TABLE II.

SHOWING THE QUANTITIES OF MATERIALS AND THE

RESULTING AMOUNT OF CONCRETE FOR TWO-BAG BATCH, USING

NATURAL MIXTURE OF BANK SAND AND GRAVEL.

--------+---------------+-------------------------------------------

| PROPORTIONS | TWO-BAG BATCH FOR NATURAL MIXTURE OF

| BY PARTS. | BANK SAND AND GRAVEL.

+-------+-------+---------------+-------+----------+--------

| | | | | Size of |

| | | Materials. | |Measuring |

KIND OF | | | | | Boxes. |

CONCRETE| | +-------+-------+ +----------+Water in

MIXTURE.| |Natural| |Natural| Con- | |Gallons

|Cement.|Mixture|Cement.|Mixture|crete. |Mixture of| for

| |of Sand| |of Sand| | Sand and |Medium

| | and | | and | | Gravel. |Wet

| |Gravel.| |Gravel.| | |Mixture.

--------+-------+-------+-------+-------+-------+----------+--------

| | | Bags. |Cu. ft.|Cu. ft.| |Gallons

1:2:4 | 1 | 4 | 2 | 7½ | 8½ |2′×4′×11½″| 10

Concrete| | | | | | |

| | | | | | |

1:2½:5 | 1 | 5 | 2 | 9½ | 10 |2′×5′×11½″| 12½

Concrete| | | | | | |

--------+-------+-------+-------+-------+-------+----------+--------