FIGS. 3 and 4.--Low-pressure Supply Station.]

Generating stations.

The general arrangements of a low-pressure supply station are shown in

figs. 3 and 4. It consists of a boiler-house containing a bank of

boilers, either Lancashire or Babcock & Wilcox being generally used (see

BOILER), which furnish steam to the engines and dynamos, provision

being made by duplicate steam-pipes or a ring main so that the failure

of a single engine or dynamo does not cripple the whole supply. The

furnace gases are taken through an economizer (generally Green's) so

that they give up their heat to the cold feed water. If condensing water

is available the engines are worked condensing, and this is an essential

condition of economy when steam turbines are employed. Hence, either a

condensing water pond or a cooling tower has to be provided to cool the

condensing water and enable it to be used over and over again.

Preferably the station should be situated near a river or canal and a

railway siding. The steam dynamos are generally arranged in an

engine-room so as to be overlooked from a switchboard gallery (fig. 3),

from which all the control is carried out. The boiler furnaces are

usually stoked by automatic stokers. Owing to the relatively small load

factor (say 8 or 10%) of a station giving electric supply for lighting

only, the object of every station engineer is to cultivate a demand for

electric current for power during the day-time by encouraging the use of

electric motors for lifts and other purposes, but above all to create a

demand for traction purposes. Hence most urban stations now supply

current not only for electric lighting but for running the town tramway

system, and this traction load being chiefly a daylight load serves to

keep the plant employed and remunerative. It is usual to furnish a

continuous current supply for traction at 500 or 600 volts, although

some station engineers are advocating the use of higher voltages. In

those stations which supply current for traction, but which have a

widely scattered lighting load, _double current_ dynamos are often

employed, furnishing from one and the same armature a continuous current

for traction purposes, and an alternating current for lighting purposes.

High-pressure continuous supply.

In some places a high voltage system of electric supply by continuous

current is adopted. In this case the current is generated at a pressure

of 1000 or 2000 volts, and transmitted from the generating station by

conductors, called high-pressure feeders, to certain sub-centres or

transformer centres, which are either buildings above ground or cellars

or excavations under the ground. In these transformer centres are placed

machines, called _continuous-current transformers_, which transform the

electric energy and create a secondary electric current at a lower

pressure, perhaps 100 or 150 volts, to be supplied by distributing mains

to users (see TRANSFORMERS). From these sub-centres insulated conductors

are run back to the generating station, by which the engineer can start

or stop the continuous-current rotatory transformers, and at the same

time inform himself as to their proper action and the electromotive

force at the secondary terminals. This system was first put in practice

in Oxford, England, and hence has been sometimes called by British

engineers "the Oxford system." It is now in operation in a number of

places in England, such as Wolverhampton, Walsall, and Shoreditch in

London. It has the advantage that in connexion with the low-pressure

distributing system secondary batteries can be employed, so that a

storage of electric energy is effected. Further, continuous-current arc

lamps can be worked in series off the high-pressure mains, that is to

say, sets of 20 to 40 arc lamps can be operated for the purpose of

street lighting by means of the high-pressure continuous current.

Alternating supply.

The alternating current systems in operation at the present time are the

_single-phase_ system, with distributing transformers or transformer

sub-centres, and the _polyphase_ systems, in which the alternating

current is transformed down into an alternating current of low pressure,

or, by means of rotatory transformers, into a continuous current. The

general arrangement of a _single-phase_ alternating-current system is as

follows: The generating station contains a number of alternators, A1 A2

(fig. 5), producing single-phase alternating current, either at 1000,

2000, or sometimes, as at Deptford and other places, 10,000 volts. This

current is distributed from the station either at the pressure at which

it is generated, or after being transformed up to a higher pressure by

the transformer T. The alternators are sometimes worked in parallel,

that is to say, all furnish their current to two common omnibus bars on

a high-pressure switchboard, and each is switched into circuit at the

moment when it is brought into step with the other machines, as shown by

some form of _phase-indicator_. In some cases, instead of the

high-pressure feeders starting from omnibus bars, each alternator works

independently and the feeders are grouped together on the various

alternators as required. A number of high-pressure feeders are carried

from the main switchboard to various transformer sub-centres or else run

throughout the district to which current is to be furnished. If the

system laid down is the transformer sub-centre system, then at each of

these sub-centres is placed a battery of alternating-current

transformers, T1 T2 T3, having their primary circuits all joined in

parallel to the terminals of the high-pressure feeders, and their

secondary circuits all joined in parallel on a distributing main,

suitable switches and cut-outs being interposed. The pressure of the

current is then transformed down by these transformers to the required

supply pressure. The secondary circuits of these transformers are

generally provided with three terminals, so as to supply the

low-pressure side on a three-wire system. It is not advisable to connect

together directly the secondary circuits of all the different

sub-centres, because then a fault or short circuit on one secondary

system affects all the others. In banking together transformers in this

manner in a sub-station it is necessary to take care that the

transformation ratio and secondary drop (see TRANSFORMERS) are exactly

the same, otherwise one transformer will take more than its full share

of the load and will become overheated. The transformer sub-station

system can only be adopted where the area of supply is tolerably

compact. Where the consumers lie scattered over a large area, it is

necessary to carry the high-pressure mains throughout the area, and to

place a separate transformer or transformers in each building. From a

financial point of view, this "house-to-house system" of

alternating-current supply, generally speaking, is less satisfactory in

results than the transformer sub-centre system. In the latter some of

the transformers can be switched off, either by hand or by automatic

apparatus, during the time when the load is light, and then no power is

expended in magnetizing their cores. But with the house-to-house system

the whole of the transformers continually remain connected with the

high-pressure circuits; hence in the case of supply stations which have

only an ordinary electric lighting load, and therefore a load-factor not

above 10%, the efficiency of distribution is considerably diminished.

[Illustration: FIG. 5.]

The single-phase alternating-current system is defective in that it

cannot be readily combined with secondary batteries for the storage of

electric energy. Hence in many places preference is now given to the

_polyphase system_. In such a system a polyphase alternating current,

either two- or three-phase, is transmitted from the generating station

at a pressure of 5000 to 10,000 volts, or sometimes higher, and at

various sub-stations is transformed down, first by static transformers

into an alternating current of lower pressure, say 500 volts, and then

by means of rotatory transformers into a continuous current of 500

volts or lower for use for lighting or traction.

