CHAPTER XXI

WHERE THE SNOW-PLOUGH WORKS IN SUMMER

The Scandinavian peninsula has been the battle-ground of many titanic

struggles on behalf of the railway. In this country the iron horse

has forced its way to the most northerly point in the world where the

shriek of a locomotive whistle may be heard. This is Ofoten, a port on

the Atlantic seaboard of Norway, beyond the 68th parallel, and well

into the Arctic circle, where the famous iron mines of Gellivare in

Sweden find a western point for shipping the ore.

It was in Sweden that steel was pressed into service for the first

time in connection with the erection of bridges by the late Major C.

Adelsköld, R.E., and Member of the Academy of Sciences. This was so

far back as 1866, and the daring engineer designed, superintended the

preparation of the metal, and also the erection of the bridge. The

claim of being the first steel bridge has been advanced on behalf of

other structures in different parts of the world, but the records are

against all such statements, for they were anticipated by a decade at

least in a convincing, practical manner.

Major Adelsköld’s bridge is highly interesting, not only from the

historical point of view, but because of its unusual design, and the

methods adopted in its erection. Through the courtesy of Madam Gustafva

Adelsköld, I am enabled to give the following particulars of its

evolution and construction.

The bridge was designed to carry the Uddevalla-Wenersborg-Herljunga

railway across the Huvudnas Falls, just above the Tröllhätten Falls.

At this point the Göta River forces its way through a gorge 137½ feet

wide, just above a fall over a lofty ledge of rock. The depth and

velocity of the water prevented any intermediate pier being erected

in the waterway, so in order to span the gap it was necessary to lift

the girders bodily to set them into position. To enable this end to be

achieved it was imperative that the main girders should be as light

as possible. An iron girder, which was the metal in exclusive vogue

at that time for this work, 153 feet in length by 12 inches wide, of

the requisite strength, would have weighed over 700 tons, and to have

handled such a weight would have demanded expensive and elaborate

erecting tackle.

Major Adelsköld consequently rejected iron as the structural material

in favour of light steel girders. Once these were set he anticipated no

further hindrance to completing the structure as a “suspension bridge.”

Up to this time steel girders never had been employed in such work, and

the engineer, when he revealed his intentions, was urged by experts and

fellow-craftsmen not to use “such a brittle and untrustworthy material”

for so long a span.

Major Adelsköld, however, was convinced of the soundness of his

proposal, and consequently continued his efforts in the face of

spirited opposition. The bridge was built at Bergsund, and the

dimensions were calculated for a strain of 8 tons per square inch,

though the metal was tested to twice that stress before being set in

position. The total weight was only 50 tons.

From the engineering point of view the design is considered somewhat

novel, for it bears no resemblance to the general conception of a

suspension bridge. It is an inverted structure of this class. The upper

members act merely as struts to keep apart the ends of the chains

below, which really carry the load through the medium of the triangular

members.

The method by which the structure was erected was quite as interesting

as the design of the bridge itself. The girders were brought to the

western bank of the river. To swing them into position a derrick was

rigged up on either bank so as to overhang the water. The outer ends

of these masts, which measured 60 feet in length, were fitted with

heavy pulleys, over which ropes were passed and carried from capstans

installed for hauling purposes. The pulley ropes on the eastern bank

were pulled across the waterway and secured to one end of the girder,

while the western bank pulley ropes were secured to the other end of

the steel member, which measured 153 feet in length. In this way the

girder was lifted, swung over the water, and lowered into position. The

event was regarded as so unusual that crowds of people from Gothenburg

and Tröllhätten assembled on the banks to witness the setting of the

steel on February 8, 1866.

Owing to the roar of the waters, the engineer could not make his voice

heard, so orders were communicated across the river in Morse code by

hand-signalling. The first girder was lifted and set in position in

thirty minutes, while the second was handled in half that time. Once

the girders were set it was an easy matter to complete the remainder of

the structure.

It may be interesting to relate that the total cost of setting the

main girders, together with the hire of the tackle borrowed from a

Gothenburg shipbuilding-yard, and including the wages of the men

assisting in the task, was only £25, or $125. At that time Major

Adelsköld’s feat was regarded as an audacious stroke of engineering,

but to-day steel is the exclusive material employed in the erection of

bridges.

