engines of 850 i.h.p., having

two cylindrical boilers constructed for a working pressure of 120 lb.

per sq. in. Each boiler is capable of supplying steam to either the

propelling or dredging machinery, thus allowing the vessel to always

have a boiler in reserve. On the trials a speed of 8-1/2 knots was

obtained. The bucket ladder, which weighs over 100 tons, exclusive of

dredgings, is raised and lowered by a set of independent engines. For

manoeuvring, powerful winches driven by independent engines are placed

at the bow and stern. The vessel is fitted throughout with electric

light, arc lamps being provided above the deck to enable dredging to

be carried on at night. Steam steering gear, a repairing shop, a

three-ton crane, and all the latest appliances are installed on board.

The "Derocheuse" (Plate II. fig. 12), constructed by Messrs Lobnitz &

Co., is a good example of the dredger fitted with their patent rock

cutters, as used on the Suez Canal. These rock cutters consist of

stamps passing down through the bottom of the dredger, slightly in

advance of the bucket chain, and are employed for breaking up rock in

front of the bucket ladder so that it may be raised by buckets

afterwards. This system of subaqueous rock cutting plant, on Messrs

Lobnitz's patent system, was effectively employed in deepening the

Manchester Ship Canal, and removed a considerable length of rock,

increasing the depth of water from 26 ft. to 28 ft. at a cost of about

9d. per cub. yd. A full and illustrated description of this plant, and

of a similar plant supplied to the Argentine Government, was published

in _Engineering_ of August 17, 1906. An illustration of a bucket of 54

cub. ft. capacity constructed by Messrs Lobnitz & Co. is given (Plate

II fig. 11), from which some idea of the size of dredging machinery as

developed in recent practice may be obtained. In regard to the depth

of water that can be obtained by dredging, it is interesting to note

that the dredger "Diver," constructed by Messrs. Hunter & English for

Mr Samuel Williams of London, is capable of working in 60 ft. of

water. In this vessel an ingenious arrangement was devised by Mr

Williams, by which part of the weight of the dredger was balanced

while the ladder itself could be drawn up through the bucket well and

placed upon the deck, enabling a long ladder to be used for a

comparatively short vessel. The "Tilbury" dredger, also constructed by

Messrs Hunter & English, was able to dredge to a depth of 45 ft. below

the surface of the water.

_Hopper Barges._--To receive the materials excavated by barge-loading

dredgers, steam hopper barges are now generally employed, capable of

carrying 500 tons or more of excavation and of steaming loaded at a

speed of about 9 m. per hour. These hopper barges are made with hinged

flaps in their bottoms, which can be opened when the place of deposit is

reached and the dredgings easily and quickly discharged.

Good examples of these vessels are the two steam hopper barges built for

the Conservators of the river Thames in 1898. The dimensions are: length

190 ft., breadth 30 ft., depth 13 ft. 3 in., hopper capacity 900 tons.

They are propelled by a set of triple expansion engines of 1200 i.h.p.,

with two return-tube boilers having a working pressure of 160 lb.

Special appliances are provided to work the hopper doors by steam power

from independent engines placed at the forward end of the hopper. A

steam windlass is fixed forward and a steam capstan aft. The vessels are

fitted with cabins for the officers and crew. On their trial trip, the

hoppers having their full load, a speed of 11 knots was obtained, the

coal consumption being 1.44 lb. per i.h.p.

_Methods of Dredging._--In river dredging two systems are pursued. One

plan consists in excavating a series of longitudinal furrows parallel to

the axis of the stream; the other in dredging cross furrows from side to

side of the river. It is found that inequalities are left between the

longitudinal furrows when that system is practised, which do not occur,

to the same extent, in side or cross dredging; and cross dredging leaves

a more uniform bottom. In either case the dredger is moored from the

head and stern by chains about 250 fathoms in length. These chains in

improved dredgers are wound round windlasses worked by the engine, so

that the vessel can be moved ahead or astern by simply throwing them

into or out of gear. In longitudinal dredging the vessel is worked

forward by the head chain, while the buckets are at the same time

performing the excavation, so that a longitudinal trench is made in the

bottom of the river. After proceeding a certain length, the dredger is

stopped and permitted to drop down and commence a new longitudinal

furrow, parallel to the first one. In cross dredging, on the other hand,

the vessel is supplied with four additional moorings, two on each side,

and these chains are, like the head and stern chains, wound round

barrels worked by steam power. In cross dredging we may suppose the

vessel to be moored at one side of the channel to be excavated. The

bucket frame is set in motion, but instead of the dredger being drawn

forward by the head chain, she is drawn across the river by the

starboard chains, and, having reached the extent of her work in that

direction, she is then drawn a few feet forward by the head chain, and

the bucket frame being still in motion the vessel is hauled across by

the port chains to the side whence she started. By means of this

transverse motion of the dredger a series of cross cuts is made; the

dredger takes out the whole excavation from side to side to a uniform

depth and leaves no protuberances such as are found to exist between the

furrows in longitudinal dredging, even when it is executed with great

care. The two systems will be understood by reference to fig. 1, where A

and B are the head and stern moorings, and C, D, E and F the side

moorings. The arc e f represents the course of the vessel in cross

dredging; while in longitudinal dredging, as already explained, she is

drawn forward towards A, and again dropped down to commence a new

longitudinal furrow.

[Illustration: Fig. 1.--Diagram showing Moorings for Transverse

Dredging.]

_Hopper Dredgers._--In places where barge-loading dredgers are

inconvenient, owing to confined space and interference with navigation,

and where it is necessary to curtail capital expenditure, hopper

dredgers are convenient and economical. These dredgers were first

constructed by Messrs. Wm. Simons & Co. of Renfrew, who patented and

constructed what they call the "Hopper Dredger," combining in itself the

advantages of a dredger for raising material and a scow hopper vessel

for conveying it to the place of discharge, both of which services are

performed by the same engines and the same crew.

