CHAPTER II.

_THE CLIFTON SUSPENSION BRIDGE._

A.D. 1829--1853. ÆTATIS 24--48.

ORIGIN OF THE UNDERTAKING--THE FIRST COMPETITION, NOVEMBER

1829--DESCRIPTION OF MR. BRUNEL’S PLANS--MR. TELFORD’S DECISION AS

UMPIRE--MR. TELFORD’S DESIGN--THE SECOND COMPETITION--MR. BRUNEL

APPOINTED ENGINEER, MARCH 1831--COMMENCEMENT OF THE WORKS, AUGUST

1836--DESCRIPTION OF THE DESIGN--ABANDONMENT OF THE WORKS,

1853--FORMATION OF A NEW COMPANY AND COMPLETION OF THE BRIDGE,

1864. _NOTE_: THE HUNGERFORD SUSPENSION BRIDGE.

After Mr. Brunel had recovered from his accident in the Thames Tunnel,

he went for a trip to Plymouth, where he examined with great interest

the Breakwater and other engineering works in the neighbourhood. He

notes in his diary that he went to Saltash, and that he thought the

river there ‘much too wide to be worth having a bridge.’ This remark was

no doubt made in consequence of his father having some years before been

consulted as to the construction of a suspension bridge at this place,

which Mr. Brunel himself, eighteen years afterwards, selected for the

crossing of the Tamar by the Cornwall Railway, and built there the

largest and most remarkable of his bridges.

For the remainder of the year 1828, and during the greater part of 1829,

Mr. Brunel kept himself fully employed in scientific researches, and in

intercourse with Mr. Babbage, Mr. Faraday, and other friends; but he was

without any regular occupation, until, in the autumn of 1829, he heard

that designs were required for a suspension bridge over the Avon at

Bristol, and he determined to compete.

This project originated in a bequest made in 1753, by Alderman William

Vick, of the sum of 1,000_l._ to be placed in the hands of the Society

of Merchant Venturers of Bristol, with directions that it should

accumulate at compound interest until it reached 10,000_l._, when it was

to be expended in the erection of a stone bridge over the river Avon,

from Clifton Down to Leigh Down. Alderman Vick stated that he had heard

and believed that the building of such a bridge was practicable, and

might be completed for less than 10,000_l._

* * * * *

The legacy was duly paid to the Society of Merchant Venturers, and

invested by them. The interest accumulated; and in 1829, when the fund

amounted to nearly 8,000_l._, a committee was appointed to consider in

what way it would be possible to carry out Alderman Vick’s intentions.

An estimate for a stone bridge was procured, but as it gave the cost at

90,000_l._, it was evident that this scheme must be abandoned.

* * * * *

The committee then advertised for designs for a suspension bridge. Mr.

Brunel, on hearing through a friend of the proposed competition, went to

Bristol; and, after examining the locality, he selected four different

points within the limits prescribed by the instructions of the

committee, and made a separate design for each of them. His plans were

sent in on the day appointed, Nov. 19, 1829, with a long statement, from

which the following description of them is taken.

The first design was for a bridge of 760 feet span between the points of

suspension, the length of the suspended floor being 720 feet. In order

to obtain a height of 215 feet above high-water mark (which was the

least that the levels allowed of), towers 70 feet high would have had to

be built on the cliffs to carry the chains. The total length of chain,

including the land-ties, was about 1,620 feet. Mr. Brunel did not

approve of this design, as the situation was not favourable to

architectural effect, a point to which the committee attached great

importance; but he suggested it from its being somewhat more economical

in construction than his other plans.

In another design, the situation being some way farther down the river

than that of the design last mentioned, towers would also have been

necessary. The distance between the points of suspension was 1,180 feet,

with a suspended floor of over 900 feet. It is probable that Mr. Brunel

only proposed this plan because the site came within the limits of

deviation, as he does not say anything in favour of it in his report.

The two remaining plans are the most interesting of the series, as there

can be no doubt that, if Mr. Brunel had had his own way, he would have

adopted one of them for execution; and it appears from a little sketch

on the top of one of his earliest letters from Bristol, that his first

idea for the bridge was that which is carried out in these two designs.

The site selected was one where the rocks rise perpendicularly for a

considerable height above the proposed level of the bridge, and

therefore piers and land-ties were dispensed with, the chains being hung

directly from the rock. No masonry was required except for architectural

effect.[25]

[Illustration: CLIFTON SUSPENSION BRIDGE.

