THE PENINSULAR MAILS.

Previous to the 4th of September, 1837, the arrangements for the Mail

Packet communication with the Peninsula were as follows:--

Mails to Lisbon were conveyed by sailing Post-office Packets, which

departed from Falmouth for Lisbon every week--wind and weather

permitting. Their departures and arrivals were, however, extremely

irregular; and it was no very infrequent occurrence for the Lisbon Mail

to be three weeks’ old on its arrival at Falmouth, instead of being

brought in five days, with an almost mail-coach or railway precision,

as is now the case.

The communication with Cadiz and Gibraltar was only once a month by a

steam packet.

The originators and original proprietors of the Peninsular Steam

Company, who had, for upwards of a year previously to the time above

mentioned, been running steam vessels at a considerable loss between

London and the principal Peninsular ports, finding themselves in

a position to effect a great improvement in the arrangements for

transmitting the Mails, applied to the Government of that day on the

subject, but were at first coldly received, and their suggestions

disregarded. They continued, however, to prosecute their enterprise;

and the celerity and regularity with which their steam packets made

their passages soon began to attract the attention of the public.

The merchants began to complain loudly of the inefficiency of the

transmission of the Mails by sailing packets; and it was at last

intimated, from an official quarter, to the Managers of the Peninsular

steamers, that if they had any plan or proposals to submit for an

improvement of the Peninsular Mail Service, the Government was then

prepared to receive and consider the same.

In consequence of this intimation, a plan and proposal was drawn up for

a weekly transmission of the Mails between Falmouth and Vigo, Oporto,

Lisbon, Cadiz, and Gibraltar, by efficient steam packets, and at a

cost to the public which should be less than that of the then existing

inferior arrangement--namely, sailing packets to and from the Port of

Lisbon, and a steam packet, once a month only, to and from Cadiz and

Gibraltar.

The plan, after due examination, was considered to embrace advantages

to the public far exceeding what the then existing arrangements

afforded; and its adoption was consequently intimated to the authors

and proposers of it; but, at the same time, they were informed that the

execution of it would be put up to public competition.

Accordingly, an advertisement was soon afterwards issued, inviting

tenders, from owners of steam vessels, for conveying the Mails between

Falmouth and the Peninsula, in conformity with the plan submitted by

the Peninsular Company; and the Contract for the Service was competed

for against that Company by the proprietors of some steam vessels,

who, under the designation of the British and Foreign Steam Navigation

Company, had a short time previously commenced running two small

steamers to the Peninsula, in opposition to the Peninsular Company’s

vessels.

This British and Foreign Company, not being able to satisfy the

Admiralty that they had the means of performing the proposed Service,

their tender was rejected. Upon which they addressed the Admiralty, and

requested that the Contract might be postponed, alleging, that if a

month more were given to them, they could provide sufficient vessels.

Their request was granted; and, contrary to all previous practice,

after the tender of the Peninsular Company had been given in, and the

amount of it, in all probability, known to their competitors, the

Contract was again advertised, and a month more given for receiving

tenders.

The British and Foreign Company again failed to show that they had any

adequate means of performing the Service; and a private negotiation

was then entered into by the Government, with the Peninsular Company,

with a view to reduce the sum required by them. This sum was £30,000

per annum, being about £5,000 less than the estimated annual cost to

the public of the sailing packets and steam packet previously employed

in conveying the Mails. This sum was ultimately reduced to £29,600,[2]

on which terms the Contract was concluded on the 22nd August, 1837,

and may be considered to have formed the basis upon which one of the

most extensive and successful steam enterprises yet known has been

established.

These facts, it is submitted, abundantly show, that so far from any

favour being shown, in regard to this Contract, to the originators of

this Company, they obtained it in the face of adverse circumstances,

and solely because they had, by their own enterprise, placed themselves

in a position to effect an important public improvement, combined with

a reduction of the public expenditure.

No. II.

_Contract for an accelerated Conveyance of the India and other

Mails between England and Malta, and Alexandria._

An Abstract of the Proceedings of the Select Committee of the House of Commons, Appointed Session, 1849, to Inquire Into the Contract Packet Service · 第 2 / 17 题