The vessel for this type of dredger is made of sufficient length and

floating capacity to contain its own dredgings, which it carries out to

the depositing ground as soon as its hopper is full. Considerable time

is of course occupied in slipping and recovering moorings, and conveying

material to the depositing ground, but these disadvantages are in many

instances counterbalanced by the fact that less capital is required for

plant and that less room is taken up by the dredger. If the depositing

ground is far away, the time available for dredging is much curtailed,

but the four-screw hopper dredger constructed by Messrs Wm. Simons & Co.

for Bristol has done good work at the cost of 5d. per ton, including

wages, repairs, coals, grease, sundries and interest on the first cost

of the plant, notwithstanding that the material has to be taken 10 m.

from the Bristol Dock. She can lift 400 tons of stiff clay per hour from

a depth of 36 ft. below the water line, and the power required varies

from 120 i.h.p. to 150 i.h.p., according to the nature of the material.

The speed is 9 knots, and 4 propellers are provided, two at the head and

two at the stern, to enable the vessel to steam equally well either way,

as the river Avon is too narrow to permit her to be turned round.

The hopper dredger "La Puissante" (Plate I. fig. 4), constructed by

Messrs Wm. Simons & Co. for the Suez Canal Co. for the improvement of

Port Said Roads, is a fine example of this class of dredger. She is

275 ft. long by 47 ft. beam by 19 ft. deep. The hopper capacity is

2000 tons, and the draught loaded 16 ft. 5 in. The maximum dredging

depth is 40 ft., and the minimum dredging depth is only limited by the

vessel's draught, she being able to cut her own way. The bucket ladder

works through the well in the stern and weighs with buckets 120 tons.

The buckets have each a capacity of 30 cub. ft. and raised on trial

1600 tons per hour. The dredger is propelled by two sets of

independent triple expansion surface-condensing engines of 1800 i.h.p.

combined, working with steam at 160 lb. pressure, supplied by two mild

steel multitubular boilers. Each set of engines is capable of driving

the buckets independently at speeds of 16 and 20 buckets per minute.

The bucket ladder is fitted with buffer springs at its upper end to

lessen the shock when working in a seaway. The dredger can deliver the

dredged material either into its own hopper or into barges lying on

either side. The vessel obtained a speed of 9-3/4 knots per hour on

trial. The coal consumption during 6 hours' steaming trial was 1.66

lb. per i.h.p. hour. Fig. 9 (Plate I.) shows a still larger hopper

dredger by the same constructors.

_Dredgers fitted with Long Shoot or Shore Delivering Apparatus._--The

first instance of dredgers being fitted with long shoots was in the Suez

Canal. The soil in the lakes was very variable, the surface being

generally loose mud which lay in some places in the sand, but frequently

more or less on hard clay. Resort was had to shoots 230 ft. long,

supported on pontoons connected with the hull of the dredger. The sand

flowed away with a moderate supply of water to the shoots when they were

fixed at an inclination of about 1 in 20, but when the sand was mixed

with shells these formed a coating which prevented the stream of water

from washing out the shoot, and even with an inclination of 1 in 10

material could not be delivered. A pair of endless chains working down

the long shoot overcame the difficulty, and also enabled hard clay in

lumps to be dealt with. One dredger turned out about 2000 cub. yds. of

thick clay in 15 hours, and when the clay was not hard it could deliver

150,000 cub. yds. in a month for several consecutive months.

Shore delivery has been successfully effected by raising the material by

buckets in the ordinary way and delivering it into a vertical cylinder

connected with floating jointed pipes through which the dredgings pass

to the shore. This, of course, can only be done where the place of

deposit is near the spot where the material is dredged. Two plans have

been satisfactorily employed for this operation. At the Amsterdam Canal

the stuff was discharged from the buckets into a vertical cylinder, and

after being mingled with water by a revolving Woodford pump was sent off

under a head of pressure of 4 or 5 ft. to the place of deposit in a

semi-fluid state through pipes made of timber, hooped with iron. These

wooden pipes were made in lengths of about 15 ft., connected with

leather joints, and floated on the surface of the water. A somewhat

similar process was also employed on the Suez Canal.

A dredger (Plate I. fig. 5), constructed by Messrs Hunter & English

for reclamation works on Lake Copais in Greece was fitted with

delivery belts running on rollers in steel lattice frames on each side

of the vessel supported by masts and ropes. It could deliver 100 cub.

metres per hour at 85 ft. from the centre of the dredger, at a cost of

1.82d. per cub. metre for working expenses, with coal at 45s. per ton,

including 0.66d. per cub. metre for renewal of belts, upon which the

wear and tear was heavy.

Another instance of the successful application of shore delivery

apparatus is that of a dredger for Lake Titicaca, Peru, constructed by

Messrs Hunter & English, which was fitted with long shoots on both

sides, conveying the dredged material about 100 ft. from the centre of

the dredger upon either side. The shoots were supported by shear-legs

and ropes, and were supplied with water from a centrifugal pump in the

engine room. This dredger could excavate and deliver 120 cub. yds. per

hour at a cost of 1.725d. per cub. yd. with coal costing 40s. per ton.

If coal had been available at the ordinary rate in England of 20s. per

ton, the cost of the dredging and delivery would have been 0.82d. per

cub. yd. for wages, coal, oil, &c., but not including the salary of

the superintendent.

An interesting example of a shore delivering dredger is a light

draught dredger constructed by Messrs Hunter & English for the Lakes

of Albufera at the mouth of the river Ebro in Spain (Plate I. fig. 6).

The conditions laid down for this dredger were that it should float in

18 in. of water and deliver the dredged material at 90 ft. from the

centre of its own hull. In order to meet these requirements the vessel

was made of steel plates 1/8 in. thick, and longitudinal girders from

end to end of the vessel, the upward strain of flotation being

conveyed to them from the skin plating by transverse bulkheads at

short intervals. The dredger was 94 ft. long, 25 ft. wide, and 3 ft.

deep, and the height of the top tumbler above the water was 25 ft.

