CHAPTER XXV

THE INVASION OF THE FAR EAST

II.--_Modern Developments in China and Japan_

The Chinese, once they were awakened to the possibilities of the

railway, were not content to permit their country to be covered with

foreign-built lines. They decided to become active participators in the

movement--in other words, they acquired all the knowledge they could,

and then undertook constructional engineering. Their aptitude for this

work finds an excellent expression in the Pekin-Kalgan railway, 125

miles in length. This road was built throughout by Chinese effort, the

engineer-in-chief being His Excellency Chang-Tien-Yow, who is to-day

the foremost Chinese engineer in this field in China. He was educated

in the United States, where he acquired valuable knowledge concerning

this branch of engineering, and completed his training under Mr.

Kinder, the builder of the oldest railway in the Celestial Kingdom.

The road is excellently built, and the engineer displayed his ingenuity

in coping with the problem of carrying the line through the Nankow

Pass. This pass guards the entrance of the main road through the Great

Wall, and to overcome the obstruction a gradient of 1 in 30 had to be

introduced for a distance of 13 miles. At the foot of the pass three

Mallet locomotives of British construction are maintained, and they

crawl to the summit of the pass, at an altitude of about 1,500 feet, in

two hours--a speed of about 6½ miles an hour.

The alignment of the railway up this pass is noteworthy. The road

clings for the most part to the side of the mountains, crossing deep

rifts and wide clefts, as well as cutting through spurs and humps and

compassing massive crags. Four tunnels were found to be unavoidable,

one, 3,580 feet in length, burrowing 200 feet beneath the Great Wall.

When the summit is gained, the railway enters a flat plateau, the only

difficulty here, as on the flats around Pekin, being the preservation

of the road from the attacks of floods. That this is no slight factor

is proved from the fact that in the vicinity of Pekin a wash-out

which overwhelmed the line cost no less than, £32,000, or $160,000,

to repair. The completion of the work, however, offers convincing

testimony that the Chinese, under competent supervision, are perfectly

capable of building railways without the aid of foreigners, and that no

fault can be found with their work so far as solidity and durability

are concerned.

For centuries the Chinese have been famed for their prowess in matters

pertaining to civil engineering. At times this skill pursues a quaint

course, but probably the most extraordinary illustration was in

connection with the Shanghai-Nangchow-Ningpo railway. By an imperial

edict a Chinese official was appointed as engineer-in-chief.

At one point it was necessary to throw a bridge across a river. How

it was to be accomplished passed the comprehension of the engineer.

But he evolved a solution which, to say the least, would be difficult

to equal in originality. He built the bridge on dry land, on one bank

of the river. When this was completed satisfactorily, he diverted the

waterway, so that the river ran beneath the bridge through a new,

specially-built channel, and the old one was filled up! In another

instance, where a similar situation presented itself, a pier in the

centre of the waterway became necessary. The river ran swiftly and the

water was deep. The engineer knew nothing about coffer-dams, caissons,

or other methods which the foreign engineer would have adopted. As

the men could not work on dry land to build the bridge, he proceeded

to provide them with this requisition. Hundreds of tons of spoil were

dumped into the river at the point where the pier was to be erected

until an island was formed, and on this the necessary constructional

work was carried out.