In the case of large cities such as London, New York, Chicago, Berlin

and Paris the use of small supply stations situated in the interior of

the city has gradually given way to the establishment of large supply

stations outside the area; in these alternating current is generated on

the single or polyphase system at a high voltage and transmitted by

underground cables to sub-stations in the city, at which it is

transformed down for distribution for private and public electric

lighting and for urban electric traction.

Owing to the high relative cost of electric power when generated in

small amounts and the great advantages of generating it in proximity to

coal mines and waterfalls, the supply of electric power in bulk to small

towns and manufacturing districts has become a great feature in modern

electrical engineering. In Great Britain, where there is little useful

water power but abundance of coal, electric supply stations for supply

in bulk have been built in the coal-producing districts of South Wales,

the Midlands, the Clyde valley and Yorkshire. In these cases the current

is a polyphase current generated at a high voltage, 5000 to 10,000

volts, and sometimes raised again in pressure to 20,000 or 40,000 volts

and transmitted by overhead lines to the districts to be supplied. It is

there reduced in voltage by transformers and employed as an alternating

current, or is used to drive polyphase motors coupled to direct current

generators to reproduce the power in continuous current form. It is then

distributed for local lighting, street or railway traction, driving

motors, and metallurgical or electrochemical applications. Experience

has shown that it is quite feasible to distribute in all directions for

25 miles round a high-pressure generating station, which thus supplies

an area of nearly 2000 sq. m. At such stations, employing large turbine

engines and alternators, electric power may be generated at a works cost

of 0.375d. per kilowatt (K.W.), the coal cost being less than 0.125d.

per K.W., and the selling price to large load-factor users not more than

0.5d. per K.W. The average price of supply from the local generating

stations in towns and cities is from 3d. to 4d. per unit, electric

energy for power and heating being charged at a lower rate than that for

lighting only.

Conductors.

We have next to consider the structure and the arrangement of the

conductors employed to convey the currents from their place of creation

to that of utilization. The conductors themselves for the most part

consist of copper having a conductivity of not less than 98% according

to Matthiessen's standard. They are distinguished as (1) _External

conductors_, which are a part of the public supply and belong to the

corporation or company supplying the electricity; (2) _Internal

conductors_, or house wiring, forming a part of the structure of the

house or building supplied and usually the property of its owner.

External conductors.

The external conductors may be overhead or underground. _Overhead_

conductors may consist of bare stranded copper cables carried on

porcelain insulators mounted on stout iron or wooden poles. If the

current is a high-pressure one, these insulators must be carefully

tested, and are preferably of the pattern known as oil insulators. In

and near towns it is necessary to employ insulated overhead conductors,

generally india-rubber-covered stranded copper cables, suspended by

leather loops from steel bearer wires which take the weight. The British

Board of Trade have issued elaborate rules for the construction of

overhead lines to transmit large electric currents. Where telephone and

telegraph wires pass over such overhead electric lighting wires, they

have to be protected from falling on the latter by means of guard wires.

By far the largest part, however, of the external electric distribution

is now carried out by _underground conductors_, which are either bare or

insulated. Bare copper conductors may be carried underground in culverts

or chases, air being in this case the insulating material, as in the

overhead system. A culvert and covered chase is constructed under the

road or side-walk, and properly shaped oak crossbars are placed in it

carrying glass or porcelain insulators, on which stranded copper

cables, or, preferably, copper strips placed edgeways, are stretched and

supported. The advantages of this method of construction are cheapness

and the ease with which connexions can be made with service-lines for

house supply; the disadvantages are the somewhat large space in which

coal-gas leaking out of gas-pipes can accumulate, and the difficulty of

keeping the culverts at all times free from rain-water. Moisture has a

tendency to collect on the negative insulators, and hence to make a dead

earth on the negative side of the main; while unless the culverts are

well ventilated, explosions from mixtures of coal-gas and air are liable

to occur. Insulated cables are insulated either with a material which is

in itself waterproof, or with one which is only waterproof in so far as

it is enclosed in a waterproof tube, e.g. of lead. Gutta-percha and

india-rubber are examples of materials of the former kind. Gutta-percha,

although practically everlasting when in darkness and laid under water,

as in the case of submarine cables, has not been found satisfactory for

use with large systems of electric distribution, although much employed

for telephone and telegraph work. Insulated underground external

conductors are of three types:--(a) _Insulated Cables drawn into

Pipes._--In this system of distribution cast-iron or stoneware pipes, or

special stoneware conduits, or conduits made of a material called

bitumen concrete, are first laid underground in the street. These

contain a number of holes or "ways," and at intervals drawing-in boxes

are placed which consist of a brick or cast-iron box having a

water-tight lid, by means of which access is gained to a certain section

of the conduit. Wires are used to draw in the cables, which are covered

with either india-rubber or lead, the copper being insulated by means of

paper, impregnated jute, or other similar material. The advantages of a

drawing-in system are that spare ways can be left when the conduits are

put in, so that at a future time fresh cables can be added without

breaking up the roadway. (b) _Cables in Bitumen._--One of the earliest

systems of distribution employed by T.A. Edison consisted in fixing two

segment-shaped copper conductors in a steel tube, the interspace between

the conductors and the tube being filled in with a bitumen compound. A

later plan is to lay down an iron trough, in which the cables are

supported by wooden bearers at proper distances, and fill in the whole

with natural bitumen. This system has been carried out extensively by

the Callendar Cable Company. Occasionally concentric lead-covered and

armoured cables are laid in this way, and then form an expensive but

highly efficient form of insulated conductor. In selecting a system of

distribution regard must be paid to the nature of the soil in which the

cables are laid. Lead is easily attacked by soft water, although under

some conditions it is apparently exceedingly durable, and an atmosphere

containing coal-gas is injurious to india-rubber. (c) _Armoured

Cables._--In a very extensively used system of distribution armoured

cables are employed. In this case the copper conductors, two, three or

more in number, may be twisted together or arranged concentrically, and

insulated by means of specially prepared jute or paper insulation,

overlaid with a continuous tube of lead. Over the lead, but separated by

a hemp covering, is put a steel armour consisting of two layers of steel

strip, wound in opposite directions and kept in place by an external

covering. Such a cable can be laid directly in the ground without any

preparation other than the excavation of a simple trench, junction-boxes

being inserted at intervals to allow of branch cables being taken off.

