Placing the Concrete

Always begin placing the concrete on the low side of the floor, so that

the rain from sudden showers will not run from the hard onto the newly

placed concrete. Fill the trench and the slab section of the forms with

concrete. Bring the surface to grade by drawing over it a straight edge

with its ends on the opposite forms or with one end on the form and the

other on the finished concrete. Four inches in from the edge, on each

of the low sides, temporarily embed the rounded 4 by 6-inch gutter mold

and tamp it down until its square top is even with the surface of the

slab section of the floor. Remove the mold, finish with a wooden float

and cure the floor as described on pages 31-34. Connect the gutters

with the manure pit by means of a trough, another gutter, or by large

drain tile laid underground.

[Illustration]

On the next page is given an itemized bill of materials necessary for a

6-inch floor 24 by 36 feet, amply large to accommodate 50 hogs.

=Materials Required=

Crushed rock or screened gravel, 20 cubic yards @ $1.10 $22.00

Sand, 10 cubic yards @ $1.00 10.00

Portland cement, 28 barrels @ $2.50 70.00

-------

$102.00

Mixing the concrete by hand, 5 men can usually finish this floor in two

days. Depending upon the price of labor and materials and the thickness

of the concrete, the floor will cost 6 to 12 cents for each square foot

of surface.