Possibly the greatest and one of the most important lines, however,

is the Pekin-Hankow railway, which is 760 miles in length, and which

eventually will be an important link in the great road that is

under construction, whereby through communication will be provided

from Kowloon via Canton, Hankow, Pekin, Mukden and Harbin to the

Trans-Siberian railway. This line was carried out with Belgian and

French money for the most part, and £5,000,000, or $25,000,000, was

sunk in the enterprise. The undertaking was commenced in 1900, but

the Boxer Rebellion interfered seriously with its progress. The

insurrectionists expended their full fury upon the railway, and

inflicted damage to the value of nearly £1,000,000, or $5,000,000,

which, however, was paid over by the Government as compensation. It

has been built cheaply, and does not compare, in point of solidity,

with the English-built lines. At the same time, however, there are some

outstanding engineering achievements. The most important is the bridge

across the Yellow River, which consists of 102 spans, giving a total

length of nearly 2 miles. It proved a particularly trying structure to

erect, owing to the treacherous character of the river-bed, while the

scouring action of the water, which is particularly severe, demanded

elaborate protective works around the bottom of the piers. After

various schemes were tried and had proved futile, large mattresses of

brushwood interwoven with rushes were fashioned, and laid around the

feet of the piers, hundreds of tons of heavy pieces of stone being

dumped on these to keep them in position. This has been found more

or less successful to prevent the soft silt from being washed away,

and to protect the supports to the bridge from being undermined. The

structure, however, is scarcely strong enough for heavy traffic, and

consequently trains upon arrival at the ends of the bridge have the

large locomotives uncoupled, and are drawn across the river by special

light engines retained for the purpose.

One of the most important lines from the commercial point of view,

however, is the Canton-Kowloon railway stretching from Kowloon, in

British territory, to the busy centre of Canton, and thence continued

northward to Hankow to provide connection with the other great systems

of the country, and also with Europe by means of the Trans-Siberian

railway. This project has passed through many vicissitudes. The British

& Chinese Corporation received official sanction to build a road

between Canton and Kowloon as far back as 1898, but the project became

shelved. An American syndicate, which had secured the concession to

connect Canton with Hankow, asserted that they had secured rights to

carry the line from the former point to the coast. Such action would

have dealt a serious blow to British commercial supremacy, and the

money was subscribed to buy out the American concession, which in the

meantime had been sold to a Belgian syndicate, and regained.

The section between Kowloon and Canton, 100 miles in length, was

divided. The Hong-Kong Government was held responsible for the 23

miles through British territory, while the balance of the line through

Chinese territory was carried out by the Chinese Government.

The English section proved tremendously difficult. The country

traversed was exceedingly rough and mountainous. The difficulties

encountered proved so abnormal that the cost of the undertaking has

exceeded the original estimates by nearly 150 per cent. Some idea of

the arduous character of the work may be gathered from the fact that

nearly 2½ out of the 23 miles in British territory are represented by

tunnels. The most arduous enterprise of this class was the Beacon Hill

tunnel, 7000 feet in length, driven through the heart of the mountain

ridge that rises up 3 miles from the coast. The tunnel is perfectly

straight, and ranks as the largest work of its type in the Chinese

Empire.

It is driven through a depth of disintegrated granite on either

approach, where heavy timbering became necessary until the solid rock

was gained. Water was encountered and gave considerable trouble. At

first labour was a serious problem, as the natives could not be induced

to toil underground, and coolies had to be imported from India. After

the work was well started, Chinese labourers, who had been working on

the South African gold-fields and had returned home, were available,

and proved highly useful workmen, especially when the wrestle commenced

with the hard, solid rock.

The tunnelling task, however, was equalled by the work in the cuts

and on the fills. Some of the cuttings are of enormous depth, and the

engineers have had to guard against the danger of heavy landslides,

which, with wash-outs, are two of the greatest menaces to the railway

in China. Heavy earthworks were required, because the line follows

roughly the coast-line, which is serrated, and to preserve alignment

it was necessary to strike straight across these indentations where

the water in many places proved to be very deep. The treacherous

character of the sea-bed, which for the most part is a silt, demanded

the provision of massive foundations upon which to raise the grade,

and months were expended while a huge fleet of junks dumped hundreds

of tons of rock into the water. Occasionally the work as completed

was washed out by heavy rains, while now and again the typhoon left

evidences of its wrath. A noticeable feature in the grading was the

amount of work performed by women, who had recourse to their native

basket slung on a pole for the conveyance of excavated earth to the

fills.