Plate I.

Fig. 1.

Elevation of Drawing Nº 3 of Mr. Brunel’s Designs in the first

competition. AD. 1829

Fig. 2.

H. Adlard So.

Elevation of the Bridge according to the Design on which the works were

commenced. AD. 1836.]

The principal difference between these two designs is that in the second

a short tunnel is avoided at one end. The style of architecture selected

for the tunnel-front and the face of the rock, as shown on the drawings

sent in to the committee, is Norman. There are also extant many

beautiful sketches made by Mr. Brunel for different parts of the

design.[26]

In determining upon the mode of construction, which was the same in the

four designs, Mr. Brunel acted upon the principle which guided him in

all his subsequent undertakings, which was, as he states in his report,

‘to make use of all that has been found good in similar works, and to

avail himself of the experience gained in them, and to combine with all

their advantages the precautions which time and experience had pointed

out.’

He dismissed in a few words the plan of breaking the span into two or

three lengths. This was in his opinion unnecessary, and he computed that

the cost of a pier built up from the water’s edge to sufficient height

above the bridge to carry the chains, would be at least 10,000_l._ For

this reason he recommended the adoption of spans, the smallest of which

far exceeded any up to that time constructed.

In designing the chains, he dispensed with the short connecting links,

which had been previously adopted in suspension bridges, introducing

instead the method now universally used, of connecting each set of links

directly with the adjoining one by means of a pin passed through the

holes of both. The number of joints and pins was thus reduced one half,

and a considerable saving of expense, as well as diminution of weight,

effected.

Another improvement, which diminished still further the weight of the

chains, was making the links in lengths of 16 feet, or nearly double

that of the longest links at the Menai bridge. The chief reason for this

alteration was to ensure a near approximation to equality in the strains

on the different links, should all the distances between the holes not

be exactly equal. This improvement was afterwards carried still further

in the Hungerford Suspension Bridge, the links of which were 24 feet

long.[27]

Mr. Brunel also intended to introduce equalising beams in the supports

of the floor, so that each chain should bear an equal share of the load.

By this arrangement, there would have been comparatively few points of

suspension, and ‘the view of the scenery would not be impeded from the

observer being surrounded by a forest of suspension rods.’

The disturbance of the strains on the links arising from the greater

expansion of the metal of the outer links by the direct heat of the sun,

he proposed to obviate by sheet-iron plates placed on each side of the

chains, but separated from them by a small interval, and thus screening

them from the heat. He did not, however, use this protecting covering at

the Hungerford bridge.

All the designs show a camber or rise in the centre of the platform of

the bridge, to the extent of two or three feet; and the main chains are

brought down almost to the level of the platform. To this last

arrangement, as tending to prevent undulation, Mr. Brunel attached some

importance; and he further intended to stiffen the bridge against the

action of high winds by a system of transverse bracing, and by the

addition of inverted chains, similar to those used with success by his

father in the Bourbon bridges.[28]

Such, then, were the main features of the bold and carefully matured

designs placed by Mr. Brunel before the committee. Out of twenty-two

plans submitted, only those of Mr. Brunel and four other competitors

were deemed worthy of consideration. He and his friends were naturally

much gratified at this, and were full of hope for his ultimate victory.

But now, when he seemed to have a fair chance of success in a contest

which he justly deemed would have a most important bearing upon his

future professional career, an obstacle presented itself, which for the

time seemed almost insurmountable; for he met with an unexpected

opponent in Mr. Telford, the foremost engineer of the day, and the

designer of the famous suspension bridge over the Menai Straits.

The committee of the Society of Merchants had, not unnaturally, found

themselves unable to decide upon the merits of designs for a suspension

bridge, and had asked Mr. Telford to act as their adviser in the matter.

Unfortunately for Mr. Brunel, Mr. Telford was of opinion that the

maximum span admissible was that of the Menai bridge, _i.e._ under 600

feet, and that Mr. Brunel’s proposed bridge, though very pretty and

ingenious, would most certainly tumble down in a high wind.

This decision was, of course, fatal to the success of any design which

substituted one large span for two or more smaller ones, and dispensed

with pillars. Mr. Brunel therefore obtained permission to withdraw his

plans from the competition.

