CHAPTER XXIV

Engine Building in Newark. Introduction of Harris Tabor.

After my return from Philadelphia the first order I received was a very

important one. On the advice of Mr. Holley, the Albany and Rensselaer

Iron and Steel Co. of Troy, N. Y., decided to order from me two engines

for the new roll trains they were about to establish; this being the

first opportunity I had of applying my engine in what proved to be its

most important field. These were a 22×36-inch engine to drive a 16-inch

train for rolling light steel rails, and an 18×30-inch engine to drive

an 8- or 10-inch train for rolling merchant steel. These engines did

not run rapidly; the first was a direct-connected engine making only

75 revolutions per minute; the second made only 112 revolutions per

minute, but was belted to drive the train at twice that speed.

Mr. Corning, president of the company, did not like the slow way in

which the rails were turned out of the former train. I happened to

be standing with him observing this work when he asked a boy why the

billets were not fed to the rolls faster. The boy replied, “Because

the gentlemen at the hooks could not catch them, sir.” Where are the

gentlemen at the hooks to-day, when rails 200 feet long are turned out

of the rolls?

These engines stood near each other, the trains extending in opposite

directions. The battery of boilers was located at a considerable

distance from them. I set between them a vertical steam receiver,

four feet in diameter and twelve feet high. This receiver performed

two functions: it maintained the steam pressure at the cylinders and

separated the steam from the water carried over. This latter was

accomplished by admitting the steam at the top of the receiver by a

pipe extending two thirds of the way to the bottom, draining the water

from the bottom by means of a Nason steam trap, and taking the dry

steam to the engine from the top of the receiver. This was my first

application of this method, which afterwards proved most valuable in

cases of greater importance. These engines were of the highest interest

to me, as their successful running opened the door to that important

field.

While they were still lying on the floor of the shop ready for

shipment, I had an opportunity of submitting them to the criticism of

William R. Jones, the manager of the Edgar Thompson Steel Works, to

whom, as already related, I had sold a small engine and governors for

his large ones. I had not made these engines properly in one respect,

as he pointed out to me that, for rolling-mill uses, they must be made

capable of being run backwards by hand from any position, a requirement

of which I had been ignorant. I soon made the necessary additions to

the valve-gear which enabled this to be done. I never knew how Mr.

Jones came to make this opportune visit, but undoubtedly Mr. Holley

sent him.

I had another visitor before these engines were shipped. It was the

manager of the Laclede rolling mill at St. Louis, accompanied by his

engineer. They had designed a system of driving several trains of rolls

from one engine, the power of which was to be transmitted through

gearing. They were greatly fascinated by the appearance of the engines,

and gave me an order for a large engine on the spot.

This engine afforded me a curious experience. When it was started,

teeth were broken out of the gear at the very first revolution, and I

received a telegram from them telling me of this misfortune and that I

must come to St. Louis immediately and see what was the trouble with

_the engine_. I was too busy to go myself, but Mr. Phillips kindly

permitted his engineer, Mr. Collins, to go in my place. Mr. Collins

took with him everything necessary to expose the defect, whatever

it might be, which we expected would be found in the gearing. Among

other things he had the pattern-maker prepare for him two or three

short pieces of lath about two inches wide and one eighth of an inch

thick; these latter proved to be all that he needed. On his arrival the

proprietors assured him there could be no fault with the gearing, for

they had it made by the most eminent engineering firm in St. Louis.