The armoured cable used is generally of the concentric pattern (fig. 6).

It consists of a stranded copper cable composed of a number of wires

twisted together and overlaid with an insulating material. Outside this

a tubular arrangement of copper wires and a second layer of insulation,

and finally a protective covering of lead and steel wires or armour are

placed. In some cases three concentric cylindrical conductors are formed

by twisting wires or copper strips with insulating material between. In

others two or three cables of stranded copper are embedded in insulating

material and included in a lead sheath. This last type of cable is

usually called a _two-_ or _three-core_ pattern cable (fig. 7).

[Illustration: FIG. 6.--Armoured Concentric Cable (Section).

IC, Inner conductor.

OC, Outer conductor.

I, Insulation.

L, Lead sheath.

S, Steel armour.

H, Hemp covering.]

[Illustration: FIG. 7.--Triple Conductor Armoured Cable (Section).

C, Copper conductor.

I, Insulation.

L, Lead sheath.

H, Hemp covering.

S, Steel armour.]

The arrangement and nature of the external conductors depends on the

system of electric supply in which they are used. In the case of

continuous-current supply for incandescent electric lighting and motive

power in small units, when the external conductors are laid down on the

three-wire system, each main or branch cable in the street consists of a

set of three conductors called the positive, middle and negative. Of

these triple conductors some run from the supply station to various

points in the area of supply without being tapped, and are called the

_feeders_; others, called the _distributing mains_, are used for making

connexions with the service lines of the consumers, one service line, as

already explained, being connected to the middle conductor, and the

other to either the positive or the negative one. Since the middle

conductor serves to convey only the difference between the currents

being used on the two sides of the system, it is smaller in section than

the positive and negative ones. In laying out the system great judgment

has to be exercised as to the selection of the points of attachment of

the feeders to the distributing mains, the object being to keep a

constant electric pressure or voltage between the two service-lines in

all the houses independently of the varying demand for current. Legally

the suppliers are under regulations to keep the supply voltage constant

within 4% either way above or below the standard pressure. As a matter

of fact very few stations do maintain such good regulation. Hence a

considerable variation in the light given by the incandescent lamps is

observed, since the candle-power of carbon glow lamps varies as the

fifth or sixth power of the voltage of supply, i.e. a variation of only

2% in the supply pressure affects the resulting candle-power of the

lamps to the extent of 10 or 12%. This variation is, however, less in

the case of metallic filament lamps (see LIGHTING: _Electric_). In the

service-lines are inserted the meters for measuring the electric energy

supplied to the customer (see METER, ELECTRIC).

Interior wiring.

In the interior of houses and buildings the conductors generally consist

of india-rubber-covered cables laid in wood casing. The copper wire must

be tinned and then covered, first with a layer of unvulcanized pure

india-rubber, then with a layer of vulcanized rubber, and lastly with

one or more layers of protective cotton twist or tape. No conductor of

this character employed for interior house-wiring should have a smaller

insulation resistance than 300 megohms per mile when tested with a

pressure of 600 volts after soaking 24 hours in water. The wood casing

should, if placed in damp positions or under plaster, be well varnished

with waterproof varnish. As far as possible all joints in the run of the

cable should be avoided by the use of the so-called looping-in system,

and after the wiring is complete, careful tests for insulation should be

made. The Institution of Electrical Engineers of Great Britain have

drawn up rules to be followed in interior house-wiring, and the

principal Fire Insurance offices, following the lead of the Phoenix Fire

Office, of London, have made regulations which, if followed, are a

safeguard against bad workmanship and resulting possibility of damage by

fire. Where fires having an electric origin have taken place, they have

invariably been traced to some breach of these rules. Opinions differ,

however, as to the value and security of this method of laying interior

conductors in buildings, and two or three alternative systems have been

much employed. In one of these, called the _interior conduit_ system,

highly insulating waterproof and practically fireproof tubes or conduits

replace the wooden casing; these, being either of plain insulating

material, or covered with brass or steel armour, may be placed under

plaster or against walls. They are connected by bends or joint-boxes.

The insulated wires being drawn into them, any short circuit or heating

of the wire cannot give rise to a fire, as it can only take place in the

interior of a non-inflammable tube. A third system of electric light

wiring is the safety concentric system, in which concentric conductors

are used. The inner one, which is well insulated, consists of a

copper-stranded cable. The outer may be a galvanized iron strand, a

copper tape or braid, or a brass tube, and is therefore necessarily

connected with the earth. A fourth system consists in the employment of

twin insulated wires twisted together and sheathed with a lead tube; the

conductor thus formed can be fastened by staples against walls, or laid

under plaster or floors.

The general arrangement for distributing current to the different

portions of a building for the purpose of electric lighting is to run up

one or more rising mains, from which branches are taken off to

distributing boxes on each floor, and from these boxes to carry various

branch circuits to the lamps. At the distributing boxes are collected

the cut-outs and switches controlling the various circuits. When

alternating currents are employed, it is usual to select as a type of

conductor either twin-twisted conductor or concentric; and the

employment of these types of cable, rather than two separate cables, is

essential in any case where there are telephone or telegraph wires in

proximity, for otherwise the alternating current would create inductive

disturbances in the telephone circuit. The house-wiring also comprises

the details of _switches_ for controlling the lamps, _cut-outs_ or fuses

for preventing an excess of current passing, and fixtures or supports

for lamps often of an ornamental character. For the details of these,

special treatises on electric interior wiring must be consulted.