When completed the dredger drew 17 in. of water. The dredgings were

delivered by the buckets upon an endless belt, driven from the main

compound surface-condensing engine, which ran over pulleys supported

upon a steel lattice girder, the outer end of which rested upon an

independent pontoon. This belt delivered the dredgings at 90 ft. from

the centre of the dredger round an arc of 180 deg. The dredger

delivered 125 cub. yds. per hour of compact clay at a cost of 1.16d.

per cub. yd. or 0.86d. per ton for wages, coal and stores. Another

method of delivering dredgings is that of pneumatic delivery,

introduced by Mr F. E. Duckham, of the Millwall Dock Co., by which the

dredgings are delivered into cylindrical tanks in the dredger, closed

by air-tight doors, and are expelled by compressed air either into the

sea or through long pipes to the land. The Millwall Dock dredger is

113 ft. long, with a beam of 17 ft. and a depth of 12 ft. The draught

loaded is 8 ft. It contains two cylindrical tanks, having a combined

capacity of 240 cub. yds., and is fitted with compound engines of

about 200 i.h.p., with a 20 in. air-compressing cylinder. The

discharge pipe is 15 in. diameter by 150 yds. long. The nozzles of the

air-injection pipes must not be too small, otherwise the compressed

air, instead of driving out the material, simply pierces holes through

it and escapes through the discharging pipe, carrying with it all the

liquid and thin material in the tanks. The cost of working the

Millwall Dock dredger is given by Mr Duckham at 1.75d. per cub. yd. of

mud lifted, conveyed and deposited on land 450 ft. from the

water-side, for working expenses only. This dredger is believed to be

the first machine constructed with a traversing ladder, as suggested

by Captain Gibson when dock-master of the Millwall Docks.

_Blasting combined with Dredging._--In some cases it has been found that

the bottom is too hard to be dredged until it has been to some extent

loosened and broken up. Thus at Newry, John Rennie, after blasting the

bottom in a depth of from 6 to 8 ft. at low water, removed the material

by dredging at an expense of from 4s. to 5s. per cub. yd. The same

process was adopted by Messrs Stevenson at the bar of the Erne at

Ballyshannon, where, in a situation exposed to a heavy sea, large

quantities of boulder stones were blasted, and afterwards raised by a

dredger worked by hand at a cost of 10s. 6d. per cub. yd. Sir William

Cubitt also largely employed blasting in connexion with dredging on the

Severn (see _Proc. Inst. C.E._ vol. iv. p. 362). The cost of blasting

and dredging the marl beds is given as being 4s. per cub. yd. A

combination of blasting and dredging was employed in 1875 by John Fowler

of Stockton at the river Tees. The chief novelty was in the barge upon

which the machinery was fixed. It was 58 ft. by 28 ft. by 4 ft., and had

eight legs which were let down when the barge was in position. The legs

were then fixed to the barge, so that on the tide falling it became a

fixed platform from which the drilling was done. Holes were bored and

charged, and when the tide rose the legs were heaved up and the barge

removed, after which the shots were discharged. There were 24 boring

tubes on the barge, and that was the limit which could at any time be

done in one tide. The area over which the blasting was done measured 500

yds. in length by 200 in breadth, a small part being uncovered at low

water. The depth obtained in mid-channel was 14 ft. at low water, the

average depth of rock blasted being about 4 ft. 6 in. The holes, which

were bored with the diamond drill, varied in depth from 7 to 9 ft., the

distance between them being 10 ft. Dynamite in tin canisters fired by

patent fuse was used as the explosive, the charges being 2 lb. and

under. The rock is oolite shale of variable hardness, and the average

time occupied in drilling holes 5 ft. deep was 12 minutes. The dredger

raised the blasted rock. The cost for blasting, lifting and discharging

at sea was about 4s. per cub. yd., including interest on dredging and

other plant employed. The dredger sometimes worked a face of blasted

material of from 7 to 8 ft. The quantity blasted was 110,000 cub. yds.,

and the contract for blasting so as to be lifted by the dredger was 3s.

1d. per cub. yd. A similar plan was adopted at Blyth Harbour (see _Proc.

Inst. C.E._ vol. 81, p. 302). The cost of the explosives per cub. yd.

was 1s. 4d., of boring 1s. 9d. per cub. yd., and of dredging 3s. per

cub. yd., including repairs, but nothing for the use of plant. The whole

cost worked out at 6s. 1d. per cub. yd. on the average.

_Sand-pump Dredgers._--Perhaps the most important development which has

taken place in dredging during recent years has been the employment of

sand-pump dredgers, which are very useful for removing sandy bars where

the particular object is to remove quickly a large quantity of sand or

other soft material. They are, however, apt to make large holes, and are

therefore not fitted for positions where it is necessary to finish off

the dredging work to a uniform flat bottom, for which purpose bucket

dredgers are better adapted. Pump dredgers are, however, admirable and

economical machines for carrying out the work for which they are

specially suited.

In the discussion upon Mr J. J. Webster's paper upon

"Dredging-Appliances" (_Proc. Inst. C.E._ vol. 89) at the Institution

of Civil Engineers in 1886, Sir John Coode stated that he had first

seen sand-pump dredgers at the mouth of the Maas in Holland. The

centrifugal pump was placed against the bulkheads in the after part of

the vessel, and the sand and water were delivered into a horizontal

breeches-piece leading into two pipes running along the full length of

the hopper. The difficulty of preventing the sand from running

overboard was entirely obviated by its being propelled by the pump

through these pipes, the bottoms of which were perforated by a series

of holes. In addition, there were a few small flap-doors fixed at

intervals, by means of which the men were able to regulate the

discharge. On being tested, the craft pumped into its hopper 400 tons

of sand in 22 minutes. The coamings round the well of the hoppers were

constructed with a dip, and when the hopper was full the water ran

over in a steady stream on either side. The proportion of sand

delivered into the hopper was about 20% of the total capacity of the

pump. The dredger was constructed by Messrs Smit of Kinderdijk, near

Rotterdam. In the same discussion Mr A. A. Langley, then engineer to

the Great Eastern railway, gave particulars of a sand pump upon the

Bazin system, which had been used successfully at Lowestoft. The boat

was 60 ft. long by 20 ft. wide, and the pump was 2 ft. in diameter,

with a two-bladed disk. The discharge pipe was 12 in. in diameter. The

pump raised 400 tons of sand, gravel and stones per hour as a maximum

quantity, the average quantity being about 200 tons per hour. The

depth dredged was from 7 ft. to 25 ft. The pump was driven by a

double-cylinder engine, having cylinders of 9 in. diameter by 10 in.

stroke, and making 120 revolutions per minute. An important

improvement was made by fitting the working faces of the pump with

india-rubber, which was very successful and largely reduced the wear

and tear. The cost of the dredging at Lowestoft was given by Mr

Langley at 2d. per ton, including delivery 2 m. out at sea. The

quantity dredged was about 200,000 tons per annum.

