FOOTNOTES

1 It was not for some months after this date that the transport

officers were allowed to move their camp to a more habitable spot.

2 This regimental arrangement was carried out during the latter part

of the march to Magdala, and was found to answer extremely well.

3 My anticipations with regard to the railway were more than realised;

for the last two miles of the railway to Koomaylo were not made at

the termination of the expedition, and the portion which was

completed was, without exception, the roughest, most shaky, and most

dangerous piece of railway ever laid down. It is to be hoped that

upon any future occasion a contractor will be employed instead of an

engineer officer, who cannot have either the requisite knowledge or

experience.

The March to Magdala · 第 15 / 16 题