For further information the reader may be referred to the following

books:--C.H. Wordingham, _Central Electrical Stations_ (London, 1901);

A. Gay and C.Y. Yeaman, _Central Station Electricity Supply_ (London,

1906); S.P. Thompson, _Dynamo Electric Machinery_ (2 vols., London,

1905); E. Tremlett Carter and T. Davies, _Motive Power and Gearing_

(London, 1906); W.C. Clinton, _Electric Wiring_ (2nd ed., London,

1906); W. Perren Maycock, _Electric Wiring, Fitting, Switches and

Lamps_ (London, 1899); D. Salomons, _Electric Light Installations_

(London, 1894); Stuart A. Russell, _Electric Light Cables_ (London,

1901); F.A.C. Perrine, _Conductors for Electrical Distribution_

(London, 1903); E. Rosenberg, W.W. Haldane Gee and C. Kinzbrunner,

_Electrical Engineering_ (London, 1903); E.C. Metcalfe, _Practical

Electric Wiring for Lighting Installations_ (London, 1905); F.C.

Raphael, _The Wireman's Pocket Book_ (London, 1903). (J. A. F.)

History.

II. _Commercial Aspects._--To enable the public supply enterprises

referred to in the foregoing section to be carried out in England,

statutory powers became necessary to break up the streets. In the early

days a few small stations were established for the supply of electricity

within "block" buildings, or by means of overhead wires within

restricted areas, but the limitations proved uneconomical and the

installations were for the most part merged into larger undertakings

sanctioned by parliamentary powers. In the year 1879 the British

government had its attention directed for the first time to electric

lighting as a possible subject for legislation, and the consideration of

the then existing state of electric lighting was referred to a select

committee of the House of Commons. No legislative action, however, was

taken at that time. In fact the invention of the incandescent lamp was

incomplete--Edison's British master-patent was only filed in Great

Britain in November 1879. In 1881 and 1882 electrical exhibitions were

held in Paris and at the Crystal Palace, London, where the improved

electric incandescent lamp was brought before the general public. In

1882 parliament passed the first Electric Lighting Act, and considerable

speculation ensued. The aggregate capital of the companies registered in

1882-1883 to carry out the public supply of electricity in the United

Kingdom amounted to L15,000,000, but the onerous conditions of the act

deterred investors from proceeding with the enterprise. Not one of the

sixty-two provisional orders granted to companies in 1883 under the act

was carried out. In 1884 the Board of Trade received only four

applications for provisional orders, and during the subsequent four

years only one order was granted. Capitalists declined to go on with a

business which if successful could be taken away from them by local

authorities at the end of twenty-one years upon terms of paying only the

then value of the plant, lands and buildings, without regard to past or

future profits, goodwill or other considerations. The electrical

industry in Great Britain ripened at a time when public opinion was

averse to the creation of further monopolies, the general belief being

that railway, water and gas companies had in the past received valuable

concessions on terms which did not sufficiently safeguard the interests

of the community. The great development of industries by means of

private enterprise in the early part of the 19th century produced a

reaction which in the latter part of the century had the effect of

discouraging the creation by private enterprise of undertakings

partaking of the nature of monopolies; and at the same time efforts were

made to strengthen local and municipal institutions by investing them

with wider functions. There were no fixed principles governing the

relations between the state or municipal authorities and commercial

companies rendering monopoly services. The new conditions imposed on

private enterprise for the purpose of safeguarding the interests of the

public were very tentative, and a former permanent secretary of the

Board of Trade has stated that the efforts made by parliament in these

directions have sometimes proved injurious alike to the public and to

investors. One of these tentative measures was the Tramways Act 1870,

and twelve years later it was followed by the first Electric Lighting

Act.

It was several years before parliament recognized the harm that had been

done by the passing of the Electric Lighting Act 1882. A select

committee of the House of Lords sat in 1886 to consider the question of

reform, and as a result the Electric Lighting Act 1888 was passed. This

amending act altered the period of purchase from twenty-one to forty-two

years, but the terms of purchase were not materially altered in favour

of investors. The act, while stipulating for the consent of local

authorities to the granting of provisional orders, gives the Board of

Trade power in exceptional cases to dispense with the consent, but this

power has been used very sparingly. The right of vetoing an undertaking,

conferred on local authorities by the Electric Lighting Acts and also by

the Tramways Act 1870, has frequently been made use of to exact unduly

onerous conditions from promoters, and has been the subject of complaint

for years. Although, in the opinion of ministers of the Crown, the

exercise of the veto by local authorities has on several occasions led

to considerable scandals, no government has so far been able, owing to

the very great power possessed by local authorities, to modify the law

in this respect. After 1888 electric lighting went ahead in Great

Britain for the first time, although other countries where legislation

was different had long previously enjoyed its benefits. The developments

proceeded along three well-defined lines. In London, where none of the

gas undertakings was in the hands of local authorities, many of the

districts were allotted to companies, and competition was permitted

between two and sometimes three companies. In the provinces the cities

and larger towns were held by the municipalities, while the smaller

towns, in cases where consents could be obtained, were left to the

enterprise of companies. Where consents could not be obtained these

towns were for some time left without supply.

Some statistics showing the position of the electricity supply

business respectively in 1896 and 1906 are interesting as indicating

the progress made and as a means of comparison between these two

periods of the state of the industry as a whole. In 1896 thirty-eight

companies were at work with an aggregate capital of about L6,000,000,

and thirty-three municipalities with electric lighting loans of nearly

L2,000,000. The figures for 1906, ten years later, show that 187

electricity supply companies were in operation with a total investment

of close on L32,000,000, and 277 municipalities with loans amounting

to close on L36,000,000. The average return on the capital invested in

the companies at the later period was 5.1% per annum. In 1896 the

average capital expenditure was about L100 per kilowatt of plant

installed; and L50 per kilowatt was regarded as a very low record. For

1906 the average capital expenditure per kilowatt installed was about

L81. The main divisions of the average expenditure are:--

1896. 1906.

Land and buildings 22.3% 17.8%

Plant and machinery 36.7 36.5

Mains 32.2 35.5

Meters and instruments 4.6 5.7

Provisional orders, &c. 3.2 2.8

The load connected, expressed in equivalents of eight candle-power

lamps, was 2,000,000 in 1896 and 24,000,000 in 1906. About one-third

of this load would be for power purposes and about two-thirds for

lighting. The Board of Trade units sold were 30,200,000 in 1896 and

533,600,000 in 1906, and the average prices per unit obtained were

5.7d. and 2.7d. respectively, or a revenue of L717,250 in 1896 and

over L6,000,000 in 1906. The working expenses per Board of Trade unit

sold, excluding depreciation, sinking fund and interest were as

follows:--

1896. 1906.

