PUMPING ARRANGEMENTS.

The general arrangement of piping was designed so that it was possible

to pump from any flooded compartment by two independent systems of

10-inch mains having cross connections between them. These were

controlled from above by rods and wheels led to the level of the

bulkhead deck. By these it was possible to isolate any flooded space,

together with any suctions in it. If any of these should happen

accidentally to be left open, and consequently out of reach, it could be

shut off from the main by the wheel on the bulkhead deck. This

arrangement was specially submitted to the Board of Trade and approved

by them.

The double bottom of the vessel was divided by 17 transverse water-tight

divisions, including those bounding the fore and aft peaks, and again

subdivided by a center fore-and-aft bulkhead, and two longitudinal

bulkheads, into 46 compartments. Fourteen of these compartments had

8-inch suctions, 23 had 6-inch suctions, and 3 had 5-inch suctions

connected to the 10-inch ballast main suction; 6 compartments were used

exclusively for fresh water.

The following bilge suctions were provided for dealing with water above

the double bottom, viz, in No. 1 hold two 3-1/2-inch suctions, No. 2

hold two 3-1/2-inch and 2 3-inch suctions, bunker hold, two 3-1/2-inch

and two 3-inch suctions.

The valves in connection with the forward bilge and ballast suctions

were placed in the firemen's passage, the water-tight pipe tunnel

extending from No. 6 boiler room to the after end of No. 1 hold. In this

tunnel, in addition to two 3-inch bilge suctions, one at each end, there

was a special 3-1/2-inch suction with valve rod led up to the lower deck

above the load line, so as always to have been accessible should the

tunnel be flooded accidentally.

In No. 6 boiler room there were three 3-1/2-inch, one 4-1/2-inch, and

two 3-inch suctions.

In No. 5 boiler room there were three 3-1/2-inch, one 5-inch, and two

3-inch suctions.

In No. 4 boiler room there were three 3-1/2-inch, one 4-1/2-inch, and

two 3-inch suctions.

In No. 3 boiler room there were three 3-1/2-inch, one 5-inch, and two

3-inch suctions.

In No. 2 boiler room there were three 3-1/2-inch, one 5-inch, and two

3-inch suctions.

In No. 1 boiler room there were two 3-1/2-inch, one 5-inch, and two

3-inch suctions.

In the reciprocating engine room there were two 3-1/2-inch, six 3-inch,

two 18-inch, and two 5-inch suctions.

In the turbine engine room there were two 3-1/2-inch, three 3-inch, two

18-inch, two 5-inch, and one 4-inch suctions.

In the electric engine room there were four 3-1/2-inch suctions.

In the storerooms above the electric engine room there was one 3-inch

suction.

In the forward tunnel compartment there were two 3-1/2-inch suctions.

In the water-tight flat over the tunnel compartment there were two

3-inch suctions.

In the tunnel after compartment there were two 3-1/2-inch suctions.

In the water-tight flat over the tunnel after compartment there were two

3-inch suctions.

Loss of the Steamship "Titanic" · 第 33 / 120 题