Mr. Telford then reported to the committee that none of the remaining

designs were suitable for adoption without the introduction of such

material alterations as would, in fact, constitute a new design.

Whereupon the committee took the only course which, under the

circumstances, was open to them, and requested Mr. Telford to prepare a

design himself.

Mr. Brunel was not a little disappointed at the turn matters had taken;

but, having, as he said,‘smoked away his anger,’ he took leave of his

friends at Bristol, and went for a visit to some of the principal

manufacturing towns in the north.

Meanwhile Mr. Telford prepared his design, and it was exhibited in

Bristol in January 1830. It consisted of a suspension bridge of three

spans (the centre span 360 feet, and the side ones 180 feet each), the

chains being supported at the intermediate points by tall stone piers

rising from the river’s banks at just sufficient distance apart to avoid

interfering with the roadways on either side of the stream. The style of

architecture was a florid Gothic; and, in order to display the peculiar

features of that style, the faces of the piers were covered with

elaborate panelling, and the chains ornamented with fret-work.

This design was received with a flourish of trumpets; numerous

engravings were published, exhibiting the bridge from various points of

view, and ‘thousands of copies were disposed of;’ but, after a time, it

would appear that the captivating effect of the Gothic belfries wore

off, and that the more the citizens of Bristol looked at Mr. Telford’s

plan, the less they were satisfied with it; for, although it was

deposited in the Private Bill Office, on application being made for an

Act of Parliament, the trustees who were appointed under the Act

determined to invite a second competition.

On this occasion, Mr. Telford appeared as a competitor and not as a

referee, that office being filled by Mr. Davies Gilbert, sometime

President of the Royal Society.

The site of the bridge was fixed, being that selected by Mr. Telford;

but the trustees expressly left it to the judgment of the competitors to

decide whether there should be intermediate piers or one unbroken span.

Of the thirteen designs sent in, five, including those submitted by Mr.

Telford and Mr. Brunel, were reserved for further examination. On March

17, 1831, Mr. Davies Gilbert (who had been assisted by Mr. Seward) made

his report. Mr. Telford’s design was put aside, ‘on account of the

inadequacy of the funds requisite for meeting the cost of such high and

massive towers as were essential to the plan which that distinguished

individual had proposed.’

Mr. Brunel’s design was placed second.[29] Although Mr. Gilbert reported

that it presented every desirable strength and security, he saw

objections to many of the details, and therefore did not recommend it

for adoption. However, on the following day, March 18, he stated to the

trustees that he had seen Mr. Brunel, and that it gave him much pleasure

to state that the explanations made by Mr. Brunel had materially altered

his views as to the details of the plans, which he (Mr. Gilbert) was now

satisfied were quite equal to those which he had placed first, and that,

considering the superiority of Mr. Brunel’s design in the essential

particular of strength, he should judge it preferable to any of the

others.

Thereupon the trustees, ‘having considered Mr. Davies Gilbert’s report,

and referred to all the plans, including Mr. Telford’s, unanimously gave

the preference to Mr. Brunel’s,’ and appointed him their engineer.

Subscriptions came in but slowly, and it was not till 1836 that the

works were commenced.

The first stone of the abutment on the Leigh woods or Somersetshire side

of the river was laid on August 27 by the Marquis of Northampton,

President of the British Association, which was then holding its meeting

in Bristol.[30]

The span of the bridge is greater than that of Mr. Brunel’s design for

the second competition, but much less than the spans of the earlier

designs, to which he had given the preference.[31] On this point, as

well as on the question of site, he had to conform to the wishes of the

trustees.[32] The span approved of by them necessitated the building of

a very large abutment on the Leigh woods side, the height of which, from

the surface of the rock to the level of the roadway, is 110 feet. Above

the roadway, the tower to carry the chains is built to a height of 86

feet. On the Clifton side, the base of the tower is formed by one of the

boldest of the range of St. Vincent’s rocks, which here rise almost

perpendicularly to a height of 230 feet above high water, and

consequently a very small abutment was required. The tower on this side

is 3 feet higher than that on the Leigh woods side, and the roadway has

a general inclination of about 1 in 233. Mr. Brunel thought that if the

roadway were level, it would have the appearance of falling towards

Clifton, owing to the ground there being precipitous, while on the

Leigh woods side it is sloping.