Generation and distribution 2.81d. .99d.

Rent, rates and taxes .35 .14

Management .81 .18

Sundries .10 .02

------ ------

Total 4.07d. 1.33d.

In 1896 the greatest output at one station was about 5-1/2 million

units, while in 1906 the station at Manchester had the largest output

of over 40 million units.

The capacity of the plants installed in the United Kingdom in 1906

was:--

K.W.

Continuous current 417,000 / Provinces 333,000

\ London 84,000

Alternating current 132,000 / Provinces 83,000

\ London 49,000

Continuous current and \

alternating current > 480,000 / Provinces 366,000

combined / \ London 114,000

---------

1,029,000 k.w.

Economics.

The economics of electric lighting were at first assumed to be similar

to those of gas lighting. Experience, however, soon proved that there

were important differences, one being that gas may be stored in

gasometers without appreciable loss and the work of production carried

on steadily without reference to fluctuations of demand. Electricity

cannot be economically stored to the same extent, and for the most part

it has to be used as it is generated. The demand for electric light is

practically confined to the hours between sunset and midnight, and it

rises sharply to a "peak" during this period. Consequently the

generating station has to be equipped with plant of sufficient capacity

to cope with the maximum load, although the peak does not persist for

many minutes--a condition which is very uneconomical both as regards

capital expenditure and working costs (see LIGHTING: _Electric_). In

order to obviate the unproductiveness of the generating plant during the

greater part of the day, electricity supply undertakings sought to

develop the "daylight" load. This they did by supplying electricity for

traction purposes, but more particularly for industrial power purposes.

The difficulties in the way of this line of development, however, were

that electric power could not be supplied cheaply enough to compete with

steam, hydraulic, gas and other forms of power, unless it was generated

on a very large scale, and this large demand could not be developed

within the restricted areas for which provisional orders were granted

and under the restrictive conditions of these orders in regard to

situation of power-house and other matters.

The leading factors which make for economy in electricity supply are the

magnitude of the output, the load factor, and the diversity factor,

also the situation of the power house, the means of distribution, and

the provision of suitable, trustworthy and efficient plant. These

factors become more favourable the larger the area and the greater and

more varied the demand to be supplied. Generally speaking, as the output

increases so the cost per unit diminishes, but the ratio (called the

load factor) which the output during any given period bears to the

_maximum_ possible output during the same period has a very important

influence on costs. The ideal condition would be when a power station is

working at its normal _maximum_ output continuously night and day. This

would give a load-factor of 100%, and represents the ultimate ideal

towards which the electrical engineer strives by increasing the area of

his operations and consequently also the load and the variety of the

overlapping demands. It is only by combining a large number of demands

which fluctuate at different times--that is by achieving a high

diversity factor--that the supplier of electricity can hope to approach

the ideal of continuous and steady output. Owing to the dovetailing of

miscellaneous demands the actual demand on a power station at any moment

is never anything like the aggregate of all the maximum demands. One

large station would require a plant of 36,000 k.w. capacity if all the

demands came upon the station simultaneously, but the maximum demand on

the generating plant is only 15,000 kilowatts. The difference between

these two figures may be taken to represent the economy effected by

combining a large number of demands on one station. In short, the

keynote of progress in cheap electricity is increased and diversified

demand combined with concentration of load. The average load-factor of

all the British electricity stations in 1907 was 14.5%--a figure which

tends to improve.

Power companies.

Several electric power supply companies have been established in the

United Kingdom to give practical effect to these principles. The

Electric Lighting Acts, however, do not provide for the establishment of

large power companies, and special acts of parliament have had to be

promoted to authorize these undertakings. In 1898 several bills were

introduced in parliament for these purposes. They were referred to a

joint committee of both Houses of Parliament presided over by Lord

Cross. The committee concluded that, where sufficient public advantages

are shown, powers should be given for the supply of electricity over

areas including the districts of several local authorities and involving

the use of exceptional plant; that the usual conditions of purchase of

the undertakings by the local authorities did not apply to such

undertakings; that the period of forty-two years was "none too long" a

tenure; and that the terms of purchase should be reconsidered. With

regard to the provision of the Electric Lighting Acts which requires

that the consent of the local authority should be obtained as a

condition precedent to the granting of a provisional order, the

committee was of opinion that the local authority should be entitled to

be heard by the Board of Trade, but should not have the power of veto.

No general legislation took place as a result of these recommendations,

but the undermentioned special acts constituting power supply companies

were passed.

In 1902 the president of the Board of Trade stated that a bill had been

drafted which he thought "would go far to meet all the reasonable

objections that had been urged against the present powers by the local

authorities." In 1904 the government introduced the Supply of

Electricity Bill, which provided for the removal of some of the minor

anomalies in the law relating to electricity. The bill passed through

all its stages in the House of Lords but was not proceeded with in the

House of Commons. In 1905 the bill was again presented to parliament but

allowed to lie on the table. In the words of the president of the Board

of Trade, there was "difficulty of dealing with this question so long as

local authorities took so strong a view as to the power which ought to

be reserved to them in connexion with this enterprise." In the official

language of the council of the Institution of Electrical Engineers, the

development of electrical science in the United Kingdom is in a backward

condition as compared with other countries in respect of the practical

application to the industrial and social requirements of the nation,

notwithstanding that Englishmen have been among the first in inventive

genius. The cause of such backwardness is largely due to the conditions

under which the electrical industry has been carried on in the country,

and especially to the restrictive character of the legislation governing

the initiation and development of electrical power and traction

undertakings, and to the powers of obstruction granted to local

authorities. Eventually The Electric Lighting Act 1909 was passed. This

Act provides:--(1) for the granting of provisional orders authorizing

any local authority or company to supply electricity in bulk; (2) for

the exercise of electric lighting powers by local authorities jointly

under provisional order; (3) for the supply of electricity to railways,

canals and tramways outside the area of supply with the consent of the

Board of Trade; (4) for the compulsory acquisition of land for

generating stations by provisional order; (5) for the exemption of

agreements for the supply of electricity from stamp duty; and (6) for

the amendment of regulations relating to July notices, revision of

maximum price, certification of meters, transfer of powers of

undertakers, auditors' reports, and other matters.