One of the earliest pumps to be applied to dredging purposes was the

Woodford, which consisted of a horizontal disk with two or more arms

working in a case somewhat similar to the ordinary centrifugal pump.

The disk was keyed to a vertical shaft which was driven from above by

means of belts or other gear coupled to an ordinary portable engine.

The pump within rested on the ground; the suction pipe was so arranged

that water was drawn in with the sand or mud, the proportions being

regulated to suit the quality of the material. The discharge pipe was

rectangular and carried a vertical shaft, the whole apparatus being

adjustable to suit different depths of water. This arrangement was

very effective, and has been used on many works. Burt & Freeman's sand

pump, a modification of the Woodford pump, was used in the

construction of the Amsterdam Ship Canal, for which it was designed.

The excavations from the canal had to be deposited on the banks some

distance away from the dredgers, and after being raised by the

ordinary bucket dredger, instead of being discharged into the barges,

they were led into a vertical chamber on the top side of the pump,

suitable arrangements being made for regulating the delivery. The pump

was 3-1/2 ft. in diameter, and made about 230 revolutions per minute.

The water was drawn up on the bottom side and mixed with the

descending mud on the top side, and the two were discharged into a

pipe 15 in. in diameter. The discharge pipe was a special feature, and

consisted of a series of wooden pipes jointed together with leather

hinges and floated on buoys from the dredger to the bank. In some

cases this pipe was 300 yds. long, and discharged the material 8 ft.

above the water level. Each dredger and pump was capable of

discharging an average of 1500 cub. yds. per day of 12 hours.

Schmidt's sand pump is claimed to be an improvement on the Burt &

Freeman pump. It consists of a revolving wheel 6 ft. in diameter, with

cutters revolving under a hood which just allows the water to pass

underneath. To the top side of the hood a 20 in. suction pipe from an

ordinary centrifugal pump is attached. The pump is driven by two 16

in. by 20 in. cylinders, at 134 revolutions per minute, the boiler

pressure being 95 lb. per sq. in. This apparatus is capable of

excavating sticky blue clayey mud, and will deliver the material at

500 to 650 yds. distance. The best results are obtained when the

mixture of mud and water is as 1 to 6.5. The average quantity

excavated per diem by the apparatus is 1300 cub. yds., the maximum

quantity being 2500 cub. yds.

Kennard's sand pump is entirely different from the pumps already

described, and is a direct application of the ordinary lift pump. A

wrought iron box has a suction pipe fitted at the bottom, rising about

half way up the inside of the box; on the top of the box is fitted the

actual pump and the flap valves. The apparatus is lowered by chains,

and the pump lowered from above. As soon as the box is filled with

sand it is raised, the catches holding up the bottom released, and the

contents discharged into a punt.

Sand-pump dredgers, designed and arranged by Mr Darnton Hutton, were

extensively used on the Amsterdam Ship Canal. A centrifugal pump with

a fan 4 ft. in diameter was employed, the suction and delivery pipes,

each 18 in. in diameter, being attached to an open wrought-iron

framework. The machine was suspended between guides fixed to the end

of the vessel, which was fitted with tackle for raising, lowering and

adjusting the machine. The vessel was fitted with a steam engine and

boiler for working and manipulating the pumps and the heavy side

chains for the guidance of the dredger. The engine was 70 h.p., and

the total cost of one dredger was L8000. The number of hands required

for working this sand-pump dredger was one captain, one engineer, one

stoker and four sailors. Each machine was capable of raising about

1300 tons of material per day, the engines working at 60 and the pump

at 180 revolutions per minute. The sand was delivered into barges

alongside the dredger. The cost of raising the material and depositing

it in barges was about 1d. per ton when the sand pumps were working,

but upon the year's work the cost was 2.4d. per cub. yd. for working

expenses and repairs, and 1.24d. per cub. yd. for interest and

depreciation at 10% upon the cost of the plant, making a total cost

for dredging of 3.64d. per cub. yd. The cost for transport was 3.588d.

per cub. yd., making a total cost for dredging and transport of

7.234d. per cub. yd. Dredging and transport on the same works by an

ordinary bucket dredger and barges cost 8.328d. per cub. yd.

Two of the largest and most successful instances of sand-pump dredgers

are the "Brancker" and the "G. B. Crow," belonging to the Mersey

Docks and Harbour Board. Mr A. G. Lyster gave particulars of the work

done by these dredgers in a paper read before the Engineering Congress

in 1899. They are each 320 ft. long, 47 ft. wide and 20.5 ft. deep,

the draught loaded being 16 ft. They are fitted with two centrifugal

pumps, each 6 ft. in diameter, with 36 in. suction and delivery pipes,

united into a 45 in. diameter pipe, hung by a ball and socket joint in

a trunnion, so as to work safely in a seaway when the waves are 10 ft.

high. The suction pipe is 76 ft. long and will dredge in 53 ft. of

water. The eight hoppers hold 3000 tons, equivalent when solid to 2000

cub. yds.; they can be filled in three-quarters of an hour and

discharged in five minutes. Mr Lyster stated that up to May 1899, the

quantity removed from bar and main-channel shoals amounted to

41,240,360 tons, giving a width of channel of 1500 ft. through the

bar, with a minimum depth of 27 ft. The cost of dredging on the bar by

the "G. B. Crow" during 1898, when 4,309,350 tons of material were

removed, was 0.61d. per ton for wages, supplies and repairs. These

figures include all direct working costs and a proportion of the

charge for actual superintendence, but no allowance for interest on

capital cost or depreciation. On an average, 20% of the sand and mud

that are raised escapes over the side of the vessel. Mr Lyster has,

however, to a considerable extent overcome this difficulty by a

special arrangement added to the hoppers (see _Proc. Inst. C.E._ vol.