The members of this firm showed him triumphantly the broken pieces and

directed his attention to the perfect soundness of the metal, as proved

by the fractured surfaces. His first experiment was to whittle an end

of one piece of lath to fit exactly between two teeth of a wheel at one

end of the space. To his amazement he found that this templet would

not fit in any other space around the whole wheel, every one was in

some degree or other too large or too small; neither would the templet

fit in the opposite end of the same space. This one experiment settled

the matter; the engine, to be sure, had broken the gears, because the

larger teeth of the driving-wheels had wedged into the smaller spaces

of the driven wheels. How such work could be produced was a puzzle to

Mr. Collins; as for myself, I have never wondered at any imperfection

in gearing since my experience with Mr. Whitworth’s work. The owners

of the rolling mill applied for advice to Samuel T. Wellman, the

manager of the Otis Steel Works at Cleveland. He gave them the sensible

advice to abandon altogether the plan of driving through gearing, and

to drive each train by a separate engine, directly connected, which

my high-speed engine would enable them to do. This was the first I

heard of Mr. Wellman, with whom I was afterwards to have such pleasant

relations.

While on the subject of gearing I will state a couple of incidents.

One of my first small engines I sold to Mr. Albright of Newark, a

harness-maker. Half of the power of the engine was to be transmitted

to an adjoining building driving a vertical shaft through a pair of

miter gears. It was required that these should run noiselessly, which

at 350 revolutions per minute seemed a difficult thing to accomplish.

I had the gears cut in the best gear cutter I knew of, and fitted

them to run in a lathe, the spindle of the driven gear running in a

frame made for the purpose, and being provided with a friction wheel

and brake. To make sure that the same teeth and spaces should always

come together, I made a prick-punch mark on one tooth and behind the

corresponding space. When started at 350 revolutions they rattled

finely. The resistance of the friction brake was sufficient to make

the points of contact on the teeth mark themselves well in 15 minutes’

running. I then took them down and carefully removed the bright spots

on the surface with a scraper. The next time the noise was more than

half gone, and four successive scrapings by a skillful workman cured it

entirely. There is this encouragement in correcting gearing, that its

subsequent running always tends to improve the truth of the surfaces;

they wear to a more general contact.

One day I had a letter from Mr. Barclay, the miller for whom I had made

my first engine in Harlem, and which I arranged to drive his millstones

by belting. He told me he had moved his mill from Harrison Street to

a building on North Moore Street, New York, and he found there was

something the matter with the engine. (In these cases there is always

something the matter with the engine.) It used to drive three runs of

stones, now it would only drive two, and he burned a great deal more

coal than before. He wanted me to come and see what the matter was.

The moment I opened the door of his mill I knew what the matter was. I

heard the roar of rough gearing and was pretty mad. I told him I hoped

he liked that music, for it cost him more than half the coal he was

burning to keep it up. I gave him a sharp piece of my mind for changing

the system of driving from that which I had provided without consulting

me on the subject. I told him when he threw out his gearing and put the

pulleys and belts back just as I made them, he would find the engine

would give him the same power that it had done for five or six years in

its old location.

[Illustration: ROBERT W. HUNT]

In the first engines which I built in Newark the governor had a more

or less uncomfortable action. This annoyed me exceedingly. It did not

sensibly affect the running of the engine, but was a drawback to the

appearance of the engine in motion. I was utterly at a loss how to

account for it, so I finally determined I would solve the problem by

a comparison of two engines of the same size. One of these was the

smaller engine for the rolling mill at Troy, where the action of the

governor was quite satisfactory; the other was an engine I had made

for the Newark Lime and Cement Company, in which the action of the

governor was very unsatisfactory. After some weeks of comparison I

gave the problem up: I could get no light on the subject. Soon after

I had occasion to go to Troy and found my smaller engine running at

double its former speed or at 224 revolutions per minute. Mr. Robert

W. Hunt, the general superintendent, informed me that they planned to

employ this speed when rolling steel to finish at very small sizes,

which they were then doing for the first time. The action of the

governor which had before been so perfect was now most abominable; the

counterpoise flying up and down furiously between the extreme points

of its action. I told Mr. Hunt that something was hindering the action

of the governor, and asked him if he would have an examination made

and let me know what he found. A few days after I received a letter

from him saying he had found nothing at all, but he added that that

order had been completed and the engine was running at its old speed,

and the governor was working as well as ever. In an instant the truth

flashed upon me; it was the inertia of those polished cast-iron disks

on the rocker-shaft which I had thought so much of that caused all

the trouble. This inertia, increasing as the square of the speed, had

offered four times the resistance to the reversing of their motion

when the speed of the engine was doubled, and the pressure of the link

which was necessary to overcome this resistance held the block fast.