The first of the Power Bills was promoted in 1898, under which it was

proposed to erect a large generating station in the Midlands from which

an area of about two thousand square miles would be supplied. Vigorous

opposition was organized against the bill by the local authorities and

it did not pass. The bill was revived in 1899, but was finally crushed.

In 1900 and following years several power bills were successfully

promoted, and the following are the areas over which the powers of these

acts extend:

In Scotland, (1) the Clyde Valley, (2) the county of Fife, (3) the

districts described as "Scottish Central," comprising Linlithgow,

Clackmannan, and portions of Dumbarton and Stirling, and (4) the

Lothians, which include portions of Midlothian, East Lothian, Peebles

and Lanark.

In England there are companies operating in (1) Northumberland, (2)

Durham county, (3) Lancashire, (4) South Wales and Carmarthenshire, (5)

Derbyshire and Nottinghamshire, (6) Leicestershire and Warwickshire, (7)

Yorkshire, (8) Shropshire, Worcestershire and Staffordshire, (9)

Somerset, (10) Kent, (11) Cornwall, (12) portions of Gloucestershire,

(13) North Wales, (14) North Staffordshire, Derbyshire, Denbighshire and

Flintshire, (15) West Cumberland, (16) the Cleveland district, (17) the

North Metropolitan district, and (18) the West Metropolitan area. An

undertaking which may be included in this category, although it is not a

Power Act company, is the Midland Electric Corporation in South

Staffordshire. The systems of generation and distribution are generally

10,000 or 11,000 volts three-phase alternating current.

The powers conferred by these acts were much restricted as a result of

opposition offered to them. In many cases the larger towns were cut out

of the areas of supply altogether, but the general rule was that the

power company was prohibited from supplying direct to a power consumer

in the area of an authorized distributor without the consent of the

latter, subject to appeal to the Board of Trade. Even this restricted

power of direct supply was not embodied in all the acts, the power of

taking supply in bulk being left only to certain authorized distributors

and to authorized users such as railways and tramways. Owing chiefly to

the exclusion of large towns and industrial centres from their areas,

these power supply companies did not all prove as successful as was

expected.

In the case of one of the power companies which has been in a favourable

position for the development of its business, the theoretical

conclusions in regard to the economy of large production above stated

have been amply demonstrated in practice. In 1901, when this company was

emerging from the stage of a simple electric lighting company, the total

costs per unit were 1.05d. with an output of about 2-1/2 million units per

annum. In 1905 the output rose to over 30 million units mostly for power

and traction purposes, and the costs fell to 0.56d. per unit.

An interesting phase of the power supply question has arisen in London.

Under the general acts it was stipulated that the power-house should be

erected within the area of supply, and amalgamation of undertakings was

prohibited. After less than a decade of development several of the

companies in London found themselves obliged to make considerable

additions to their generating plants. But their existing buildings were

full to their utmost capacity, and the difficulties of generating

cheaply on crowded sites had increased instead of diminished during the

interval. Several of the companies had to promote special acts of

parliament to obtain relief, but the idea of a general combination was

not considered to be within the range of practical politics until 1905,

when the Administrative County of London Electric Power Bill was

introduced. Compared with other large cities, the consumption of

electricity in London is small. The output of electricity in New York

for all purposes is 971 million units per annum or 282 units per head of

population. The output of electricity in London is only 42 units per

head per annum. There are in London twelve local authorities and

fourteen companies carrying on electricity supply undertakings. The

capital expenditure is L3,127,000 by the local authorities and

L12,530,000 by the companies, and their aggregate capacity of plant is

165,000 k.w. The total output is about 160,000,000 units per annum, the

total revenue is over L2,000,000, and the gross profit before providing

for interest and sinking fund charges is L1,158,000. The general average

cost of production is 1.55d. per unit, and the average price per unit

sold is 3.16d., but some of the undertakers have already supplied

electricity to large power consumers at below 1d. per unit. By

generating on a large scale for a wide variety of demands the promoters

of the new scheme calculated to be able to offer electrical energy in

bulk to electricity supply companies and local authorities at prices

substantially below their costs of production at separate stations, and

also to provide them and power users with electricity at rates which

would compete with other forms of power. The authorized capital was

fixed at L6,666,000, and the initial outlay on the first plant of 90,000

k.w., mains, &c., was estimated at L2,000,000. The costs of generation

were estimated at 0.15d. per unit, and the total cost at 0.52d. per unit

sold. The output by the year 1911 was estimated at 133,500,000 units at

an average selling price of 0.7d. per unit, to be reduced to 0.55d. by

1916 when the output was estimated at 600,000,000 units. The bill

underwent a searching examination before the House of Lords committee

and was passed in an amended form. At the second reading in the House of

Commons a strong effort was made to throw it out, but it was allowed to

go to committee on the condition--contrary to the general

recommendations of the parliamentary committee of 1898--that a purchase

clause would be inserted; but amendments were proposed to such an extent

that the bill was not reported for third reading until the eve of the

prorogation of parliament. In the following year (1906) the

Administrative Company's bill was again introduced in parliament, but

the London County Council, which had previously adopted an attitude both

hostile and negative, also brought forward a similar bill. Among other

schemes, one known as the Additional Electric Power Supply Bill was to

authorize the transmission of current from St Neots in Hunts. This bill

was rejected by the House of Commons because the promoters declined to

give precedence to the bill of the London County Council. The latter

bill was referred to a hybrid committee with instructions to consider

the whole question of London power supply, but it was ultimately

rejected. The same result attended a second bill which was promoted by

the London County Council in 1907. The question was settled by the

London Electric Supply Act 1908, which constitutes the London County

Council the purchasing authority (in the place of the local authorities)

for the electric supply companies in London. This Act also enabled the

Companies and other authorized undertakers to enter into agreements for

the exchange of current and the linking-up of stations.

Legislation and regulations.