188).

At the Engineering Conference, 1907, Mr Lyster read a note in which he

stated that the total quantity of material removed from the bar of the

Mersey, from the Crosby channel, and from other points of the main

channel by the "G. B. Crow" and "Brancker" suction dredgers amounted

to 108,675,570 tons up to the 1st of May 1907. "In the note of 1899

(he added) it was pointed out that the Mersey was a striking instance

of the improvement of a river by dredging rather than by permanent

works, and the economy of the system as well as the advantage which

its elasticity and adaptability to varying circumstances permit, was

pointed out.... The most recent experience, which has resulted in the

adoption of the proposal to revet the Taylor's bank, indicates that

the dredging method has its limitations and cannot provide for every

contingency which is likely to arise; at the same time, the utility

and economy of the dredging system is in no way diminished.... Having

regard to the ever-increasing size of vessels, a scheme for new docks

and entrances on a very large scale received the authority of

parliament during the session of 1905-1906 In this scheme it was

considered necessary to make provision for vessels of 1000 ft. in

length and 40 ft. in draught, and having regard to this prospective

growth of vessels it has been determined still further to deepen and

improve the outer channel of the Mersey. No fixed measure of

improvement has been decided on, but after careful survey of existing

conditions and a comparison with probable requirements, it has been

determined to construct a dredger of 10,000 tons capacity, provided

with pumping power equivalent to about three times that of any

existing dredgers. By the use of this vessel it is anticipated that it

will be possible to deal with very much larger quantities of sand at a

cheaper rate, and to 10 ft. greater depth than the existing plant

permits."

The vessel in question was launched on the Mersey from the yard of

Messrs Cammell, Laird & Co. in October 1908, and was named the

"Leviathan." Her length is 487 ft., beam 69 ft., and depth 30 ft. 7

in. Her dredging machinery consists of four centrifugal pumps driven

by four sets of inverted triple expansion engines, and connected to

four suction tubes 90 ft. long and 42 in. in internal diameter. Her

propelling machinery, consisting of two sets of triple expansion

engines, is capable of driving her at a speed of 10 knots.

Another powerful and successful sand-pump dredger, "Kate" (Plate I.

fig. 7), was built in 1897 by Messrs Wm. Simons & Co. Ltd. for the

East London Harbour Board, South Africa. Its dimensions are: length

200 ft., breadth 39 ft., depth 14 ft. 6 in., hopper capacity 1000

tons. The pumping arrangements for filling the hopper with sand or

discharging overboard consist of two centrifugal pumps, each driven

from one of the propelling engines. The suction pipes are each 27 in.

in diameter, and are so arranged that they may be used for pumping

either forward or aft, as the state of the weather may require. Four

steam cranes are provided for manipulating the suction pipes. Owing to

the exceptional weather with which the vessel had to contend, special

precautions were taken in designing the attachments of the suction

pipes to the vessel. The attachment is above deck and consists of a

series of joints, which give a perfectly free and universal movement

to the upper ends of the pipes. The joints, on each side of the

vessel, are attached to a carriage, which is traversed laterally by

hydraulic gear. By this means the pipes are pushed out well clear of

the vessel's sides when pumping, and brought inboard when not in work.

Hydraulic cushioning cylinders are provided to give any required

resistance to the fore and aft movements of the pipes. When the vessel

arrived at East London on the 18th of July 1897, there was a depth of

14 ft. on the bar at high tide. On the 10th of October, scarcely three

months afterwards, there was a depth of 20 ft. on the bar at low

water. Working 22 days in rough weather during the month of November

1898, the "Kate" raised and deposited 2-1/2 m. at sea 60,000 tons of

dredgings. Her best day's work (12 hours) was on the 7th of November,

when she dredged and deposited 6440 tons.

A large quantity of sand-pump dredging has been carried out at

Boulogne and Calais by steam hopper pump dredgers, workable when the

head waves are not more than 3 ft. high and the cross waves not more

than 1-1/2 ft. high. The dredgings are taken 2 m. to sea, and the price

for dredging and depositing from 800,000 to 900,000 cub. metres in 5

or 6 years was 7.25d. per cub. yd. The contractor offered to do the

work at 4.625d. per cub. yd. on condition of being allowed to work

either at Calais or Boulogne, as the weather might permit. Sand-pump

dredging has also been extensively carried out at the mouth of the

ports of Amsterdam, Rotterdam and on the north coast of France by sand

dredgers constructed by Messrs L. Smit & Son and G. & K. Smit. The

largest dredger, the "Amsterdam," is 141 ft. by 27 ft. by 10 ft. 8

in., and has engines of 190 i.h.p. The hopper capacity is 10,600 cub.

ft., and the vessel can carry 600 tons of dredgings. The pump fan is 6

ft. 3 in. in diameter by 10 in. wide, the plates being of wrought

iron, and makes 130 revolutions a minute. The pump can raise 230 cub.

ft. a minute from a depth of 33 ft., which, taking the proportion of 1

of sand to 7 of water, gives a delivery of 29 cub. ft. of sand per

minute. The hopper containing 10,600 cub. ft. was under favourable

circumstances filled in 40 minutes. The vessels are excellent sea

boats.

_Combined Bucket-Ladder and Sand-Pump Dredgers._--Bucket ladders and

sand pumps have also been fitted to the same dredger. A successful

example of this practice is furnished by the hopper dredger "Percy

Sanderson" (Plate I. fig. 8), constructed under the direction of Sir C.