The governor could not move it until it had accumulated sufficient

force by change of its speed; then it moved it too far, and so it was

kept in constant violent motion from one end to the other of its range

of action. I was thoroughly ashamed of myself that when I had made the

subject of inertia a study for years this action should have been going

on so long, the most prominent thing before my eyes, and I never saw

it. I had use enough at once for my new insight as will appear.

The Gautier steel works, which had been located in Jersey City, were

removing to Johnstown, Penn., having formed an alliance with the

Cambria Iron and Steel Company. Mr. Stephen W. Baldwin, then manager

of the Gautier Company, had given me an order for an engine suitable

for driving at 230 revolutions per minute their ten-inch train, or it

may have been an eight-inch. I went to Jersey City and made a careful

measurement of the indicated power required to drive this train. The

engine used was rather a large one, with a large and heavy fly-wheel

running at slow speed and driving the train at this rapid speed by

means of a belt. I found that my 10-inch by 20-inch engine directly

connected with the train would, at 230 revolutions per minute, be

capable of furnishing twice the power they were then using. I built an

engine of that size with a fly-wheel about 8 feet in diameter, shipped

it to Johnstown, and sent George Garraty, my most trusty erecter, to

set it up. I should say that Mr. Baldwin had meantime severed his

connection with the Gautier Steel Company, and it was then in the hands

of parties who were strangers to my engines. I received a letter from

Garraty stating that on his arrival he had found them just about to

send the engine back; everybody about the works had agreed that a man

who sent that little engine to drive that train to roll steel was a

fool. At his solicitation they promised to do nothing until they should

hear from me. I then wrote to the president, Mr. Douglas, stating I had

carefully measured the utmost power which that train had required at

Jersey City, and had furnished an engine capable of supplying double

that power with ease, and I was sure he would run no risk in setting

it up. This he consented to do. While Garraty was erecting the engine

they were making preparations in the mill to stall it if possible.

There was great excitement when it was started; the furnace men worked

like beavers and succeeded in feeding billets to the train twice as

rapidly as ever before, but they could not bring down its speed in the

least. Finally they lowered the steam pressure, but the engine did

not stop until they had brought this down to 40 pounds. Then a great

shout went up, not for themselves but for the engine, which had shown

itself capable of doubling the output of that train, and telegrams

were hurried off to the stockholders of the concern in New York and

Philadelphia to relieve their anxiety. Garraty left that night and

reported himself to me the following morning. After giving an account

of the success of the engine he added: “But the governor is working

very badly; they have not noticed it yet as they have thought only of

the running of the train, but they will.” By a remarkable coincidence

I had that very morning received the letter from Mr. Hunt which had

opened my eyes to the cause of this bad action; the day before I could

not have understood it.

[Illustration: STEPHEN W. BALDWIN]

Within twenty-four hours after my interview with Garraty I had started

for Johnstown, carrying with me two light steel levers to replace those

disks. In that time I had made the drawings and had the levers forged

and finished, joint-pins set and keyways cut, perfect duplicates of

the disks in all their working features. When I told my purpose to Mr.