The railway, however, has been built upon the most solid lines, and

although its cost has proved so high, the money appears to have been

expended to advantage. The traffic, although not so extensive as it

will be, is increasing promisingly, and there is no doubt that when

Hankow is reached a heavy volume of business will flow over this

highway. The Chinese are proceeding with their section, and it is

anticipated that not many years will elapse before the two points are

connected.

The French engineers are erecting monuments to their railway

engineering skill in the Flowery Land, the province of Yun-nan being

the centre of their activity. The Yun-nan railway experienced a very

chequered career through its early stages, for in endeavouring to

connect the French possession of Lao-Chay with Yun-nan-Sen, the capital

of the province, they had to break down enormous obstacles. The country

is exceedingly mountainous, the height of the ridges being paralleled

by the depth and precipitous nature of the gorges. Still the heavy

and extensive bridging necessary proved no deterrent to the French

bridge-builders, who are masters in this art, as the many remarkable

structures in France testify conclusively.

The one factor to be feared seriously was the climate. This corner of

China is one of the most unsalubrious in the whole empire. Even the

natives cannot withstand it, and their ranks are decimated heavily

by tropical diseases. The labour question was one of everlasting

perplexity, and the promoters of the enterprise found that skilled

workmen, even of north China, evinced no desire to contribute to a

distinguishing feat amid such miasmatic surroundings. The absence of

transport facilities hit the undertaking sorely, and the engineers were

compelled to make the best avail they could of the existing vehicles of

conveyance--mules and the heads of natives.

The most difficult section of the line was in the valley of the Namiti.

Here it was a stern fight for supremacy with physical obstacles for

mile after mile. The weight and dimensions of every article had to be

restricted within severe limits to facilitate handling and carriage

by the primitive systems extant, and when the question comprised the

component parts of steel bridges, the problem demanded searching

deliberation. It was found, however, that the mules could handle

weights up to about 600 pounds, and that the natives could struggle

along with loads varying between 200 and 300 pounds, but neither man

nor beast could cope with anything exceeding 7 feet in length.

[Illustration: THE FAUX-NAMITI BRIDGE COMPLETED

The structure, 220 feet long, spans a wedge-shaped fissure and is 350

feet above the water. The bridge is approached on either side through a

tunnel.

RAILWAY BUILDING IN CHINA]

Such handicaps would appear to militate against the achievement of

any startling engineering performances. Yet, as a matter of fact, the

French engineers displayed a striking instance of their remarkable

ingenuity and capacity to meet awkward situations. The Namiti gorge

disputed the progress of the line. It is a deep, wide, V-shaped

fissure, one side dropping down perpendicularly for several hundred

feet. The line pierced its way through one bluff, and had to jump

across the rift to enter the opposite wall of rock. It was a matter of

200 feet across, and the rail-level had to be carried 300 feet above

the river below.

[Illustration: THE LINE SKIRTING THE SEASHORE NEAR OKITSU, TOKAIDO, ON

THE JAPANESE GOVERNMENT RAILWAYS]

The situation demanded a novel solution. Erection by false-work was

out of the question, as also was a cantilever bridge; and, again, the

question of transporting the material to the site had to be borne in

mind. Monsieur Georges Bodin, the presiding engineer of the Parisian

Société de Construction des Batignolles, however, rose to the occasion,

and evolved an unusual type of bridge, and at the same time elaborated

a novel method of carrying out its erection.

The bridge consists of two essential parts forming leaves, or bascules.

When set in position they have the appearance of a widely-opened,

inverted V. To carry out the task of erection, first a shelf was

excavated in each cliff-face at the requisite height to carry the

anchorages below the tunnel-mouths overlooking the gap. The top members

of each bascule were riveted up, laid vertically flat against, and

fixed firmly to, the cliff-faces. From this foundation each bascule was

completed.