A. Hartley, engineer of the Danube Commission for the deepening of the

river Danube and the Sulina bar. This dredger is 220 ft. by 40 ft. by 17

ft. 2 in., and has a hopper capacity for 1250 tons of dredgings. The

buckets have each a capacity of 25 cub. ft., and are able to raise 1000

tons of ordinary material per hour. The suction pump, which is driven by

an independent set of triple expansion engines, is capable of raising

700 tons of sand per hour, and of dredging to a depth of 35 ft. below

the water-line. The lower end of the suction pipe is controlled by

special steam appliances by which the pipe can be brought entirely

inboard. The "Percy Sanderson" raises and deposits on an average 5000

tons of material per day.

_Grab Dredgers._--The grab dredger was stated by Sir Benjamin Baker

(_Proc. Inst. C.E._ vol. 113, p. 38) to have been invented by Gouffe in

1703, and was worked by two ropes and a bar. Various kinds of apparatus

have been designed in the shape of grabs or buckets for dredging

purposes. These are usually worked by a steam crane, which lets the open

grab down to the surface of the ground to be excavated and then closes

it by a chain which forces the tines into the ground; the grab is then

raised by the crane, which deposits the contents either into the hopper

of the vessel upon which the crane is fixed or into another barge.

The Priestman grab has perhaps been more extensively used than any

other apparatus of this sort. It is very useful for excavating mud,

gravel and soft sand, but is less effective with hard sand or stiff

clay--a general defect in this class of dredger. It is also capable of

lifting large loose pieces of rock weighing from 1 to 2 tons. A

dredger of this type, with grab holding 1 ton of mud, dredged during

six days, in 19 ft. of water, an average of 52-1/2 tons and a maximum

of 68-1/2 tons per hour, and during 12 days, in 16 ft. of water, an

average of 48 tons and a maximum of 58 tons per hour, at a cost of

1.63d. per ton, excluding interest on the capital and depreciation.

The largest dredger to which this apparatus has been applied is the

grab bucket hopper dredger "Miles K. Burton" (Plate I. fig. 9),

belonging to the Mersey Docks and Harbour Board. It is equipped with 5

grabs on Morgan's patent system, which is a modification of

Priestman's, the grabs being worked by 5 hydraulic cranes. It raised

and deposited, 12 to 15 m. at sea, 11 loads of about 1450 tons each

with a double shift of hands, at a cost of about 1s. 5d. per cub. yd.

of spoil, including the working expenses for wages of crew, fuel and

stores. Mr R. A. Marillier of Hull has stated that "the efficiency of

these grabs is not at all dependent upon the force of the blow in

falling for the penetration and grip in the material, as they do their

work very satisfactorily even when lowered quite gently on to the

material to be cut out, the jaws being so framed as to draw down and

penetrate the material as soon as the upward strain is put on the

lifting chain. Even in hard material the jaws penetrate so thoroughly

as to cause the bucket to be well filled. The grab is found to work

successfully in excavating hard clay from its natural bed on dry

land." It is claimed on behalf of grabs that they lift a smaller

proportion of water than any other class of dredger.

Since the beginning of the 20th century considerable advance has been

made in the use of Priestman grabs, not only for dredging and

excavating (for which work they were originally designed), but also in

discharging bulk cargo. The first quadruple dredger used by the

Liverpool Docks Board had grabs of a capacity of 30 cub. ft., but

subsequently second and third quadruple dredgers were put to work in

the Liverpool Docks, with grabs having a capacity of 70 and 100 cub.

ft. respectively. In discharging coal at Southampton, Havre, Erith,

as well as at the coaling station at Purfleet on the Thames, grabs

having a capacity of about 80 cub. ft. are in constant use. Perhaps

the most difficult kind of bulk cargo to lift is "Narvick" iron ore,

which sets into a semi-solid body in the holds of the vessels, and for

this purpose one of the largest grabs, having about 150 cub. ft.

capacity and weighing about 8 tons, has been adopted. This grab was

designed as a result of experiments extending over a long period in

lifting iron ore. It is fitted with long, forged, interlocked steel

teeth for penetrating the compact material, which is very costly to

remove by hand labour. The Priestman grab is made to work with either

one or two chains or wire ropes. Grabs worked with two chains or ropes

have many advantages, and are therefore adopted for large

undertakings.

Wild's single chain half-tine grab works entirely with a single chain,

and has been found very useful in excavating the cylinders in Castries

harbour. Upon experimenting with an ordinary grab a rather curious

condition of things was observed with respect to sinking. On

penetrating the soil to a certain depth the ground was found as it

were nested, and nothing would induce the grab to sink lower. Sir W.

Matthews suggested that a further set of external tines might possibly

get over this difficulty. A new grab having been made with this

modification, and also with a large increase of weight--all the parts

being of steel--it descended to any required depth with ease, the

outside tines loosening the ground effectually whilst the inside

bucket or tines picked up the material.

_Miscellaneous Appliances._--There are several machines or appliances

which perhaps can hardly be called dredgers, although they are used for

cleansing and deepening rivers and harbours.

Kingfoot's dredger, used for cleansing the river Stour, consisted of a

boat with a broad rake fitted to the bow, capable of adjustment to

different depths. At the sides of the boat were hinged two wings of

the same depth as the rake and in a line with it. When the rake was

dropped to the bottom of the river and the wings extended to the side,

they formed a sort of temporary dam, and the water began to rise

gradually. As soon as a sufficient head was raised, varying from 6 to

12 in., the whole machine was driven forward by the pressure, and the

rake carried the mud with it. Progress at the rate of about 3 m. an

hour was made in this manner, and to prevent the accumulation of the

dredgings, operations were begun at the mouth of the river and carried

on backwards. The apparatus was very effective and the river was

cleansed thoroughly, but the distance travelled by the dredger must

have been great.

In 1876 J. J. Rietschoten designed a "propeller dredger" for removing

the shoals of the river Maas. It consisted of an old gunboat fitted

with a pair of trussed beams, one at each side, each of which carried

a steel shaft and was capable of being lowered or raised by means of a

crab. An ordinary propeller 3 ft. 6 in. in diameter was fixed to the

lower end of the shaft, and driven by bevel gear from a cross shaft

which derived its motion by belting from the fly-wheel of a 12 h.p.

portable engine. The propellers were lowered until they nearly reached

the shoals, and were then worked at 150 revolutions per minute. This

operation scoured away the shoal effectively, for in about 40 minutes

it had been lowered about 3 ft. for a space of 150 yds. long by 8 yds.

wide.