Douglas he smiled and said for the life of him he could not see what

disks on the rocker-shaft had to do with the governor action. However,

they had not yet started their night shift, so I might have the engine

after 6 o’clock, but it must be ready for use at 6 o’clock the next

morning. I told him that as the change would probably occupy me less

than an hour, I thought I might safely assure him on that point. I

engaged a machinist with the engineer to help me at 7 o’clock in the

evening and amused myself the rest of the day about the mill. The

furious governor action was so irritating I did not stay long in the

engine-room. In the evening we had the disks off and the levers on and

all connected up, ran the engine idle for a few minutes to see that all

was right and I was back in my hotel within the hour, which illustrated

the advantage of working to gauges. I had taken off 29 pounds weight,

that being the difference between the weight of the disks and the

levers. Next morning I went down to see the effect of this change. It

seemed magical. The governor appeared to have gone to sleep, it was not

taking any interest in the activity about it; the counterpoise stood

at about the middle of its range of action, only moving lazily a short

distance up or down occasionally. After calling Mr. Douglas in to see

what disks on the rocker-shaft, with their motion reversed 460 times a

minute, had to do with the governor action, and hearing his expressions

of admiration, I took the next train home. As might be supposed I was

not long in eliminating all traces of this blunder from drawings and

from engines already made.

I had an order from John W. Hyatt of Newark for a 6×12-inch engine to

make 450 revolutions per minute, to drive an attrition mill running

at 900 revolutions per minute, in which he pulverized bones to dust

for manufacturing artificial ivory. This was the highest number of

revolutions per minute that I had ever employed, and perhaps it was

the most absolutely silent running engine that I ever made. Not

long after its completion I had a call from a young gentleman who

introduced himself to me as Harris Tabor. He told me he had invented

a steam-engine indicator which he thought would be superior to the

Richards indicator, as the pencil movement was very much lighter and

would draw a straight vertical line. He said he called in the hope

that I might give him an opportunity to test his indicator on a very

high-speed engine. I told him I thought I could do just what he wanted.

I took him down to Mr. Hyatt’s place where the engine was running with

the indicator rig on it which I had been using; he was, of course,

greatly pleased with this remarkable opportunity. He took a number of

diagrams with his indicator, and they proved to be quite free from the

vibrations which were produced by the Richards indicator at the same

speed. I gave him a certificate that these diagrams had been taken by

his indicator from a Porter-Allen engine at a speed of 450 revolutions

per minute. With these he started for Boston to see Mr. Ashcroft. With

the result of that interview the engineering world is familiar. To

my great regret not one of the diagrams taken at that time has been

preserved either by Mr. Tabor, Mr. Ashcroft or myself, an omission

that none of us can account for. The Hyatt plant was afterwards, I

understood, removed to Albany, N. Y.

I had a singular experience with another 6×12-inch engine which I sold

to William A. Sweet, elder brother of Prof. John E. Sweet, for use in

his spring manufactory in Syracuse, N. Y. Mr. Sweet had two batteries

of boilers set at some distance from each other and at different

elevations; these were connected by a pipe which was necessarily

inclined. About the middle of the length of this pipe a stop-valve

had been introduced, and when this valve was shut the pipe in the

upper end of it was, of course, partly filled with water. My engine

received its steam from the bottom of this pipe below the stop-valve.

The boilers at the lower end were one day overloaded, and while I

happened to be present Mr. Sweet himself opened the stop-valve for

the purpose of getting an additional supply of steam from the upper

battery, but he did not get it. What he did get was a charge of solid

water, which brought my engine to an instantaneous stop from a speed

of 350 revolutions per minute. I was standing near the engine and saw

shooting out from the joint of the back cylinder head a sheet of water,

which at the top struck the roof of the building. On examination it

was found that the steel key of the fly-wheel had been driven into the

wrought-iron shaft almost half an inch and the shaft was bent. The

engine suffered no other injury; the bolts of the cylinder head had not

been strained to their elastic limit, and the nuts did not require to

be tightened. The shaft was straightened, new key-seats were cut for

the fly-wheel, and the engine worked as well as ever--a pretty good

proof of its general strength.

[Illustration: HARRIS TABOR]

I had a couple of funny experiences arising out of my new way of boring

fly-wheels and belt-drums. I sold an engine to Mr. Westinghouse for his

original shop in Pittsburg, before the appearance of the Westinghouse

engine. They erected it for themselves. I received a telegram from

their superintendent, reading: “The hole in your wheel hub is oblong,

what shall we do about it?” To which I wired back: “Put the wheel on

the shaft and drive in the key.”