While the mantling of the steel-work was progressing, other gangs

were busy at work cutting out large niches in the cliff-face, some

height above the tunnel portals, and on these platforms powerful

winches were erected. Each of these carried heavy chains measuring 900

feet in length. The transport of this essential piece of tackle was

interesting. Large gangs of coolies were disposed in Indian file 7 feet

apart, and the chains were trailed over their shoulders like a gigantic

serpent. In this way they wound around crags, climbed steep bluffs and

threaded narrow defiles for some 13 miles. These chains were passed

around the winches and the outer ends were attached to the upper points

of the bascules.

When each bascule was completed it was pinned firmly to its anchorage,

the lashings securing each leaf of steel to the rock face were knocked

away, and the two arms were held merely by the chains. Gangs of

coolies were stationed at each winch under the supervision of a French

engineer, and at the word of command the chains were slowly paid out,

causing the bascules to heel over towards one another. Care had to be

exercised that the lowering proceeded evenly from either side until the

two arms met at a point. Workmen then swarmed up the arm on either side

and rapidly drove in the pins and rivets which secured the two leaves

firmly in position. The whole task of lowering and securing took only

four hours, which was a noteworthy achievement.

Two short steel towers were now erected on the haunches, or central

part of each bascule, to support the steel deck of the bridge, the

members of which were brought up to the mouth of the tunnel and

launched by being pulled out over rollers. With the spanning of

the Namiti gorge, the most difficult part of the railway line was

completed. When the enterprise was undertaken it was computed that the

railway could be completed for £3,840,000, or $19,200,000, but by the

time this gorge was spanned a revision in the estimates showed that the

cost would approach £6,620,000, or $33,100,000.

In Japan, the strides in railway development within a comparatively few

years have been quite as notable as in China. In the former country,

however, the conversion from primitive means of communication to steam

locomotion commenced at an earlier date, and was attended with greater

success. As in China, the railway invasion of Japan was fathered by an

Englishman, Mr. H. N. Lay, who visited Tokio as a guest of the then

British Minister, the late Sir Harry Parkes, in 1869. He approached

the Government and stated that he was prepared to furnish the funds

necessary to commence the railway conquest of the country.

He made his offer at a peculiarly appropriate moment. The military

regency which had ruled the country for so many centuries had drawn to

a close, and the new Government welcomed the proposal. Foremost among

the supporters of the project were the present Count Okuma and the

late Prince Ito. Mr. Lay undertook to raise a loan of; £1,000,000, or

$5,000,000, and this was accepted, while Mr. Lay was entrusted with

the carrying out of the scheme. The promoter of the enterprise secured

the services of Mr. E. Morell as engineer-in-chief, and in 1870 the

work commenced. But friction arose between the English capitalist and

the Government, who did not approve of the financier’s methods. The

agreement was nullified, and the Oriental Bank was established to carry

out the undertaking, Mr. Morell being retained in his engineering

capacity.

He set to work in grim earnest. The question of gauge had to be

settled first. This vital detail was threshed out in all its bearings,

a gauge of 3½ feet was selected, and the building of the first line

between Tokio and Yokohama--a distance of 18 miles--commenced. Once

the fashioning of the grade began, other schemes were put forward.

Among them was a line from Kobe to Osaka, a distance of 20 miles,

which was put in hand, while an extension of the latter line to Otsu

was surveyed. The first railway in the country was opened on October

14, 1872, amid elaborate festivities, in the presence of the Emperor.

Within six years of Mr. Morell’s arrival, no less than 70 miles of line

had been laid and opened. This was a highly satisfactory and energetic

start for a young country, and the success of the experiment spurred

the Government to more ambitious schemes. These, however, were doomed

to temporary derangement owing to internal troubles, and the rebellion

in South Japan in 1877, which drained the imperial exchequer to such a

degree that no funds were available for railway-building operations.

