PUTTING IN FOUNDATIONS

The following data have been compiled and the drawings made by Mr.

George W. Repp, a Chicago architect, and are based on the most

widely followed building practice.

There is no intention of trying to inform the master mason or

the master carpenter about his craft with which he is perfectly

familiar, but to show the master carpenter builder the best methods

of handling the brick problems that may confront him in solid

brick, hollow tile, and veneer wall construction. A glossary of

technical terms will be found at the close of this volume.

[Sidenote: Footings]

Whatever type of construction is chosen, solid brick, hollow

tile, or veneer, it should rest upon a solid brick foundation.

In the majority of cases, where soil conditions are favorable,

the brick foundation walls of moderate sized houses do not need a

footing except at points bearing concentrated loads. Naturally,

the excavation should be carried down to good solid earth, free

from loose, spongy soil or filled-in ground which might later

permit sufficient unequal settlement to result in serious cracks

throughout the wall of the house. Where conditions seem to require

a footing, it may be either of brick laid in good cement mortar

(Fig. 1) or of concrete as shown in our working drawings, and

should be strengthened at points of special bearing stress. Which

footing is chosen will depend largely on convenience of getting

local material and labor. The bottom of the foundation wall or

footing must always be below frost line which, of course, varies in

different sections of the country; and this rule applies as well to

all brickwork outside of the foundation wall proper.

[Illustration: Fig. 1. Brick Footing]

[Sidenote: Drains or Drainage]

Where the conditions of soil require, porous tile with open joints

should be laid around the base of the foundation wall, not above

the level of the basement floor nor below the bottom of the wall or

footing, and slightly pitched to a point where it may be connected

with the sewer or some natural outlet. Where this tile is laid in

loose sandy Soil, the open joints should be wrapped with building

paper to prevent the sand from clogging the drain. In heavy clay

soil, the tile should be covered to the depth of about a foot with

crushed stone to prevent packing of clay around the tile.

[Sidenote: The Wall]

Foundation walls, technically speaking, are those walls below

the grade line of the building that support the super-structure.

Similar walls around areas are termed retaining walls and are not

properly a part of the foundation. The thickness of foundation,

as well as other walls for different structures, is usually

established by ordinance in cities and towns; but, where there are

no ordinances on the subject, a brick foundation wall of 12 inches,

for two-story buildings, or one of 8 inches, for small one-story

buildings, conforms to good practice.

[Sidenote: The Bond]

The foundation wall should be built of a hard-burned common brick,

and laid in Common Bond (See Fig. 47), with a good cement-lime

mortar, starting at the bottom with a header course. As the

headers, which serve as transverse bond, are not long enough to

extend through the entire thickness of the 12-inch, as they do

through the 8-inch wall, the header courses in the 12-inch wall

very naturally cannot be on the same level at the front and back

of the wall. In the bottom course, the header row is laid inside

and the stretcher row outside, while in the next course above the

position is reversed, and so on wherever the bonding header courses

come.

[Sidenote: Laying the Brick]

The first course of brick is well bedded in mortar on the footing

or the solid ground, as the case may be. At the corners and at

proper intervals along the wall where necessary, a few brick,

four or five courses high, are laid up in the advance to serve as

leads or starting points for the bond and supports for the line

which guides the mason to the proper level and alignment of the

brick. The mortar is well spread with the trowel along the top of

the brick course, and the brick to be laid is firmly pressed down

on this mortar bed next the lead. The mortar thus squeezed out of

the joint is cut off by the trowel and scraped on the head of the

next brick to be laid which is then pressed on the mortar bed and

shoved against the brick just laid, so as to squeeze mortar into

the bottom of the vertical or head joint which is then thoroughly

filled from the top by slushing with mortar. The stretcher courses

for structural reasons should be well slushed with mortar between

the front and back rows or tiers of brick, laid to break joint.

As the work progresses, the joints on the inside face of the

basement wall should be neatly struck, while the outside joints

should be cut flush for receiving a waterproof coating. The inside

joints are struck by running the point of the trowel, held firmly

at an angle, along the upper or lower edge of the brick, thus

making a smooth beveled joint (See Fig. 57).

The wall should be widened where indicated on any plan to serve

as a foundation for the fireplace, and should be built hollow to

provide for an ash pit. Where other chimneys occur, the wall at

their base should be corbeled out to serve as a support for them.

[Sidenote: Scaffolding]

After the wall has risen four or five feet, scaffolding is erected

to carry on the upper portion. The scaffolding, necessary for

the usual house, or other small building, consists of a series

of rigid horses or trestles, approximately 5'-0" wide and 5'-0"

high, on which are placed a half-dozen 2" × 10" planks laid close.

The joists for the floor above may be used for this planking and

then lifted into place when the wall is ready to receive them,

thus effecting a saving in labor. Care should be taken to keep

the horses several inches away from the inside face of the wall,

lest the jarring caused by bricks and mortar being deposited on

the scaffold may push the green wall out of plumb. The scaffolding

for the foundation wall may be dispensed with, if it is found more

convenient to lay the upper portion of the wall from the outside.

[Sidenote: Waterproofing]

All brick foundation walls should be water-proofed on the outside

except in gravelly, sandy, or very dry soil. In case there is

danger of moisture rising in the wall by capillary attraction, the

top of the footing should be water-proofed, before starting the

walls, by a course of slate well bedded in mortar or by a strip of

composition roofing. In wet locations, it would be well to carry

the waterproofing under the basement floor also. For waterproofing

the foundation walls, in slightly wet soils where the drainage is

fair, a coating of one-half inch cement plaster may be applied to

the outside surface of the brick as the wall is carried up. This

plaster should be composed of one part Portland cement and two

parts clean, sharp sand. The possibility of settlement cracking

this cement coating makes it undesirable for use in heavy soils

such as wet clay, or in low-lying land where the subsoil is likely

to be wet. In such conditions, a coating of asphalt applied

while boiling hot, thoroughly covering the brickwork, is very

satisfactory. A less expensive though excellent waterproofing,

which we suggest in our specifications, is made of three parts

of tar and one of pitch. Tar alone is sometimes used, but is not

recommended as it becomes brittle and is subject to cracks, similar

to cement. Except in dry, warm weather, it is well to prepare

the wall for the waterproofing by sizing or priming it with hot

creosote, to overcome any dampness that might prevent the asphalt

or tar-pitch from taking proper hold.

[Illustration: Fig. 2 Fig. 3 Fig. 4 Fig. 5 Fig. 6 Fig. 7