_Cement Mortars_ _Cement_ _Lime_ _Sand_
1 part cement 1-3/4 bbls. 1/4 bbl. 1/2 cu. yd.
2 parts sand optional
1 part cement 1-3/8 bbls. 1/4 bbl. 1/2 cu. yd.
2-1/2 parts sand optional
1 part cement 1/18 bbls. 1/4 bbl. 1/2 cu. yd.
3 parts sand optional
_Lump Lime Mortars_
1 part lime 7/8 bbl. 1/2 cu. yd.
2 parts sand
1 part lime 3/4 bbl. 1/2 cu. yd.
2-1/2 parts sand
1 part lime 5/8 bbl. 1/2 cu. yd.
3 parts sand
_Hydrated Lime Mortar_
1 part lime 3-1/2 sacks 1/2 cu. yd.
2 parts sand
1 part lime 3 sacks 1/2 cu. yd.
2-1/2 parts sand
1 part lime 2-1/2 sacks 1/2 cu. yd.
3 parts sand
_Cement-Lime Mortars_
1 part cement 1 sack
1 part lime 1/2 bbl. hydrated, or 1/2 cu. yd.
6 parts sand 1/4 bbl. lump
lime
_Grout for 3/16"-1/4" Joints_
1 part cement approx. approx.
3 parts sand 3/4 bbl. 1/3 cu. yd.