A Concrete Entrance Floor

[Illustration]

[Illustration]

At a point 3 feet from the building, dig a trench 6 inches wide and

18 inches deep—the length of this trench to be 2 feet greater than

the width of the doorway of the building. From the edge of the trench

nearest to the building, dig away the earth between trench and building

to a depth of 1 foot, and place here, to a depth of 6 inches, a fill

of either coarse gravel or crushed rock. Do not, however, place any of

this gravel fill in the trench. Mix concrete 1: 2½: 5, and lay same,

first in the trench, and then on top of the gravel fill; sloping the

surface so that it just meets the floor level at the doorway. Before

the concrete has had time to set, provide a runway slot for the sliding

doors—or better, build little guides or humps with the concrete,

to hold the doors in position. If the doors happen to be swinging

ones, place a gas pipe or iron socket in the soft concrete, for a

“shove-fastener.”

Note the concrete curb on the right of entrance door. This prevents the

gravel that surrounds the building from washing down onto the approach

and getting in the way of the doors. To build this curb, use 1-inch

planks placed on top of the concrete floor, to serve as forms to hold

concrete in place.

=Materials Required=

One cubic yard of crushed stone or screened gravel;

2½ cubic yards of sand;

5 bags of Portland cement.

This entrance floor was constructed in half a day, by one man.

[Illustration]