Railway-building in these twin countries has been attended always with

grave difficulties, owing to the rugged nature of the country and the

extreme hardness of the rock. When the sea is left, and the interior

plateau is gained, the full brunt of the Arctic weather is experienced,

and it is of a character to deter the most intrepid engineer.

One of the most momentous enterprises that has been carried to

fulfilment in this northern country is the trans-Norwegian railway,

whereby Christiania is brought into direct communication with the

Atlantic seaboard at Bergen. Owing to the prodigious difficulties

involved, however, it occupied some thirty years to carry the scheme

through, although the line is only 306 miles in length.

[Illustration: TRAIN EMERGING FROM REINUNGA TUNNEL, 5,217 FEET LONG, IN

DISTANCE, SHOWING SNOWSCOOP-PLOUGH ON LOCOMOTIVE

WHERE THE SNOWPLOUGH WORKS IN SUMMER]

[Illustration: MYRDAL STATION, SHOWING ENTRANCE TO GRAVEHALS TUNNEL,

17,420 FEET IN LENGTH]

[Illustration: MYRDAL STATION IN WINTER, SHOWING DEPTH OF SNOWFALL

THE BERGEN RAILWAY]

In 1870, commercial interests petitioned for the establishment of

a shorter route between the east coast and the Norwegian capital.

Surveyors, therefore, were deputed to investigate the interior and to

ascertain the practicability of building such a railway. After infinite

labour the engineers reported favourably upon the project, but pointed

out that the work would be unprecedentedly arduous, and would be highly

expensive.

For five years the scheme lay dormant, but in 1875 the Government

decided to commence the enterprise, with a section of line 67½ miles

long, connecting the seaboard at Bergen with Vossevangen. In deference

to views prevailing at the time, however, the narrow- or metre-gauge

was adopted, and in 1883 it was opened for traffic.

Although no further headway was made with the continuation of the main

scheme, it was not abandoned by any means. A mountain barrier, the

Dovrejelf range, barred the way to the interior. Its penetration was

recognised as one demanding great skill, for the peaks are precipitous,

with sides dropping into valleys so narrow as to be mere defiles on the

sea side of the chain. Apart from these physical handicaps, however,

the rain- and snow-falls upon the highest levels were found to be

tremendous, and it was essential that elaborate examination should

be made concerning these adverse influences before the location was

decided definitely.

A cautious policy was practised. No attempt to proceed beyond

Vossevangen was made until the mountain wall had been searched through

and through. No less than twelve alternative routes were prepared and

submitted to the Government. These demonstrated the conclusive fact

that no route could offer avoidance of the snow and rain. The question

was to follow a location, if possible, where these drawbacks were

emphasised to the least degree. For this purpose several meteorological

stations were established among the mountains and on the plateau to

gather exhaustive data by daily observations.

The outcome was the production of some decidedly startling facts, even

to those who were convinced of the extremely inclement conditions

prevailing inland. The observers had been instructed to record

particularly the maximum fall of snow during twenty-four hours, the

depth of the snow among the mountains during the winter, and the

effect of the winds which swept the plateau mercilessly during the

latter season. It was found that snow fell every month during the year

at Fjeldberg, even June, July and August not being free from such

visitations, while at another point the snowfall in winter aggregated

no less than 11 feet. At no point along the projected location of

the line was a depth of less than 8 feet recorded, while the general

average was from 10 feet to 14 feet.

The winds were found to drive the dry, fleecy flakes before them like

dust, to pile up huge drifts in sheltered places, running up to 161

feet deep. Some of these drifts remained throughout the summer, and

were found to be of respectable proportions. The sum of these reports

presaged the fact that, when the line was completed, the question of

maintaining it free from snow-blocks would demand superhuman effort.

At last the Government decided to proceed with the undertaking. The

advantages and disadvantages of the various locations had been weighed

diligently, and promoted the decision to adopt the Gravehals route.

The authorities regarded this location with misgiving in the first

instance, because it involved the piercing of a tunnel 17,420 feet in

length, at an elevation of 2,818 feet. Funds were voted to build the

next section from Vossevangen to Taugevand, a distance of 47 miles.

