Corner Stones and Survey Monuments

[Illustration]

To property owners, as well as engineers, survey monuments which last

forever and can be easily distinguished from surrounding rocks, are of

the utmost importance. Expensive re-surveys and legal fights can be

avoided by making such monuments easily distinguishable, permanent,

and in such a way as to avoid confusion with other marks. The use of

concrete for this purpose fills all the requirements better than any

other material.

Get from the proper public official (usually the county engineer or

surveyor) the exact location of corner stones. Drive four stakes in the

ground so that strings stretched between every other stake will cross

each other directly over the original monument.

Remove the old monument, and, with a post auger, bore a hole deep

enough to reach below the frost line (at least 3 feet deep), where the

old monument stood.

Fill the hole with concrete mixed 1: 2: 4, rounding the top with

the hands so it will extend 3 or 4 inches above the level of the

surrounding ground.

While placing the last foot of concrete, imbed a harrow tooth, iron

bolt, or gas pipe, with its top just showing above the finished

concrete at a point directly under where the strings cross. Protect the

monument from damage by stock for one week, by placing a box over it.

Concrete Construction for the Home and the Farm · 第 125 / 131 题