A. Lavalley in 1877 designed an arrangement for the harbour of Dunkirk

to overcome the difficulty of working an ordinary bucket-ladder

dredger when there is even a small swell. A pump injects water into

the sand down a pipe terminating in three nozzles to stir up the sand,

and another centrifugal pump draws up the mixed sand and water and

discharges it into a hopper, the pumps and all machinery being on

board the hopper. To allow for the rising and falling of the

vessel--either by the action of the tide or by the swell--the ends of

the pipes are made flexible. The hopper has a capacity of 190 cub.

yds., and is propelled and the pumps worked by an engine of 150 i.h.p.

From 50 to 80 cub. yds. per hour can be raised by this dredger.

The "Aquamotrice," designed by Popie, and used on the Garonne at Agen,

appears to be a modification of the old bag and spoon arrangement. A

flat-bottomed boat 51-1/2 ft. long by 6-1/2 ft. wide was fitted at the

bow with paddles, which were actuated by the tide. Connected with the

paddles was a long chain, passing over a pulley on uprights and under

a roller, and a beam was attached to the chain 14 ft. 8 in. long,

passing through a hole in the deck. At the end of the beam was an iron

scoop 2 ft. wide and 2 ft. 6 in. deep. When the tide was strong enough

it drew the scoop along by means of the paddles and chains, and the

scoop when filled was opened by a lever and discharged. About 65 cub.

yds. of gravel could be raised by the apparatus in 12 hours. When the

tide failed the apparatus was worked by men.

The Danube Steam Navigation Co. removed the shingle in the shallow

parts of the river by means of a triangular rake with wrought-iron

sides 18 ft. long, and fitted with 34 teeth of chilled cast iron 12

in. deep. This rake was hung from the bow of a steamer 180 ft. long by

21 ft. beam, and dragged across the shallows, increasing the depth of

water in one instance from 5 ft. 6 in. to 9 ft., after passing over

the bank 355 times.

A combination of a harrow and high pressure water jets, arranged by B.

Tydeman, was found very efficacious in removing a large quantity of

mud which accumulated in the Tilbury Dock basin, which has an area of

about 17 acres, with a depth of 26 ft. at low-water spring tides. In

the first instance chain harrows merely were used, but the addition of

the water jets added materially to the success of the operation. The

system accomplished in six tides more than was done in twelve tides

without the water jets which worked at about 80 lb pressure per sq.

in. at the bottom of the dock.

Ive's excavator consists of a long weighted spear, with a sort of

spade at the end of it. The spade is hinged at the top, and is capable

of being turned at right angles to the spear by a chain attached to

the end of the spear. The spade is driven into the ground, and after

releasing the catch which holds it in position during its descent, it

is drawn up at right angles to the spear by the chain, carrying the

material with it. Milroy's excavator is similar, but instead of having

only one spade it generally has eight, united to the periphery of an

octagonal iron frame fixed to a central vertical rod. When these eight

spades are drawn up by means of chains, they form one flat table or

tray at right angles to the central rod. In operation the spades hang

vertically, and are dropped into the material to be excavated; the

chains are then drawn up, and the table thus formed holds the material

on the top, which is lifted and discharged by releasing the spade.

This apparatus has been extensively used both in Great Britain and in

India for excavating in bridge cylinders.

The clam shell dredger consists of two hinged buckets, which when

closed form one semi-cylindrical bucket. The buckets are held open by

chains attached to the top of a cross-head, and the machine is dropped

on to the top of the material to be dredged. The chains holding the

bucket open are then released, while the spears are held firmly in

position, the buckets being closed by another chain. Bull's dredger,

Gatmell's excavator, and Fouracre's dredger are modifications with

improvements of the clam shell dredger, and have all been used

successfully upon various works.

Bruce & Batho's dredger, when closed, is of hemispherical form, the

bucket being composed of three or four blades. It can be worked by

either a single chain or by means of a spear, the latter being

generally used for stiff material. The advantage of this form of

dredger bucket is that the steel points of the blades are well adapted

for penetrating hard material. Messrs Bruce & Batho also designed a

dredger consisting of one of these buckets, but worked entirely by

hydraulic power. This was made for working on the Tyne. The excavator

or dredger is fixed to the end of a beam which is actuated by two

hydraulic cylinders, one being used for raising the bucket and the

other for lowering it; the hydraulic power is supplied by the pumps in

the engine-room. The novelty in the design is the ingenious way in

which the lever in ascending draws the shoot under the bucket to

receive its contents, and draws away again as the bucket descends. The

hydraulic cylinder at the end of the beam is carried on gimbals to

allow for irregularities on the surface being dredged. The hydraulic

pressure is 700 lb. per sq. in., and the pumps are used in connexion

with a steam accumulator.

An unloading apparatus was designed by Mr A. Manning for the East &

West India Dock Co. for unloading the dredged materials out of barges

and delivering it on the marsh at the back of the bank of the river

Thames at Crossness, Kent. A stage constructed of wooden piles

commanded a series of barge beds, and the unloading dredger running

from end to end of the stage, lifted and delivered the materials on

the marsh behind the river wall at the cost of 1 d. per cub. yd.

_Dredging on the River Scheldt below Antwerp._--This dredging took place

at Krankeloon and the Belgian Sluis under the direction of L. Van

Gansberghe. At Melsele there is a pronounced bend in the river, causing

a bar at the Pass of Port Philip, and just below the pass of Lillo there

is a cross-over in the current, making a neutral point and forming a

shoal. After dredging to 8 metres (26.24 ft.) below low tide, in clay

containing stone and ferruginous matter, a sandstone formation was

encountered, which was very compact and difficult to raise. A suction

dredger being unsuited to the work, a bucket-ladder dredger was

employed. The dredging was commenced at Krankeloon in September 1894 and

continued to the end of 1897. A depth of 6 metres (19.68 ft.) was

excavated at first, but was afterwards increased to 8 metres (26.24

ft.). The place of deposit was at first on lands acquired by the State,

2.17 m. above Krankeloon, and placed at the disposal of the contractor.