Among these early enterprises was a trans-insular railway to connect

the Pacific coast of the island with the shores of the Sea of Japan,

with ferry-steamers on Lake Biwa to connect the inland break in

the railways due to that sheet of water. By this time the Japanese

engineers considered themselves competent to build railways, for they

had proved apt pupils under Mr. Morell’s training. Native talent

found its first opportunity on the Kioto-Otsu undertaking. This was a

peculiarly difficult enterprise, but the Japanese engineers rose to

the occasion, though English engineers were retained to advise them

and to design the bridges. On this line tunnelling had to be carried

out, and this was the first occasion on which the Japanese engineers

were faced with this work in their own country. Still they succeeded in

complying with the original plans to perfect satisfaction, and had the

pleasure of learning, when the road was opened in 1880, that the cost

of construction was less than the estimates.

The completion of this undertaking marked the decadence of the foreign

engineer in railway-building in Japan. Native engineers were found to

be capable of fulfilling the difficult position of assistants, and

consequently only a few British engineers were retained in the capacity

of advisers or consultants.

Private enterprise also entered the field, and numerous schemes

were sanctioned. The first of these was the Nippon Railway Company,

organised through the instrumentality of the late Prince Iwakura,

a strong advocate of railway expansion, mainly for the purpose of

assisting the peers to secure a profitable investment. It took several

years of ardent campaigning to enlist the sympathy of the latter

in such a project, but at last they fell victims to the Prince’s

persuasion, and the Nippon Railway Company was born.

[Illustration: THE MOST STRIKING EXAMPLE OF JAPANESE RAILWAY ENGINEERING

The conquest of the Usui Pass, showing heavy tunnelling and the rack

rail in the centre of the track.]

This company projected the building of no less than 510 miles of

railway. The two greatest contributions to this scheme were the

Tokio-Takasaki railway, on which the Government guaranteed a profit of

8 per cent. for ten years, and the Tokio-Sendai section, guaranteed

similarly for fifteen years. Numerous other private companies followed,

many of which received liberal Government subsidies. But while private

initiative was displaying considerable energy, the Government railway

enterprise slackened, and threatened to collapse, until Prince Yamagata

proposed that trunk lines should be laid along all the main routes

of the country, when the movement received a fresh impetus. Thus in

1883 there was renewed national activity in construction, and although

many of these undertakings were beset with difficulties of a physical

character, they were pushed through to completion.

[Illustration:

_Copyright, 1911, Kiser Photo Co., for

Spokane, Portland & Seattle Railway_] [_See page 310_

TWO RAILWAYS RACING TO THE PACIFIC COAST THROUGH THE DESCHUTES RIVER

CANYON

The Hill line describes a horseshoe curve on one side of the river,

following the waterway. The Harriman line, on the opposite side of the

river, tunnels through the projecting tongue of rock.]

One of the most notable of these early achievements was the

Takasaki-Naoyetsu line, which was commenced originally to facilitate

the transportation of constructional material for another road. The

engineers were baulked by the Usui Pass, and this gap was left open,

the two sections on either side of the range being opened for traffic

in 1887. The intervening division was undertaken subsequently, being

deferred from time to time in the hope that an easier location than

had been plotted would be found. Though the engineers searched the

mountains diligently, they failed to secure any improvement free from

heavy work, and at last the mountain division was taken in hand. The

grades were so steep, however, that the rack had to be introduced,

the Abt system being selected. The engineers found this section

particularly trying, as they had to drive no less than 26 tunnels

through mountain spurs in a distance of 7 miles, while the deep clefts

in the mountain’s flanks called for massive masonry bridges. This

work, however, was completed in 1893, and it served to provide through

communication between Tokio and Naoyetsu.

It is doubtful whether the iron road ever has made such a phenomenal

growth in other parts of the world within a short time as has

characterised its development in the East. In China there was not a

mile of line in 1877. To-day over 10,000 miles of railways have been

built, are under construction, or are projected. In Japan the network

has grown from 18 miles in 1872, to 5,141 miles at the end of the 1910

fiscal year, of which total 4,634 miles belong to the State, and 597

to private companies, while the former at that date had 2,790 miles in

hand, and private enterprise about 160 miles.

The Railway Conquest of the World · 第 25 / 26 章