He intended, in the construction of the bridge, to have followed out the

ideas embodied in his report of 1829, and would have preferred to have

had only one chain on each side of the bridge, and that much stronger

than was usually adopted; but, in deference to public opinion, he put

two chains, though he doubted if they would expand equally. ‘A rigid

platform would in some degree prevent the unequal distribution of load

thus caused, but he endeavoured to lessen the effect of unequal

expansion by arranging a stirrup at the top of each suspending rod, so

as to hold equally at all times on both chains, and thus to cause each

to sustain its proportion of the load.’

The road platform was to have had beneath it ‘a complete system of

triangular bracing, which would render it very stiff.’

In order to lessen the action of wind on the bridge, he brought down the

main chains in the centre nearly to the level of the platform, and

intended to apply the system of brace chains at a small angle to check

vibration. There were, moreover, to be two curved chains lying

horizontally, and attached underneath the platform, so as to resist the

lateral action of the wind.[33]

He here introduced movable saddles to carry the chains on the top of the

towers, with rollers running on perfectly flat and horizontal roller

beds.[34] By this arrangement no pressure except a vertical one could

come on the towers.

He also devised means, by levers and hydraulic presses, for relieving

the rollers and roller beds from pressure, in the event of their

requiring renewal.

Mr. Brunel ultimately determined to adopt the Egyptian style of

architecture. His brother-in-law, Mr. John Callcott Horsley, R.A., gives

the following account of the proposed designs for the towers:--

‘His conception of the towers or gateways at either end of the bridge

was peculiarly grand and effective, as may be seen from his sketches

still existing. They were to be purely Egyptian; and, in his design, he

had caught the true spirit of the great remains at Philæ and Thebes. He

intended to case the towers with cast iron, and, as in perfect

accordance with the Egyptian character of his design, to decorate them

with a series of figure subjects, illustrating the whole work of

constructing the bridge, with the manufacture of the

materials--beginning with quarrying the iron ore, and making the iron,

and ending with a design representing the last piece of construction

necessary for the bridge itself. The subjects would have been arranged

in tiers (divided by simple lines) from top to bottom of the towers, and

in the exact proportion of those found upon Egyptian buildings. He made

very clever sketches for some of these proposed figure subjects, just to

show what he intended by them. I remember a group of men carrying one of

the links of the chainwork, which was excellent in character. He

proposed that I should design the figure subjects, and he asked me to go

down with him to Merthyr Tydvil, and make sketches of the iron

processes. We accomplished our journey, and all the requisite drawings

for the intended designs were made.’

The works were commenced with the Leigh abutment, which was completed in

1840, great delay having been caused by the failure of the contractors.

This misfortune led to a large excess of expenditure over the original

estimates. In 1843 the whole of the funds raised (amounting to

45,000_l._) were exhausted, and there still remained to be executed the

ornamental additions to the piers (the cost of which was estimated at

about 4,000_l._), half of the iron work, the suspension of the chains

and rods, the construction of the flooring, and the completion of the

approaches, &c., the estimate for the execution of which was 30,000_l._

Unfortunately, all efforts to raise further subscriptions were

unsuccessful; and in July 1853, when the time limited for the completion

of the bridge had expired, the works were closed in, and the undertaking

abandoned.[35]

Several proposals for completing the bridge were made in Mr. Brunel’s

lifetime, and he took every opportunity of furthering this object, which

he had very much at heart. It was not, however, till about a year after

his death that the superstructure of the bridge was actually commenced.

A company was formed in 1860 by some of the principal members of the

Institution of Civil Engineers, ‘who had an interest in the work as

completing a monument to their late friend Brunel, and at the same time

removing a slur from the engineering talent of the country.’[36] Mr.

John Hawkshaw, F.R.S., and Mr. W. H. Barlow, F.R.S., were appointed the

engineers, and Mr. Brunel’s old friend Captain Christopher Claxton,

R.N., the secretary. The works were carried on with vigour; and the

bridge was opened with much ceremony on December 8, 1864.

The chains were brought from the Hungerford Suspension Bridge, then in

process of demolition. A description of the Hungerford bridge will be

found in the note to this chapter.[37]

Although the Clifton bridge was not completed by Mr. Brunel, his

connection with it forms a very important passage in the history of his

life. Doubtless, if he had never heard of the proposed competition in

1829, or if he had been one of the disappointed competitors, he would

have found some other opportunity of making a name in his profession;

but, as a matter of fact, the Clifton bridge competition did give him

the opportunity he desired, and all his subsequent success was traced by

him to this victory, which he fought hard for, and gained only by

persevering struggles. He never forgot the debt he owed to Bristol, and

to the friends who helped him there; and he would have greatly rejoiced

to see the completion of his earliest and favourite work.