In this distance the line was to be lifted a matter of 4000 feet to

the highest point to be attained between the Atlantic seaboard and

Christiania.

The route selected comprised the boring of no less than 12 tunnels,

making in the aggregate not less than 11¼ miles, of which the Gravehals

tunnel represented over 3 miles. While this difficult section was being

prosecuted, the Government resolved to come to a definite conclusion

as to the route the railway should follow after attaining the summit

at Taugevand, so as to enable operations to be continued without delay

when the latter point was reached.

The exposed position of the Gravehals tunnel rendered the work

exhausting to the men. As the timber line is about 2000 feet below,

the mountain-sides are quite bare, and there is no protection against

the elements whatever. The work is the longest of its kind in Northern

Europe, and has proved probably one of the most exacting to construct.

It extends through granite which was found to be exceedingly tough, so

that boring was unavoidably slow, especially at times when everything

appeared to be pitted against the contractors.

The firm who accepted the contract undertook to complete the work

for £158,400, or $792,000, which was considered to be a very low

price. It was attacked from both ends, and mechanical boring was

adopted. Convenient water power was harnessed to drive the Brandt rock

drills, which worked under a pressure of some 1,200 pounds per square

inch. Boring proceeded somewhat slowly, more so, in fact, than the

contractors had anticipated; but this was due to the extreme hardness

of the rock encountered, while the work was handicapped by delays which

the contractors could not have controlled. In the first place labour

proved scarce and expensive. The men working on the coast, although

experienced in drilling and blasting rock, could not be persuaded to

proceed up-country to practise their skill. The situation was too

remote, and the elements were too bitter, and seeing that extensive

railway construction was proceeding at the same time in other and more

congenial parts of the country, there was no cogent reason why the men

should hie to an inhospitable locality for work.

The tunnel-borers, however, were spared the tribulations which have

assailed their colleagues in other parts of Europe. Faults in the rock

strata were very few and far between, while subterranean streams and

pockets of viscous mud did not overwhelm them. The temperature within

the boring, moreover, never rose to an intolerable point, the maximum

recorded being 52° Fahrenheit. This was in striking contrast to the

conditions on the Gotthard, Cenis, Simplon, and other central European

tunnels, where the mercury rose at times to the vicinity of 90 degrees.

Yet the workers in the Gravehals tunnel experienced their own peculiar

dangers and exasperating misadventures. The climatic conditions were

the most trying, and many men abandoned their tasks after a short

experience in this bleak situation, for work at a lower level. This

monotony was varied one day by an avalanche, which crashed down the

mountain-side, smashed into the power-house and carried away some of

the machinery. Work had to be suspended for some six weeks while the

damage thus caused was repaired. At another time work could not be

carried forward because no water was available, and about two months

of enforced idleness had to be endured until the turbines could be set

going once more.

On the same section is another heavy piece of work of this character,

the Reinunga tunnel, extending for 5,217 feet through a massive

mountain shoulder. Here the country is extremely wild, and the location

of the line taxed the plotters supremely. The track crawls along a

narrow ledge for some distance, poised nearly 500 feet above the

highroad. The situation is precarious, for landslides and avalanches

are of frequent occurrence, while detached boulders rattle down the

slopes at times and threaten the railway with extinction. Fortunately,

as the metals are laid on a gallery of solid rock hewn in the

mountain-side, the extent of the damage inflicted by these visitations

is limited to the permanent way, though the presence of these untoward

obstacles, and the result of their impact with the metals, may

interrupt communication for a short time.

[Illustration: A VIEW ON THE BERGEN RAILWAY IN WINTER, SHOWING SCREENS

TO PROTECT LINE FROM DRIFTING SNOW, AND SNOWSHEDS]

Seeing that a difference in level of over 4,100 feet has to be

overcome in the 47 miles between Vossevangen and Taugevand, it is

a teasing up-hill pull all the way. The grades are very abrupt at

places, and impose a severe tax upon the locomotives. The passenger,

however, has one compensation for slowness in travel. Some of the

grandest scenery to be seen on the European continent is unfolded

to the train as it glides in and out among the mountain rifts, and

consequently, from the tourist point of view, the route possesses

illimitable attractions, inasmuch as it offers facilities to gain some

of the most beautiful parts of the country, which hitherto have been

unapproachable, except in the face of an arduous and tedious journey by

primitive means of conveyance.