Another superintendent discovered the same unaccountably bad piece of

work, and did _not_ communicate with me. He did the best he could by

centering the shaft in the hole and filling the spaces on each side

with thin iron scarfed down on each edge. Then the key would not enter

the keyway; so he reduced it until it would. Then the wheel ran an

eighth of an inch out of truth. Then he unstopped the vials of his

wrath and poured out their contents on my devoted head.

I had an order from Mr. Mathieson, manager of the works of the National

Tube Company, at McKeesport, Penn., for two engines, 28 and 32 inches

diameter, with 48 inches stroke. The interest of this story centers in

the former of these engines, which made 125 revolutions per minute. One

day the governor spindle stuck fast in its column, an accident I never

knew to happen before or since, whether caused by a tight fit or for

want of lubrication I do not know. Of course the engine ran away like

mad. Mr. Mathieson and I were in the engine-room; the last I saw of him

his coat skirt was nearly horizontal as he rushed through the door. The

engineer ran to screw down the starting-valve. I thought that would be

too long a process and ran in front of the fly-wheel to unhook the gab.

On the instant, however, I feared what might be the possible effect in

the cylinder of instantly arresting the motion of the admission valves

at an unknown point in the stroke at that speed, and I did not do it.

In a few seconds the engineer had the valve closed, and the engine soon

slowed down. The fly-wheel, which was 20 feet in diameter, did not

burst, and I was confident it would not. I never had an accident to a

fly-wheel, but this was the most severe test to which my fly-wheels

were ever subjected. I have heard of many accidents to fly-wheels, in

which it was evident that they were so carelessly made it seemed as if

they were intended to burst on a moderate acceleration of their speed.

This fly-wheel was necessarily made in halves in order to transport it,

and the joints were so made as to be as strong as the section of the

rim. As the accompanying drawing will show, they were held together by

two steel loops opened out of the solid and shrunk in. It will be seen

that any section of cast iron at this point was equal to the section

of the rim, while the steel loops were stronger. The halves of the hub

were held together by bolts and steel rings.

I sold an engine for a rubber manufactory in Cleveland, Ohio, and some

months after received a letter from the proprietor saying he had been

adding to his machinery and the engine would not drive it all and would

not give its guaranteed power, and he wanted me to come immediately

and see what was the matter with it. On going into the boiler-room I

saw that the steam-gauge showed only 55 pounds pressure. I asked the

engineer why he carried so little pressure, and he told me that the

safety-valve was set to blow off at 60 pounds, which he considered

to be all the pressure a boiler ought to carry; that he had been an

engineer several years on the Lakes, where 60 pounds was the greatest

pressure allowed. I asked the proprietor if he had his boiler insured;

he said he had, in the Hartford Boiler Insurance Company. I said I

supposed that company had an agent in Cleveland. He said: “Yes, and his

office is around the corner on this block, and if you want to see him I

presume I can have him here in ten minutes.” Pretty soon he appeared,

and I said to him: “I understand you have insured this boiler.”

“Yes.”

“Have you made a personal examination of it?”

“I have.”

“What would you consider a safe pressure to carry?”

“One hundred and twenty pounds.”

[Illustration: Mr. Porter’s Fly-wheel.]

“Would you hold it insured at that pressure?”

“Certainly, it would be perfectly safe.”

“Now,” said I to the proprietor, “you will observe that my guarantee

of power assumes a pressure of 85 pounds, and you have no excuse for

not carrying that pressure, and if you do so you will have no trouble;

as for the practice on the Lakes, if you will come to New York we will

show you that on our river and sound steamboats the practice is to

carry only 25 pounds pressure.” He readily agreed to carry the higher

pressure, which he found ample; so I was fooled into going to Cleveland

pretty much for nothing. Afterwards I went there to a better purpose.

Engineering reminiscences contributed to "Power" and "American machinist" · 第 24 / 28 章