[Illustration: HUNGERFORD SUSPENSION BRIDGE

H. Adiard Sc.]

NOTE (p. 58).

_The Hungerford Suspension Bridge._

The suspension bridge which spanned the Thames at Charing Cross, on the

site of the present railway bridge, was designed and constructed by Mr.

Brunel between the years 1841 and 1845. It consisted of a centre span of

676 feet, and two side spans of 343 feet each. Being intended for foot

passengers only, its width was 14 feet. The versed sine, or deflection

of the middle of the catenary, was 50 feet. The two river piers, which

still exist up to the level of the railway, and form piers of the

present bridge, were of brickwork, with large footings at the bottom, so

as to distribute the pressure over a considerable area. The whole

structure was made hollow and as light as possible. From the level of

the footway the piers were carried up as ornamental campanile towers,

the weight of the chains being taken by four solid pillars of brickwork,

7 feet 3 inches square, forming the angles. Mr. Brunel introduced here

many of the arrangements he had designed for the Clifton bridge. In

order that the pressure from the chains might be always vertical on the

piers, the saddles rested on rollers working in oil, on the level

surface of a large cast-iron bed-plate. By this arrangement it was

rendered possible for the chains of the land spans to leave the tower at

a greater inclination than those of the middle span, so that the chains

were made shorter, and as they were at a lower level where they met the

abutment, there was less change in their direction at that point, and

consequently less thrust on the brickwork. Freedom of horizontal motion

was also secured, so that, in the case of unequal loading of the spans,

the chains might accommodate themselves to the strains, and move

horizontally until equilibrium was restored. At each of the land

abutments the chains passed down over a fixed saddle, at an inclination,

to anchorages placed at the bottom of the abutment. The brickwork under

the fixed saddle was so disposed as to resist directly the thrust

resulting from the change of direction between the main chains and the

anchor chains. To resist any movement of the abutments, the piles on

which they rested were driven obliquely, with their heads inclined from

the river. These piles were very numerous, the abutments spreading out

so as to cover a large area at the foundations. Nearly all the spaces

between the longitudinal, cross, and outside walls were filled with

concrete, in order that the abutments might be as massive as possible.

The details of the brickwork in the piers and abutments showed Mr.

Brunel’s skill in the economical employment of this material. The chains

were constructed so that the sectional area was proportional to the

strain; the total area at the centre was 296 square inches, while near

the piers it was 312 square inches. There were four chains, two on each

side of the bridge, placed one above the other, and consisting each

alternately of ten and eleven links. The links were 24 feet long and 7

inches in depth, the thickness varying so as to give the requisite

sectional area.

The relative diameter of pin, and proper form of the ends of the link,

were subjects of much consideration, and many experiments were made in

order to determine these points. The fact that two specimens of iron,

apparently identical in every respect, sometimes exhibit considerable

difference in their breaking weights, shows that an average of a great

number of experiments is required in order to test satisfactorily any

proposed refinements of construction. Mr. Brunel, however, convinced

himself by experiment that he had practically arrived at such a form of

link and diameter of pin that the chain would have no tendency to break

at one point rather than another. The links were forged with shoulders

near the eyes, in order that by means of clamps the pin could be taken

out and the links disengaged, if necessary.

The efficient action of the rollers was demonstrated shortly after the

completion of the bridge. On the occasion of the opening of the Corn

Exchange by Prince Albert, one of the land spans was crowded with

people, while the centre span was nearly empty. In consequence of this

the land chains became depressed considerably below their normal

position; and the saddles on the top of the tower nearest to the loaded

span moved horizontally on the rollers to the extent of 3 inches; and,

when the crowd had dispersed, they returned to their original position.

Many years after the completion of the bridge a proposal was made to

widen it for carriage traffic; but this was not carried out, and

eventually the superstructure was removed, to make way for the bridge of

the Charing Cross Railway. As the Hungerford Suspension Bridge has

ceased to exist, an engraving has been given of it (Plate II. p. 59), in

order that some record of its appearance may remain.