The general supply of electricity is governed primarily by the two acts

of parliament passed in 1882 and 1888, which apply to the whole of the

United Kingdom. Until 1899 the other statutory provisions relating to

electricity supply were incorporated in provisional orders granted by

the Board of Trade and confirmed by parliament in respect of each

undertaking, but in that year an Electric Lighting Clauses Act was

passed by which the clauses previously inserted in each order were

standardized. Under these acts the Board of Trade made rules with

respect to applications for licences and provisional orders, and

regulations for the protection of the public, and of the electric lines

and works of the post office, and others, and also drew up a model form

for provisional orders.

Until the passing of the Electric Lighting Acts, wires could be placed

wherever permission for doing so could be obtained, but persons breaking

up streets even with the consent of the local authority were liable to

indictment for nuisance. With regard to overhead wires crossing the

streets, the local authorities had no greater power than any member of

the public, but a road authority having power to make a contract for

lighting the road could authorize others to erect poles and wires for

the purpose. A property owner, however, was able to prevent wires from

being taken over his property. The act of 1888 made all electric lines

or other works for the supply of electricity, not entirely enclosed

within buildings or premises in the same occupation, subject to

regulations of the Board of Trade. The postmaster-general may also

impose conditions for the protection of the post office. Urban

authorities, the London County Council, and some other corporations have

now powers to make by-laws for prevention of obstruction from posts and

overhead wires for telegraph, telephone, lighting or signalling

purposes; and electric lighting stations are now subject to the

provisions of the Factory Acts.

Parliamentary powers to supply electricity can now be obtained by (A)

Special Act, (B) Licence, or (C) Provisional order.

A. _Special Act._--Prior to the report of Lord Cross's joint committee

of 1898 (referred to above), only one special act was passed. The

provisions of the Electric Power Acts passed subsequently are not

uniform, but the following are some of the usual provisions:--

The company shall not supply electricity for lighting purposes except to

authorized undertakers, provided that the energy supplied to any person

for power may be used for lighting any premises on which the power is

utilized. The company shall not supply energy (except to authorized

undertakers) in any area which forms part of the area of supply of any

authorized distributors without their consent, such consent not to be

unreasonably withheld. The company is bound to supply authorized

undertakers upon receiving notice and upon the applicants agreeing to

pay for at least seven years an amount sufficient to yield 20% on the

outlay (excluding generating plant or wires already installed). Other

persons to whom the company is authorized to supply may require it upon

terms to be settled, if not agreed, by the Board of Trade. Dividends are

usually restricted to 8%, with a provision that the rate may be

increased upon the average price charged being reduced. The maximum

charges are usually limited to 3d. per unit for any quantity up to 400

hours' supply, and 2d. per unit beyond. No preference is to be shown

between consumers in like circumstances. Many provisions of the general

Electric Lighting Acts are excluded from these special acts, in

particular the clause giving the local authority the right to purchase

the undertaking compulsorily.

B. _Licence._--The only advantages of proceeding by licence are that it

can be expeditiously obtained and does not require confirmation by

parliament; but some of the provisions usually inserted in provisional

orders would be _ultra vires_ in a licence, and the Electric Lighting

Clauses Act 1899 does not extend to licences. The term of a licence does

not exceed seven years, but is renewable. The consent of the local

authority is necessary even to an application for a licence. None of the

licences that have been granted is now in force.

C. _Provisional Order._--An intending applicant for a provisional order

must serve notice of his intention on every local authority within the

proposed area of supply on or before the 1st of July prior to the

session in which application is to be made to the Board of Trade. This

provision has given rise to much complaint, as it gives the local

authorities a long time for bargaining and enables them to supersede

the company's application by themselves applying for provisional orders.

The Board of Trade generally give preference to the applications of

local authorities.

In 1905 the Board of Trade issued a memorandum stating that, in view of

the revocation of a large number of provisional orders which had been

obtained by local authorities, or in regard to which local authorities

had entered into agreements with companies for carrying the orders into

effect (which agreements were in many cases _ultra vires_ or at least of

doubtful validity), it appeared undesirable that a local authority

should apply for a provisional order without having a definite intention

of exercising the powers, and that in future the Board of Trade would

not grant an order to a local authority unless the board were satisfied

that the powers would be exercised within a specified period.

Every undertaking authorized by provisional order is subject to the

provision of the general act entitling the local authority to purchase

compulsorily at the end of forty-two years (or shorter period), or after

the expiration of every subsequent period of ten years (unless varied by

agreement between the parties with the consent of the Board of Trade),

so much of the undertaking as is within the jurisdiction of the

purchasing authority upon the terms of paying the then value of all

lands, buildings, works, materials and plant, suitable to and used for

the purposes of the undertaking; provided that the value of such lands,

&c., shall be deemed to be their fair market value at the time of

purchase, due regard being had to the nature and then condition and

state of repair thereof, and to the circumstance that they are in such

positions as to be ready for immediate working, and to the suitability

of the same to the purposes of the undertaking, and where a part only of

the undertaking is purchased, to any loss occasioned by severance, but

without any addition in respect of compulsory purchase or of goodwill,

or of any profits which may or might have been or be made from the

undertaking or any similar consideration. Subject to this right of

purchase by the local authority, a provisional order (but not a licence)

may be for such period as the Board of Trade may think proper, but so

far no limit has been imposed, and unless purchased by a local authority

the powers are held in perpetuity. No monopoly is granted to

undertakers, and since 1889 the policy of the Board of Trade has been to

sanction two undertakings in the same metropolitan area, preferably

using different systems, but to discourage competing schemes within the

same area in the provinces. Undertakers must within two years lay mains

in certain specified streets. After the first eighteen months they may

be required to lay mains in other streets upon conditions specified in

the order, and any owner or occupier of premises within 50 yds. of a

distributing main may require the undertakers to give a supply to his

premises; but the consumer must pay the cost of the lines laid upon his

property and of so much outside as exceeds 60 ft. from the main, and he

must also contract for two and in some cases for three years' supply.

But undertakers are prohibited in making agreements for supply from

showing any undue preference. The maximum price in London is 13s. 4d.

per quarter for any quantity up to 20 units, and beyond that 8d. per

unit, but 11s. 8d. per quarter up to 20 units and 7d. per unit beyond is

the more general maximum. The "Bermondsey clause" requires the

undertakers (local authority) so to fix their charges (not exceeding the

specified maximum) that the revenue shall not be less than the

expenditure.