The dredgings excavated by the bucket-ladder dredger were deposited in

scows, which were towed to the front of the deposit ground and

discharged by a suction pump fixed in a special boat, moored close to

the bank of the river. The material brought by the suction dredger in

its own hull was discharged by a plant fixed upon the dredger itself. In

both instances the material was deposited at a distance of 1640 ft. from

the river, the spoil bank varying in depth from 2 to 7 metres. The water

thrown out behind the dyke with the excavated material returned to the

river, after settlement, by a special discharge lock built under the

dyke. After 1896 the material was delivered into an abandoned pass by

means of barges with bottom hopper doors or by the suction dredger. One

suction dredger and three bucket-ladder dredgers were employed upon the

work, and a vessel called "Scheldt I." used for discharging the material

from the scows. Four tugboats and twenty scows were also employed.

The largest dredger, "Scheldt III.," was 147.63 ft. long by 22.96 ft.

wide by 10.98 ft. deep, and had buckets of 21.18 cub. ft. capacity.

The output per hour was 10,594 cub. ft. This dredger had also a

complete installation as a suction dredger, the suction pipe being 2

ft. diameter. The fan of the centrifugal pump was 5.25 ft. diameter,

and was driven by the motor of the bucket ladder. The three bucket

dredgers worked with head to the ebb tide. They could also work with

head to the flood tide, but it took so long a time to turn them about

that it was impracticable. The work was for from 13 to 14 hours a day

on the ebb tide. The effective daily excavation averaged 4839 cub.

yds. Each dredger was fitted with six anchors. The excavated cut was

164 ft. wide by 6.56 ft. deep. "Scheldt III." was capable of lifting a

mass 9.84 ft. thick. The suction dredger "Scheldt II." was of the

multiple type, and is stated to be unique in construction. It can

discharge material from a scow alongside, fill its own hopper with

excavations, discharge its own load upon the bank or into a scow by

different pipes provided for the purpose, and discharge its own load

through hopper doors. The machinery is driven by a triple expansion

engine of 300 i.h.p. working the propeller by a clutch. Owing to the

rise and fall in the tide of 23 ft. the suction pipe is fitted with

spherical joints and a telescopic arrangement. The vessel is 157.5 ft.

by 28.2 ft. by 12.8 ft. The diameter of the pump is 5.25 ft. The wings

of the pump are curved, the surface being in the form of a cylinder

parallel to the axis of rotation, the directrix of which is an arc of

a circle of 2.62 ft. radius with the straight part beyond. The suction

and discharge pipes are 2 ft. diameter. A centrifugal pump is provided

for throwing water into the scows to liquefy the material during

discharge. The dredger, which is fitted with electric lights for work

at night, is held by two anchors, to prevent lurching backwards and

forwards; it can work on the flood as well as on the ebb tide, and can

excavate to a depth of 42.65 ft., the output depending upon the nature

of the material. With good material it can fill its tanks in thirty

minutes. To empty the tanks by suction and discharge upon the bank

over the dyke takes about fifty minutes, depending upon the height and

distance to which the material requires to be delivered. The daily

work has averaged eighteen hours, ten trips being made when the

distance from the dredging ground to the point of delivery is about 1

m. When the dredged material is discharged into the Scheldt, a

quantity of 5886 cub. yds. has been raised and deposited in a day, the

mean quantity being 4700 cub. yds. When the distance of transportation

is increased to 2-1/2 m., six voyages were made in a day, and the day's

work amounted to 3530 cub. yds.

_Gold Dredgers._--Dredgers for excavating from river beds soil

containing gold are generally fitted with a screen and elevator.

[Illustration: FIG. 2.--Diagram showing Action of Lobnitz Gold Dredger.]

They have been extensively designed and built by Messrs Lobnitz & Co.

(fig. 2) and also by Messrs Hunter & English.

The writer is indebted to the _Proceedings_ of the Institution of

Civil Engineers, and especially to the paper of Mr J. J. Webster

(_Proc. Inst. C.E._ vol. 89), for much valuable information upon the

subject treated. He is also indebted to many manufacturers who have

furnished him with particulars and photographs of dredging plant.

(W. H.*)

Plate I.

[Illustration: FIG. 3.--Barge-loading dredger, "St Austell," constructed

for the British Government by Wm. Simons & Co.]

[Illustration: FIG. 4.--Stern-well hopper-dredger "La Puissante," by Wm.

Simons & Co. Length 275 ft., breadth 47 ft., depth 19 ft.]

[Illustration: FIG. 5.--Dredger constructed for the Lake Copais Co. by

Hunter & English.]

[Illustration: FIG. 6.--Light-draught dredger, with delivery apparatus

working round an arc of 210 deg., by Hunter & English.]

[Illustration: FIG. 7.--Twin-screw sand-pump dredger, "Kate," built for

the East London Harbour Board by Wm. Simons & Co.]

[Illustration: FIG. 8.--Twin-screw hopper-dredger, "Percy Sanderson,"

built for the European Danube Commission by Wm. Simons & Co.]

[Illustration: FIG. 9.--Twin-screw grab-dredger, "Miles K. Burton,"

built for the Mersey Docks and Harbour Board by Wm. Simons & Co.]

[Illustration: FIG. 10.--Hopper-dredger, "David Dale," with buckets of

54 cub. ft. capacity (see fig. 11) built for the North Eastern Railway

Company by Lobnitz & Co.]

Plate II.

[Illustration: FIG. 11.--BUCKETS OF 5 AND 54 CUBIC FEET CAPACITY

COMPARED.

The latter, the largest ever made, were for the hopper-dredger "David

Dale" (Plate I. fig. 10), built by Lobnitz & Co.]

[Illustration: FIG. 12.--MODEL OF ROCK-CUTTING DREDGER, "DEROCHEUSE."

Built for special work on the Suez Canal by Lobnitz & Co. Length 180

ft., breadth 40 ft., depth 12 ft.]