Number of Men

For the above operation only two men are required, although more can

be used to advantage. If three men are available, let two of them mix

as described above and the third man supply the water, help mix the

concrete by raking over the dry or unmixed spots as the two mixers turn

the concrete, help load the wheelbarrows with sand and stone or gravel,

etc. Fig. 5 shows a third man on the board. In this illustration, he is

helping mix the sand and cement by raking it—a most effective practice.

If four men are available, it is best to increase the size of the batch

mixed to a four-bag batch, doubling the quantities of all materials

used. The cement board should also be increased to 10 by 12 feet as

shown under “Tools.” In this case start the mixing in the middle of the

board, and each pair of men mixing exactly as if for a two-bag batch,

except that the concrete is shoveled into one big mass each time it

is turned back on to the center of the board. When more than four men

are available, the rest may place the concrete, make new runs, load

wheelbarrows, etc., taking the concrete away from the board as fast as

it is mixed. In this case another small concrete board should be placed

next to the big “board,” so that in the last turning the batch can be

shoveled over on to the small board for placing, making room on the big

board to mix the next batch. The small platform need be only just big

enough to hold the pile of mixed concrete.