There is no statutory obligation on municipalities to provide for

depreciation of electricity supply undertakings, but after providing for

all expenses, interest on loans, and sinking fund instalments, the local

authority may create a reserve fund until it amounts, with interest, to

one-tenth of the aggregate capital expenditure. Any deficiency when not

met out of reserve is payable out of the local rates.

The principle on which the Local Government Board sanctions municipal

loans for electric lighting undertakings is that the period of the loan

shall not exceed the life of the works, and that future ratepayers shall

not be unduly burdened. The periods of the loans vary from ten years for

accumulators and arc lamps to sixty years for lands. Within the county

of London the loans raised by the metropolitan borough councils for

electrical purposes are sanctioned by the London County Council, and

that body allows a minimum period of twenty years for repayment. Up to

1904-1905, 245 loans had been granted by the council amounting in the

aggregate to L4,045,067.

Standardization.

In 1901 the Institution of Civil Engineers appointed a committee to

consider the advisability of standardizing various kinds of iron and

steel sections. Subsequently the original reference was enlarged, and in

1902 the Institution of Electrical Engineers was invited to co-operate.

The treasury, as well as railway companies, manufacturers and others,

have made grants to defray the expenses. The committee on electrical

plant has ten sub-committees. In August 1904 an interim report was

issued by the sub-committee on generators, motors and transformers,

dealing with pressures and frequencies, rating of generators and motors,

direct-current generators, alternating-current generators, and motors.

In 1903 the specification for British standard tramway rails and

fish-plates was issued, and in 1904 a standard specification for tubular

tramway poles was issued. A sectional committee was formed in 1904 to

correspond with foreign countries with regard to the formation of an

electrical international commission to study the question of an

international standardization of nomenclature and ratings of electrical

apparatus and machinery.

The electrical industry.

The electrical manufacturing branch, which is closely related to the

electricity supply and other operating departments of the electrical

industry, only dates from about 1880. Since that time it has undergone

many vicissitudes. It began with the manufacture of small arc lighting

equipments for railway stations, streets and public buildings. When the

incandescent lamp became a commercial article, ship-lighting sets and

installations for theatres and mansions constituted the major portion of

the electrical work. The next step was the organization of

house-to-house distribution of electricity from small "central

stations," ultimately leading to the comprehensive public supply in

large towns, which involved the manufacture of generating and

distributing plants of considerable magnitude and complexity. With the

advent of electric traction about 1896, special machinery had to be

produced, and at a later stage the manufacturer had to solve problems in

connexion with bulk supply in large areas and for power purposes. Each

of these main departments involved changes in ancillary manufactures,

such as cables, switches, transformers, meters, &c., so that the

electrical manufacturing industry has been in a constant state of

transition. At the beginning of the period referred to Germany and

America were following the lead of England in theoretical developments,

and for some time Germany obtained electrical machinery from England.

Now scarcely any electrical apparatus is exported to Germany, and

considerable imports are received by England from that country and

America. The explanation is to be found mainly in the fact that the

adverse legislation of 1882 had the effect of restricting enterprise,

and while British manufacturers were compulsorily inert during periods

of impeded growth of the two most important branches of the

industry--electric lighting and traction--manufacturers in America and

on the continent of Europe, who were in many ways encouraged by their

governments, devoted their resources to the establishment of factories

and electrical undertakings, and to the development of efficient selling

organizations at home and abroad. When after the amendment of the

adverse legislation in 1888 a demand for electrical machinery arose in

England, the foreign manufacturers were fully organized for trade on a

large scale, and were further aided by fiscal conditions to undersell

English manufacturers, not only in neutral markets, but even in their

own country. Successful manufacture on a large scale is possible only by

standardizing the methods of production. English manufacturers were not

able to standardize because they had not the necessary output. There had

been no repetitive demand, and there was no production on a large scale.

Foreign manufacturers, however, were able to standardize by reason of

the large uniform demand which existed for their manufactures.

Statistics are available showing the extent to which the growth of the

electrical manufacturing industry in Great Britain was delayed. Nearly

twenty years after the inception of the industry there were only

twenty-four manufacturing companies registered in the United Kingdom,

having an aggregate subscribed capital of under L7,000,000. But in 1907

there were 292 companies with over L42,000,000 subscribed capital. The

cable and incandescent lamp sections show that when the British

manufacturers are allowed opportunities they are not slow to take

advantage of them. The cable-making branch was established under the

more encouraging conditions of the telegraph industry, and the lamp

industry was in the early days protected by patents. Other departments

not susceptible to foreign competition on account of freightage, such as

the manufacture of storage batteries and rolling stock, are also fairly

prosperous. In departments where special circumstances offer a prospect

of success, the technical skill, commercial enterprise and general

efficiency of British manufacturers manifest themselves by positive

progress and not merely by the continuance of a struggle against adverse

conditions. The normal posture of the British manufacturer of electrical

machinery has been described as one of desperate defence of his home

trade; that of the foreign manufacturer as one of vigorous attack upon

British and other open markets. In considering the position of English

manufacturers as compared with their foreign rivals, some regard should

be had to the patent laws. One condition of a grant of a patent in most

foreign countries is that the patent shall be worked in those countries

within a specified period. But a foreign inventor was until 1907 able to

secure patent protection in Great Britain without any obligation to

manufacture there. The effect of this was to encourage the manufacture

of patented apparatus in foreign countries, and to stimulate their

exportation to Great Britain in competition with British products. With

regard to the electrochemical industry the progress which has been

achieved by other nations, notably Germany, is very marvellous by

comparison with the advance made by England, but to state the reasons

why this industry has had such extraordinary development in Germany,

notwithstanding that many of the fundamental inventions were made in

England, would require a statement of the marked differences in the

methods by which industrial progress is promoted in the two countries.

There has been very little solidarity among those interested in the

commercial development of electricity, and except for the discussion of

scientific subjects there has been very little organization with the

object of protecting and promoting common interests. (E. GA.)

Encyclopaedia Britannica, 11th Edition, "Ehud" to "Electroscope" Volume 9, Slice 2 · 第 29 / 43 题