[Illustration: MULES CARRYING WATER IN BARRELS]

[Illustration:

[_See page 279_

LOAD OF RAILWAY METALS ON A MULE’S BACK

RAILWAY BUILDING IN THE ANDES]

After crossing the summit level the railway commences an easy descent,

for the inland plateau is gently undulating, and the valleys being

wider, the surveyors were assisted appreciably in their task of

discovering an easy location. The downward run continues until Bromma,

205 miles west of Bergen, is gained at an altitude of some 450 feet.

Then comes another rise to overcome a low range, which is accomplished

through a tunnel 7,644 feet in length.

This tunnel proved a more exacting and troublesome undertaking than

either the Gravehals or Reinunga works. The boring was attempted

at first on the time system, but the advance was so slow and

unsatisfactory that this principle was abandoned. The whole tunnel was

then handed over to a contractor, but he found the rock so hard that a

piece-work system was instituted. In this arrangement the workmen were

stimulated to supreme effort by the offer of tempting premiums. Issuing

from this tunnel, there is another descent for some miles, when another

ridge intervenes, necessitating a sharp climb of 700 feet, followed

by a smart downward run to Roa, where a junction is effected with the

Norwegian eastern railway system.

Contemporaneously with the building of this line between Vossevangen

and Roa, the original section between Bergen and Vossevangen had to be

overhauled. The metre gauge was in vogue upon this division, whereas

the rest of the line was being built on the standard gauge to secure

uniformity with the other lines. Accordingly, the narrow-gauge was

replaced by standard-gauge track.

The Bergen-Christiania line ranks as one of the most striking pieces

of railway engineering in Europe, and testifies to the remarkable

skill and dogged perseverance of the Scandinavians in breaking down

tremendous obstacles as they arose, with complete success. It is no

light undertaking to attempt such an enterprise as this in such a

latitude across a terribly exposed, storm-swept plateau, among the most

sparsely populated regions of Europe, and where the winter lasts for

eight or nine months. The rainfall is tropical in its severity, while

the storms are of terrific fury, as the workmen found to their cost.

Some idea of the magnitude of the work consummated by the engineers

may be gathered from a few general details. The line passes through no

less than 184 tunnels, which represent an aggregate length of nearly 24

miles. To carry the line across depressions which could not be filled,

14 bridges, ranging from a single-span stone structure of 60 feet to

a metal bridge 566 feet from end to end, had to be built. Between the

two terminal points 55 stations and stopping-places have been provided.

In order to fashion the permanent way the engineers had to excavate

about 35,000,000 cubic feet of earth, and nearly 30,000,000 cubic feet

of rock on the highest parts of the mountain section, this latter task

being assisted by the expenditure of over 1,800,000 pounds of dynamite.

The anticipated task of maintaining communication, especially on the

higher and more exposed sections of the railway, has been appreciated

to the full. To deal with the snow three powerful rotary ploughs have

been acquired, and one is kept in constant readiness. It is no unusual

circumstance for this equipment to be called out in the middle of

summer to cope with a block in one of the deep cuttings. The drift is

a danger against which especial attention has to be devoted, for the

wind catches up the fine, dry flakes and whirls them in clouds across

the country. To prevent this being deposited upon the line, and thus

obstructing traffic, timber screens have been erected beside the line,

this defence continuing in an almost unbroken line for 60 miles between

Mjolfjeld and Gjeilo.

The provision of the line, however, is of far-reaching importance to

the commercial interests of Norway. Formerly, 54 hours were required

to travel between Christiania and Bergen, but now, by cutting almost

straight across the peninsula, the journey can be covered in 14

hours. To forge the link of 215 miles between Vossevangen and Roa, to

complete this undertaking, occupied ten years, and the £3,333,000, or

$16,665,000, expended upon the enterprise is considered an excellent

investment for the country.

The Railway Conquest of the World · 第 21 / 26 章